Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Initial Analysis of Digitally Enabled Cooperative Operations in Class D Terminal Airspace

The primary contribution of this paper is an initial analysis of integrating digitally enabled cooperative operations (or digital operations for short) with Visual Flight Rules (VFR) and Instrument Flight Rules (IFR) operations in the terminal airspace around a Class D airport, specifically around Fort Worth Alliance airport (KAFW). Enabled by connected digital technologies and automated information exchange, digital operations as envisioned would utilize cooperative practices and operator-responsible separation to ensure safety. In the present study, three conflict management configurations for digital operations were analyzed: 1) centralized with a single instance of a conflict management service to model a scenario with only one fleet operator conducting digital operations or all fleet operators utilizing the same service, 2) federated with two different instances to model a scenario with two different fleet operators conducting digital operations, and 3) fully distributed with a different instance for each digital operation. In simulations in which recorded tracks for VFR and IFR operations were played back and digital operations were modeled that would nominally arrive at KAFW once every 20 minutes (given no conflict resolution maneuvers), there were one or fewer losses of separation (LOS) across the three conflict management configurations. The same result was seen in simulations in which digital operations would nominally arrive at KAFW once every 10 minutes. However, in simulations in which digital operations would nominally arrive at KAFW once every 5 minutes, the number of LOS ranged between six and ten. This highlights the need for follow-on research to investigate the extent to which additional capabilities for digital operations, such as complexity management and/or flow organization, may be needed.

digitally enabled cooperative operations, digital ↗

Initial Analysis of Digitally Enabled Cooperative Operations in Class D Terminal Airspace

The primary contribution of this paper is an initial analysis of integrating digitally enabled cooperative operations (or digital operations for short) with Visual Flight Rules (VFR) and Instrument Flight Rules (IFR) operations in the terminal airspace around a Class D airport, specifically around Fort Worth Alliance airport (KAFW). Enabled by connected digital technologies and automated information exchange, digital operations as envisioned would utilize cooperative practices and operator-responsible separation to ensure safety. In the present study, three conflict management configurations for digital operations were analyzed: 1) centralized with a single instance of a conflict management service to model a scenario with only one fleet operator conducting digital operations or all fleet operators utilizing the same service, 2) federated with two different instances to model a scenario with two different fleet operators conducting digital operations, and 3) fully distributed with a different instance for each digital operation. In simulations in which recorded tracks for VFR and IFR operations were played back and digital operations were modeled that would nominally arrive at KAFW once every 20 minutes (given no conflict resolution maneuvers), there were one or fewer losses of separation (LOS) across the three conflict management configurations. The same result was seen in simulations in which digital operations would nominally arrive at KAFW once every 10 minutes. However, in simulations in which digital operations would nominally arrive at KAFW once every 5 minutes, the number of LOS ranged between six and ten. This highlights the need for follow-on research to investigate the extent to which additional capabilities for digital operations, such as complexity management and/or flow organization, may be needed.

digitally enabled cooperative operations↗

Operator function modeling: Cognitive task analysis, modeling and intelligent aiding in supervisory control systems

The design, implementation, and empirical evaluation of task-analytic models and intelligent aids for operators in the control of complex dynamic systems, specifically aerospace systems, are studied. Three related activities are included: (1) the models of operator decision making in complex and predominantly automated space systems were used and developed; (2) the Operator Function Model (OFM) was used to represent operator activities; and (3) Operator Function Model Expert System (OFMspert), a stand-alone knowledge-based system was developed, that interacts with a human operator in a manner similar to a human assistant in the control of aerospace systems. OFMspert is an architecture for an operator's assistant that uses the OFM as its system and operator knowledge base and a blackboard paradigm of problem solving to dynamically generate expectations about upcoming operator activities and interpreting actual operator actions. An experiment validated the OFMspert's intent inferencing capability and showed that it inferred the intentions of operators in ways comparable to both a human expert and operators themselves. OFMspert was also augmented with control capabilities. An interface allowed the operator to interact with OFMspert, delegating as much or as little control responsibility as the operator chose. With its design based on the OFM, OFMspert's control capabilities were available at multiple levels of abstraction and allowed the operator a great deal of discretion over the amount and level of delegated control. An experiment showed that overall system performance was comparable for teams consisting of two human operators versus a human operator and OFMspert team.

