Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mobile Operations Facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

278 records · Page 16

Antennas Designed for Advanced Communications for Air Traffic Management (AC/ATM) Project

The goal of the Advanced Communications for Air Traffic Management (AC/ATM) Project at the NASA Glenn Research Center at Lewis Field is to enable a communications infrastructure that provides the capacity, efficiency, and flexibility necessary to realize a mature free-flight environment. The technical thrust of the AC/ATM Project is targeted at the design, development, integration, test, and demonstration of enabling technologies for global broadband aeronautical communications. Since Ku-band facilities and equipment are readily available, one of the near-term demonstrations involves a link through a Kuband communications satellite. Two conformally mounted antennas will support the initial AC/ATM communications links. Both of these are steered electronically through monolithic microwave integrated circuit (MMIC) amplifiers and phase shifters. This link will be asymmetrical with the downlink to the aircraft (mobile vehicle) at a throughput rate of greater than 1.5 megabits per second (Mbps), whereas the throughput rate of the uplink from the aircraft will be greater than 100 kilobits per second (kbps). The data on the downlink can be narrow-band, wide-band, or a combination of both, depending on the requirements of the experiment. The AC/ATM project is purchasing a phased-array Ku-band transmitting antenna for the uplink from the test vehicle. Many Ku-band receiving antennas have been built, and one will be borrowed for a short time to perform the initial experiments at the NASA Glenn Research Center at Lewis Field. The Ku-band transmitting antenna is a 254-element MMIC phased-array antenna being built by Boeing Phantom Works. Each element can radiate 100 mW. The antenna is approximately 43-cm high by 24-cm wide by 3.3-cm thick. It can be steered beyond 60 from broadside. The beamwidth varies from 6 at broadside to 12 degrees at 60 degrees, which is typical of phased-array antennas. When the antenna is steered to 60 degrees, the beamwidth will illuminate approximately five satellites on the orbital arc. Spread spectrum techniques will be employed to keep the power impinging on the adjacent satellites below their noise floor so that no interference results. This antenna is power limited. If the antenna elements (currently 254) are increased by a factor of 4 (1024) or 16 (4096), the gain will increase and the beamwidth will decrease in proportion. For the latter two antenna sizes, the power must be "backed off" to prevent interference with the neighboring satellites. The receiving antenna, which is approximately 90-cm high, 60-cm wide, and 3.5-cm thick, is composed of 1500 phased-array elements. The system phased-array controller can control both a 1500-element receiving antenna and a 500-element transmitting antenna. For ground testing, this controller will allow manual beam pointing and polarization alignment. For normal operation, the system can be connected to the receiving antenna and the navigation system for real-time autonomous track operation. This will be accomplished by first pointing both antennas at the satellite using information from the aircraft data bus. Then, the system phased-array controller will electronically adjust the antenna pointing of the receiving antenna to find the peak signal. After the peak signal has been found, the beam of the transmitting antenna will be pointed to the same steering angles as the receiving antenna. For initial ground testing without an aircraft, the ARINC 429 data bus (ARINC Inc., Annapolis, Maryland) will be simulated by a gyro system purchased for the follow-on to the Monolithic Microwave Integrated Circuit (MMIC) Arrays for Satellite Communication on the Move (MASCOM) Project. MASCOM utilized the Advanced Communications Technology Satellite (ACTS) with a pair of Ka-band experimental phased-array antennas.

