Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operational Acceptability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Traffic Management Advisor: Iterative Field Development and Assessment at Multiple Sites

Previous studies have demonstrated the necessity of involving users in the development of automation aids, especially for complex domains such as air traffic control (ATC). Traditional development only demanded a single field test to validate a completed system, but a more iterative combination of development and assessment ensures that the technology meets the requirements of its application domain. Exposure across an adequate spectrum of field users is also required during development, and the use of multiple development sites provides an opportunity to consider individual facility cultures as they relate to implementation strategies. The development of the Center/TRACON Automation System (CTAS) Traffic Management Advisor (TMA) at the Denver and Dallas ATC facilities demonstrates successful iterative development and assessment at multiple field sites. The use of field development changes the nature of assessment. As development progresses, periodic assessments are required to validate that system development is progressing along an appropriate track. In the development of the TMA, assessments were performed based on software in the field, and input from traffic managers was analyzed and incorporated into subsequent releases of the TMA, to be reassessed in the field. This has led to a tool with operational suitability and broad user acceptance. Assessment at multiple sites provides a more generalizable perspective that allows the production of a system that is both generic enough to be used at different sites and tailored enough to be of use at any site. In addition to providing a better understanding of specific facility requirements, the use of multiple assessment sites in the development of TMA has provided an opportunity to consider individual facility operations, procedures and cultures as they relate to development and implementation strategies.

Sanford, Beverly D.↗

Arrival Metering Precision Study

This paper describes the background, method and results of the Arrival Metering Precision Study (AMPS) conducted in the Airspace Operations Laboratory at NASA Ames Research Center in May 2014. The simulation study measured delivery accuracy, flight efficiency, controller workload, and acceptability of time-based metering operations to a meter fix at the terminal area boundary for different resolution levels of metering delay times displayed to the air traffic controllers and different levels of airspeed information made available to the Time-Based Flow Management (TBFM) system computing the delay. The results show that the resolution of the delay countdown timer (DCT) on the controllers display has a significant impact on the delivery accuracy at the meter fix. Using the 10 seconds rounded and 1 minute rounded DCT resolutions resulted in more accurate delivery than 1 minute truncated and were preferred by the controllers. Using the speeds the controllers entered into the fourth line of the data tag to update the delay computation in TBFM in high and low altitude sectors increased air traffic control efficiency and reduced fuel burn for arriving aircraft during time based metering.

human/systems↗

Initial operation of a solar heating and cooling system in a full-scale solar building test facility

The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

Knoll, R. H.↗

Orbital transfer vehicle oxygen turbopump technology. Volume 2: Nitrogen and ambient oxygen testing

The testing of a rocket engine oxygen turbopump using high pressure ambient temperature nitrogen and oxygen as the turbine drive gas in separate test series is discussed. The pumped fluid was liquid nitrogen or liquid oxygen. The turbopump (TPA) is designed to operate with 400 F oxygen turbine drive gas which will be demonstrated in a subsequent test series. Following bearing tests, the TPA was finish machined (impeller blading and inlet/outlet ports). Testing started on 15 February 1989 and was successfully concluded on 21 March 1989. Testing started using nitrogen to reduce the ignition hazard during initial TPA checkout. The Hydrostatic Bearing System requires a Bearing Pressurization System. Initial testing used a separate bearing supply to prevent a rubbing start. Two test series were successfully completed with the bearing assist supplied only by the pump second stage output which entailed a rubbing start until pump pressure builds up. The final test series used ambient oxygen drive and no external bearing assist. Total operating time was 2268 seconds. There were 14 starts without bearing assist and operating speeds up to 80,000 rpm were logged. Teardown examination showed some smearing of silverplated bearing surfaces but no exposure of the underlying monel material. There was no evidence of melting or oxidation due to the oxygen exposure. The articulating, self-centering hydrostatic bearing exhibited no bearing load or stability problems. The only anomaly was higher than predicted flow losses which were attributed to a faulty ring seal. The TPA will be refurbished prior to the 400 F oxygen test series but its condition is acceptable, as is, for continued operating. This was a highly successful test program.