Mitchell, Christine M.↗

A Concept of Operations (ConOps) of an In-time Aviation Safety Management System (IASMS) for Advanced Air Mobility (AAM)

The growth of new emerging operations involving Advanced Air Mobility (AAM) necessitates developing a perspective for an In-time Aviation Safety Management System (IASMS). This perspective advances from the National Academies report on IASMS and its recommendation for developing a Concept of Operations (ConOps) for IASMS. A ConOps has been developed for In-time System-Wide Safety Assurance (ISSA) from which the IASMS ConOps pivots to provide a robust scope commensurate with the broad vision defined by the National Academies. The IASMS ConOps focuses on emerging operations and spans innovations in Unmanned Aircraft System (UAS) and an increasingly complex ecosystem comprised of a widening mix of vehicles and technologies, Urban Air Mobility (UAM) with industry-federated services, traditional operations, as well as new supersonic aircraft and space launch systems.The challenge for the IASMS ConOps is to be broad to encompass innovations in the coming years and decades while agile to ensure levels of safety compatible with operational and certification requirements of the National Airspace System (NAS). The IASMS ConOps interweaves increasing complexity of operational safety capabilities and unlocking UAS Maturity Levels (UMLs). The relationships between increased complexity of automation and automated systems, fewer operators who are not as traditionally higher skilled, more complex operational environments, and aviation operations management with mixed aircraft and equipage pose a multi-dimensional space for IASMS capabilities essential for safety assurance and risk management. Instantiating IASMS capabilities and how they would be integral to AAM operations and increasing maturity of UAM could be accomplished through a series of Safety Demonstrators. These Safety Demonstrators could provide increased understanding and insight into use of controls for risk mitigation, means of compliance for certification, and operational experience with safety services such as in relation to contingency management. The IASMS capabilities can be viewed as initially residing with the vehicle, airspace, and Supplemental Data Service Provider (SDSP). For example, vehicle capabilities include communications including the command and control link, Remote Identification (ID), conflict advisory/alerting, and UAS system monitoring. These capabilities monitor and assess data such as battery health, aircraft state, and human performance. Complexity of ISAMS capabilities depends on a number of factors. These factors are intendedonly as a notional categorization with the purpose being to reflect the complexity of the AAM ecosystem that would drive up the complexity of ISSA capabilities including systems, sensors, models, standards, and controls. Factors could include the Vehicle Flight Management, Environment, Airspace, and Contingency Management. Each of these factors can be comprised of multiple sub-factors that contribute to increasing complexity. For example, Airspace at a lower level of complexity could be dedicated to UTM operations that are unmonitored, and at a higher level of complexity could involve mixed UTM and ATM operations. The IASMS concept includes safety services that provide data and information to different participants in AAM. The roles and responsibilities of participants can be defined using the Responsible-Accountable-Consulted-Informed (RACI) analysis. For example, for the safety service involving the Remote ID, the Operator would be accountable for providing the data, the Vehicle would be responsible for transmitting it, and the USS, SDSP, Vertiports, FIMS (FAA), and Public Entities such as safety services would be informed by receiving the data. The IASMS ConOps identifies the capabilities needed for risk mitigation and safety assurance in the increasingly complex national airspace. The ConOps serves as a pathway for engaging with industry to gain operational experience including through the Safety Demonstrator series, the RACI analysis, and operational complexity factors. The ConOps serves to integrate these different perspectives to build a cohesive and cogent approach to an AAM safety management system.

In-Time Aviation Safety Management System↗

A new systems engineering approach to streamlined science and mission operations for the Far Ultraviolet Spectroscopic Explorer (FUSE)

The Mission Operations and Data Systems Directorate (MO&DSD, Code 500), the Space Sciences Directorate (Code 600), and the Flight Projects Directorate (Code 400) have developed a new approach to combine the science and mission operations for the FUSE mission. FUSE, the last of the Delta-class Explorer missions, will obtain high resolution far ultraviolet spectra (910 - 1220 A) of stellar and extragalactic sources to study the evolution of galaxies and conditions in the early universe. FUSE will be launched in 2000 into a 24-hour highly eccentric orbit. Science operations will be conducted in real time for 16-18 hours per day, in a manner similar to the operations performed today for the International Ultraviolet Explorer. In a radical departure from previous missions, the operations concept combines spacecraft and science operations and data processing functions in a single facility to be housed in the Laboratory for Astronomy and Solar Physics (Code 680). A small missions operations team will provide the spacecraft control, telescope operations and data handling functions in a facility designated as the Science and Mission Operations Center (SMOC). This approach will utilize the Transportable Payload Operations Control Center (TPOCC) architecture for both spacecraft and instrument commanding. Other concepts of integrated operations being developed by the Code 500 Renaissance Project will also be employed for the FUSE SMOC. The primary objective of this approach is to reduce development and mission operations costs. The operations concept, integration of mission and science operations, and extensive use of existing hardware and software tools will decrease both development and operations costs extensively. This paper describes the FUSE operations concept, discusses the systems engineering approach used for its development, and the software, hardware and management tools that will make its implementation feasible.

