Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Subscale Motor Test Bed Development to Simulate Solid Rocket Motor Internal Environments for Material Characterization

NASA Marshall Space Flight Center’s Materials and Processes Department, with support from the Propulsion Systems Department has developed a test bed for exposing ablative thermal protection materials to an environment similar to that of solid rocket motors (SRMs) by using a hybrid-propellant combustor. The Solid Fuel Torch (SFT) is a pressurized. small-scale hybrid rocket motor which utilizes an aluminized solid fuel and a gaseous oxygen (GOx) oxidizer to vary internal environments which can be tailored to specific program needs. The baseline design for the SFT was developed to support the Space Shuttle Program and was redesigned to support Space Launch System (SLS) Booster program requirements. There are four configurations of the SFT testbed: 1.) Insulation configuration with the option of a “dome” or “converging cone” insulation test section, 2.) Super Sonic Blast Tube configuration to simulate nozzle exit cone environments, 3.) Flow Straightened configuration which includes an additional instrumented length between the fuel grain and the insulation, and 4.) Constant Diameter Throat configuration which includes a cylindrical phenolic test section to test samples with different ply angles under the same environment simultaneously. Motor pressures for each configuration can range from 150 to 1500 psi with heat fluxes up to 1200 BTU/sq.ft/s. This paper discusses the development of each configuration and the results obtained during the initial test series.

C.L. Bower↗

Moving Beyond Data Paralysis to Effective use of Building Analytics

As digital controls and smart meters become commonplace in commercial buildings, facilities teams have access to overwhelming amounts of data. This data does not typically lead to insights and corrective actions unless it is analyzed and prioritized in automated ways. Analytic software has been commercially available for over 20 years, but only recently have these tools seen increased adoption. This monitoring infrastructure helps uncover hidden operational opportunities, which is enticing for decision makers looking for short paybacks. Rather than single project savings, monitoring-based commissioning (MBCx) provides tools and processes to implement persistent, continuous improvement. What was formerly a data onslaught is now becoming a controlled resource for improved energy management. In 2016, a Research and Industry Partnership program was launched to support the use of analytics and diagnostics technologies and MBCx practices. This program couples technical assistance to owners to help increase adoption with a data collection effort to inform industry. It includes the most comprehensive data available nationally on analytics installation and use. The first-year results are in, with data from 46 organizations representing over 185 million square feet and 2,300 buildings. These organizations have achieved a median year-over-year energy savings of $0.20/sq ft with a median first year technology implementation cost of $0.12/sq ft. The paper summarizes attributes of successful analytics and MBCx installations, and cost-effectiveness results. The research provides insight for utilities considering adopting analytics technologies into incentive programs, for analytics developers to improve the performance of their solutions, and for commercial building facility staff considering these technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cadmium Telluride Photovoltaics Accelerator Consortium Solicitation: Request for Proposals Information

Cadmium telluride photovoltaics (CdTe PV) is a leading PV technology built on U.S. innovations that currently holds significant market share within domestic utility scale PV systems. In order to keep pace with a highly competitive and innovative global PV module market, CdTe manufacturing needs readily adaptable advances at the cell and module levels that simultaneously enable higher conversion efficiencies and manufacturing cost reductions without risking long-term module durability. In pursuit of this goal, the Department of Energy (DOE) Solar Energy Technologies Office (SETO) has asked the National Renewable Energy Laboratory (NREL) to launch and support a Consortium to accelerate domestic CdTe technology development through a competitive solicitation process. NREL will competitively select a CdTe Consortium with the goals of enhancing U.S. competitiveness and expanding domestic CdTe PV material and module production through 2030. NREL will provide coordination and oversight through development of technical scopes, review of technical proposals, subcontract support, and review of deliverables along with research support to the Consortium. The new Consortium is expected to include major U.S. companies and universities that possess strong technology development, transfer, and validation capabilities. The research and analysis output of the CdTe Consortium will inform purchasing, design, deployment, and operations decisions of companies in the domestic CdTe PV supply chain, leading to increased material and module production in the U.S.

