Search NASA⌕ Search

SEARCH · Search NASA

Results for “Logistics Analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Analysis of Tank PMD Rewetting Following Thrust Resettling

Recent investigations have successfully demonstrated closed-form analytical solutions of spontaneous capillary flows in idealized cylindrical containers with interior corners. In this report, the theory is extended and applied to complex containers modeling spacecraft fuel tanks employing propellant management devices (PMDs). The specific problem investigated is one of spontaneous rewetting of a typical partially filled liquid fuel/cryogen tank with PMD after thrust resettling. The transients of this flow impact the logistics of orbital maneuvers and potentially tank thermal control. The general procedure to compute the initial condition (mean radius of curvature for the interface) for the closed-form transient flows is first outlined then solved for several 'complex' cylindrical tanks exhibiting symmetry. The utility and limitations of the technique as a design tool are discussed in a summary, which also highlights comparisons with NASA flight data of a model propellant tank with PMD.

Weislogel, M. M.↗

Component-Level Electronic-Assembly Repair (CLEAR) Analysis of the Problem Reporting and Corrective Action (PRACA) Database of the International Space Station On-Orbit Electrical Systems

The NASA Constellation Program is investigating and developing technologies to support human exploration of the Moon and Mars. The Component-Level Electronic-Assembly Repair (CLEAR) task is part of the Supportability Project managed by the Exploration Technology Development Program. CLEAR is aimed at enabling a flight crew to diagnose and repair electronic circuits in space yet minimize logistics spares, equipment, and crew time and training. For insight into actual space repair needs, in early 2008 the project examined the operational experience of the International Space Station (ISS) program. CLEAR examined the ISS on-orbit Problem Reporting and Corrective Action database for electrical and electronic system problems. The ISS has higher than predicted reliability yet, as expected, it has persistent problems. A goal was to identify which on-orbit electrical problems could be resolved by a component-level replacement. A further goal was to identify problems that could benefit from the additional diagnostic and test capability that a component-level repair capability could provide. The study indicated that many problems stem from a small set of root causes that also represent distinct component problems. The study also determined that there are certain recurring problems where the current telemetry instrumentation and built-in tests are unable to completely resolve the problem. As a result, the root cause is listed as unknown. Overall, roughly 42 percent of on-orbit electrical problems on ISS could be addressed with a component-level repair. Furthermore, 63 percent of on-orbit electrical problems on ISS could benefit from additional external diagnostic and test capability. These results indicate that in situ component-level repair in combination with diagnostic and test capability can be expected to increase system availability and reduce logistics. The CLEAR approach can increase the flight crew s ability to act decisively to resolve problems while reducing dependency on Earth-supplied logistics for future Constellation Program missions.

Oeftering, Richard C.↗

Operations analysis (study 2.1). Volume 1: Executive summary

Subjects related to future STS operations concepts were investigated. The majority of effort was directed at assessing the benefits of automated space servicing concepts as related to improvements in payload procurement and shuttle utilization. Another subject was directed at understanding shuttle upper stage software development and recurring costs relative to total program projections. Space serving of automated payloads is addressed by examining the broad spectrum of payload applications with the belief that shared logistic operations will be a major contributor to reduction of future program costs. However, there are certain requirements for support of payload operations, such as availability of the payload, that may place demands upon the shuttle fleet. Because future projections of the NASA Mission Model are only representative of the payload traffic, it is important to recognize that it is the general character of operations that is significant rather than service to any single payload program.