Butler, Madeline J.↗

Cruise-Efficient Short Takeoff and Landing (CESTOL): Potential Impact on Air Traffic Operations

The National Aeronautics and Space Administration (NASA) is investigating technological and operational concepts for introducing Cruise-Efficient Short Takeoff and Landing (CESTOL) aircraft into a future US National Airspace System (NAS) civil aviation environment. CESTOL is an aircraft design concept for future use to increase capacity and reduce emissions. CESTOL provides very flexible takeoff, climb, descent and landing performance capabilities and a high-speed cruise capability. In support of NASA, this study is a preliminary examination of the potential operational impact of CESTOL on airport and airspace capacity and delay. The study examines operational impacts at a subject site, Newark Liberty Intemational Airport (KEWR), New Jersey. The study extends these KEWR results to estimate potential impacts on NAS-wide network traffic operations due to the introduction of CESTOL at selected major airports. These are the 34 domestic airports identified in the Federal Aviation Administration's Operational Evolution Plan (OEP). The analysis process uses two fast-time simulation tools to separately model local and NAS-wide air traffic operations using predicted flight schedules for a 24-hour study period in 2016. These tools are the Sen sis AvTerminal model and NASA's Airspace Concept Evaluation System (ACES). We use both to simulate conventional-aircraft-only and CESTOL-mixed-with-conventional-aircraft operations. Both tools apply 4-dimension trajectory modeling to simulate individual flight movement. The study applies AvTerminal to model traffic operations and procedures for en route and terminal arrival and departures to and from KEWR. These AvTerminal applications model existing arrival and departure routes and profiles and runway use configurations, with the assumption jet-powered, large-sized civil CESTOL aircraft use a short runway and standard turboprop arrival and departure procedures. With these rules, the conventional jet and CESTOL aircraft are procedurally separated from each other geographically and in altitude during tenninal airspace approach and departure operations, and each use a different arrival runway. AvTeminal implements its unique Focal-point Scheduling Process to sequence, space and delay aircraft to resolve spacing and overtake conflicts among flights in the airspace and airport system serving KEWR. This Process effectively models integrated arrival and departure operations. AvTerminal assesses acceptance rates and delay magnitude and causality at selected locations, including en route outer boundary fixes, tenninal airspace arrival and departure boundary fixes, terminal airspace arrival merge and departure diverge fixes, and runway landing and takeoff runways. The analysis compares the resulting capacity impacts, flight delays and delay sources between CESTOL and conventional KEWR operations. AvTerminal quantitative results showed that CESTOL has significant capability to increase airport arrival acceptance rates (35-40% at KEWR) by taking advantage of otherwise underused airspace and runways where available. The study extrapolates the AvTerminal-derived KEWR peak arrival and departure acceptance rates to estimate capacity parameter values for each of the OEP airports in the ACES modeling of traffic through the entire NAS network. The extrapolations of acceptance rates allow full, partial or no achievement of CESTOL capacity gains at an OEP airport as determined by assessments of the degree to which local procedures allow leveraging of CESTOL capabilities. These assessments consider each OEP airport's runway geometries, runway system configurations, airport and airspace operations, and potential CESTOL traffic loadings. The ACES modeling, simulates airport and airspace spacing constraints imposed by airport runway system, terminal and en route air traffic control and traffic flow management operations using airport acceptance rates representing conventional-aircraft-only and CESTOL-mixed operations. CEOL aircraft are assumed to have Mach 0.8, and alternatively Mach 0.7, cruise speeds to examine compatibility with conventional aircraft operations in common airspace. The ACES results provides estimates of CESTOL delay impact NAS-wide and at OEP airports due to changes in OEP airport acceptance rates and changes in en route airspace potential conflict rates. Preliminary results show meaningful nationwide delay reductions (20%) due to CESTOL operations at 34 major domestic airports.