41 EE - Solar Energy Technologies Office (EE-4S)↗

All Hands On Deck: Raising the Bar on Whole Building Performance-Based Code Compliance and Above-Code Programs

In 2019 a large-scale national effort was launched with support from U.S. Department of Energy, Pacific Northwest National Laboratory and Northwest Energy Efficiency Alliance (NEEA). The project aimed to develop a long-term vision and a roadmap for achieving a practical application of whole building performance-based code and above code program compliance in commercial buildings. The work was aided by engaging over 70 stakeholders across the country representing jurisdictions, above-code programs such as LEED and ENERGY STAR Multifamily Program, members of the ASHRAE Standard 90.1 and other Standard committees, IBPSA and software developers. The performance path requires whole building energy modeling and is gaining momentum. Many see it as the future of the commercial energy codes and the main pathway for achieving zero energy buildings. The paper describes the findings from a stakeholder survey funded by NEEA on the current state of performance-based path, its market penetration, trends, implementation practices and adoption challenges. It discusses the patterns revealed by experience of the states with decades-long history of performance-based compliance such as Florida and California and opportunities for taking advantage of the synergies between code and above-code programs. In addition, the paper provides an overview of the tools and resources developed as part of the effort including the compliance form for ASHRAE Standard 90.1 Section 11 and Appendix G, modeling submittal review manual, and modeler and reviewer qualification requirements. The tools and resources would help remove market barriers, deliver immediate benefits to jurisdictions and rating authorities, and achieve energy efficiency through whole-building performance path.

TSPR, Performance Based Complinace, Washington Sta↗

Manned Mars mission accommodation: Sprint mission

The results of a study conducted at the NASA-LaRC to assess the impacts on the Phase 2 Space Station of Accommodating a Manned Mission to Mars are documented. In addition, several candidate transportation node configurations are presented to accommodate the assembly and verification of the Mars Mission vehicles. This study includes an identification of a life science research program that would need to be completed, on-orbit, prior to mission departure and an assessment of the necessary orbital technology development and demonstration program needed to accomplish the mission. Also included is an analysis of the configuration mass properties and a preliminary analysis of the Space Station control system sizing that would be required to control the station. Results of the study indicate the Phase 2 Space Station can support a manned mission to Mars with the addition of a supporting infrastructure that includes a propellant depot, assembly hangar, and a heavy lift launch vehicle to support the large launch requirements.

Cirillo, William M.↗

The J-2X Upper Stage Engine: From Design to Hardware

NASA is well on its way toward developing a new generation of launch vehicles to support of national space policy to retire the Space Shuttle fleet, complete the International Space Station, and return to the Moon as the first step in resuming this nation s exploration of deep space. The Constellation Program is developing the launch vehicles, spacecraft, surface systems, and ground systems to support those plans. Two launch vehicles will support those ambitious plans the Ares I and Ares V. (Figure 1) The J-2X Upper Stage Engine is a critical element of both of these new launchers. This paper will provide an overview of the J-2X design background, progress to date in design, testing, and manufacturing. The Ares I crew launch vehicle will lift the Orion crew exploration vehicle and up to four astronauts into low Earth orbit (LEO) to rendezvous with the space station or the first leg of mission to the Moon. The Ares V cargo launch vehicle is designed to lift a lunar lander into Earth orbit where it will be docked with the Orion spacecraft, and provide the thrust for the trans-lunar journey. While these vehicles bear some visual resemblance to the 1960s-era Saturn vehicles that carried astronauts to the Moon, the Ares vehicles are designed to carry more crew and more cargo to more places to carry out more ambitious tasks than the vehicles they succeed. The government/industry team designing the Ares rockets is mining a rich history of technology and expertise from the Shuttle, Saturn and other programs and seeking commonality where feasible between the Ares crew and cargo rockets as a way to minimize risk, shorten development times, and live within the budget constraints of its original guidance.