Zakrajsek, Robert J.↗

FTIR instrumentation to monitor vapors from Shuttle tile waterproofing materials

The Space Shuttle Thermal Protection System (TPS) tiles and blankets are waterproofed using DimethylEthoxySilane (DMEX) in the Orbiter Processing Facilities (OPF). DMES has a Threshold Limit Value (TLV) for exposure of personnel to vapor concentration in air of 0.5 ppm. The OPF high bay cannot be opened for normal work after a waterproofing operation until the DMES concentration is verified by measurement to be below the TLV. On several occasions the high bay has been kept closed for up to 8 hours following waterproofing operations due to high DMES measurements. In addition, the Miran 203 and Miran 1 BX infrared analyzers calibrated at different wavelengths gave different readings under the same conditions. There was reason to believe that some of the high DMES concentration readings were caused by interference form water and ethanol vapors. The Toxic Vapor Detection Laboratory (TVDL) was asked to test the existing DMES instruments and identify the best qualified instrument. In addition the TVDL was requested to develop instrumentation to ensure the OPF high bay could be opened safely as soon as possible after a waterproofing operation. A Fourier Transform Infrared (FTIR) spectrophotometer instrument developed for an earlier project was reprogrammed to measure DMES vapor along with ethanol, water, and several common solvent vapors. The FTIR was then used to perform a series of laboratory and field tests to evaluate the performance of the single wavelength IR instruments in use. The results demonstrated that the single wavelength IR instruments did respond to ethanol and water vapors, more or less depending on the analytical IR wavelength selected. The FTIR was able to separate the responses to DMES, water and ethanol, and give consistent readings for the DMES vapor concentration. The FTIR was then deployed to the OPF to monitor real waterproofing operations. The FTIR was also used to measure the time for DMES to evaporate from TPS tile under a range of humidity conditions in controlled laboratory tests. The combination of laboratory and field tests with the FTIR instrument demonstrated superior sensitivity, ability to reject interference from water and ethanol vapors, ruggedness to be transported from the lab to the OPF and set up without special procedures or degradation of performance. The multiple component vapor analysis algorithm was developed at KSC and incorporates automatic baseline correction and shape fitting of the spectra. The analysis for DMES, TetraMethylDiSiloxane (TMDS), ethanol, methanol, isopropanol, and baseline parameters uses 161 points per sample at 4 cm(exp -1) resolution, and processes an eight scan sample every ten seconds. The standard deviation of the measurements is 0.013 ppm and the upper linear limit is 125 ppm DMES. Based on successful demonstration of capabilities we produced three mobile instrument carts to be used in each OPF to support future waterproofing operations. The design and building of the 'DMES Carts' were accomplished in Fiscal year 1995.

Mattson, C. B.↗

Pyrolysis of Radioactive Spent Resins in the PRIME Installation - 20190

Montair and Belgoprocess developed the pilot PRIME (Pyrolysis Resins In Mobile Electric) Installation for treatment of spent resins in one single reactor without pre-treatment and without intermixing of other waste, allowing for easy traceability and isotopic characterization of the end product. Both low level waste (LLW, < 2 mSv/h) and medium level waste (MLW, > 2 mSv/h) can be treated in the installation. The PRIME pilot installation is designed to treat 2 batches of 100 liter of saturated ion exchange resins over a period of 24 hours. A dosing unit with screw feeder is used for the dosing of the saturated ion exchange resins to the pyrolysis reactor. This completely new developed innovative pyrolysis reactor contains a special design mechanical stirrer and can operate at a temperature of up to 600 deg. C under inert conditions. As a result, the organic molecules will decompose at an accelerated rate until only the mineralized material remains. The lower temperature and the absence of oxygen also prevent the breakdown of ion exchange resins into (powdery) ash, which is a considerable advantage during further handling. Gases that are released during drying and pyrolysis are treated in an also newly developed thermal oxidizer, which uses an innovative, electrically heated design instead of a traditional natural gas- or fuel oil secondary combustion chamber design. After passing through the thermal oxidizer, the gases are cooled down to saturation temperature and treated in the wet scrubbing system. An extraction fan keeps the system under negative pressure to prevent the possibility of any off-gas leakage out of the system. A series of tests were performed successfully with wet cationic resins, anionic resins and a mixture of both. The results of these tests are described in the presentation. For intellectual property protection, the system and process of pyrolysis of organic waste and the system of thermal oxidation of pyrolysis gases described in this paper are patent pending. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tours of High-containment and Pristine Facilities in Support of Mars Sample Return (MSR) Sample Receiving Facility (SRF) Definition Studies

