Search NASA⌕ Search

SEARCH · Search NASA

Results for “POLICIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

The devil that we know: lead (Pb) replacement policies under conditions of scientific uncertainty

Engineering and economic considerations are typical driving forces behind the selection of specific chemicals used in the manufacture of consumer products. Only recently has post-consumer environmental impact become part of the major considerations during the initial phases of product design. Therefore, reactive, rather than proactive strategies have dominated the consideration of environmental and health issues in product design.

Pb-free↗

An Agent-Based Model for Analyzing Control Policies and the Dynamic Service-Time Performance of a Capacity-Constrained Air Traffic Management Facility

Simple agent-based models may be useful for investigating air traffic control strategies as a precursory screening for more costly, higher fidelity simulation. Of concern is the ability of the models to capture the essence of the system and provide insight into system behavior in a timely manner and without breaking the bank. The method is put to the test with the development of a model to address situations where capacity is overburdened and potential for propagation of the resultant delay though later flights is possible via flight dependencies. The resultant model includes primitive representations of principal air traffic system attributes, namely system capacity, demand, airline schedules and strategy, and aircraft capability. It affords a venue to explore their interdependence in a time-dependent, dynamic system simulation. The scope of the research question and the carefully-chosen modeling fidelity did allow for the development of an agent-based model in short order. The model predicted non-linear behavior given certain initial conditions and system control strategies. Additionally, a combination of the model and dimensionless techniques borrowed from fluid systems was demonstrated that can predict the system s dynamic behavior across a wide range of parametric settings.

Conway, Sheila R.↗

Recent Developments in Space Debris Mitigation Policy and Practices

In recent years, emphasis has shifted from national efforts to control the space debris population to international ones. Here, too, great progress has been made, most notably by the Inter-Agency Space Debris Coordination Committee (IADC) and the Committee on the Peaceful Uses of Outer Space (COPUOS) of the United Nations. Today, a firm international consensus is rapidly building on the principal space debris mitigation measures. The IADC is an association of the space agencies of ten countries (China, France, Germany, India, Italy, Japan, Russia, Ukraine, the United Kingdom, and the United States) and the European Space Agency, representing 17 countries of which four (France, Germany, Italy, and the United Kingdom) are also full IADC members. At the 17th meeting of the IADC in October 1999, a new Action Item (AI 17.2) was adopted to develop a set of consensus space debris mitigation guidelines. The purpose of the activity was to identify the most valuable space debris mitigation measures and to reach an international agreement on common directives. The IADC Space Debris Mitigation Guidelines (www.iadc-online.org/index.cgi?item=docs_pub) were formally adopted in October 2002 during the Second World Space Congress in Houston, Texas. Two years later a companion document, entitled Support to the IADC Space Debris Mitigation Guidelines, was completed to provide background and clarification for the guidelines.

Johnson, Nicholas L.↗

Fire in the Brazilian Amazon: A Spatially Explicit Model for Policy Impact Analysis

This article implements a spatially explicit model to estimate the probability of forest and agricultural fires in the Brazilian Amazon. We innovate by using variables that reflect farmgate prices of beef and soy, and also provide a conceptual model of managed and unmanaged fires in order to simulate the impact of road paving, cattle exports, and conservation area designation on the occurrence of fire. Our analysis shows that fire is positively correlated with the price of beef and soy, and that the creation of new conservation units may offset the negative environmental impacts caused by the increasing number of fire events associated with early stages of frontier development.

Arima, Eugenio Y.↗

Recommendations for Sense and Avoid Policy Compliance

Since unmanned aircraft do not have a human on board, they need to have a sense and avoid capability that provides an "equivalent level of safety" (ELOS) to manned aircraft. The question then becomes - is sense and avoid ELOS for unmanned aircraft adequate to satisfy the requirements of 14 CFR 91.113? Access 5 has proposed a definition of sense and avoid, but the question remains as to whether any sense and avoid system can comply with 14 CFR 91.113 as currently written. The Access 5 definition of sense and avoid ELOS allows for the development of a sense and avoid system for unmanned aircraft that would comply with 14 CFR 91.113. Compliance is based on sensing and avoiding other traffic at an equivalent level of safety for collision avoidance, as manned aircraft. No changes to Part 91 are necessary, with the possible exception of changing "see" to "sense," or obtaining an interpretation from the FAA General Counsel that "sense" is equivalent to "see."

