Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar landing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Analysis of Alternative Architectures for a 2024 Lunar Sortie

This study focused on performing a broad analysis of lunar architectures to identify key alternatives capable of performing a 2024 human lunar landing mission. The goal of the study was to identify architecture alternatives which exhibit robustness, as measured by launch vehicle payload margin, to absorb the natural growth that occurs during design maturation. The study consisted of up to three element architectures which perform the mission from cis-lunar aggregation, through the surface sortie, and return to cis-lunar space. More than 600,000 data points were evaluated utilizing a novel architecture synthesis framework currently being developed by NASA/MSFC. Key findings from the study indicate that architecture complexity can be reduced by minimizing the number of discrete, unique architecture elements, which in turn translates into reduced design, development, test, and evaluation (DDT&E) complexity. It was identified that heavy lift launch vehicles enable such architectures while also providing significant increases to launch vehicle margin over existing and near-term commercial launch vehicle (CLV) performance expected in the 2024 time frame. Additionally, the study identified storable propellant based lander architectures as leading alternatives in achieving a 2024 human lunar landing by providing reduced technology needs and development schedules.

Architecture Analysis↗

Launch Availability Analysis for the Artemis Program

On March 26, 2019, Vice President Pence stated that the policy of the Trump administration and the United States of America is to return American astronauts to the Moon within the next five years i.e., by 2024. Since that time, NASA has begun the process of developing concepts of operations and launch campaign options to achieve that goal as well as to provide a sustainable human presence on the Moon. Whereas the Apollo program utilized one Saturn V rocket to carry out a single lunar landing mission of short duration, NASA’s preliminary plans for the Artemis Program call for a combination of medium lift class rockets along with the heavy lift Space Launch System (SLS)to achieve a lunar landing by 2024 as well as subsequent missions. This paper describes how discrete event simulation is used to model the launch campaigns and provide metrics on launch availability and mission duration for each element being launched. Possible methods for improving launch availability are presented.

Grant Cates↗

Lessons learned - Americans in space

Milestones in the learning process during development of spaceflight capability for different NASA missions are traced from the initial launch of the Mercury escape rocket to the advent of the Shuttle. A detached heat shield on the first manned Mercury orbital flight led to a decision for reentry with retrorockets attached, a situation which demonstrated a need for on-line communications with the spacecraft construction engineers. The Gemini program served to develop EVA techniques and docking procedures essential for the Apollo missions. Apollo 8 circled the moon after only one manned test flight of the equipment due to the success of the first flight. Lunar landing simulation training exposed the astronauts to situations beyond the human ability to respond. The training was justified when computer overload required the pilot to retake manual control of some spacecraft functions during the successful first lunar landing. All lessons previously learned were used to safely return the damaged Apollo 13 to earth. The Skylab missions provided an opportunity to maintain rotating teams of flight controllers on a 24-hr/day basis for periods of months. Finally, the six-year hiatus of U.S. manned space activities between the end of the Skylab missions and the first Shuttle flight provided time for incorporating previous lessons into new procedures, training strategies, and data resources.

Kranz, E.↗

Lunar Lander Landing Modeling and Simulation in Simscape

The landing gear is a critical subsystem of a lander for a successful landing on the moon or a planet. During a landing event, structural loading, energy absorption and toppling stability are important factors for the landing gear development. These aspects can be studied using simulations. The landing gear comprising the primary struct, secondary structs, footpad, and joints, is easily modeled using Simscape Multibody toolbox. The energy absorption mechanisms in the structs is readily modeled using Simulink and Multibody blocks based on the relative motions of the inner and outer cylinder of the structures. During touchdown, the footpads strike the lunar surface, and the contact forces can be modeled including the soil mechanical properties. Slosh dynamics are included using a mechanical pendulum model. Tip-over controllers are developed using Simulink blocks and toolboxes. This model was intensively tested manually then additionally with Monte Carlo simulation. It offers the opportunity for landing stability study, i.e. the max slope a lander can land without tipping over in 3D realistic landing situations.

