Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

National Space Transportation System Reference. Volume 2: Operations

An overview of the Space Transportation System is presented in which aspects of the program operations are discussed. The various mission preparation and prelaunch operations are described including astronaut selection and training, Space Shuttle processing, Space Shuttle integration and rollout, Complex 39 launch pad facilities, and Space Shuttle cargo processing. Also, launch and flight operations and space tracking and data acquisition are described along with the mission control and payload operations control center. In addition, landing, postlanding, and solid rocket booster retrieval operations are summarized. Space Shuttle program management is described and Space Shuttle mission summaries and chronologies are presented. A glossary of acronyms and abbreviations are provided.

Source record↗

Horizontal Launch: A Versatile Concept for Assured Space Access

The vision of horizontal launch is the capability to provide a mobile launch pad that can use existing aircraft runways, cruise above weather, loiter for mission instructions, and achieve precise placement for orbital intercept, rendezvous, or reconnaissance. Another compelling benefit of horizontal launch is that today s ground-based vertical launch pads are a single earthquake, hurricane, or terrorist attack away from disruption of critical U.S. launch capabilities. The study did not attempt to design a new system concept for horizontal launch, but rather focused on the refinement of many previously-studied horizontal launch concepts. Because of the large number of past horizontal launch studies, a process was developed to narrow the number of concepts through prescreening, screening, and evaluation of point designs. The refinement process was not intended to select the "best" concept, but rather to establish the feasibility of horizontal launch from a balanced assessment of figures of merit and to identify potential concepts that warrant further exploration.

Bartolotta, Paul↗

Space Shuttle Day-of-Launch Trajectory Design Operations

A top priority of any launch vehicle is to insert as much mass into the desired orbit as possible. This requirement must be traded against vehicle capability in terms of dynamic control, thermal constraints, and structural margins. The vehicle is certified to specific structural limits which will yield certain performance characteristics of mass to orbit. Some limits cannot be certified generically and must be checked with each mission design. The most sensitive limits require an assessment on the day-of-launch. To further minimize vehicle loads while maximizing vehicle performance, a day-of-launch trajectory can be designed. This design is optimized according to that day s wind and atmospheric conditions, which increase the probability of launch. The day-of-launch trajectory design and verification process is critical to the vehicle s safety. The Day-Of-Launch I-Load Update (DOLILU) is the process by which the National Aeronautics and Space Administration's (NASA) Space Shuttle Program tailors the vehicle steering commands to fit that day s environmental conditions and then rigorously verifies the integrated vehicle trajectory s loads, controls, and performance. This process has been successfully used for almost twenty years and shares many of the same elements with other launch vehicles that execute a day-of-launch trajectory design or day-of-launch trajectory verification. Weather balloon data is gathered at the launch site and transmitted to the Johnson Space Center s Mission Control. The vehicle s first stage trajectory is then adjusted to the measured wind and atmosphere data. The resultant trajectory must satisfy loads and controls constraints. Additionally, these assessments statistically protect for non-observed dispersions. One such dispersion is the change in the wind from the last measured balloon to launch time. This process is started in the hours before launch and is repeated several times as the launch count proceeds. Should the trajectory design not meet all constraint criteria, Shuttle would be No-Go for launch. This Shuttle methodology is very similar to other unmanned launch vehicles. By extension, this method would likely be employed for any future NASA launch vehicle. This paper will review the Shuttle s day-of-launch trajectory optimization and verification operations as an example of a more generic application of day-of-launch design and validation. With Shuttle s retirement, it is fitting to document the current state of this critical process and capture lessons learned to benefit current and future launch vehicle endeavors.