Brannam, R. J.↗

Electric Propulsion Applications and Impacts

Most space missions require on-board propulsion systems and these systems are often dominant spacecraft mass drivers. Presently, on-board systems account for more than half the injected mass for commercial communications systems and even greater mass fractions for ambitious planetary missions. Anticipated trends toward the use of both smaller spacecraft and launch vehicles will likely increase pressure on the performance of on-board propulsion systems. The acceptance of arcjet thrusters for operational use on commercial communications satellites ushered in a new era in on-board propulsion and exponential growth of electric propulsion across a broad spectrum of missions is anticipated. NASA recognizes the benefits of advanced propulsion and NASA's Office of Space Access and Technology supports an aggressive On-Board Propulsion program, including a strong electric propulsion element, to assure the availability of high performance propulsion systems to meet the goals of the ambitious missions envisioned in the next two decades. The program scope ranges from fundamental research for future generation systems through specific insertion efforts aimed at near term technology transfer. The On-Board propulsion program is committed to carrying technologies to levels required for customer acceptance and emphasizes direct interactions with the user community and the development of commercial sources. This paper provides a discussion of anticipated missions, propulsion functions, and electric propulsion impacts followed by an overview of the electric propulsion element of the NASA On-Board Propulsion program.

Curran, Frank M.↗

In-Depth Modeling and Simulation Analysis of Artemis Missions Using the Impact Probabilistic Risk Assessment Tool

BACKGROUND The Artemis campaign is a Moon exploration program with a series of six planned missions, five of which will be crewed. These five crewed missions will contain a single mission segment (space flight), or multiple mission segments involving space flight (Orion), lunar landing (LTV) and/or space habitat (Gateway). Each crewed segment faces the risk of unique medical conditions, necessitating medical sets/kits tailored to those specificities. To support and enable a data-driven and evidence-based decision-making process through out a mission’s life cycle, a software tool called IMPACT was developed. Using probabilistic risk assessment (PRA) methodologies, IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces) is a novel tool built for analyzing the possibility of encountering complex medical risks during space flight, and for identifying the medical resources and capabilities needed to treat those potential at-risk medical conditions. IMPACT achieves this by performing hundreds of thousands of Monte Carlo simulations of missions to build aggregate pictures of medical risk. During an extended simulation modeling phase, IMPACT generated analytical results for medical risks, and the medical resources and capabilities to address those risks, for every segment of every crewed Artemis mission. This presentation will highlight the reliability, consistency and validity of IMPACT’s computational modeling techniques and will showcase the library of analytical outcomes generated for the Artemis missions. OVERVIEW During the early stages of IMPACT’s design, architecture and technical requirements collection, “scenarios” (use cases) - achievement goals required for acceptance testing, were identified by stakeholders. IMPACT successfully completed the scenario testing requirements and undertook an extensive operational run phase utilizing a wide range of input combinations with a goal of delivering a cohesive, trustworthy, reliable, vast, and diverse body of evidence. The intent of these modeling runs was to validate consistency in output, ensure solidity of executable operations and to streamline processes by identifying areas requiring efficiency improvements. Using the many missions of Artemis, IMPACT ran variations of operational runs to assess the output for acceptable, as well as unusual characteristics. This rigorous long-term “shakedown” analysis was implemented to help build a collective body of evidence to aid in securing a high level of confidence, reliability, and validity in the output, whether from the applicational components of IMPACT, or the entirety of the operational process. ANTICIPATED ANALYSIS AND CONCLUSION This presentation will discuss the various categories of input criteria; the comparisons in the application of these input criteria to various Artemis missions; the preparation and collection of the body of evidence, and reliability of the computational modeling techniques. This paper serves as an initial analytical overview of IMPACT’s probabilistic risk assessment (PRA) medical risk outputs covering Artemis missions and is not intended to be deemed the official medical response for the Artemis campaign.