Wolfe, R. R.↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15 year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Sean M Fuller↗

Gateway Program Development Progress

This paper provides an overview and status of Gateway, humanity’s first space station to orbit the Moon providing vital support for a sustained, long-term human return to the lunar surface and a steppingstone to Mars as part of the Artemis missions. As a lunar outpost, Gateway is a destination for deep space crew expeditions and science investigations, a port for deep space transportation, including landers transiting to the lunar surface or spacecraft embarking to deep space destinations beyond the Earth-Moon system. The National Aeronautics and Space Administration (NASA) leads the Program and is the integrator of the spaceflight capabilities and contributions of U.S. commercial partners and international partners to develop Gateway. This paper will provide an overview of Gateway’s major components in various stages of development. The entire Gateway spacecraft is at preliminary design level of maturity, with some components at or near critical design review. Gateway’s major components are the Power and Propulsion Element; the Habitation and Logistics Outpost; Deep Space Logistics; the International Habitation module; Gateway External Robotics System; European System Providing Refueling, Infrastructure and Telecommunications; and an Airlock. This paper will also provide an update on the status of the integration activities necessary to fly and operate this complex, next-generation integrated spacecraft for a minimum 15-year design life, including systems engineering integrated analysis cycles, the autonomous Vehicle System Manager software, verification and validation labs, and common vehicle equipment. Expanding on the successful partnership that has provided over 20 years of continuous crew operations in low-Earth orbit on the International Space Station, Gateway is an evolution of this extraordinary partnership leveraging the capabilities of each contributor to expand humankind’s sustained exploration deeper into the cosmos. Highlighting the international program with participation from multiple space agencies, this paper will also provide a status of Gateway multilateral governance structure and international agreements.

Gateway↗

Comparative Modeling Studies of Boreal Water and Carbon Balance

The coordination of the modeling and field efforts for an Intensive Field Campaign (IFC) may resemble the chicken and egg dilemma. This session's theme advocates that early and proactive involvement by modeling teams can produce a scientific and operational benefit for the IFC and Experiment. This talk will provide some examples and suggestions originating from the NASA funded IFC's of the FIFE First ISLSCP (International Satellite Land Surface Climatology Project) Field Experiment, Oregon Transect Ecosystem Research (OTTER) and predominately Boreal Ecosystem-Atmosphere Study (BOREAS) Experiments. In February 1994 and prior to the final selection of the BOREAS study sites, a group of funded BOREAS investigators agreed to run their models with data for five community types representing the proposed tower flux sites. All participating models were given identical initial values and boundary conditions and driven with identical climate data. The objectives of the intercomparison exercise were: 1) compare simulation results of participating terrestrial, hydrological, and atmospheric models over selected time frames; 2) learn about model behavior and sensitivity to estimated boreal site and vegetation definitions; 3) prioritize BOREAS field data collection efforts supporting modeling studies; 4) identify individual model deficiencies as early as possible. Out of these objectives evolved some important coordination and science issues for the BOREAS Experiment that can be generalized to IFCs and long term archiving of the data. Some problems are acceptable because they are endemic to maintaining fair and open competition prior to the peer review process. Others are logistical and addressable through application of planning, management, and information sciences. This investigator has identified one source of measurement and model incompatibility that is manifest in the IFC scaling approach. Although intuitively obvious, scaling problems are already more formally defined in the Geography literature. An example of the scaling problem will be demonstrated with Vegetation/Ecosystem Mapping and Analysis Project (VEMAP) and OTTER data.

Coughlan, J.↗

Drilling Automation Demonstrations in Subsurface Exploration for Astrobiology

This project proposes to study subsurface permafrost microbial habitats at a relevant Arctic Mars-analog site (Haughton Crater, Devon Island, Canada) while developing and maturing the subsurface drilling and drilling automation technologies that will be required by post-2010 missions. It builds on earlier drilling technology projects to add permafrost and ice-drilling capabilities to 5m with a lightweight drill that will be automatically monitored and controlled in-situ. Frozen cores obtained with this drill under sterilized protocols will be used in testing three hypotheses pertaining to near-surface physical geology and ground H2O ice distribution, viewed as a habitat for microbial life in subsurface ice and ice-consolidated sediments. Automation technologies employed will demonstrate hands-off diagnostics and drill control, using novel vibrational dynamical analysis methods and model-based reasoning to monitor and identify drilling fault states before and during faults. Three field deployments, to a Mars-analog site with frozen impact crater fallback breccia, will support science goals, provide a rigorous test of drilling automation and lightweight permafrost drilling, and leverage past experience with the field site s particular logistics.