Harrington, Brian E.↗

Business Intelligence Modeling in Launch Operations

This technology project is to advance an integrated Planning and Management Simulation Model for evaluation of risks, costs, and reliability of launch systems from Earth to Orbit for Space Exploration. The approach builds on research done in the NASA ARC/KSC developed Virtual Test Bed (VTB) to integrate architectural, operations process, and mission simulations for the purpose of evaluating enterprise level strategies to reduce cost, improve systems operability, and reduce mission risks. The objectives are to understand the interdependency of architecture and process on recurring launch cost of operations, provide management a tool for assessing systems safety and dependability versus cost, and leverage lessons learned and empirical models from Shuttle and International Space Station to validate models applied to Exploration. The systems-of-systems concept is built to balance the conflicting objectives of safety, reliability, and process strategy in order to achieve long term sustainability. A planning and analysis test bed is needed for evaluation of enterprise level options and strategies for transit and launch systems as well as surface and orbital systems. This environment can also support agency simulation .based acquisition process objectives. The technology development approach is based on the collaborative effort set forth in the VTB's integrating operations. process models, systems and environment models, and cost models as a comprehensive disciplined enterprise analysis environment. Significant emphasis is being placed on adapting root cause from existing Shuttle operations to exploration. Technical challenges include cost model validation, integration of parametric models with discrete event process and systems simulations. and large-scale simulation integration. The enterprise architecture is required for coherent integration of systems models. It will also require a plan for evolution over the life of the program. The proposed technology will produce long-term benefits in support of the NASA objectives for simulation based acquisition, will improve the ability to assess architectural options verses safety/risk for future exploration systems, and will facilitate incorporation of operability as a systems design consideration, reducing overall life cycle cost for future systems. The future of business intelligence of space exploration will focus on the intelligent system-of-systems real-time enterprise. In present business intelligence, a number of technologies that are most relevant to space exploration are experiencing the greatest change. Emerging patterns of set of processes rather than organizational units leading to end-to-end automation is becoming a major objective of enterprise information technology. The cost element is a leading factor of future exploration systems.

Bardina, Jorge E.↗

Operations planning simulation model extension study. Volume 1: Long duration exposure facility ST-01-A automated payload

Ground processing and operation activities for selected automated and sortie payloads are evaluated. Functional flow activities are expanded to identify payload launch site facility and support requirements. Payload definitions are analyzed from the launch site ground processing viewpoint and then processed through the expanded functional flow activities. The requirements generated from the evaluation are compared with those contained in the data sheets. The following payloads were included in the evaluation: Long Duration Exposure Facility; Life Sciences Shuttle Laboratory; Biomedical Experiments Scientific Satellite; Dedicated Solar Sortie Mission; Magnetic Spectrometer; and Mariner Jupiter Orbiter. The expanded functional flow activities and descriptions for the automated and sortie payloads at the launch site are presented.

Marks, D. A.↗

Challenges of space medical operations and life sciences management

The Kennedy Space Center (KSC) has been the premier launch and landing site for America's space program since the early 1960s. Visitors are cognizant of space vehicles, processing facilities and launch pads which are treasured national resources. However, most are unaware of the unique organization which supports launch and landing activities and manages the center's occupational medicine, environmental health, ecological and environmental monitoring functions, as well as human and plant research programs. Management of this multifaceted organization can be complex because funding its different functions comes from a number of sources. Additionally the diverse disciplines of personnel present a special challenge in maintaining professional competencies while assuring efficiency in cyclical operations. This article explains the organization's structure and reviews some of its accomplishments.

Haddad, S. G.↗

Trajectory optimization for a National Launch System vehicle

A trajectory design process is presented for a proposed National Launch System (NLS) vehicle configuration. A software trajectory planner was developed to generate near optimal pitch plane trajectories for variable mission plans, variable launch site selections, and last minute wind conditions at the time of launch. In addition, the trajectory planner performs in-flight near optimal trajectory redesign in the event of an engine-out or unexpected wind dispersions. The trajectory planner iteratively simulates trial trajectories defined by variables corresponding to a parameterized trajectory shape. The trajectory planner optimizes these trajectory parameters according to the fuel used to realize the trajectories. For prelaunch scenarios, the trajectory planner generated near optimal trajectories of consistent fuel performance irrespective of the winds encountered at the launch site. In-flight trajectory redesigns were also shown to be effective in fulfilling the mission plan and preserving the structural integrity of the vehicle. The in-flight redesign results indicate that closed-loop guidance in the early stages of ascent is highly effective in accommodating engine failures or wind dispersions. All trajectory designs were verified using a 6DOF simulation with flight controllers.

