Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Abort System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Simulation Assisted Risk Assessment: Blast Overpressure Modeling

A probabilistic risk assessment (PRA) approach has been developed and applied to the risk analysis of capsule abort during ascent. The PRA is used to assist in the identification of modeling and simulation applications that can significantly impact the understanding of crew risk during this potentially dangerous maneuver. The PRA approach is also being used to identify the appropriate level of fidelity for the modeling of those critical failure modes. The Apollo launch escape system (LES) was chosen as a test problem for application of this approach. Failure modes that have been modeled and/or simulated to date include explosive overpressure-based failure, explosive fragment-based failure, land landing failures (range limits exceeded either near launch or Mode III trajectories ending on the African continent), capsule-booster re-contact during separation, and failure due to plume-induced instability. These failure modes have been investigated using analysis tools in a variety of technical disciplines at various levels of fidelity. The current paper focuses on the development and application of a blast overpressure model for the prediction of structural failure due to overpressure, including the application of high-fidelity analysis to predict near-field and headwinds effects.

Lawrence, Scott L.↗

Onboard Systems Record Unique Videos of Space Missions

Ecliptic Enterprises Corporation, headquartered in Pasadena, California, provided onboard video systems for rocket and space shuttle launches before it was tasked by Ames Research Center to craft the Data Handling Unit that would control sensor instruments onboard the Lunar Crater Observation and Sensing Satellite (LCROSS) spacecraft. The technological capabilities the company acquired on this project, as well as those gained developing a high-speed video system for monitoring the parachute deployments for the Orion Pad Abort Test Program at Dryden Flight Research Center, have enabled the company to offer high-speed and high-definition video for geosynchronous satellites and commercial space missions, providing remarkable footage that both informs engineers and inspires the imagination of the general public.

Source record↗

Potential Improvements to the Nuclear Safety and Launch Approval Process for Nuclear Reactors Utilized for Space Power and Propulsion Applications

This study examines potential improvements that could be made to the nuclear safety and launch approval process for fission reactors to reduce the associated uncertainties in cost and schedule while continuing to ensure public safety and environmental protection. It concentrates on the launch approval and mission safety of fission power and propulsion applications of nuclear energy. Improvements to the launch approval process for radioisotope power systems (RPSs) are being considered elsewhere but are acknowledged throughout the report. The study considered technical, process, and organizational improvements to the launch approval processes. The study exclusively evaluated reactors that would not be started up prior to achieving a “sufficiently high orbit,” per United Nations (UN) Resolution 47/68.Potential criticality accidents were considered that could occur during a launch failure or abort or during reentry. Numerous scenarios were examined that might involve one or more Earth flybys as well as potential transportation missions that could intentionally return an active, or previously active fission reactor to Earth orbit. The Study Group was guided in its deliberations according to a number of fundamental principles. These included the paramount importance of adequate and appropriate levels of public safety and environmental protection as well as the importance of the inclusion of independent scientific, engineering, and safety reviews of the applications and proposals as a critical part of the process. Also considered was the need for the development of launch approval processes that might be different, depending upon the source of the application for launch approval, whether it be derived as a governmental launch, a commercial launch, or a hybrid/combination of the two. It is clear that all launches of nuclear reactors into space should have similar safety requirements; however, the safety review effort and the details of the analysis that are required should be commensurate with the potential hazards and the actual risk, which may differ based on the reactor design and its intended purpose. Finally, the study aimed at ensuring that whatever processes and procedures are developed should maximize the sufficiency, simplicity, and transparency of the processes. The Study Group reached five Conclusions and makes thirteen Recommendations. The Conclusions and Recommendations presented here are extensions of those presented previously in other studies. This report attempts to add specificity to the actions that need to be taken in order to move forward with successful space fission reactor programs. Without action to address the perceived and real problems in the launch approval process, designers and mission managers will be reluctant to commit the resources necessary to make space fission reactors a reality.

Camp, Allen↗

Crew Exploration Vehicle Ascent Abort Trajectory Analysis and Optimization

The Orion Crew Exploration Vehicle is the first crewed capsule design to be developed by NASA since Project Apollo. Unlike Apollo, however, the CEV is being designed for service in both Lunar and International Space Station missions. Ascent aborts pose some issues that were not present for Apollo, due to its launch azimuth, nor Space Shuttle, due to its cross range capability. The requirement that a North Atlantic splashdown following an abort be avoidable, in conjunction with the requirement for overlapping abort modes to maximize crew survivability, drives the thrust level of the service module main engine. This paper summarizes 3DOF analysis conducted by NASA to aid in the determination of the appropriate propulsion system for the service module, and the appropriate propellant loading for ISS missions such that crew survivability is maximized.