Byrd, Thomas↗

Launch Pad in a Box

NASA Kennedy Space Center (KSC) is developing a new deployable launch system capability to support a small class of launch vehicles for NASA and commercial space companies to test and launch their vehicles. The deployable launch pad concept was first demonstrated on a smaller scale at KSC in 2012 in support of NASA Johnson Space Center's Morpheus Lander Project. The main objective of the Morpheus Project was to test a prototype planetary lander as a vertical takeoff and landing test-bed for advanced spacecraft technologies using a hazard field that KSC had constructed at the Shuttle Landing Facility (SLF). A steel pad for launch or landing was constructed using a modular design that allowed it to be reconfigurable and expandable. A steel flame trench was designed as an optional module that could be easily inserted in place of any modular steel plate component. The concept of a transportable modular launch and landing pad may also be applicable to planetary surfaces where the effects of rocket exhaust plume on surface regolith is problematic for hardware on the surface that may either be damaged by direct impact of high speed dust particles, or impaired by the accumulation of dust (e.g., solar array panels and thermal radiators). During the Morpheus free flight campaign in 2013-14, KSC performed two studies related to rocket plume effects. One study compared four different thermal ablatives that were applied to the interior of a steel flame trench that KSC had designed and built. The second study monitored the erosion of a concrete landing pad following each landing of the Morpheus vehicle on the same pad located in the hazard field. All surfaces of a portable flame trench that could be directly exposed to hot gas during launch of the Morpheus vehicle were coated with four types of ablatives. All ablative products had been tested by NASA KSC and/or the manufacturer. The ablative thicknesses were measured periodically following the twelve Morpheus free flight tests. The thermal energy from the Morpheus rocket exhaust plume was only found to be sufficient to cause appreciable ablation of one of the four ablatives that were tested. The rocket exhaust plume did cause spalling of concrete during each descent and landing on a landing pad in the hazard field. The Extended Abstract ASE Earth and Space Conference April, 2016 - Orlando, FL concrete surface was laser scanned following each Morpheus landing, and the total volume of spalled concrete that eroded between the first and final landings of the Morpheus Project's test campaign was estimated. This paper will also describe a new deployable launch system (DLS) capability that is being developed at KSC and was publicly announced in May 2015 (KSC Partnerships, 2015). The DLS is a set of multi-user Ground Support Equipment that will be used to test and launch small class launch vehicles. The system is comprised of four main elements: the Launch Stand, the Flame Deflector, the Pad Apron and the KAMAG transporter. The system elements are designed to be deployed at launch or test sites within the KSC/CCAFS boundaries. The DLS is intended to be used together with the Fluid and Electrical System of the Universal Propellant Servicing Systems and Mobile Power Data and Communications Unit.