Chen, Eugene S.↗

Future operational plans for the National Space Transportation System

In March 1985, the NASA/DOD Space Transportation System Master Plan was published. This document establishes objectives and plans for operating the Space Transportation System (STS) for the next decade. In the present paper, some key points are discussed, and the significance of the weather forecasting capability is indicated. The STS is to become fully operational by the later 1980's and is to support fully the national needs into the mid-1990's. Attention is given to NASA/DOD STS coordination, NASA/DOD STS Master Plan Traffic Models, the Orbiter Launch-Rate Capability, Launch-Rate Capabilities for Shuttle Processing Facilities at Kennedy Space Center, and Launch-Rate Capabilities for Shuttle Processing Facilities at Vandenberg Air Force Base.

Neubauer, C. H., Jr.↗

2006 NASA Range Safety Annual Report

Throughout 2006, Range Safety was involved in a number of exciting and challenging activities and events, from developing, implementing, and supporting Range Safety policies and procedures-such as the Space Shuttle Launch and Landing Plans, the Range Safety Variance Process, and the Expendable Launch Vehicle Safety Program procedures-to evaluating new technologies. Range Safety training development is almost complete with the last course scheduled to go on line in mid-2007. Range Safety representatives took part in a number of panels and councils, including the newly formed Launch Constellation Range Safety Panel, the Range Commanders Council and its subgroups, the Space Shuttle Range Safety Panel, and the unmanned aircraft systems working group. Space based range safety demonstration and certification (formerly STARS) and the autonomous flight safety system were successfully tested. The enhanced flight termination system will be tested in early 2007 and the joint advanced range safety system mission analysis software tool is nearing operational status. New technologies being evaluated included a processor for real-time compensation in long range imaging, automated range surveillance using radio interferometry, and a space based range command and telemetry processor. Next year holds great promise as we continue ensuring safety while pursuing our quest beyond the Moon to Mars.

TenHaken, Ron↗

National Launch System KSC facilities and operations

The current planning for the launch site ground operations and facilities required at the Kennedy Space Center to accommodate the National Launch System (NLS) are described. Special consideration is given to the program activities associated with reducing costs for ground operations and with the ground operations vehicle processing scenarios for launching the NLS vehicles from KSC. The KSC facilities described include the Payload Encapsulation Facility, the Mobile Launcher Platform, and the Cargo Transfer Vehicle Checkout Facility. Attention is also given to the modifications of existing facilities required to accommodate the NLS facilities and the transportation and handling equipment.

Evans, R. T., Jr.↗

Understanding and Resolution of the Block 2 SSME, STS-104 Engine Shutdown Pressure Surge In-flight Anomaly

STS-104, launched July 2001, marked the first flight of a single Block 2 Space Shuttle Main Engine (SSME). This new configuration of the SSME is the culmination of well over a decade of gradual engine system upgrades. The launch and mission were a success. However, in the process of post-launch data analysis a Main Propulsion System (MPS) anomaly was noted and tied directly to the shutdown of the Block 2 SSME. An investigation into this anomaly was organized across NASA facilities and across the various hardware component contractors. This paper is a very brief summary of the eventual understanding of the root causes of the anomaly and the process whereby an appropriate mitigation action was proposed. An analytical model of the High Pressure Fuel Pump (HPFP) and the low pressure fuel system of the SSME is presented to facilitate the presentation of this summary. The proposed mitigation action is discussed and, with the launch of STS-108 in November 2001, successfully demonstrated under flight conditions.