Crew Composition↗

Metal tube reducer is inexpensive and simple to operate

Low-cost metal tube reducer accepts tubing up to 1 inch outer diameter and can reduce this diameter to less than 1/2 inch with controlled wall thickness. This device can reduce all of the tube without waste. It produces extremely good surface finishes.

Mayfield, R. M.↗

Analysis of faults detected in a large-scale multi-version software development experiment

In a multiversion software experiment, twenty programs were built to the same specification of an inertial navigation problem. The programs were then subjected to a three-phase testing and debugging process: an acceptance test, a certification test, and an operational test. Less than 20 percent of the faults discovered during the certification and operational testing were nonunique, i.e., the same or very similar faults would be found in more than one program. However, some of these common faults spanned as many as half of the versions. Faults discovered during the certification testing were due to specification errors and ambiguities, inadequate programmer background knowledge, insufficient programming experience, incomplete analysis, and insufficient acceptance testing. Faults discovered during the operational testing were of a more subtle nature, and were mostly due to various programmer knowledge defects and incomplete analysis errors. Techniques that might have prevented the observed faults are discussed.

Vouk, Mladen A.↗

Combustion for future supersonic transport propulsion

Even with it's marginal performance, Concorde has demonstrated that supersonic civil aircraft are a practical proposition. A second generation machine will need sufficiently good performance for a robust operating system that can provide reliable, frequent service with competitive economics. Additionally, the propulsion system must be acceptable environmentally. That is it must create acceptable noise levels around airports and have acceptable emissions throughout its mission including cruise. Whatever devices may be used to improve the acceptability at subsonic flight conditions, the high operating temperatures at cruise can create difficult targets for the operation of the combustion system both mechanically and in the combustion process itself. While the driving force is ever better fuel consumption and weight to achieve economic viability, a future supersonic transport engine will have cycle temperatures limited only by the mechanical integrity of the major components. The environment of the major components in modern gas turbine engines is dominated by the air delivered by the compressor system. Consequently the maximum compression temperature is governed by materials available for the turbine and compressor discs. The continued improvement of the disc material leads to combustion inlet temperatures beyond today's experience and sets difficult targets for combustion system emissions. This is worsened by the requirement being at cruise and therefore maintained for the major part of the mission. Problems such as creep and oxidation of metallic parts are also considered.

B. W. Lowrie↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

A preliminary study of containment concepts for aircraft landing on elevated STOL-ports

A preliminary study of containment systems for aircraft landing on elevated STOL-ports was conducted as part of an overall study of human acceptance problems associated with STOL operations. The study included a survey and feasibility study of different concepts and a computer analysis of four arrestment systems. The principal conclusion was that a system referred to as the FAA system appears to offer the greatest promise. In this system, standard arresting gear cables are stretched across the roof-top, at roughly 100-foot intervals, but are shielded over the 100-foot-wide primary landing strip. Thus a pilot can land with an arresting hook down, but will not contact the cable unless he swerves off the landing strip, either because he has made a bad landing, or because his landing gear has failed. It was also noted that a suitable curb or guard rail should be developed. Presently available arresting gears and nylon net barriers were considered satisfactory for the overshoot problem.

Haviland, J. K.↗

Information management system breadboard data acquisition and control system.

Description of a breadboard configuration of an advanced information management system based on requirements for high data rates and local and centralized computation for subsystems and experiments to be housed on a space station. The system is to contain a 10-megabit-per-second digital data bus, remote terminals with preprocessor capabilities, and a central multiprocessor. A concept definition is presented for the data acquisition and control system breadboard, and a detailed account is given of the operation of the bus control unit, the bus itself, and the remote acquisition and control unit. The data bus control unit is capable of operating under control of both its own test panel and the test processor. In either mode it is capable of both single- and multiple-message operation in that it can accept a block of data requests or update commands for transmission to the remote acquisition and control unit, which in turn is capable of three levels of data-handling complexity.