Ablatives Testing↗

Launch Pad in a Box

NASA Kennedy Space Center (KSC) is developing a new deployable launch system capability to support a small class of launch vehicles for NASA and commercial space companies to test and launch their vehicles. The deployable launch pad concept was first demonstrated on a smaller scale at KSC in 2012 in support of NASA Johnson Space Center's Morpheus Lander Project. The main objective of the Morpheus Project was to test a prototype planetary lander as a vertical takeoff and landing test-bed for advanced spacecraft technologies using a hazard field that KSC had constructed at the Shuttle Landing Facility (SLF). A steel pad for launch or landing was constructed using a modular design that allowed it to be reconfigurable and expandable. A steel flame trench was designed as an optional module that could be easily inserted in place of any modular steel plate component. The concept of a transportable modular launch and landing pad may also be applicable to planetary surfaces where the effects of rocket exhaust plume on surface regolith is problematic for hardware on the surface that may either be damaged by direct impact of high speed dust particles, or impaired by the accumulation of dust (e.g., solar array panels and thermal radiators). During the Morpheus free flight campaign in 2013-14, KSC performed two studies related to rocket plume effects. One study compared four different thermal ablatives that were applied to the interior of a steel flame trench that KSC had designed and built. The second study monitored the erosion of a concrete landing pad following each landing of the Morpheus vehicle on the same pad located in the hazard field. All surfaces of a portable flame trench that could be directly exposed to hot gas during launch of the Morpheus vehicle were coated with four types of ablatives. All ablative products had been tested by NASA KSC and/or the manufacturer. The ablative thicknesses were measured periodically following the twelve Morpheus free flight tests. The thermal energy from the Morpheus rocket exhaust plume was only found to be sufficient to cause appreciable ablation of one of the four ablatives that were tested. The rocket exhaust plume did cause spalling of concrete during each descent and landing on a landing pad in the hazard field. The Extended Abstract ASE Earth and Space Conference April, 2016 - Orlando, FL concrete surface was laser scanned following each Morpheus landing, and the total volume of spalled concrete that eroded between the first and final landings of the Morpheus Project's test campaign was estimated. This paper will also describe a new deployable launch system (DLS) capability that is being developed at KSC and was publicly announced in May 2015 (KSC Partnerships, 2015). The DLS is a set of multi-user Ground Support Equipment that will be used to test and launch small class launch vehicles. The system is comprised of four main elements: the Launch Stand, the Flame Deflector, the Pad Apron and the KAMAG transporter. The system elements are designed to be deployed at launch or test sites within the KSC/CCAFS boundaries. The DLS is intended to be used together with the Fluid and Electrical System of the Universal Propellant Servicing Systems and Mobile Power Data and Communications Unit

Mobile Launch Pad Development↗

Integrated operations/payloads/fleet analysis. Volume 5: Mission, capture and operations analysis

The current baseline mission model consists of the DOD Option B prepared for space transportation system mission analysis and a NASA model prepared for the integrated operations /payloads/ fleet analysis. Changes from the previous mission model are discussed, and additional benefits of the reusable space shuttle system are identified. The methodology and assumptions used in the capture analysis are described, and satellite and launch vehicle traffic models for the current and low cost expendable launch vehicle systems and the reusable space shuttle system are presented. The areas of fleet sizing, limitations and abort modes, system ground support requirements, and ground support systems assessment are covered. Current and extended launch azimuth limitations used for both ETR and WTR are presented for the current and low cost expendable vehicles and also the reusable space shuttle system. The results of a survey of launch support capability for the launch vehicle fleets are reported.

Source record↗

Introduction to Orbital Sciences Corporation

A general overview of the Orbital Sciences Corporation (OSC) is presented. The following topics are covered: (1) manpower, facilities, and financial growth; (2) organization and management team; (3) the Space Data Division organization; (4) the Chandler facility; (5) Space Data-Products and Services; (6) space transportation systems; (7) spacecraft and space support systems; (8) turn-key suborbital launch services and support systems; and (9) OSC suborbital booster performance.

Source record↗

Space station accommodations for lunar base elements: A study

The results of a study conducted at NASA-LaRC to assess the impact on the space station of accommodating a Manned Lunar Base are documented. Included in the study are assembly activities for all infrastructure components, resupply and operations support for lunar base elements, crew activity requirements, the effect of lunar activities on Cape Kennedy operations, and the effect on space station science missions. Technology needs to prepare for such missions are also defined. Results of the study indicate that the space station can support the manned lunar base missions with the addition of a Fuel Depot Facility and a heavy lift launch vehicle to support the large launch requirements.