Source record↗

NASA Earth Observations Informing Renewable Energy Management and Policy Decision Making

The NASA Applied Sciences Program partners with domestic and international governmental organizations, universities, and private entities to improve their decisions and assessments. These improvements are enabled by using the knowledge generated from research resulting from spacecraft observations and model predictions conducted by NASA and providing these as inputs to the decision support and scenario assessment tools used by partner organizations. The Program is divided into eight societal benefit areas, aligned in general with the Global Earth Observation System of Systems (GEOSS) themes. The Climate Application of the Applied Sciences Program has as one of its focuses, efforts to provide for improved decisions and assessments in the areas of renewable energy technologies, energy efficiency, and climate change impacts. The goals of the Applied Sciences Program are aligned with national initiatives such as the U.S. Climate Change Science and Technology Programs and with those of international organizations including the Group on Earth Observations (GEO) and the Committee on Earth Observation Satellites (CEOS). Activities within the Program are funded principally through proposals submitted in response to annual solicitations and reviewed by peers.

Eckman, Richard S.↗

Update on the Ares V to Support Heavy Lift for U.S. Space Exploration Policy

The focus of design efforts in the near future will be on the primary Lunar mission. We are currently just beginning to integrate the design functions from the various centers for this mission. We appreciate all thoughts and ideas for different ways to use the Ares V platform. The Ares V can support an order of magnitude more science instrumentation for outer planetary exploration missions. It can also reach outer planets such as Neptune and other high energy insertion destinations. Current Ares V Point-of-Departure (51.00.48) exceeds Saturn mass capability by approx.40%. Ares V Lunar Capabilities Concept Review analysis focused on meeting lunar requirements and developing margin. Ares V is sensitive to Loiter, Attitude, Power, and Altitude requirements in addition to payload performance. LCCR-approved 51.00.48 POD 5.5-segment steel case booster/6 engine core) Ares V can meet current Human Lunar Return requirements with approx.6 mT of Margin. LCCR-approved 51.00.47 option maintained (5 segment HTPB composite case booster/6 engine core) can meet HLR requirement with more than 9 mT Margin. Ares V team is actively reaching out to external organizations during this early concept phase to ensure that the Ares V vehicle can be leveraged for national security, scientific and commercial development needs.

Creech, Steve↗

Update on the Ares V to Support Heavy Lift for U.S. Space Exploration Policy

When NASA's Ares V cargo launch vehicle begins flying late next decade, its capabilities will significantly exceed the 1960s-era Saturn V. It will send more crew and cargo to more places on the lunar surface than Apollo and provide ongoing support to a permanent lunar outpost that will open the Moon to greater exploration, science and adventure than ever before. Moreover, it will restore the United States heavy-lift capability, which can support human and robotic exploration for decades to come. Ares V remains in a pre-design analysis cycle stage pending a planned Authority to Proceed (ATP) in late 2010. Ares V benefits from the decision to draw from heritage hardware and its commonality with the Ares I crew launch vehicle, which completed its preliminary design review (PDR) in September 2008. Most of the work on Ares V to date has been focused on refining the vehicle design through a variety of internal studies. This paper will provide background information on the Ares V evolution, emphasizing the vehicle configuration as it exists today.

Sumrall, John P.↗

Achieving a Risk-Informed Decision-Making Environment at NASA: The Emphasis of NASA's Risk Management Policy

This slide presentation reviews the evolution of risk management (RM) at NASA. The aim of the RM approach at NASA is to promote an approach that is heuristic, proactive, and coherent across all of NASA. Risk Informed Decision Making (RIDM) is a decision making process that uses a diverse set of performance measures along with other considerations within a deliberative process to inform decision making. RIDM is invoked for key decisions such as architecture and design decisions, make-buy decisions, and budget reallocation. The RIDM process and how it relates to the continuous Risk Management (CRM) process is reviewed.