Glass, Brian↗

Using Statistical Multivariable Models to Understand the Relationship Between Interplanetary Coronal Mass Ejecta and Magnetic Flux Ropes

In-situ measurements of interplanetary coronal mass ejections (ICMEs) display a wide range of properties. A distinct subset, "magnetic clouds" (MCs), are readily identifiable by a smooth rotation in an enhanced magnetic field, together with an unusually low solar wind proton temperature. In this study, we analyze Ulysses spacecraft measurements to systematically investigate five possible explanations for why some ICMEs are observed to be MCs and others are not: i) An observational selection effect; that is, all ICMEs do in fact contain MCs, but the trajectory of the spacecraft through the ICME determines whether the MC is actually encountered; ii) interactions of an erupting flux rope (PR) with itself or between neighboring FRs, which produce complex structures in which the coherent magnetic structure has been destroyed; iii) an evolutionary process, such as relaxation to a low plasma-beta state that leads to the formation of an MC; iv) the existence of two (or more) intrinsic initiation mechanisms, some of which produce MCs and some that do not; or v) MCs are just an easily identifiable limit in an otherwise corntinuous spectrum of structures. We apply quantitative statistical models to assess these ideas. In particular, we use the Akaike information criterion (AIC) to rank the candidate models and a Gaussian mixture model (GMM) to uncover any intrinsic clustering of the data. Using a logistic regression, we find that plasma-beta, CME width, and the ratio O(sup 7) / O(sup 6) are the most significant predictor variables for the presence of an MC. Moreover, the propensity for an event to be identified as an MC decreases with heliocentric distance. These results tend to refute ideas ii) and iii). GMM clustering analysis further identifies three distinct groups of ICMEs; two of which match (at the 86% level) with events independently identified as MCs, and a third that matches with non-MCs (68 % overlap), Thus, idea v) is not supported. Choosing between ideas i) and iv) is more challenging, since they may effectively be indistinguishable from one another by a single in-situ spacecraft. We offer some suggestions on how future studies may address this.

Riley, P.↗

Comparing Trash Disposal and Reuse Options for Deep Space Gateway and Mars Missions

Taking out the trash at NASA's newly proposed Deep Space Gateway (DSG) will not be a trivial task. While not the most important aspect of planning this cislunar outpost, there are several options that should be carefully considered since they may affect the crew as well as mission mass and volume. This study extends an earlier one, which focused on waste disposal options for a Mars Transit Vehicle. In that study, gasifying and venting trash along the way was found to noticeably reduce propellant needs and launch mass, whereas keeping processed trash on board in the form of radiation shielding tiles would significantly lower the crew's radiation dose during a solar particle event. Another favorable strategy was packing trash in a used logistics module for disposal. Since the DSG does not need much propulsion to maintain its orbit and Orion will be present with its own radiation storm shelter at the Gateway, the driving factors of the waste disposal trade study are different than for the Mars mission. Besides reviewing the propulsion and radiation shielding factors, potential drivers such as mass, power, volume, crew time, and human factors (e.g. smell) were studied. Disposal options for DSG include jettison of a used logistics module containing waste after every human stay, jettison of the same logistics module after several missions once it is full, regular disposal of trash via an airlock, or gasifying waste products for easier disposal or reuse. Conversely, a heat melt compactor device could be used to remove water and stabilize trash into tiles which could be more compactly stored on board and used as radiation shielding. Equivalent system mass analysis is used to tally the benefits and costs (mass, volume, power, crew time) of each case on an equivalent mass basis. Other more subjective factors are also discussed. Recommendations are made for DSG and Mars mission waste disposal.