Weidman, Deene J.↗

Use of Taguchi design of experiments to optimize and increase robustness of preliminary designs

The research performed this summer includes the completion of work begun last summer in support of the Air Launched Personnel Launch System parametric study, providing support on the development of the test matrices for the plume experiments in the Plume Model Investigation Team Project, and aiding in the conceptual design of a lunar habitat. After the conclusion of last years Summer Program, the Systems Definition Branch continued with the Air Launched Personnel Launch System (ALPLS) study by running three experiments defined by L27 Orthogonal Arrays. Although the data was evaluated during the academic year, the analysis of variance and the final project review were completed this summer. The Plume Model Investigation Team (PLUMMIT) was formed by the Engineering Directorate to develop a consensus position on plume impingement loads and to validate plume flowfield models. In order to obtain a large number of individual correlated data sets for model validation, a series of plume experiments was planned. A preliminary 'full factorial' test matrix indicated that 73,024 jet firings would be necessary to obtain all of the information requested. As this was approximately 100 times more firings than the scheduled use of Vacuum Chamber A would permit, considerable effort was needed to reduce the test matrix and optimize it with respect to the specific objectives of the program. Part of the First Lunar Outpost Project deals with Lunar Habitat. Requirements for the habitat include radiation protection, a safe haven for occasional solar flare storms, an airlock module as well as consumables to support 34 extra vehicular activities during a 45 day mission. The objective for the proposed work was to collaborate with the Habitat Team on the development and reusability of the Logistics Modules.

Carrasco, Hector R.↗

Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center

The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility

Ernst, E. W.↗

Space shuttle launch vehicle (13 P-OTS) strut support interference effects study in the Rockwell International 7- by 7-foot trisonic wind tunnel (IA68)

Strut support interference investigations were conducted on an 0.004-(-) scale representation of the space shuttle launch vehicle in order to determine transonic and supersonic model support interference effects for use in a future exhaust plume effects study. Strut configurations were also tested. Orbiter, external tank, and solid rocket booster pressures were recorded at Mach numbers 0.9, 1.2, 1.5, and 2.0. Angle of attack and angle of sideslip were varied between plus or minus 4 degrees in 2 degree increments. Parametric variations consisted only of the strut configurations.

Rogge, R. L.↗

Payload processing study for ELV launches

A NASA-KSC study on payload ground processing activities in support of Expendable Launch Vehicle (ELV) launches at Cape Canaveral Air Force Station from January 1977 through February 1988, showed that nearly half of the payloads experienced schedule delays. While about 10 percent of the delays were weather-related, over 65 percent were caused by payload/launch vehicle problems. The planned processing time was exceeded by more than two weeks in most cases. Nearly 30 percent of the payloads required some storage time.

Terhune, Creighton A.↗

An Overview of the Process for Pre-Launch Checkout and Transition Activities in Support of the International Space Station (ISS) Payload Operations Integration Center

The objective of this paper is to provide future ISS scientists and/or engineers with an overview of the coordination process for the preparation and implementation of the pre-launch checkout and transition activities as observed from the Marshall Control Flight Center (MSFC) Payload Operations Integration Center perspective. This includes 4 major phases: (1) Verification and validation of the new command and telemetry databases that are needed for new payload experiments and new onboard formats; (2) Integration testing of the new ground control software and hardware; (3) Final internal and external pre-launch checkouts with cadre and experiment teams; (4) Performance of the actual synchronized transition between MSFC, Johnson Space Center (JSC), and ISS onboard configuration to new onboard software, ground software, and databases.

Digesu, Sam↗

Constellation Program Thermal and Environmental Control and Life Support System Status: 2009 - 2010

The Constellation Program (CxP) consists of spacecrafts, launch vehicles, and support systems to execute the Exploration Architecture. The Program is currently divided into three distinct phases. The first phase is to develop a vehicle to provide limited cargo resupply capability and allow crew member rotation to the International Space Station (ISS). The second phase is to support the return of humans to the moon. The final phase is currently envisioned to allow the delivery of humans and cargo to Mars for an extended time. To implement this phased approach the CxP is currently working on the first vehicle and support systems to replace the Space Shuttle and allow continued access to space. This paper provides a summary of the CxP Thermal and Environmental Control and Life Support (ECLS) work that that has occurred across the different parts of the Program in support of these three phases over the past year.

Williams, David E.↗