Falck, Robert D.↗

NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

The National Aeronautics and Space Administration s (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit. The SLS Program, managed at NASA s Marshall Space Fight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced propulsion technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability after 2021, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include asteroids, Lagrange Points, and Mars, among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the information they deliver, while creating a framework for further collaboration among domestic and international partners, and potentially spurring economic expansion into new markets.

Creech, Stephen A.↗

Timing Control System

A timing control system is disclosed which is particularly useful in connection with simulated mortar shells. Special circuitry is provided to assure that the shell does not over shoot, but rather detonates early in case of an improper condition; this ensures that ground personnel will not be harmed by a delayed detonation. The system responds to an externally applied frequency control code which is configured to avoid any confusion between different control modes. A premature detonation routine is entered in case an improper time-setting signal is entered, or if the shell is launched before completion of the time-setting sequence. Special provisions are also made for very early launch situations and improper detonator connections. An alternate abort mode is provided to discharge the internal power supply without a detonation in a manner that can be externally monitored, thereby providing a mechanism for non-destructive testing. The abort mode also accelerates the timing function for rapid testing.

Wiker, Gordon A.↗

Timing control system

A timing control system is disclosed which is particularly useful in connection with simulated mortar shells. Special circuitry is provided to assure that the shell does not overshoot, but rather detonates early in case of an improper condition; this ensures that ground personnel will not be harmed by a delayed detonation. The system responds to an externally applied frequency control code which is configured to avoid any confusion between different control modes. A premature detonation routine is entered in case an improper time-setting signal is entered, or if the shell is launched before completion of the time-setting sequence. Special provisions are also made for very early launch situations and improper detonator connections. An alternate abort mode is provided to discharge the internal power supply without a detonation in a manner that can be externally monitored, thereby providing a mechanism for non-destructive testing. The abort mode also accelerates the timing function for rapid testing.

Wiker, Gordon A.↗

Evolution of Orion Mission Design for Exploration Mission 1 and 2

The evolving mission design and concepts of NASA’s next steps have shaped Orion into the spacecraft that it is today. Since the initial inception of Orion, through the Constellation Program, and now in the Exploration Mission frame-work with the Space Launch System (SLS), each mission design concept and pro-gram goal have left Orion with a set of capabilities that can be utilized in many different mission types. Exploration Missions 1 and 2 (EM-1 and EM-2) have now been at the forefront of the mission design focus for the last several years. During that time, different Design Reference Missions (DRMs) were built, analyzed, and modified to solve or mitigate enterprise level design trades to ensure a viable mission from launch to landing. The resulting DRMs for EM-1 and EM-2 were then expanded into multi-year trajectory scans to characterize vehicle performance as affected by variations in Earth-Moon geometry. This provides Orion’s subsystems with stressing reference trajectories to help design their system. Now that Orion has progressed through the Preliminary and Critical Design Reviews (PDR and CDR), there is a general shift in the focus of mission design from aiding the vehicle design to providing mission specific products needed for pre-flight and real time operations. Some of the mission specific products needed include, large quantities of nominal trajectories for multiple monthly launch periods and abort options at any point in the mission for each valid trajectory in the launch window.

Gutkowski, Jeffrey P.↗

Empire. a study of early manned interplanetary missions final report, may 26 - nov. 25, 1962