During 2019 and 2020, the NASA Tiger Team RAMA (acronym of the authors) toured several high-containment biosafety laboratories and pristine space-mission facilities worldwide to better understand their practices, capabilities, and lessons-learned to aid in planning a Sample Receiving Facility (SRF) in support of Mars Sample Return (MSR). The team also included tours of a manufacturer of mobile and modular high-containment facilities as well as manufacturers of isolators and gloveboxes. In addition, the team visited the European Space Agency (ESA)ultraclean and sterile ISO 3 / airborne molecular contamination -9 (AMC-9) isolator line to clean and assemble the most critical hardware for ESA’s ExoMars Mars Lander System, and researchers developing a novel double-walled isolator (DWI) and robotic handling techniques in support of an MSR SRF. The RAMA team visits covered several construction modalities for an MSR SRF: (1) a new traditional fixed facility; (2) use of an existing fixed Biosafety Level 4(BSL-4) facility; (3) a novel modular BSL-4 approach; and (4) a hybrid combination of fixed, modular, and existing facilities. A new fixed facility approach can be tailored to MSR’s needs and is the approach used by all U.S. BSL-4 laboratories constructed to date. However, this approach could be the most expensive modality, take the longest to implement (8-12 years), and have significant programmatic risk of delay. The utilization of an existing BSL-4 facility may be possible depending on the final contamination control and science requirements for the MSR SRF. Due to the internal dimensions of the labs visited and facility structural requirements, it is unlikely that any modification can be made to the facility to meet cleanliness requirements. Furthermore, due to possible construction delays, possible capacity issues, and potential cross contamination vectors from in-house select agents, there may also be significant programmatic risks for sharing an existing facility. Another approach is building a contemporary modular facility. This is a novel approach that has recently been used for a BSL-3/3Ag facilities. The modular elements would be installed in a traditional building or shell structure. A modular facility has many advantages over a traditional fixed facility with lower costs, shorter design/construction/ commissioning schedule, and flexibility for easier retrofits and future expansion. Lastly, a hybrid approach of combining the use of either: (1) a modular facility inside a new fixed facility or (2) a modular and/or fixed BSL-4 annex in conjunction with an existing BSL-4 space should be considered. The advantage of a hybrid approach is that the facility could leverage the strengths of other approaches. Beyond facility construction approaches, the RAMA team investigated technologies and techniques for isolating and handling Martian samples in pristine environments. For example, ESA has been studying and developing a DWI breadboard along with other sample-handling technologies. The research and development investment for clean, remote manipulation and robotics at the start of the facility design phase would be beneficial to the SRF. Additionally, under-standing the lessons learned from Thales Alenia Space during the construction and operation of the most advanced state-of-the-art precision cleaning, sterilization, and assembly glovebox isolators ever developed for spacecraft hardware are also critical for the SRF. The RAMA team lays out a summary of the 18 facilities toured, and includes 43 observations,18 findings, and 22 areas of possible follow-up that the RAMA team and others could pursue to enable further findings. The observations and findings illustrate that constructing an MSR SRF would combine the complexity of both high-containment and pristine facilities, and merging these technologies would be challenging, but achievable.