Wei Wu↗

Kennedy Space Center: Apollo to Multi-User Spaceport

NASA Kennedy Space Center (KSC) was established as the gateway to exploring beyond earth. Since the establishment of KSC in December 1963, the Center has been critical in the execution of the United States of Americas bold mission to send astronauts beyond the grasp of the terra firma. On May 25, 1961, a few weeks after a Soviet cosmonaut became the first person to fly in space, President John F. Kennedy laid out the ambitious goal of landing a man on the moon and returning him safely to the Earth by the end of the decade. The resultant Apollo program was massive endeavor, driven by the Cold War Space Race, and supported with a robust budget. The Apollo program consisted of 18 launches from newly developed infrastructure, including 12 manned missions and six lunar landings, ending with Apollo 17 that launched on December 7, 1972. Continuing to use this infrastructure, the Skylab program launched four missions. During the Skylab program, KSC infrastructure was redesigned to meet the needs of the Space Shuttle program, which launched its first vehicle (STS-1) on April 12, 1981. The Space Shuttle required significant modifications to the Apollo launch pads and assembly facilities, as well as new infrastructure, such as Orbiter and Payload Processing Facilities, as well as the Shuttle Landing Facility. The Space Shuttle was a workhorse that supported many satellite deployments, but was key for the construction and maintenance of the International Space Station, which required additional facilities at KSC to support processing of the flight hardware. After reaching the new Millennium, United States policymakers searched for new ways to reduce the cost of space exploration. The Constellation Program was initiated in 2005 with a goal of providing a crewed lunar landing with a much smaller budget. The very successful Space Shuttle made its last launch on July 8, 2011, after 135 missions. In the subsequent years, KSC continues to evolve, and this paper will address past and future efforts of the transformation of the KSC Apollo and Space Shuttle heritage infrastructure into a more versatile, multi-user spaceport. The paper will also discuss the US Congressional and NASA initiatives for developing and supporting multiple commercial partners, while simultaneously supporting NASAs human exploration initiative, consisting of Space Launch System (SLS), Orion spacecraft and associated ground launch systems. In addition, the paper explains the approach with examples for NASA KSC to leverage new technologies and innovative capabilities developed to reduce the cost to individual users.

launchpad↗

Commercialization and Human Settlement of the Moon and Cislunar Space – A Look Ahead at the Possibilities over the Next 50 Years

Over 50 years have passed since the movie 2001: A Space Odyssey debuted in April 1968. In the film, Dr. Heywood Floyd flies to a large artificial gravity space station orbiting Earth aboard a commercial space plane. He then embarks on a commuter flight to the Moon arriving there 25hours later. Today, on the 50th anniversary of the Apollo 11 lunar landing, the images portrayed in 2001 still remain well beyond our capabilities. This paper examines key technologies and systems (in-situ resource utilization, fission power, advanced chemical and nuclear propulsion),and orbiting infrastructure elements (providing a propellant depot and cargo transfer function),that could be developed by NASA and the private sector in future decades allowing the operational capabilities presented in 2001 to be achieved, albeit on a more spartan scale. Lunar derived propellants (LDPs) will be essential to reducing the launch mass requirements from Earth and developing a reusable lunar transportation system (LTS) that can allow initial outposts to evolve into settlements supporting a variety of commercial activities like in-situ propellant production. Deposits of icy regolith found within permanently shadowed craters at the lunar pole scan supply the feedstock material to produce liquid oxygen (LO2) and hydrogen (LH2) propellan tneeded by surface-based lunar landing vehicles (LLVs) using chemical rocket engines. Along the Moon's nearside equatorial corridor, iron oxide-rich volcanic glass beads from vast pyroclasticdeposits, together with mare regolith, can provide the materials to produce lunar-derived LO2plus other important solar wind implanted (SWI) volatiles, including H2 and helium-3. Mega watt classfission power systems will be essential for providing continuous "24/7" power to LLVs will provide cargo and passenger "orbit-to-surface" access and willalso be used to transport LDP to Space Transportation Nodes (STNs) located in lunar polar(LPO) and equatorial orbits (LLO). Spaced-based, reusable lunar transfer vehicles (LTVs),operating between STNs in low Earth orbit (LEO), LLO, and LPO, and able to refuel with LDPs,can offer unique mission capabilities including short transit time crewed cargo transports. Even acommuter shuttle service similar to that portrayed in 2001 appears possible, allowing 1-way trip times to and from the Moon as short as 24 hours. The performance of LTVs using both RL10B-2chemical rockets, and a variant of the nuclear thermal rocket (NTR), the LO2-Augmented NTR(LANTR), are examined and compared. The bipropellant LANTR engine utilizes its divergent nozzle section as an afterburner into which oxygen is injected and supersonically combusted with reactor-heated hydrogen emerging from the engine's sonic throat. If only 1% of the LDP obtained from icy regolith, volcanic glass, and SWI volatile deposits were available for use in lunar orbit,such a supply could support routine commuter flights to the Moon for many thousands of years!This paper provides a look ahead at what might be possible in the not too distant future,quantifies the operational characteristics of key in-space and surface technologies and systems,and provides conceptual designs for the various architectural elements discussed.