This report summarizes the investigations and results of the EMPIRE Study Program undertaken by Aeronutronic Division of Ford Motor Company for the Future Projects Office, Marshall Space Flight Center, under Contract NAS8-5025. The dual planet flyby missions of the Crocco and Symmetric trajectory classes are discussed. The Crocco mission with an August 1971 launch window requires an interplanetary injection velocity increment of i0.i km/sec, has a return velocity of 13.5 km/sec, and takes approximately 400 days. The Symmetric mission with a July 1970 launch window has an injection velocity increment of 5.3 km/sec, a return velocity of 15.8 km/sec, and takes approximately 630 days. Additional results of the trajectory studies and abort trajectories are reported. The guidance and navigation subsystem, midcourse corrections, and planetary approach corrections are discussed. A detailed analysis of the reentry phase of EMPIRE includes consideration of an Apollo-type, a Drag Brake, and a lifting-type reentry vehicle to return the six-man crew at mission completion or in an aborted condition. The High L/D reentry vehicle is used in the missions considered. The various technological areas required for design criteria are developed and several spacecraft designs are considered. The all chemical propulsion Crocco system is discarded due to weight, complexity, and cost. The nuclear injected Crocco is treated in a similar manner. The lower energy injection for the Symmetric Mission leads to the feasibility of a nuclear injected vehicle with an Earth orbit weight of about 180,000 kilograms (400,000 pounds) before interplanetary transit. In addition, two chemical symmetric vehicles are treated. Conservative radiation exposures are derived, for the 630 day mission, of less than 200 REM and a polyethelene radiation shelter is designed. Scientific aspects of the missions are discussed. Mission Success Probabilities are presented for the various missions considered and for Saturn C-5, Nova, and Super-Nova Earth launch vehicles in light of possible development. The need for acceleration of nuclear rocket engine developments and auxiliary power developments is indicated. Definition of a larger nuclear engine of the order of 200,000 pounds thrust and about 800 seconds burning time or 50,000 pound thrust and 3600 seconds burning time is indicated for the Symmetric Mission in 1970 (energy requirements are higher in 1972 and for later launch due to the less favorable position of Mars)_ Immediate development of this advanced nuclear propulsion capability is recommended. A Development Plan and Funding Schedule is given for the 1970 launch window pinpointing the critical development areas and indicating a total program cost of $12.6 billion independent of other programmed R&D costs. In conclusion, technological feasibility for an early manned dual planet Mars-Venus flyby is believed to be demonstrated in this study. Several areas of accelerated development and experimental confirmation of theory are pinpointed. The necessary funding and development of Nova or orbital operations capability with Saturn C-5's is required. The 1970 launch window appears to offer the least expensive Symmetric Mission for several years into the 1980's.

F. P. Dixon↗

NASA's Space Launch System: A Heavy-Lift Platform for Entirely New Missions

The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) will contribute a new capability for human space flight and scientific missions beyond low-Earth orbit (LEO). The SLS Program, managed at NASA s Marshall Space Flight Center, will develop the heavy-lift vehicle that will launch the Orion Multi-Purpose Crew Vehicle (MPCV), equipment, supplies, and major science missions for exploration and discovery. Orion will carry crews to space, provide emergency abort capability, sustain the crew during space travel, and provide safe reentry from deep-space return velocities. Supporting Orion s first autonomous flight to lunar orbit and back in 2017 and its first crewed flight in 2021, the SLS ultimately offers a flexible platform for both human and scientific exploration. The SLS plan leverages legacy infrastructure and hardware in NASA s inventory, as well as continues with advanced technologies now in development, to deliver an initial 70 metric ton (t) lift capability in 2017, evolving to a 130-t capability, using a block upgrade approach. This paper will give an overview of the SLS design and management approach against a backdrop of the missions it will support. It will detail the plan to deliver the initial SLS capability to the launch pad in the near term, as well as summarize the innovative approaches the SLS team is applying to deliver a safe, affordable, and sustainable long-range capability for entirely new missions-opening a new realm of knowledge and a world of possibilities for multiple partners. Design reference missions that the SLS is being planned to support include Mars, Jupiter, Lagrange Points, and near-Earth asteroids (NEAs), among others. The Agency is developing its mission manifest in parallel with the development of a heavy-lift flagship that will dramatically increase total lift and volume capacity beyond current launch vehicle options, reduce trip times, and provide a robust platform for conducting new missions destined to rewrite textbooks with the information they deliver, while creating a framework for further collaboration among domestic and international partners, and potentially spurring economic expansion into new markets.

Creech, Stephen D.↗

Optimization of Second Fault Detection Thresholds to Maximize Mission POS

In order to support manned spaceflight safety requirements, the Space Launch System (SLS) has defined program-level requirements for key systems to ensure successful operation under single fault conditions. To accommodate this with regards to Navigation, the SLS utilizes an internally redundant Inertial Navigation System (INS) with built-in capability to detect, isolate, and recover from first failure conditions and still maintain adherence to performance requirements. The unit utilizes multiple hardware- and software-level techniques to enable detection, isolation, and recovery from these events in terms of its built-in Fault Detection, Isolation, and Recovery (FDIR) algorithms. Successful operation is defined in terms of sufficient navigation accuracy at insertion while operating under worst case single sensor outages (gyroscope and accelerometer faults at launch). In addition to first fault detection and recovery, the SLS program has also levied requirements relating to the capability of the INS to detect a second fault, tracking any unacceptable uncertainty in knowledge of the vehicle's state. This detection functionality is required in order to feed abort analysis and ensure crew safety. Increases in navigation state error and sensor faults can drive the vehicle outside of its operational as-designed environments and outside of its performance envelope causing loss of mission, or worse, loss of crew. The criteria for operation under second faults allows for a larger set of achievable missions in terms of potential fault conditions, due to the INS operating at the edge of its capability. As this performance is defined and controlled at the vehicle level, it allows for the use of system level margins to increase probability of mission success on the operational edges of the design space. Due to the implications of the vehicle response to abort conditions (such as a potentially failed INS), it is important to consider a wide range of failure scenarios in terms of both magnitude and time. As such, the Navigation team is taking advantage of the INS's capability to schedule and change fault detection thresholds in flight. These values are optimized along a nominal trajectory in order to maximize probability of mission success, and reducing the probability of false positives (defined as when the INS would report a second fault condition resulting in loss of mission, but the vehicle would still meet insertion requirements within system-level margins). This paper will describe an optimization approach using Genetic Algorithms to tune the threshold parameters to maximize vehicle resilience to second fault events as a function of potential fault magnitude and time of fault over an ascent mission profile. The analysis approach, and performance assessment of the results will be presented to demonstrate the applicability of this process to second fault detection to maximize mission probability of success.