Couluris, G. J.↗

Launch Complex 34, SWMU CC054 2023 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring and Phase Two Expansion Construction Completion Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 14 operations and performance monitoring of the hydraulic containment (HC) Interim Measure (IM), details associated with construction and implementation of the HS 6 AS system expansion (Phase Two), and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. The timeframe for activities documented in this PMR extends from April 1, 2023 to March 31, 2024. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the shallow and deep DSZ and surrounding dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to recharacterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS and install additional recovery wells in Layer 7 to more adequately capture residual contaminant mass. The operational period for Year 14 of the HCS was from April 1, 2023 to March 31, 2024. Operational runtime for the system was 94 percent during Year 14, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2024, a total of 344,849,634 cumulative gallons of groundwater containing 94,656 pounds of chlorinated volatile organic compounds (CVOCs) have been removed by the HCS. During the reporting period covered under this report, the HCS recovered 31,176,393 gallons and approximately 6,319 pounds of CVOC mass. Total combined influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 25,000 µg/L (March 2024). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in January 2024 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2022. Full vertical profile sampling was completed at each DPT from 8 to 98 feet below land surface (bls), at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 28 to 98 feet bls. An overall decreasing trend of TCE concentrations was observed in DPT samples during this reporting period, which is a reduction from the previous event (December 2022) and the peak event in December 2021, where TCE percentages appeared to increase in all depth zones because several recovery wells were turned off during the AS pilot study in the DSZ. The maximum TCE concentration in January 2024 was 1,600,000 µg/L in the 53 feet bls depth interval at DPT594 (previous maximum result in 2022 was 1,800,000 µg/L in the 48 feet bls depth interval at DPT599). This maximum concentration in the 53 feet bls depth interval is in the deep capture zone. During the January 2024 DPT event, the largest portion of TCE mass was observed in the 48 feet bls interval above/within Layer 4. This trend remains consistent with previous years and appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, annual groundwater samples were collected from 11 deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2023 to verify vertical and horizontal delineation. Three of the wells were also sampled biweekly to evaluate operations of recovery well RW21D (screened 86 to 106 feet bls), which was installed in January 2023. Of the Layer 7/8 monitoring sampled only annually, results were non-detect or less than groundwater cleanup target levels GCTLs in December 2023, with the exception of one well, IW45D2, which had a cis-1,2-dichloroethene (cDCE), detection greater than the GCTL. Of the three wells sampled biweekly during the operational period, the well located closest to Layer 7 recovery well RW21D (IW44D2, screened 105 to 115 feet bls) had concentrations of TCE, cDCE and vinyl chloride (VC) greater than GCTLs throughout the operational period, but displayed a decreasing trend since the peak concentrations in September 2023. The maximum TCE concentration during this operational period was 190,000 µg/L at IW44D2 in September 2023, but reduced to 700 µg/L in March 2024, indicating the HCS is still effectively removing mass from the source area. Expansion of the HCS and addition of new recovery wells is ongoing and will continue to be evaluated as the groundwater recovery scheme is optimized. Details of the expansion and optimization will be provided in a future PMR. The HS 6 AS IM was initiated in 2018 with 160 AS wells and expanded in 2019 with another 140 AS wells. An additional expansion of the HS 6 AS IM was completed during the reporting period covered under this report and details of the construction implementation and startup of the expansion are detailed in Section III of this report. The new expansion, referred to as Phase Two, was implemented between August 17, 2022 and August 28, 2023, and included the installation of 190 air sparge wells to treat an additional 11.2 acres. The original configuration (referred to as Phase One) operated until Phase Two came online, then all but 52 AS wells were turned off so the components could be moved and utilized in the Phase Two area. The 52 AS wells that remain on are in a barrier configuration preventing contaminated groundwater from impacting the treated area. The HS 6 AS system (both Phase One and Two) operated normally during the reporting period covered under this report. Semi-annual performance monitoring of the Phase One configuration was conducted in April and November 2023, consistent with previous years. For the Phase Two configuration, 21 new monitoring wells were installed and sampled quarterly, with a baseline event in July 2023, and quarterly events in November 2023 and February 2024 summarized in this report. Semi-annual monitoring results collected in April and October 2023 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and VC) have decreased to less than GCTLs in nearly all wells and not impacting the surface water drainage canal, indicating the HS 6 IM continues to meet objectives. The baseline and quarterly sampling for the Phase Two configuration indicate generally decreasing concentrations in wells within and around the perimeter of the treatment area. At least two more quarters of monitoring will be conducted and once those results are evaluated a reduced the sampling frequency may be considered. Overall, the tasks associated with Year 14 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with recommendations included in the previous 2022 LC34 (Year 13) PMR. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

groundwater remediation↗

Postfault Operation of Three-Level Inverter Driven Six-Phase PMSM With Enhanced Torque–Speed Region

This article presents an open-switch postfault operational technique with enhanced torque–speed region for three-level (3L) active neutral point clamped (ANPC) inverter-driven symmetrical six-phase (SSP) permanent magnet synchronous machines (PMSMs). Maximum torque (MT), minimum loss (ML), and single three-phase (STP) operations are commonly used for the postfault operations of six-phase drives. The maximum possible torque and speed in these operations are generally limited by voltage, current ratings, and the neutral point configuration of the motor. To enhance the postfault torque and speed operating region, the torque and speed limits in different postfault operational techniques are determined based on the voltage, current constraints, and neutral point configuration of the SSP-PMSM. In this work, a unified postfault operation is proposed that increases the postfault operational limits by combining MT, ML, and STP operations and modifying the neutral point configuration of the SSP-PMSM. In addition, a technique is also presented that modifies the pulsewidth modulation technique to enable full torque operation below 0.5 p.u. speed. The proposed postfault operational technique enables full-speed (1 p.u.) operation by operating in STP mode and full torque operation (1 p.u.) below 0.5 p.u. speed. Furthermore, the postfault operational technique is experimentally validated using a Gallium Nitride (GaN) device-based3L-ANPC inverter-driven SSP-PMSM.