Mallary, W. E.↗

A Microwave Pressure Sounder

An instrument to measure atmospheric pressure at the earth's surface from an orbiting satellite would be a valuable addition to the expanding inventory of remote sensors. The subject of this report is such an instrument - the Microwave Pressure Sounder (MPS). It is shown that global-ocean coverage is attainable with sufficient accuracy, resolution and observational frequency for meteorological, oceanographic and climate research applications. Surface pressure can be deduced from a measurement of the absorption by an atmospheric column at a frequency in the wing of the oxygen band centered on 60 GHz. An active multifrequency instrument is needed to make this measurement with sufficient accuracy. The selection of optimum operating frequencies is based upon accepted models of surface reflection, oxygen, water vapor and cloud absorption. Numerical simulation using a range of real atmospheres defined by radiosonde observations were used to validate the frequency selection procedure. Analyses are presented of alternative system configurations that define the balance between accuracy and achievable resolution.

Flower, D. A.↗

The utility of Thematic Mapper sensor characteristics for surface mine monitoring

The employment of Landsat Multispectral Scanner (MSS) data for surface coal mine inventory and inspection applications has been extensively investigated. However, in spite of encouraging research results, MSS data have not gained wide acceptance for surface mine monitoring operations. This situation is partly related to MSS spatial resolution (80 m), which is considered insufficient for detailed surface mine inspection. The Thematic Mapper (TM) employed on the Landsat-4 and 5 satellites provides an improved resolution (30 m) and other refinements which are expected to enhance the usefulness of TM data relative to MSS data. The present paper reports research which was conducted to assess the usefulness of actual TM data and to quantitatively evaluate the contribution of individual sensor characteristics to data utility for surface mine monitoring. The obtained results demonstrate that the TM spatial resolution can be of immediate benefit for certain applications such as surface mine monitoring.

Irons, J. R.↗

Active Suppression of Rotor Vibrations

In active rotor control, vibrations of flexibly supported rotors suppressed by use of electronic feedback control system. System senses vibration level of rotor system and, in turn, provides damping such that vibration level maintained within acceptable limits. Enables rotor to operate through and above its critical speeds, increases bearing life, reduces size and weight of rotating shafts, and generally enables rotors to operate more smoothly.

Dirusso, Eliseo↗

Structured prototyping as risk management

A methodology is presented for integrating the systems-engineering management recommendation of prototyping into the traditional project-management process for developing large-scale systems. The suggested methodology begins with the identification of life-cycle risk areas, outlines the structure and conduct of the prototyping process, and defines the composition of the prototyping team. The methodology includes a step-by-step procedure for creating, executing, and documenting a prototyping test plan to evaluate design alternatives. It is argued that managers who adopt this methodology and apply it rigorously will increase the likelihood that the systems they build will be operationally effective and will be accepted by the intended users.

Hornstein, Rhoda SH.↗

Seamless transitions from early prototypes to mature operational software - A technology that enables the process for planning and scheduling applications

New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.

Hornstein, Rhoda S.↗

A plan for spacecraft automated rendezvous

An automated rendezvous approach has been developed that utilizes advances in technology to reduce real-time/near real-time flight operations support personnel to an acceptable level that is near the minimum without jeopardizing the success of the mission. The on-board flight targeting uses a rule-based system to select the pursuit vehicle phasing orbits and uses precise navigation updates from the pursuit/target spacecraft made possible by the global positioning system receivers/processors on both spacecraft to adjust the phasing orbits and achieve rendezvous. The ascent-to-orbit targeting for the pursuit vehicle has been successfully decoupled from the on-orbit orbit transfer phasing targeting. Typical launch window data have been developed for the heavy lift launch vehicle and cargo transfer vehicle for a Space Station Freedom rendezvous mission.

Deaton, A. W.↗