Dezfuli, Homayoon↗

Developing Flexible Discrete Event Simulation Models in an Uncertain Policy Environment

On February 1st, 2010 U.S. President Barack Obama submitted to Congress his proposed budget request for Fiscal Year 2011. This budget included significant changes to the National Aeronautics and Space Administration (NASA), including the proposed cancellation of the Constellation Program. This change proved to be controversial and Congressional approval of the program's official cancellation would take many months to complete. During this same period an end-to-end discrete event simulation (DES) model of Constellation operations was being built through the joint efforts of Productivity Apex Inc. (PAl) and Science Applications International Corporation (SAIC) teams under the guidance of NASA. The uncertainty in regards to the Constellation program presented a major challenge to the DES team, as to: continue the development of this program-of-record simulation, while at the same time remain prepared for possible changes to the program. This required the team to rethink how it would develop it's model and make it flexible enough to support possible future vehicles while at the same time be specific enough to support the program-of-record. This challenge was compounded by the fact that this model was being developed through the traditional DES process-orientation which lacked the flexibility of object-oriented approaches. The team met this challenge through significant pre-planning that led to the "modularization" of the model's structure by identifying what was generic, finding natural logic break points, and the standardization of interlogic numbering system. The outcome of this work resulted in a model that not only was ready to be easily modified to support any future rocket programs, but also a model that was extremely structured and organized in a way that facilitated rapid verification. This paper discusses in detail the process the team followed to build this model and the many advantages this method provides builders of traditional process-oriented discrete event simulations.

Miranda, David J.↗

Methodology to Support Dynamic Function Allocation Policies Between Humans and Flight Deck Automation

Function allocation assigns work functions to all agents in a team, both human and automation. Efforts to guide function allocation systematically have been studied in many fields such as engineering, human factors, team and organization design, management science, cognitive systems engineering. Each field focuses on certain aspects of function allocation, but not all; thus, an independent discussion of each does not address all necessary aspects of function allocation. Four distinctive perspectives have emerged from this comprehensive review of literature on those fields: the technology-centered, human-centered, team-oriented, and work-oriented perspectives. Each perspective focuses on different aspects of function allocation: capabilities and characteristics of agents (automation or human), structure and strategy of a team, and work structure and environment. This report offers eight issues with function allocation that can be used to assess the extent to which each of issues exist on a given function allocation. A modeling framework using formal models and simulation was developed to model work as described by the environment, agents, their inherent dynamics, and relationships among them. Finally, to validate the framework and metrics, a case study modeled four different function allocations between a pilot and flight deck automation during the arrival and approach phases of flight.

Johnson, Eric N.↗

Policy for Robust Space-based Earth Science, Technology and Applications

Over the past six decades, satellite remote sensing technology has contributed to the transformation of using earth science not only to advance science, but to improve quality of life. With satellite missions launched almost every year, new types of earth science data are being incorporated into science, models and decision-making systems in a broad array of organizations. A challenge for space agencies has been ensuring that satellite missions serve both the scientific community and the applied community of decision makers without the missions becoming unfocused and overly expensive. By understanding and considering the needs of the environmental data and applied research user community early on in the mission-design process, agencies can ensure that satellites meet the needs of multiple constituencies. This paper describes the mission development process in the European Space Agency and the National Aeronautics and Space Administration and compares and contrasts the successes of and challenges faced by these agencies in balancing science and applications within their missions.

Brown, Molly E.↗

Tailoring Enterprise Systems Engineering Policy for Project Scale and Complexity

Space systems are characterized by varying degrees of scale and complexity. Accordingly, cost-effective implementation of systems engineering also varies depending on scale and complexity. Recognizing that systems engineering and integration happen everywhere and at all levels of a given system and that the life cycle is an integrated process necessary to mature a design, the National Aeronautic and Space Administration's (NASA's) Marshall Space Flight Center (MSFC) has developed a suite of customized implementation approaches based on project scale and complexity. While it may be argued that a top-level system engineering process is common to and indeed desirable across an enterprise for all space systems, implementation of that top-level process and the associated products developed as a result differ from system to system. The implementation approaches used for developing a scientific instrument necessarily differ from those used for a space station. .

Cox, Renee I.↗