Mars Sample Return↗

Refreshing Waste Tracking Software for the 2020's - 20059

The Waste Compliance and Tracking System (WCATS) is a software application designed to manage waste operations from cradle to grave. The system provides the support needed for characterization, generation, processing, and shipment of all waste generated or stored at Los Alamos National Laboratory (LANL). Waste is tracked with task records for containers in real-time via both desktop and mobile device applications. The software allows application administrators to configure sites with appropriate limits for Pu-239 equivalent Curies (PE-Ci), fissile gram equivalents (FGEs), volume limits, as well as custom limits for site-specific technical safety requirements (TSRs). WCATS was developed based on a need at Los Alamos National Laboratory for a modern, customizable waste tracking system that could support many different waste types. The application is built using Oracle{sup R} database and Oracle{sup R} ADF Swing application framework. The technologies and software frameworks selected for the system were finalized in 2006. Although Oracle{sup R} Database has proven to be robust, the user interface and application framework interface with the database have been deprecated and need to be replaced. The technologies selected for modernization follow the open-source model, which allows the WCATS team to more easily recruit developers, improve the speed of development, and ease the deployment and adoption of the system. The tools that support the re-engineering effort are Vue.js{sup R}, a JavaScript{sup R} framework, and Spring Boot{sup R}, an API (application programming interface) development tool written in Java{sup R}. An API allows for simplified communication from the database to the user interface of the application. In addition, legacy Crystal Reports{sup R} will be replaced with reports developed with the open source Pentaho{sup TM}f Report Designer community edition. Because the application uses HTML and JavaScript{sup R}, it builds upon tools that have been used for many years in web development. These tools have large community support and their proven track record will ensure that enhancements to WCATS can continue for years to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Change in Uranium Mobility in Sediments from the Hanford 300-FF-5 Stage B Polyphosphate Field Injection

The purpose of this study was to evaluate the change in uranium mobility in the periodically re-wetted zone (PRZ) and upper unconfined aquifer of the Hanford Site’s 300-FF-5 operable unit as a result of Stage B polyphosphate (PO 4 ) injections. These 300 Area sediments are beneath or near the former North Process Pond, which has previously been shown to contain metatorbernite [Cu(UO 2 ) 2 (PO 4 ) 2 •8H 2 O] and uranophane [Ca(UO 2 ) 2 (SiO 3 OH) 2 •5H 2 O], along with aqueous and adsorbed uranium (U), and small amounts of U in calcite as a result of acidic disposal with a significant number of co-contaminants. Previous laboratory-scale studies have identified multiple mechanisms that decrease uranium mobility with polyphosphate injection: (a) precipitation of a low-solubility uranium-phosphate mineral (autunite); (b) precipitation of a Ca-phosphate solid that incorporates U; (c) precipitation of Ca-phosphate mineral (apatite group minerals) that coats existing uranium phases (i.e., U in calcite, U in Fe-oxides), reducing uranium leaching; and (d) aqueous Ca-U-carbonate species adsorption onto apatite. Given the significant amount of apatite precipitation, other U phases such as carbonates could also coprecipitate with apatite. To quantify differences in solubility, leachability, and phases of uranium between pre- and post-PO 4 -treated sediments, different types of analyses were conducted, including analysis of uranium in (a) a carbonate solution extraction from sediment over 1000 h (41.67 days), (b) six sequential liquid extractions from sediment over approximately 1 week, (c) leaching of uranium from sediments in one dimensional (1-D) column experiments over 2 months, and (d) solid phase characterization of select sediments. An additional extraction and solid phase measurements were conducted to evaluate phosphate precipitate formation. Metals were also analyzed in sequential liquid extractions as indicators of (a) amendment injection delivery, (b) co-contaminant movement, and (c) changes in solid phases. Aqueous and solid phase carbonate measurements were also conducted to evaluate changes in carbonates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Iodine Co-Precipitation with Calcium Carbonate in the Presence of Silica Ions - 20360