42 ENGINEERING↗

DEVELOPMENT AND DEMONSTRATION TESTBED FOR THE REMOTE OPERATIONS AND MONITORING OF MICROREACTORS

The nuclear industry is rapidly developing many advanced-reactor concepts for near-term deployment in both traditional and non-traditional nuclear-powered applications. One such category of advanced reactor is the microreactor, a class of reactor with less than 20MWth power output, intended for applications where the economics or logistics of traditional power sources are difficult. This includes applications such as remote communities, mining sites, defense installations, or humanitarian and disaster-relief missions. One key enabling feature for the successful deployment of microreactors is a remote operations capability. Remote operations provide monitoring and control capabilities which can significantly reduce staffing costs by eliminating the need for licensed operators at each reactor facility and improve the economic viability for microreactor deployment. A remote concept of operations is not currently an established capability in the nuclear industry. In addition, no demonstration microreactor is expected to complete construction or go critical until at least 2026. This leaves two major capability gaps: the successful demonstration of a remote concept of operations for microreactors and a test bed suitable for said demonstration. Both gaps must be addressed in order to advance the remote concepts of nuclear operation and, more broadly, microreactors themselves from paper to reality. This paper aims to fill these gaps and describes a test bed that would support development and deployment of a remote concept of nuclear operations, initial experimental results from that test bed, and the application of the test bed and experimental results for a digital-twin-based remote concept of operations underdevelopment at Idaho National Laboratory (INL). The platform chosen as a remote concept of nuclear operations test bed is the Single Primary Heat Extraction and Removal Emulator, known as SPHERE, located at INL. SPHERE is a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The small-scale and non-nuclear nature of SHPERE limit safety concerns associated with remote operations while still providing the physical response representative of a microreactor. A network connection was added to SPHERE that enables remote-monitoring capability. This allows for real-time data streaming to networked workstations, data historians, and human-machine interfaces (HMIs). These are all critical components in a remote concept of operations, thus providing a robust development and demonstration platform. An initial experiment was performed using the SPHERE remote operations testbed. This included running a comprehensively instrumented SPHERE through a series of steady-state and transient operating scenarios in both normal and abnormal operating conditions, all while streaming live test data to a remote HMI and data warehouse. This initial experiment served three purposes: (1) characterizing the response of SPHERE, (2) demonstrating the remote connection to SPHERE, and (3) providing a baseline data set for development of a digital-twin-based remote concept of operations that is under development at INL.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Platform for Remote Deployment and Training for Enhanced Building Operation Practices (Building Re-Tuning and On-going Commissioning)

While a building’s energy usage is driven largely by its design and use, building operator behavior has a strong influence on its energy consumption. This project developed and piloted a specific, data-driven coaching methodology to help operators understand how they can adjust operations and/or affect no/low-cost repairs or upgrades to their specific building HVAC systems to reduce energy consumption. Named BuildingCoach, the operational optimization method used is based on the Building Re-tuning approach developed by the Pacific Northwest National Laboratory. A building operations analytics market has matured over the past decade, though its potential to affect energy-saving changes has not been fully realized. Training operators to understand the methods for operational optimization with the explicit approach of using building-system performance data is hypothesized to create a more effective, longer lasting result in building energy efficiency, and this strategy is the fundamental premise of this project. With the support of an Industry Advisory Board, the project succeeded in developing materials and recruiting for and delivering three pilot cohorts. Deliverables included twenty-two self-paced training modules (accessed via a Learning Management System) and a web-based platform that includes access to real-time building system data and a repository for building system documentation. The project set out to have 100 participants from 50 buildings in three pilot cohorts. In the end, there were 28 participants from 17 buildings, i.e., a significant shortfall. The first two pilot cohorts had only two buildings in each, and this was partially due to difficulties in deploying the Building Operator Coaching Solution (“the BOCS”), which is technology that extracts the data from the controls network and presents it as prescribed for coaching. In the third cohort, the project team deployed the BOCS successfully to 13 buildings, the methodology was piloted as intended, and numerous opportunities for optimization were identified. The BuildingCoach business plan charts a path to an economically sustainable effort. However, even with a licensing model captured in the final version of the business plan, the scalability is still limited to keeping less than 1,000 buildings affected by 2033. Even so, there are unexplored paths to greater scalability that are being considered. CUNY BPL is working to perpetuate and grow the use of BuildingCoach. As of this writing, about twenty buildings have either been connected or will be connected with operators coached / to be coached in the NYC municipal portfolio, twelve buildings across four campuses in NY State will use BuildingCoach, a NY upstate county wishes for six or seven buildings to participate with the support of funding from NYSERDA, and others have also expressed interest. In the decades to come, there will be an increasing percentage of large and mid-sized buildings that incorporate automated system optimization (ASO), and the building operators’ role will shift to spend more time on maintenance and monitoring. Meanwhile, programs such as BuildingCoach will play a critical role in optimizing operations. And, regardless of the emergence of ASO, operators will still need to understand how their systems operate so that they can monitor them properly. Within that context, BuildingCoach is an important step towards operators’ understanding of efficient building system operations.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