Borowski, Stanley K.↗

Commercial and Human Settlement of the Moon and Cislunar Space – A Look Ahead at the Possibilities over the Next 50 Years

Over 50 years have passed since the movie 2001: A Space Odyssey debuted in April 1968. In the film, Dr. Heywood Floyd flies to a large artificial gravity space station orbiting Earth aboard a commercial space plane. He then embarks on a commuter flight to the Moon arriving there 25 hours later. Today, on the 50th anniversary of the Apollo 11 lunar landing, the images portrayed in 2001 still remain well beyond our capabilities. This paper examines key technologies and systems (in-situ resource utilization, fission power, advanced chemical and nuclear propulsion), and orbiting infrastructure elements (providing a propellant depot and cargo transfer function), that could be developed by NASA and the private sector in future decades allowing the operational capabilities presented in 2001 to be achieved, albeit on a more spartan scale. Lunar-derived propellants (LDPs) will be essential to reducing the launch mass requirements from Earth and developing a reusable lunar transportation system (LTS) that can allow initial outposts to evolve into settlements supporting a variety of commercial activities like in-situ propellant production. Deposits of icy regolith found within permanently shadowed craters at the lunar poles can supply the feedstock material to produce liquid oxygen (LO2) and hydrogen (LH2) propellant needed by surface-based lunar landing vehicles (LLVs) using chemical rocket engines. Along the Moon’s nearside equatorial corridor, iron oxide-rich volcanic glass beads from vast pyroclastic deposits, together with mare regolith, can provide the materials to produce lunar-derived LO2 plus other important solar wind implanted (SWI) volatiles, including H2 and helium-3. Megawatt-class fission power systems will be essential for providing continuous “24/7” power to processing plants, evolving human settlements, and other commercial activities that develop on the Moon and in orbit. Reusable LLVs will provide cargo and passenger “orbit-to-surface” access and will also be used to transport LDP to Space Transportation Nodes (STNs) located in lunar polar (LPO) and equatorial orbits (LLO). Spaced-based, reusable lunar transfer vehicles (LTVs), operating between STNs in low Earth orbit (LEO), LLO, and LPO, and able to refuel with LDPs, can offer unique mission capabilities including short transit time crewed cargo transports. Even a commuter shuttle service similar to that portrayed in 2001 appears possible, allowing 1-way trip times to and from the Moon as short as 24 hours. The performance of LTVs using both RL10B-2 chemical rockets, and a variant of the nuclear thermal rocket (NTR), the LO2-Augmented NTR (LANTR), are examined and compared. The bipropellant LANTR engine utilizes its divergent nozzle section as an afterburner into which oxygen is injected and supersonically combusted with reactor-heated hydrogen emerging from the engine’s sonic throat. If only 1% of the LDP obtained from icy regolith, volcanic glass, and SWI volatile deposits were available for use in lunar orbit, such a supply could support routine commuter flights to the Moon for many thousands of years! This paper provides a look ahead at what might be possible in the not too distant future, quantifies the operational characteristics of key in-space and surface technologies and systems, and provides conceptual designs for the various architectural elements discussed.

Borowski, Stanley K.↗

Project Apollo: The Tough Decisions

The report reviews the major Mercury and then Gemini precursors for the Apollo mission program and its development and mission sequence. But, very importantly, it describes the major and often complex deliberations that encouraged inputs from the broad range of informed internal Agency individuals in order to arrive at the resulting actions taken; it recognizes differences among their various views, including even sensitivities within the leadership of the Agency, and it acknowledges NASA's relationships with the President and key executive branch personnel, as well as the very important and often complex relationships with members of Congress. The process of writing this book was searching and comprehensive. The achievement of the world's first manned lunar landings, after the earlier Mercury and Gemini programs played catch-up to match the Soviet Union's advanced position, clearly established the United States' preeminence in space. Early in the book, Bob describes an extended meeting in the White House in which the President's views and those of Mr. Webb were seriously discussed. Bob tells how, through Apollo's lunar landing, NASA clearly met both President Kennedy's goal to overcome the Soviets' leadership image and James Webb's goal to use Apollo as a major part of his program to demonstrate U.S. technological preeminence.

