Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Methods”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Vertical regolith shield wall construction for lunar base applications

Lunar bases located on the lunar surface will require permanent protection from radiation and launch ejecta. This paper outlines a method of providing physical protection using lunar regolith that is constructed in situ as a modular vertical wall using specially devised methods of containment and construction. Deployable compartments, reinforced with corner struts, are elevated and filled by a moving gantry. The compartments interlock to form a stable wall. Different wall heights, thicknesses, and plan configurations are achieved by varying the geometry of the individual compartments, which are made from woven carbon fibers. Conventional terrestrial structural engineering techniques can be modified and used to establish the structural integrity and performance of the wall assembly.

Kaplicky, Jan↗

A perspective on the Human-Rating process of US spacecraft: Both past and present

The purpose of this report is to characterize the process of Human-Rating as employed by NASA for human spaceflight. An Agency-wide committee was formed in November 1992 to develop a Human-Rating Requirements Definition for Launch Vehicles based on conventional (historical) methods. The committee members were from NASA Headquarters, Marshall Space Flight Center, Kennedy Space Center, Stennis Space Center, and Johnson Space Center. After considerable discussion and analysis, committee members concluded that Human-Rating is the process of satisfying the mutual constraints of cost, schedule, mission performance, and risk while addressing the requirements for human safety, human performance, and human health management and care.

Zupp, George↗

Airframe Design and Integration

The objectives of the project this viewgraph presentation summarizes include the following: (1) Decompose operational, safety, and cost requirements into a comprehensive and consistent set of design criteria for different structural and material concepts for Reusable Launch Vehicles (RLVs); (2) Develop compliance methods to ensure that different structural and material concepts are assessed at a consistent and adequate level of fidelity and safety; (3) Develop and assess weight reduction potential of integrated airframe concepts for RLVs, e.g., Thermal Protection System (TPS)/TPS Support/Cryogenic Tank System; (4) Compare performance and weight of various airframe structural and material concepts and structural arrangements and identify technology development needs; and (5) Develop high fidelity parametric models that include airframe structural interactions and major design drivers. The approaches taken to complete these objectives include the definition of vehicle requirements, airframe structural design requirements, load conditions, factors of safety, and integrated concepts.

Scotti, Stephen↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth-to-Orbit Team (ETO) of the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) is considered the pre-eminent go-to group for pre-phase A and phase A concept definition. Over the past several years the ETO team has evaluated thousands of launch vehicle concept variations for a significant number of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Augustine Report, Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). The ACO ETO Team is called upon to address many needs in NASA s design community; some of these are defining extremely large trade-spaces, evaluating advanced technology concepts which have not been addressed by a large majority of the aerospace community, and the rapid turn-around of highly time critical actions. It is the time critical actions, those often limited by schedule or little advanced warning, that have forced the five member ETO team to develop a design process robust enough to handle their current output level in order to meet their customer s needs. Based on the number of vehicle concepts evaluated over the past year this output level averages to four completed vehicle concepts per day. Each of these completed vehicle concepts includes a full mass breakdown of the vehicle to a tertiary level of subsystem components and a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. A structural analysis of the vehicle to determine flight loads based on the trajectory output, material properties, and geometry of the concept is also performed. Due to working in this fast-paced and sometimes rapidly changing environment, the ETO Team has developed a finely tuned process to maximize their delivery capabilities. The objective of this paper is to describe the interfaces between the three disciplines used in the design process: weights and sizing, trajectory, and structural analysis. The tools used to perform such analysis are INtegrated Rocket Sizing (INTROS), Program to Optimize Simulated Trajectories (POST), and Launch Vehicle Analysis (LVA) respectively. The methods each discipline uses to streamline their particular part of the design process will also be discussed.