Historical releases of I-129 to the subsurface at the U.S. Department of Energy Hanford Site have resulted in large dilute plumes that cover an area of over 50 km{sup 2}. The most concentrated I-129 plume is associated with the 200 West Area in the 200-UP-1 operable unit of the Hanford Central Plateau, where peak concentrations have been measured up to 30 times the drinking water standard of 1 pCi/L. The mobility of iodine depends on many factors, including chemical speciation, pH, redox conditions, as well as the presence of organic matter, calcium carbonate minerals and microbial activities. Speciation measurements estimate that the majority of the iodine (∼76%) in Hanford groundwater exists as iodate. Information on processes that affect iodate mobility in the Hanford subsurface support evaluation of environmental management options for the I-129 plumes. Iodate can be incorporated into calcium carbonate, which is a potential mechanism of naturally attenuating radioiodine in groundwater. However, the silica content in porewater may impact the contaminant-calcium carbonate incorporation process. Silica is one of the most abundant elements in nature and can have an impact on chemical weathering of alkaline-earth carbonates in the environment. Hence, this research aims to advances knowledge of the iodine co-precipitation process with calcium carbonate in the presence of silica. This information supports the technical basis evaluation of natural attenuation for I-129. Samples for these studies were prepared using calcium carbonate-forming solutions that included certified grade sodium meta-silicate nonahydrate (Na{sub 2}SiO{sub 3}), calcium chloride dehydrate (CaCl{sub 2}.2H{sub 2}O), sodium carbonate (NaCO{sub 2}), and sodium hydroxide (NaOH) solutions for pH adjustments. Triplicate samples were prepared with silica concentrations in the solution of 0 mM, 0.5 mM and 20 mM, mixed with an iodate standard (1000 ppm of IO{sub 3}{sup -} in H{sub 2}O) and sampled over a one-week period. Preliminary data analyses suggest that less iodine remains in solution in the presence of silica (average remaining aqueous fraction 0.23±0.03 at 20 mM of Si) relative to samples without silica (0.52±0.06); an indication that more iodine has been sorbed or incorporated into precipitates. However, the mechanisms for this behavior are still under investigation and need to be interpreted relative to pore water compositions that are representative of Hanford site-specific conditions. Scanning electron microscope equipped with energy dispersive spectroscopy (SEM-EDS) analyses were performed to observe the solid phase morphology in these experiments and showed rhombohedral calcite crystals covered with amorphous Si floccules. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating Vadose Zone Flow Properties at the 100 K-East Soil Flushing Site Using ERT Monitoring Data: 2023 Interim Report - 100 KE Soil Property Estimation

In situ soil flushing is being using at the Hanford 100 K-East (100 KE) area to transport mobile chromium contamination in the vadose zone to the water table, where it can be collected and treat through pump and treat operations. The efficacy of soil flushing is directly related to the volume of clean water that infiltrates through contaminated soils. In practice, it is infeasible to comprehensively monitor which regions of the vadose zone are being infiltrated through direct sampling of pore water. Consequently, there can be significant uncertainty about which regions of the subsurface have been treated, especially if hydrogeologic conditions are favorable for the development of unstable flows and preferred flow pathways through the vadose zone (Jarvis, Koestel, and Larsbo 2016). Current approaches for quantitative monitoring of soil flushing performance rely on contaminant concentration measurements collected from extractions wells. There is no quantitative information on the volume of flush water delivered to targeted regions of the vadose zone at the Hanford Site, leading to significant uncertainty regarding source term removal and long-term impacts to groundwater. If the subsurface hydrogeologic properties at the 100 KE Area were adequately known, qualitative metrics of soil flushing performance could be simulated, thereby negating expenses required to obtain quantitative performance information through borehole drilling/sampling. However, estimating in situ hydrogeologic properties has long proven elusive, due primarily to a lack of sufficient information to constrain heterogeneous property estimates to a useful degree of certainty. Estimating vadose zone hydrogeologic properties is particularly challenging due the dependence of hydraulic conductivity on saturation. This report describes progress toward a first-of-its-kind demonstration using surface time-lapse 3D electrical resistivity tomography (ERT) monitoring data to estimate the hydrogeologic properties that control flush water transport at the 100 KE soil flushing site. The ultimate objective is (1) to verify sufficient information exists in the ERT monitoring data to adequately resolve vadose zone hydraulic properties, and (2) generate a “digital twin” (i.e., a numerical simulator) that can be used to simulate the amount of flush water that has been delivered to each targeted region of the vadose zone, and thereby assess the efficacy of flush water delivery. Resulting performance estimates can be used in leu of comprehensive borehole drilling and direct sampling (or wellbore logging) that would otherwise be required to obtain the same information.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