DEVELOPMENT AND DEMONSTRATION TESTBED FOR THE REMOTE OPERATIONS AND MONITORING OF MICROREACTORS

The nuclear industry is rapidly developing many advanced-reactor concepts for near-term deployment in both traditional and non-traditional nuclear-powered applications. One such category of advanced reactor is the microreactor, a class of reactor with less than 20MWth power output, intended for applications where the economics or logistics of traditional power sources are difficult. This includes applications such as remote communities, mining sites, defense installations, or humanitarian and disaster-relief missions. One key enabling feature for the successful deployment of microreactors is a remote operations capability. Remote operations provide monitoring and control capabilities which can significantly reduce staffing costs by eliminating the need for licensed operators at each reactor facility and improve the economic viability for microreactor deployment. A remote concept of operations is not currently an established capability in the nuclear industry. In addition, no demonstration microreactor is expected to complete construction or go critical until at least 2026. This leaves two major capability gaps: the successful demonstration of a remote concept of operations for microreactors and a test bed suitable for said demonstration. Both gaps must be addressed in order to advance the remote concepts of nuclear operation and, more broadly, microreactors themselves from paper to reality. This paper aims to fill these gaps and describes a test bed that would support development and deployment of a remote concept of nuclear operations, initial experimental results from that test bed, and the application of the test bed and experimental results for a digital-twin-based remote concept of operations underdevelopment at Idaho National Laboratory (INL). The platform chosen as a remote concept of nuclear operations test bed is the Single Primary Heat Extraction and Removal Emulator, known as SPHERE, located at INL. SPHERE is a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The small-scale and non-nuclear nature of SHPERE limit safety concerns associated with remote operations while still providing the physical response representative of a microreactor. A network connection was added to SPHERE that enables remote-monitoring capability. This allows for real-time data streaming to networked workstations, data historians, and human-machine interfaces (HMIs). These are all critical components in a remote concept of operations, thus providing a robust development and demonstration platform. An initial experiment was performed using the SPHERE remote operations testbed. This included running a comprehensively instrumented SPHERE through a series of steady-state and transient operating scenarios in both normal and abnormal operating conditions, all while streaming live test data to a remote HMI and data warehouse. This initial experiment served three purposes: (1) characterizing the response of SPHERE, (2) demonstrating the remote connection to SPHERE, and (3) providing a baseline data set for development of a digital-twin-based remote concept of operations that is under development at INL.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Launch Complex 34, SWMU Cc054 2021 DNAPL Source Zone Operations, Maintenance, and Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ) and Hot Spot 6 (HS 6) Air Sparge (AS) System presents the results of Year 12 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. Site-wide biennial LTM sampling was not conducted during this reporting period and is scheduled to be conducted in December 2022. The timeframe for activities documented in this PMR extends from April 1, 2021 to March 31, 2022. LC34 has been designated Solid Waste Management Unit CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act Corrective Action Program. The objective of the HC IM at LC34 is to contain the DSZ and deep dissolved-phase trichloroethene (TCE) high concentration plume via operation of a hydraulic containment system (HCS). The pre-IM design 300 micrograms per liter (μg/L) TCE groundwater contour was used to establish the deep zone capture area for deep recovery wells, and the shallow zone capture area was defined by the DSZ. The system began operating in 2010, and in 2015, the system was expanded to provide HC for areas within the 300 μg/L TCE groundwater isocontours of HS 3 and 4. In 2018 and 2019, an investigation was conducted to re-characterize the DSZ, which included investigating TCE mass in Layer 7. This data was subsequently used to optimize the pumping rates of the HCS to more adequately capture residual contaminant mass. The operational period for Year 12 of the HCS was from April 1, 2021 to March 31, 2022. Operational runtime for the system was 94 percent during Year 12, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2022, a total of 285,712,801 gallons of groundwater containing 84,933 pounds of VOCs have been removed by the HCS. Influent concentrations of TCE have decreased since startup from approximately 280,000 µg/L (January 2010) to 12,000 µg/L (March 2022). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2021 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events in 2017, 2018, 2019, and 2020. Full vertical profile sampling was completed at each DPT from 8 to 98 ft bls, at 5 foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 µg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations at depths ranging from 8 to 98 ft bls. An overall increasing trend of TCE concentrations was observed in DPT samples during this reporting period, which may be due to several recovery wells that were turned off during the AS Pilot Study in the DSZ that operated from July 2021 to February 2022 (documented separately from this report). The maximum TCE concentration in 2021 was 15,400,000 µg/L in the 58 ft bls depth interval at DPT597 (previous maximum result in 2020 was 1,690,000 at 48 ft bls at DPT596). During the 2021 DPT event, the overall majority of TCE contamination was identified in the 58 ft bls interval (below Layer 4), where in the previous year the majority of mass was observed in Layer 4. This trend appears to indicate continued mass discharge from Layer 4 (fine-grained unit). In addition to DPT sampling, monitoring well samples were collected from deep wells in the DSZ area (Layers 7 and 8) to verify vertical delineation. All monitoring well results were non-detect or below cleanup levels, with exception of one well (IW0162, screened 105 to 115 ft bls, which is below the existing recovery well capture zone) where TCE was identified above cleanup target levels. The HS 6 AS system remained operational during the reporting period covered under this report. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual prior to this operational period. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2021 show concentrations of contaminants of concern (cis-1,2-dichloroethene, trans-1,2- dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. Overall, the tasks associated with Year 12 operation of the HC IM and operation of the HS 6 AS IM were performed in accordance with the recommendations of the 2020 LC34 (Year 11) Operations, Maintenance, and Monitoring Report for DNAPL Source Zone, Site Wide LongTerm Monitoring, and Hot Spot 6 Air Sparging System PMR (NASA, 2021c). Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives.