Ewert, Michael↗

Evolving software reengineering technology for the emerging innovative-competitive era

This paper reports on a multi-tool commercial/military environment combining software Domain Analysis techniques with Reusable Software and Reengineering of Legacy Software. It is based on the development of a military version for the Department of Defense (DOD). The integrated tools in the military version are: Software Specification Assistant (SSA) and Software Reengineering Environment (SRE), developed by Computer Command and Control Company (CCCC) for Naval Surface Warfare Center (NSWC) and Joint Logistics Commanders (JLC), and the Advanced Research Project Agency (ARPA) STARS Software Engineering Environment (SEE) developed by Boeing for NAVAIR PMA 205. The paper describes transitioning these integrated tools to commercial use. There is a critical need for the transition for the following reasons: First, to date, 70 percent of programmers' time is applied to software maintenance. The work of these users has not been facilitated by existing tools. The addition of Software Reengineering will also facilitate software maintenance and upgrading. In fact, the integrated tools will support the entire software life cycle. Second, the integrated tools are essential to Business Process Reengineering, which seeks radical process innovations to achieve breakthrough results. Done well, process reengineering delivers extraordinary gains in process speed, productivity and profitability. Most importantly, it discovers new opportunities for products and services in collaboration with other organizations. Legacy computer software must be changed rapidly to support innovative business processes. The integrated tools will provide commercial organizations important competitive advantages. This, in turn, will increase employment by creating new business opportunities. Third, the integrated system will produce much higher quality software than use of the tools separately. The reason for this is that producing or upgrading software requires keen understanding of extremely complex applications which is facilitated by the integrated tools. The radical savings in the time and cost associated with software, due to use of CASE tools that support combined Reuse of Software and Reengineering of Legacy Code, will add an important impetus to improving the automation of enterprises. This will be reflected in continuing operations, as well as in innovating new business processes. The proposed multi-tool software development is based on state of the art technology, which will be further advanced through the use of open systems for adding new tools and experience in their use.

Hwang, Phillip Q.↗

Advanced Electrocardiography Can Identify Occult Cardiomyopathy in Doberman Pinschers

Recently, multiple advanced resting electrocardiographic (A-ECG) techniques have improved the diagnostic value of short-duration ECG in detection of dilated cardiomyopathy (DCM) in humans. This study investigated whether 12-lead A-ECG recordings could accurately identify the occult phase of DCM in dogs. Short-duration (3-5 min) high-fidelity 12-lead ECG recordings were obtained from 31 privately-owned, clinically healthy Doberman Pinschers (5.4 +/- 1.7 years, 11/20 males/females). Dogs were divided into 2 groups: 1) 19 healthy dogs with normal echocardiographic M-mode measurements: left ventricular internal diameter in diastole (LVIDd . 47mm) and in systole (LVIDs . 38mm) and normal 24-hour ECG recordings (<50 ventricular premature complexes, VPCs); and 2) 12 dogs with occult DCM: 11/12 dogs had increased M-mode measurements (LVIDd . 49mm and/or LVIDs . 40mm) and 5/11 dogs had also >100 VPCs/24h; 1/12 dogs had only abnormal 24-hour ECG recordings (>100 VPCs/24h). ECG recordings were evaluated via custom software programs to calculate multiple parameters of high-frequency (HF) QRS ECG, heart rate variability, QT variability, waveform complexity and 3-D ECG. Student's t-tests determined 19 ECG parameters that were significantly different (P < 0.05) between groups. Principal component factor analysis identified a 5-factor model with 81.4% explained variance. QRS dipolar and non-dipolar voltages, Cornell voltage criteria and QRS waveform residuum were increased significantly (P < 0.05), whereas mean HF QRS amplitude was decreased significantly (P < 0.05) in dogs with occult DCM. For the 5 selected parameters the prediction of occult DCM was performed using a binary logistic regression model with Chi-square tested significance (P < 0.01). ROC analyses showed that the five selected ECG parameters could identify occult ECG with sensitivity 89% and specificity 83%. Results suggest that 12-lead A-ECG might improve diagnostic value of short-duration ECG in earlier detection of canine DCM as five selected ECG parameters can with reasonable accuracy identify occult DCM in Doberman Pinschers. Future extensive clinical studies need to clarify if 12-lead A-ECG could be useful as an additional screening test for canine DCM.