Anzalone, Evan↗

The Space Shuttle - Key considerations

Typical Space Shuttle flight operations, including launch/insertion, on-orbit operations, de-orbit, and ground turnaround, are summarized. The orbiter, main engine, and solid rocket boosters will be reusable. The Shuttle will be able to abort ascent and return the orbiter plus payload to the launch site if necessary. Mission capabilities include a 7-30 day duration, crew of 4-7 (with 1-4 payload specialists), and 14,500-29,500 kg payloads. Payload accommodations, including cabin, crew provisions, pointing and position stability, thermal constraints, electric power, communications, payload deployment and retrieval, contamination control, and kits for extended missions, are considered. The Thermal Protection System, utilizing pyrolized carbon and silica tiles, is described. The Space Shuttle Main Engine design and performance are considered and compared to those of the J-2 engine used on Saturn/Apollo missions.

Malkin, M. S.↗

21st century space transportation system design approach - HL-20 personnel launch system

This article provides an introduction to and overview of the research that was conducted on the HL-20 lifting body. The concept has been defined as an option for a personnel launch system (PLS) that is intended to carry six to eight Space Station Freedom crew persons. In this role the HL-20 will complement the Space Shuttle operation and ensure the ability to transport people to and from Earth orbit after the year 2000. The research covers a broad range of disciplines, including aerodynamics, aerodynamic heating and thermal protection systems, structural design, subsystem definition, trajectory and guidance system development for entry and abort, production and operations, and human factors. This article also presents the lifting-body heritage, design features of the concept, and HL-20/PLS mission requirements.

Stone, Howard W.↗

Single stage to orbit/SDIO

This paper included a discussion of the United States' need for a launch system that demonstrates both high capacity and low cost. Current systems, which typically require two years' lead time to provide on-orbit service to space platforms, are too inflexible for many missions. A system is needed that is able to operate in much the same way as existing commercial aircraft. The SSTO program is focused on satisfying aircraft-like operations and logistics support requirements such as engine-out intact abort capability and seven-day, 350-man-day vehicle turnaround times.