Waters, Eric D.↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth-to-Orbit Team (ETO) of the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) is considered the pre-eminent "go-to" group for pre-phase A and phase A concept definition. Over the past several years the ETO team has evaluated thousands of launch vehicle concept variations for a significant number of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Augustine Report, Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). The ACO ETO Team is called upon to address many needs in NASA's design community; some of these are defining extremely large trade-spaces, evaluating advanced technology concepts which have not been addressed by a large majority of the aerospace community, and the rapid turn-around of highly time critical actions. It is the time critical actions, those often limited by schedule or little advanced warning, that have forced the five member ETO team to develop a design process robust enough to handle their current output level in order to meet their customer's needs. Based on the number of vehicle concepts evaluated over the past year this output level averages to four completed vehicle concepts per day. Each of these completed vehicle concepts includes a full mass breakdown of the vehicle to a tertiary level of subsystem components and a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. A structural analysis of the vehicle to determine flight loads based on the trajectory output, material properties, and geometry of the concept is also performed. Due to working in this fast-paced and sometimes rapidly changing environment, the ETO Team has developed a finely tuned process to maximize their delivery capabilities. The objective of this paper is to describe the interfaces between the three disciplines used in the design process: weights and sizing, trajectory, and structural analysis. The tools used to perform such analysis are INtegrated Rocket Sizing (INTROS), Program to Optimize Simulated Trajectories (POST), and Launch Vehicle Analysis (LVA) respectively. The methods each discipline uses to streamline their particular part of the design process will also be discussed.

Waters, Eric D.↗

Force Limiting Vibration Tests Evaluated from both Ground Acoustic Tests and FEM Simulations of a Flight Like Vehicle System Assembly

Marshall Space Flight Center has conducted a series of ground acoustic tests with the dual goals of informing analytical judgment, and validating analytical methods when estimating vibroacoustic responses of launch vehicle subsystems. The process of repeatedly correlating finite element-simulated responses with test-measured responses has assisted in the development of best practices for modeling and post-processing. In recent work, force transducers were integrated to measure interface forces at the base of avionics box equipment. Other force data was indirectly measured using strain gauges. The combination of these direct and indirect force measurements has been used to support and illustrate the advantages of implementing the Force Limiting approach for equipment qualification tests. The comparison of force response from integrated system level tests to measurements at the same locations during component level vibration tests provides an excellent illustration. A second comparison of the measured response cases from the system level acoustic tests to finite element simulations has also produced some principles for assessing the suitability of Finite Element Models (FEMs) for making vibroacoustics estimates. The results indicate that when FEM models are employed to guide force limiting choices, they should include sufficient detail to represent the apparent mass of the system in the frequency range of interest.

Smith, Andrew↗

Feasibility Study to Extract Artemis-1 Fixed Base Modes While Mounted on a Dynamically Active Mobile Launch Platform

There are several challenges associated with the scheduled integrated modal test (IMT)of the Space Launch System (SLS) Artemis-1flight vehicle mounted on the mobile launcher (ML). While the goal of the test is to characterize the Artemis-1, the inclusion of the ML as the support stand for the test means that the entire system must be well characterized. A considerable amount of effort and schedule will have to be devoted to understanding both the test stand (the ML) and the Artemis-1 flight vehicle, and there is a risk that the effort may not be completed in time for a successful launch. NASA has requested that alternative methods be investigated to generate test results that can remove the effects of the ML from the test. ATA Engineering, Inc., (ATA)was given a reduced model f theArtemis-1 flight vehicle’s IMT configuration containing the candidate set of accelerometers and interface degrees of freedom (DOF). The model was used to determine how well ATA’s fixed base correction technique is able to estimate fixed base modes from test data collected on the IMT. This paper presents the fixed base correction method results.

modal testing↗

The Living With a Star Space Environment Testbed Payload

The objectives, instrumentation, methods and data leading up to launch of the NASA Living With a Star (LWS) Space Environment Testbed (SET) payload onboard the Air Force Research Laboratory Demonstration and Science Experiments (DSX) spacecraft are described. The experiments characterize the space radiation environment and how it affects hardware performance. The payload consists of a compact space weather instrument and a carrier containing four board experiments.