trichloroethene↗

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗

Digital Flight: A New Cooperative Operating Mode to Complement VFR and IFR

Digital Flight is a proposed new operating mode for all airspace users, complementing and adding to the existing operating modes of visual and instrument flight rules (VFR and IFR) and providing for cooperative integration in controlled airspace. Under new regulations (Digital Flight Rules, DFR) that set requirements for its sustained use, qualified operators employ Digital Flight to enhance their airspace access and operational flexibility in all visibility conditions and eventually all airspace classes without requiring segregation from incumbent operations. Enabled by connected digital information and technologies, Digital Flight operators employ cooperative practices and self-separation to ensure flight path safety in lieu of visual procedures or receiving separation services from Air Traffic Control. Its distributed structure and automated functions enable traffic densities and operational tempos not achievable with the existing operating modes. Various ongoing and emerging industry initiatives for enabling new entrants (e.g., unmanned aircraft systems, urban air taxis) and enhanced use of underserved airspace (e.g., ultra-high altitude), are pursuing various alternative operating modes with significant similarities, creating a unique and time-limited opportunity for harmonization and convergence. Digital Flight is proposed to serve that harmonizing role, creating a common new paradigm for airspace operations. Such convergence would not only bring together these emerging market segments but will also bolster the existing operators with access to this new operating mode and its advantages. Digital Flight provides an opportunity to focus regulatory development and benefit the aviation industry. This paper describes Digital Flight in sufficient detail to initiate community engagement and deliberation on a common new operating mode. It describes the essential elements, principal capabilities, and operational integration of DFR in shared airspace. It describes the value proposition from multiple perspectives and presents initial thoughts on the path forward.

Digital flight↗

Advanced Capabilities for Emergency Response Operations (ACERO)

The Advanced Capabilities for Emergency Response Operations (ACERO) project is expected to develop, integrate, demonstrate, and transition to operations, evolving aviation technologies from NASA and industry to identify, monitor, and suppress wildland fires as a means to enhance safety, improve operational efficiency, and prevent economic loss. Some of the concepts ACERO explores are: wildfire airspace mangement to improve safety and resource utilization during a disaster, applying new aviation technologies to improve safety and demonstrate new mission-support capabilities, second-shift operations to enable progress towards 24/7 aerial response, and the integration of capabilities across NASA's Aeronautics Research, Science, and Space Technology mission directorates to enable expanded and scalable operations. Realizing this vision is expected to bring positive impact to such areas as: consistency of technology adoption through a unified concept of operations, airspace coordination and deconfliction that integrates portable solutions and enables diverse operations, remote sensing and data fusion for modeling and predictions that support in-time decision making, aircraft technologies for hazard avoidance and state management, and increased response capabilities through persistent communications and surveillance. ACERO continues the research begun under the Scalable Traffic Management for Emergency Response Operations (STEReO) activity, which brings together several technologies in Unmanned Aircraft Systems (UAS) Traffic Management (UTM), Autonomy, Communications, Human Factors, and Domain Expertise & Tools, aimed at providing scalability and flexibility, as well as operational resiliency to dynamic changes during a disaster event. Some of the concepts STEReO explores are: collaborative tools to ingest remote sensing information and distribute a common mission operating picture, apply ad-hoc communication networks to facilitate timely information sharing and communication of changes, vehicle-to-vehicle and onboard autonomy technologies ensure the safety and resiliency of operations, and apply NASA’s UAS traffic management system (UTM) as a public safety UAS Service Supplier (USS) to access and coordinate use of the airspace by both manned and unmanned operations. The potential benefits of STEReO include: standardized, cross-platform communication means increased interoperability and ease of cooperation/collaboration, increased situation awareness and common operating picture allow for earlier detection and decision making, and scalable to size and complexity of environment, operations, and mission objectives. This presentation gives an informational overview of the ACERO and STEReO projects to the Council of Western State Foresters (CWSF) Western State Fire Managers (WSFM) Committee.

emergency response operations↗

LANDO: Developing Autonomous Payload Offloading Capabilities for Lunar Surface Operations