French, James R.↗

ATHLETE: A Cargo-Handling Vehicle for Solar System Exploration

As part of the NASA Exploration Technology Development Program, the Jet Propulsion Laboratory is developing a vehicle called ATHLETE: the All-Terrain Hex-Limbed Extra-Terrestrial Explorer. Each vehicle is based on six wheels at the ends of six multi-degree-of-freedom limbs. Because each limb has enough degrees of freedom for use as a general-purpose leg, the wheels can be locked and used as feet to walk out of excessively soft or other extreme terrain. Since the vehicle has this alternative mode of traversing through or at least out of extreme terrain, the wheels and wheel actuators can be sized for nominal terrain. There are substantial mass savings in the wheel and wheel actuators associated with designing for nominal instead of extreme terrain. These mass savings are comparable-to or larger-than the extra mass associated with the articulated limbs. As a result, the entire mobility system, including wheels and limbs, can be about 25% lighter than a conventional mobility chassis. A side benefit of this approach is that each limb has sufficient degrees-of-freedom to use as a general-purpose manipulator (hence the name "limb" instead of "leg"). Our prototype ATHLETE vehicles have quick-disconnect tool adapters on the limbs that allow tools to be drawn out of a "tool belt" and maneuvered by the limb. A power-take-off from the wheel actuates the tools, so that they can take advantage of the 1+ horsepower motor in each wheel to enable drilling, gripping or other power-tool functions. Architectural studies have indicated that one useful role for ATHLETE in planetary (moon or Mars) exploration is to "walk" cargo off the payload deck of a lander and transport it across the surface. Recent architectural approaches are focused on the concept that the lander descent stage will use liquid hydrogen as a propellant. This is the highest performance chemical fuel, but it requires very large tanks. A natural geometry for the lander is to have a single throttleable rocket engine on the centerline at the bottom, and to have the propellant tanks arranged as compactly as possible around and above that engine, with nearly-straight structural load paths that carry the heavy LO2 tanks as well as the ascent stage or cargo on a top deck. (The requirement for exactly one descent engine stems from the need to avoid symmetry planes in the exhaust plume that can entrain surface particles and loft them up into the system at hypervelocity.) This geometry is especially attractive since abort considerations drive the ascent stage to have as much open space around it as possible, in case the ascent stage needs to fire away from an out-of-control descent stage. These considerations lead to a configuration where the cargo deck of the lander is relatively high off the ground (over 6 meters in current concepts, using a 10-meter diameter launch shroud). These considerations have led some observers to presume that there is a "lander offloading problem". ATHLETE has been demonstrated as a solution to this problem, walking cargo off the high deck. This paper describes the applicability of the ATHLETE concept to exploration of the moon, Mars and even to Near- Earth Objects. Recent field test results for long-range traverse are described, along with plans for testing in the simulated microgravity environment of a NEO.

Space Robotics↗

Comparison Analysis of the Eastern Range False Cape 915-MHz Doppler Radar Wind Profiler

The United States Space Force (USSF) is responsible for space vehicle launches at its Eastern Range (ER), which includes the Cape Canaveral Space Force Station (CCSFS). Multiple systems are used to measure the atmosphere at the ER, including suites of Doppler Radar Wind Profilers (DRWPs) operating at 915MHz that measure winds within the lowest few kilometers of the atmosphere. Observations of boundary layer winds can be used for multiple applications, including serving as input to toxic dispersion models and characterizing winds for low-level aborts. In fall 2020 the USSF requested NASA’s Marshall Space Flight Center (MSFC) Natural Environments Branch (NE) to evaluate wind output from the False Cape(FC) DRWP system (MSFC NE 2021). In that analysis, it was found that data availability was low in the lowest few hundred meters of a profile, shown in Figure 1. To increase the available data, the USSF modified the quality control (QC) algorithm for the FCDRWP, which collected data from October 2020 to January 2021. In Fall 2021, the USSF requested NASA’s MSFC NE to evaluate the modified QC algorithm by comparing the data processed by the modified method (referred to as beam data) to data processed with the original QC method (referred to as original data). This report describes the system and the analyses that MSFC NE conducted to compare the availability and quality of data from the two QC methods

Maggire Fielder↗

Full power level development of the Space Shuttle main engine

Development of the Space Shuttle main engine for nominal operation at full power level (109 percent rated power) is continuing in parallel with the successful flight testing of the Space Transportation System. Verification of changes made to the rated power level configuration currently being flown on the Orbiter Columbia is in progress and the certification testing of the full power level configuration has begun. The certification test plan includes the accumulation of 10,000 seconds on each of two engines by early 1983. Certification testing includes the simulation of nominal mission duty cycles as well as the two abort thrust profiles: abort to orbit and return to launch site. Several of the certification tests are conducted at 111 percent power to demonstrate additional safety margins. In addition to the flight test and development program results, future plans for life demonstration and engine uprating will be discussed.

Johnson, J. R.↗

Performance Assessment of the Eastern Range Titusville-Cocoa 915-MHz Doppler Radar Wind Profiler

The United States Space Force (USSF) is responsible for space vehicle launches at its Eastern Range (ER), which includes the Cape Canaveral Space Force Station (CCSFS). Multiple systems are used to measure the atmosphere at the ER, including suites of Doppler Radar Wind Profilers (DRWPs)that operate at 915MHz and measure winds within the lowest few kilometers of the atmosphere. Observations of boundary layer winds can be used for multiple applications, including serving as input to toxic dispersion models and characterizing winds for low-level aborts. The USSF upgraded the Titusville-Cocoa(TICO)DRWP, which collected data during the spring and summer of 2020. The USSF also requested NASA’s Marshall Space Flight Center (MSFC) Natural Environments Branch (NE) to evaluate wind output from this DRWP system. This report describes the system and the analyses that MSFC NE conducted to demonstrate the system’s wind accuracy relative to balloons from the Automated Meteorological Profiling System (AMPS), data availability, and effective vertical resolution (EVR).

B. J. Barbre↗