Spiljak, M.↗

Suborbital Testing of the OSCAR Trash-to-Gas System

With the sustained human exploration of nearby celestial bodies on the horizon, a renewed outlook on crew waste management must be realized. Current waste management strategies aboard the International Space Station become impractical as we venture beyond low Earth orbit. Furthermore, for future exploration missions, extracting resources from various waste streams becomes increasingly advantageous. One method of combatting the long-duration waste management problem is by thermally degrading solid and liquid crew waste items into a chemically inert, ventable gas stream, a process known as Trash-to-Gas. The Orbital Syngas/Commodity Augmentation Reactor (OSCAR) is the state-of-the-art Trash-to-Gas system which has been designed to explore microgravity Trash-to-Gas concepts for improved mass/volume reduction and resource recovery from waste. OSCAR is a subscale testbed design that supports the NASA Logistics Reduction project under the Advanced Exploration Systems Program and Space Technology Mission Directorate Flight Opportunities Program to determine the feasibility of Trash-to-Gas technology for future use on long duration space missions. OSCAR has flown on two suborbital flight demonstrations aboard Blue Origin’s New Shepard launch vehicle. This paper presents a high-level comparative analysis of these microgravity test campaigns with Earth gravity laboratory experiments. Solid-to-gas conversion, gas production & composition, and reactor temperature & pressure are compared to highlight the operational factors and performance differences within the microgravity environment for future optimization.

Ray P Pitts↗

Trajectory Design for a Solar Necklace of Repurposed Gateway Logistics Modules

The Solar Necklace mission concept, initially formed from a study conducted by the Compass Team at NASA’s Glenn Research Center, aims to maximize the scientific potential of a spacecraft’s lifetime by redefining their proposed disposal trajectories. By repurposing logistics modules (LMs) initially designated for heliocentric disposal after servicing NASA’s Gateway, a constellation of spacecraft could be placed around the sun. This paper assesses the feasibility of reusing vehicles equipped with solar science packages, sending them into a heliocentric orbit to enhance solar science capabilities, and potentially provide early warning capabilities for future piloted spacecraft. A comprehensive analysis of the trajectory design aspects for the Solar Necklace mission was performed, highlighting key components of the study such as Earth-relative drift rates, ∆v requirements, Earth-flyby opportunities, number of lunar flybys, and final orbital state parameters. Additionally, the paper serves as a proof-of-concept for the repurposing of Gateway LMs using convenient, low-cost methods of advancing solar science, space weather understanding, and climate research.

Mission Design↗

Systems Analysis and Structural Design of an Unpressurized Cargo Delivery Vehicle

The International Space Station will require a continuous supply of replacement parts for ongoing maintenance and repair after the planned retirement of the Space Shuttle in 2010. These parts are existing line-replaceable items collectively called Orbital Replacement Units, and include heavy and oversized items such as Control Moment Gyroscopes and stowed radiator arrays originally intended for delivery aboard the Space Shuttle. Current resupply spacecraft have limited to no capability to deliver these external logistics. In support of NASA's Exploration Systems Architecture Study, a team at Langley Research Center designed an Unpressurized Cargo Delivery Vehicle to deliver bulk cargo to the Space Station. The Unpressurized Cargo Delivery Vehicle was required to deliver at least 13,200 lbs of cargo mounted on at least 18 Flight Releasable Attachment Mechanisms. The Crew Launch Vehicle design recommended in the Exploration Systems Architecture Study would be used to launch one annual resupply flight to the International Space Station. The baseline vehicle design developed here has a cargo capacity of 16,000 lbs mounted on up to 20 Flight Releasable Attachment Mechanisms. Major vehicle components are a 5.5m-diameter cargo module containing two detachable cargo pallets with the payload, a Service Module to provide propulsion and power, and an aerodynamic nose cone. To reduce cost and risk, the Service Module is identical to the one used for the Crew Exploration Vehicle design.