Introduction: The Lightweight Surface Manipulation System (LSMS) AutoNomy capabilities Development for surface Operations and construction (LANDO) project is an Early Career Initiative selected for funding by NASA Space Technology Mission Directorate. LANDO is developing a general-purpose autonomy framework applicable to serial and tension-actuated manipulation agents, that will be validated using an existing prototype of the LSMS-L35 (35-kg wrist lift capacity on the lunar surface [Fig. 1], sized for a Commercial Lunar Pay-load Services (CLPS) mission). The autonomous LSMS-L35 will be used to demonstrate autonomous payload handling capabilities for Lunar and other planetary surfaces, directly addressing STMD capability gaps in autonomous excavation and construction operations, advanced robotics and spacecraft autonomy technologies, and technologies supporting emerging space industries including the In-Space Servicing, Assembly and Manufacturing national strategy. LSMS: The LSMS is a tension actuated robotic agent that is scalable (reach and lifting capacity in different gravity environments), versatile (types of surface operations), and reusable. Compared to serial arms, the LSMS provides significantly higher structural efficiency and mechanical advantage, enabling a greater payload lift capacity at a lower system mass. The LSMS is envisioned to be a crucial part of the excavation and construction portfolio, capable of supporting a variety of activities on the lunar surface. Autonomous payload handling is one of the first activities the LSMS can support that develops capabilities that are extensible to other surface operations. Payload handling is required to: remove payloads from a lander; place payloads on mobile agents for transport from a lander to construction site/assembly point; emplace payloads in their operational configuration, and aggregate components to create an asset. As an example of this critical gap, manifested CLPS missions do not currently have a ubiquitous payload offloading capability; payloads (excluding rovers) are designed to remain on the lander. Why Autonomy? Autonomous robotic systems capable of carrying out excavation and construction operations are a fundamental and critical capability required for realizing the NASA Artemis program vision to “emplace and build the infrastructure, systems, and robotic missions that can enable a sustained lunar surface presence.” While teleoperation is still feasible for lunar surface operations, increased latency at Mars will require validated supervised autonomous technologies capable of operating with minimal human involvement (human-on-the-loop) unless an unexpected event occurs requiring human intervention. Autonomy reduces operator burden, allows operations to continue during uncrewed periods, in-creases the safety of operations by automatically detecting and handling faults, and allows operating in high latency environments. Development Activities: LANDO is extending critical autonomous operations to the manipulation domain and creating an integrated system, based on reusable software modules, that is capable of planning and executing payload handling and autonomous surface operations without requiring hu-man intervention beyond a supervisory role. The priority features under development are 1) autonomously offload payloads from a tilted lander deck without buckling the LSMS; 2) sensing whether a payload is safe to lift and handle; and 3) integrate with Astrobotic’s CLPS lander. The poster presentation will highlight current development activities over the past year on LSMS-L35 prototype hard-ware design, and autonomy software.

in-space assembly↗

Modeling for a Digital Twin-Based Remote Operation System Framework

New reactor designs and technologies are being developed to grow and advance the nuclear industry. Microreactors are one of the many new concepts for advancing the industry. Microreactors are very small reactors generally designed to have an operating power of 20 MWth or less. They are ideal for many applications in which it would not be feasible to have a large-scale reactor, such as powering remote communities, military bases, and mining sites. Many of these applications currently rely on diesel generators for power, and replacing those generators with the carbon-free energy of a microreactor is a major driving factor for microreactor development. However, most of the use cases for microreactors are in isolated locations where construction and labor costs are much higher. Microreactors will need to be comparable to other energy production methods for their deployment to be successful. Remotely operating the microreactor has a great potential to benefit the economics and make it more cost competitive. With remote operations, the operation facility location could be strategically chosen based on factors such as construction costs, workforce size, etc. The benefits of remote operations could be leveraged even more if the remote operation system is semi-autonomous. If the remote operation system is semi-autonomous, more microreactors could be operated and monitored from one remote operation facility. Additionally, with the system handling some tasks for the human operator, it could reduce the number of operating staff necessary for the microreactor. Digital twins can be used to introduce a level of automation to the remote operation system. Digital twins are capable of component monitoring, system operation and control, and predictive performance [1]. All of those features are important for a successful semi-autonomous remote operation system.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

ISS Remote User Payload Operations Training and Support

For more than ten years hundreds of payloads have been, and are currently being, successfully operated onboard the ISS. These payloads are operated by a diverse set of users all over the world. Due to the current international economic environment payload operations are being streamlined, in more and more cases, by using the payload investigators and scientists to also fill the role of operators. Taking this into consideration, increasingly, we have payload operators that are new to space operations and practices, therefore ground systems training and support have become a more critical aspect in ensuring a successful payload mission. The ISS ground systems payload interface is the Payload Operations and Integration Center (POIC), located at Marshall Space Flight Center. ISS ground systems training for all remote ISS payload operators, as well as the ISS POIC CADRE, are centralized at this facility. The POIC is the starting point for a remote payload operator to learn how to integrate, and operate their payload, successfully onboard the ISS. Additionally, the CADRE that supports the payload user community are trained and operate from this facility. This paper will give an overview of the ISS ground systems at the POIC, as it relates to the payload user/operator and CADRE community. The entire training process from initial contact with the POIC to in-flight operations will be reviewed and improvements to this process will be presented. More importantly we will present current training methods and proposed methodology whereby the user community will be trained more efficiently and thoroughly. Also, we will discuss how we can more effectively support users in their operations concept to programmatically conduct certain aspects of payload operations to reduce costs.

Roth, Karl↗