Fast longitudinal beam dynamics optimization in x-ray free electron laser linear accelerators
Not Available
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Not Available
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.
Fermilab has developed a novel concept for an industrial electron linac using Nb₃Sn coating technology and conduction cooling. We will show the range of multi-cavity linac designs targeted toward various applications. We will also discuss technology development status with results on conduction cooling of SRF cavities based on cryocoolers, which removes the need for liquid Helium, thus making SRF technology accessible to industrial applications. These conduction-cooled linacs can generate electron beam energies up to 10 MeV in continuous-wave operation and can reach higher power (>=1 MW) by combing several modules. Compact and light enough to mount on mobile platforms, our machine is anticipated to enable new in-situ environmental remediation applications such as waste-water treatment for urban areas, X-ray medical device sterilization, and innovative pavement applications. We also show cost-economics and key R&D areas that much be addressed for a practical machine.
The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and its scope covers the supply of the 650 MHz low-beta cryomodule section, with the design of the cryostat (i.e the cryomodule without the cavities, the power couplers and the frequency tuning systems) and the manufacturing of its components, the assembly and tests of the pre-production cryomodule and 9 production modules. An important milestone was reached in April 2023 with the Final Design Review. This paper presents the detailed design of the 650 MHz low-beta cryomodules.
Abstract not provided.
Proton Improvement Plan -II is high intensity and high energy proton accelerator which will be used to support neutrino program at Fermilab. Due to the requirement from experiments, this accelerator is designed to be a highly reliable and available system. In this paper, a reliability model has been created which depicts a complete accelerator system and supporting utilities. Reliability and Availability of the complete system are estimated. It has been shown that Availability and Reliability of the system can be increased significantly by introducing failure tolerance of the beamline elements in each accelerating section of superconducting linac.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The project supported the development of new methodologies for performing matrix computations that form key building blocks in modern scientific computing, such as low rank approximation of matrices, and efficient representations of global operators that arise in simulations of physical phenomena.
Abstract not provided