Wu, K. Chauncey↗

Analysis of Alternative Jettison Design Concepts for Deep-space Missions

The management of waste generated onboard spacecraft during future long-duration, deep-space missions will require different solutions from those currently implemented on the International Space Station, which consist exclusively of collecting, storing, and returning the waste to Earth. Alternative options for managing spacecraft waste are to process it for recycling and recovering resources, and to jettison it overboard. The waste generated during a deep-space mission is derived mainly from spacecraft logistics supplies, food and beverage residues, personal or scientific items used by the crew, and unused spare components. Uncontained and unprocessed trash is a health hazard and a habitat volume liability, which makes onboard long-term storage a nonviable option. Jettison of solid, processed waste appear, on the other hand, to be an effective solution for crewed deep-space missions, leading not only to volume reduction and habitat safening, but also to considerable mass savings in the spacecraft’s propulsion system. However, the disposal of trash overboard also creates a navigation hazard for spacecraft and the risk of collisions with planetary bodies. This paper investigates alternative jettison design concepts for L2 libration orbit, Mars conjunction-class, and Mars opposition-class missions.

Jurek Parodi↗

SpaceOps 1992: Proceedings of the Second International Symposium on Ground Data Systems for Space Mission Operations

The Second International Symposium featured 135 oral presentations in these 12 categories: Future Missions and Operations; System-Level Architectures; Mission-Specific Systems; Mission and Science Planning and Sequencing; Mission Control; Operations Automation and Emerging Technologies; Data Acquisition; Navigation; Operations Support Services; Engineering Data Analysis of Space Vehicle and Ground Systems; Telemetry Processing, Mission Data Management, and Data Archiving; and Operations Management. Topics focused on improvements in the productivity, effectiveness, efficiency, and quality of mission operations, ground systems, and data acquisition. Also emphasized were accomplishments in management of human factors; use of information systems to improve data retrieval, reporting, and archiving; design and implementation of logistics support for mission operations; and the use of telescience and teleoperations.

Source record↗

Common Habitat Base Camp for Moon and Mars Surface Operations

The Common Habitat uses the SLS Core Stage Liquid Oxygen tank as the primary structure (similar to Skylab) and has an internal architecture compatible with microgravity, lunar gravity, and Mars gravity, such that identical versions of the same design can be used in all three environments. Applying the large dimensions and eight-person crew size of the Common Habitat to a surface architecture leads to a unique base camp configuration. A notional such base camp is described in this analysis. The base camp includes four distributed zones – habitation, landing, power, and resource production. The base camp is deployed and assembled in three phases: site preparation, element staging, and habitat delivery, each of which are briefly discussed. Crew arrival and departure is discussed, including variations caused by orbital mechanics-induced differences between the Moon and Mars base camps. Trash and logistics operations are described. Finally, crew operations within the base camp are described.

Lunar Outpost↗

Using NASA's Giovanni System to Simulate Time-Series Stations in the Outflow Region of California's Eel River

Oceanographic time-series stations provide vital data for the monitoring of oceanic processes, particularly those associated with trends over time and interannual variability. There are likely numerous locations where the establishment of a time-series station would be desirable, but for reasons of funding or logistics, such establishment may not be feasible. An alternative to an operational time-series station is monitoring of sites via remote sensing. In this study, the NASA Giovanni data system is employed to simulate the establishment of two time-series stations near the outflow region of California s Eel River, which carries a high sediment load. Previous time-series analysis of this location (Acker et al. 2009) indicated that remotely-sensed chl a exhibits a statistically significant increasing trend during summer (low flow) months, but no apparent trend during winter (high flow) months. Examination of several newly-available ocean data parameters in Giovanni, including 8-day resolution data, demonstrates the differences in ocean parameter trends at the two locations compared to regionally-averaged time-series. The hypothesis that the increased summer chl a values are related to increasing SST is evaluated, and the signature of the Eel River plume is defined with ocean optical parameters.

Acker, James G.↗