Demonstration and Science Experiments (DSX)↗

Data Applicability of Heritage and New Hardware for Launch Vehicle System Reliability Models

Many launch vehicle systems are designed and developed using heritage and new hardware. In most cases, the heritage hardware undergoes modifications to fit new functional system requirements, impacting the failure rates and, ultimately, the reliability data. New hardware, which lacks historical data, is often compared to like systems when estimating failure rates. Some qualification of applicability for the data source to the current system should be made. Accurately characterizing the reliability data applicability and quality under these circumstances is crucial to developing model estimations that support confident decisions on design changes and trade studies. This presentation will demonstrate a data-source classification method that ranks reliability data according to applicability and quality criteria to a new launch vehicle. This method accounts for similarities/dissimilarities in source and applicability, as well as operating environments like vibrations, acoustic regime, and shock. This classification approach will be followed by uncertainty-importance routines to assess the need for additional data to reduce uncertainty.

Al Hassan Mohammad↗

Model studies of the dynamics of launch vehicles.

Structural dynamics research on launch vehicles at Langley Research Center, examining analytical method limitations and need for improved mathematical models for vibrational characteristics

LAUNCH VEHICLE↗

Thermal & Fluids Analysis and the NASA Launch Services Program

This presentation provides the What, Where, Why, and How of the thermal and fluids analysis disciplines within the Launch Services Program (LSP). The LSP manages all commercial launch services to match NASA science mission payloads to the appropriate launch system. The Flight Analysis Division within the LSP provides multi disciplinary analysis support of these flight systems to characterize payload and launch vehicle environments from payload mate to upper stage through on orbit separation. The Thermal Analysis and Fluids Analysis teams are two distinct groups within the Flight Analysis Division of the LSP who cover a wide array of standard and non standard analytical tasks. These teams offer a significant benefit to both the payload design and integration team and the launch vehicle supplier. These benefits, along with the tools and methods are described in this talk to inform engineers and analysts from both sides of the launch system interface how the LSP Thermal and Fluids Analysis teams can benefit the success of their mission.

Fortenberry, Cindy↗

Magnetic Field Response Measurement Acquisition System

This paper presents a measurement acquisition method that alleviates many shortcomings of traditional measurement systems. The shortcomings are a finite number of measurement channels, weight penalty associated with measurements, electrical arcing, wire degradations due to wear or chemical decay and the logistics needed to add new sensors. Wire degradation has resulted in aircraft fatalities and critical space launches being delayed. The key to this method is the use of sensors designed as passive inductor-capacitor circuits that produce magnetic field responses. The response attributes correspond to states of physical properties for which the sensors measure. Power is wirelessly provided to the sensing element by using Faraday induction. A radio frequency antenna produces a time-varying magnetic field used to power the sensor and receive the magnetic field response of the sensor. An interrogation system for discerning changes in the sensor response frequency, resistance and amplitude has been developed and is presented herein. Multiple sensors can be interrogated using this method. The method eliminates the need for a data acquisition channel dedicated to each sensor. The method does not require the sensors to be near the acquisition hardware. Methods of developing magnetic field response sensors and the influence of key parameters on measurement acquisition are discussed. Examples of magnetic field response sensors and the respective measurement characterizations are presented. Implementation of this method on an aerospace system is discussed.

Woodard, Stanley E.↗

Lidar for expendable launch vehicles

A lidar wind measurement system is described which can be used as an alternative to the current Jimsphere/Rawinsonde method. The decrease in wind measurement time provides significant benefits to launch vehicle operations. The faster acquisition time associated with the lidar system provides better estimates of wind persistency and gust prediction.

Lee, Michael S.↗

A shock spectra and impedance method to determine a bound for spacecraft structural loads

This paper proposes a method for the determination of design loads of a spacecraft mounted on a launch vehicle when the significant frequency ranges of the two structures overlap. The derived loads are realistic upper bounds of the flight loads. The method utilizes shock spectra of the spacecraft/launch vehicle interface directional accelerations for each event separately and introduces a reduction factor for the shock spectra which is based on the relative impedance of the spacecraft and launch vehicle. The main advantages of the method are low cost of analysis and timeliness in the design. These advantages are attained with only a slight expense of structural weight compared to the more exact transient analysis method.

Bamford, R.↗

GOES-R L1b Readiness Implementation and Management Plan

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation Readiness↗

Development of Level 1b Calibration and Validation Readiness, Implementation and Management Plans for GOES-R

A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.

Validation↗