Greene, William D.↗

Launch Commit Criteria Monitoring Agent

The Spaceport Processing Systems Branch at NASA Kennedy Space Center has developed and deployed a software agent to monitor the Space Shuttle's ground processing telemetry stream. The application, the Launch Commit Criteria Monitoring Agent, increases situational awareness for system and hardware engineers during Shuttle launch countdown. The agent provides autonomous monitoring of the telemetry stream, automatically alerts system engineers when predefined criteria have been met, identifies limit warnings and violations of launch commit criteria, aids Shuttle engineers through troubleshooting procedures, and provides additional insight to verify appropriate troubleshooting of problems by contractors. The agent has successfully detected launch commit criteria warnings and violations on a simulated playback data stream. Efficiency and safety are improved through increased automation.

Semmel, Glenn S.↗

IV&V Project Assessment Process Validation

The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

Driskell, Stephen↗

Application of System Operational Effectiveness Methodology to Space Launch Vehicle Development and Operations

The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.

Watson, Michael D.↗

Kennedy Space Center Timing and Countdown Interface to Kennedy Ground Control Subsystem

Kennedy Ground Control System (KGCS) engineers at the National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) are developing a time-tagging process to enable reconstruction of the events during a launch countdown. Such a process can be useful in the case of anomalies or other situations where it is necessary to know the exact time an event occurred. It is thus critical for the timing information to be accurate. KGCS will synchronize all items with Coordinated Universal Time (UTC) obtained from the Timing and Countdown (T&CD) organization. Network Time Protocol (NTP) is the protocol currently in place for synchronizing UTC. However, NTP has a peak error that is too high for today's standards. Precision Time Protocol (PTP) is a newer protocol with a much smaller peak error. The focus of this project has been to implement a PTP solution on the network to increase timing accuracy while introducing and configuring the implementation of a firewall between T&CD and the KGCS network.

Protocol↗

Quantification of the Uncertainties for the Space Launch System Liftoff/Transition and Ascent Databases

A detailed description of the uncertainty quantification process for the Space Launch System Block 1 vehicle configuration liftoff/transition and ascent 6-Degree-of-Freedom (DOF) aerodynamic databases is presented. These databases were constructed from wind tunnel test data acquired in the NASA Langley Research Center 14- by 22-Foot Subsonic Wind Tunnel and the Boeing Polysonic Wind Tunnel in St. Louis, MO, respectively. The major sources of error for these databases were experimental error and database modeling errors.

Favaregh, Amber L.↗

Overview of 2008 Outer Planet Flagship Studies

This slide presentation reviews the process involved in the Phase-2 studies for the next Outer Planets Flagship (OPF). These studies will be a cooperative effort with ESA and JAXA in partnership with NASA. The annoucement of oppurtunity (AO) for the science instruments and the launch approval/planetary protection processes are reviewed. There is also discussion about capturing relevant lessons from the Cassini team, supporting international collaboration, and support for science definition teams. Some mission specific tasks are also reviewed, for the three missions being proposed: (1) Europa Explorer, (2) Jupiter System Observer and (3) Titan Explorer. A timeline for the studies is also included.

outer planets↗

Genesis Recovery Processing

The Genesis spacecraft, launched in August 2001 to collect samples of the solar wind, returned to Earth on 8 September 2004. The Sample Return Capsule (SRC) failed to deploy its drogue parachute and parafoil and subsequently impacted the Utah Test and Training Range (UTTR) at an estimated 310 kph (193 mph). The goal of the Genesis mission to collect and return samples of the solar wind for precise elemental and isotopic analysis provides the scientific community with a unique set of materials to aid in understanding the origin of our solar system. The spacecraft orbited the Earth-Sun L1 point for 29 months exposing a suite of fifteen types of ultrapure, ultraclean materials in several different locations. Most of the materials were mounted on fixed or deployable wafer panels called collector arrays . A few materials were mounted as targets in the focal spot of an electrostatic mirror (the concentrator ). Other materials were strategically placed to maximize the area for solar-wind collection.

Stansbery, E. K.↗