Seamans, Robert C., Jr.↗

Handling Qualities Implications for Crewed Spacecraft Operations

Abstract Handling qualities embody those qualities or characteristics of an aircraft that govern the ease and precision with which a pilot is able to perform the tasks required in support of an aircraft role. These same qualities are as critical, if not more so, in the operation of spacecraft. A research, development, test, and evaluation process was put into effect to identify, understand, and interpret the engineering and human factors principles which govern the pilot-vehicle dynamic system as they pertain to space exploration missions and tasks. Toward this objective, piloted simulations were conducted at the NASA Langley Research Center and Ames Research Center for earth-orbit proximity operations and docking and lunar landing. These works provide broad guidelines for the design of spacecraft to exhibit excellent handling characteristics. In particular, this work demonstrates how handling qualities include much more than just stability and control characteristics of a spacecraft or aircraft. Handling qualities are affected by all aspects of the pilot-vehicle dynamic system, including the motion, visual and aural cues of the vehicle response as the pilot performs the required operation or task. A holistic approach to spacecraft design, including the use of manual control, automatic control, and pilot intervention/supervision is described. The handling qualities implications of design decisions are demonstrated using these pilot-in-the-loop evaluations of docking operations and lunar landings.

Bailey, Randall E.↗

The Apollo 17 mare basalts: Serenely sampling Taurus-Littrow

As we are all aware, the Apollo 17 mission marked the final manned lunar landing of the Apollo program. The lunar module (LM) landed approximately 0.7 km due east of Camelot Crater in the Taurus-Littrow region on the southwestern edge of Mare Serenitatis. Three extravehicular activities (EVA's) were performed, the first concentrating around the LM and including station 1 approximately 1.1 km south-southeast of the LM at the northwestern edge of Steno Crater. The second traversed approximately 8 km west of the LM to include stations 2, 3, 4, and 5, and the third EVA traversed approximately 4.5 km to the northwest of the LM to include stations 6, 7, 8, and 9. This final manned mission returned the largest quantity of lunar rock samples, 110.5 kg/243.7 lb, and included soils, breccias, highland samples, and mare basalts. This abstract concentrates upon the Apollo 17 mare basalt samples.

Neal, Clive R.↗

Apollo LM guidance computer software for the final lunar descent.

In all manned lunar landings to date, the lunar module Commander has taken partial manual control of the spacecraft during the final stage of the descent, below roughly 500 ft altitude. This report describes programs developed at the Charles Stark Draper Laboratory, MIT, for use in the LM's guidance computer during the final descent. At this time computational demands on the on-board computer are at a maximum, and particularly close interaction with the crew is necessary. The emphasis is on the design of the computer software rather than on justification of the particular guidance algorithms employed. After the computer and the mission have been introduced, the current configuration of the final landing programs and an advanced version developed experimentally by the author are described.

Eyles, D.↗

Surveyor 6 lunar mission.

Surveyor 6 lunar landing mission data on lunar topography, chemical composition, magnetic material content, radar reflectivity, density, bearing capacity, etc

Jaffe, L. D.↗

Digital Elevation Map Parametric Error Analysis Using Corresponding NAC Images

Future lunar landing systems, particularly those used to land humans on the lunar surface aspart of the ARTEMIS program, will require precision navigation relative to the lunar surface. The most common way to meet these stringent navigation require-ments is through terrain relative navigation (TRN), which localizes a spacecraft by comparing descent im-agery with a predefined map of the surface. The accu-racy achievable using TRN is limited by the accuracy of the reference Digital Elevation Map (DEM). It is therefore critical for future lunar missions that potential errors in DEMs be quantified. This paper describes one of NASA’s current efforts to develop a process for evaluating lunar DEM quality.

Chris R Gnam↗

Digital Elevation Map Parametric Error Analysis Pipeline using Corresponding NAC Images

Future lunar landing systems, particularly those used to land humans on the lunar surface as part of the ARTEMIS program, will require precision navigation relative to the lunar surface. The most common way to meet these stringent navigation requirements is through terrain relative navigation (TRN), which localizes a spacecraft by comparing descent imagery with a predefined map of the surface. The accuracy achievable using TRN is limited by the accuracy of the reference Digital Elevation Map (DEM). It is therefore critical for future lunar missions that potential errors in DEMs be quantified. This paper describes one of NASA’s current efforts to develop a process for evaluating lunar DEM quality.

Chris Gnam↗