Search NASA⌕ Search

SEARCH · Search NASA

Results for “Probabilistic Failure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY↗

Reducing a Knowledge-Base Search Space When Data Are Missing

This software addresses the problem of how to efficiently execute a knowledge base in the presence of missing data. Computationally, this is an exponentially expensive operation that without heuristics generates a search space of 1 + 2n possible scenarios, where n is the number of rules in the knowledge base. Even for a knowledge base of the most modest size, say 16 rules, it would produce 65,537 possible scenarios. The purpose of this software is to reduce the complexity of this operation to a more manageable size. The problem that this system solves is to develop an automated approach that can reason in the presence of missing data. This is a meta-reasoning capability that repeatedly calls a diagnostic engine/model to provide prognoses and prognosis tracking. In the big picture, the scenario generator takes as its input the current state of a system, including probabilistic information from Data Forecasting. Using model-based reasoning techniques, it returns an ordered list of fault scenarios that could be generated from the current state, i.e., the plausible future failure modes of the system as it presently stands. The scenario generator models a Potential Fault Scenario (PFS) as a black box, the input of which is a set of states tagged with priorities and the output of which is one or more potential fault scenarios tagged by a confidence factor. The results from the system are used by a model-based diagnostician to predict the future health of the monitored system.

James, Mark↗

Failure Bounding And Sensitivity Analysis Applied To Monte Carlo Entry, Descent, And Landing Simulations

In the study of entry, descent, and landing, Monte Carlo sampling methods are often employed to study the uncertainty in the designed trajectory. The large number of uncertain inputs and outputs, coupled with complicated non-linear models, can make interpretation of the results difficult. Three methods that provide statistical insights are applied to an entry, descent, and landing simulation. The advantages and disadvantages of each method are discussed in terms of the insights gained versus the computational cost. The first method investigated was failure domain bounding which aims to reduce the computational cost of assessing the failure probability. Next a variance-based sensitivity analysis was studied for the ability to identify which input variable uncertainty has the greatest impact on the uncertainty of an output. Finally, probabilistic sensitivity analysis is used to calculate certain sensitivities at a reduced computational cost. These methods produce valuable information that identifies critical mission parameters and needs for new technology, but generally at a significant computational cost.

Gaebler, John A.↗

Probability of Failure and Risk Assessment of Propulsion Structural Components

Due to increasing need to account for the uncertainties in material properties, loading conditions, or geometries, a methodology was developed to determine structural reliability and the assess the risk associated with it. The methodology consists of a probabilistic structural analysis by a probabilistic finite element computer code Nonlinear Evaluation of Stochastic Structures Under Stress (NESSUS) and a generic probabilistic material properties model. The methodology is versatile and is equally applicable to high and cryogenic temperature structures. Results obtained demonstrate that the whole issue of structural reliability and risk can be formally evaluated using the methodology developed which is inclusive of uncertainties in material properties, structural parameters and loading conditions. The methodology is described in some detail with illustrative examples.

Shiao, Michael C.↗

CCF Parameter Estimations, 2020 Update

This report documents the quantitative results of the common-cause failure (CCF) data collection effort (which included data through 2020) and summarizes the results of the parameter estimation quantification process performed on CCF data in the U.S. Nuclear Regulatory Commission (NRC) CCF database. This is the 2020 update to NUREG/CR-5497, updating data and parameter estimations for CCFs. This release, CCF Parameter Estimation 2020, reflects the CCF data contained within the CCF database, https://rads.inl.gov/Pages/CCF.aspx, by executing (in August 2021) the CCF query rules in the folder SPAR Rules 2020. The data covers the period from 1/1/2006 to 12/31/2020, the most recent 15-year period in which data are available. The use of the most recent rolling 15-year data in parameter estimation differs from previous updates, in which 1/1/1997 was used as the starting date (e.g., 1/1/1997 to 12/31/2015 for the 2015 update, 1/1/1997 to 12/31/2012 for the 2012 update). The new date range (i.e., the most recent 15-year period), was selected for this CCF update so as to be consistent with the date range chosen for the component reliability parameter estimation, and with the effort to include sufficient data for analysis while simultaneously reflecting the most recent industry performance. These results are appropriate for use in probabilistic risk assessment (PRA) studies, including the Standardized Plant Analysis Risk (SPAR) models of commercial nuclear power plants (NPPs) in the U.S. This update may be referred as: U.S. Nuclear Regulatory Commission, "CCF Parameter Estimations, 2020 Update," https://nrcoe.inl.gov/publicdocs/CCF/ccfparamest2020.pdf, November 2021.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of Probability Methods to Assess Crash Modeling Uncertainty

Full-scale aircraft crash simulations performed with nonlinear, transient dynamic, finite element codes can incorporate structural complexities such as: geometrically accurate models; human occupant models; and advanced material models to include nonlinear stress-strain behaviors, and material failure. Validation of these crash simulations is difficult due to a lack of sufficient information to adequately determine the uncertainty in the experimental data and the appropriateness of modeling assumptions. This paper evaluates probabilistic approaches to quantify the effects of finite element modeling assumptions on the predicted responses. The vertical drop test of a Fokker F28 fuselage section will be the focus of this paper. The results of a probabilistic analysis using finite element simulations will be compared with experimental data.

Lyle, Karen H.↗

Application of Probability Methods to Assess Crash Modeling Uncertainty

Full-scale aircraft crash simulations performed with nonlinear, transient dynamic, finite element codes can incorporate structural complexities such as: geometrically accurate models; human occupant models; and advanced material models to include nonlinear stress-strain behaviors, and material failure. Validation of these crash simulations is difficult due to a lack of sufficient information to adequately determine the uncertainty in the experimental data and the appropriateness of modeling assumptions. This paper evaluates probabilistic approaches to quantify the effects of finite element modeling assumptions on the predicted responses. The vertical drop test of a Fokker F28 fuselage section will be the focus of this paper. The results of a probabilistic analysis using finite element simulations will be compared with experimental data.

Lyle, Karen H.↗

Optimization Testbed Cometboards Extended into Stochastic Domain

COMparative Evaluation Testbed of Optimization and Analysis Routines for the Design of Structures (CometBoards) is a multidisciplinary design optimization software. It was originally developed for deterministic calculation. It has now been extended into the stochastic domain for structural design problems. For deterministic problems, CometBoards is introduced through its subproblem solution strategy as well as the approximation concept in optimization. In the stochastic domain, a design is formulated as a function of the risk or reliability. Optimum solution including the weight of a structure, is also obtained as a function of reliability. Weight versus reliability traced out an inverted-S-shaped graph. The center of the graph corresponded to 50 percent probability of success, or one failure in two samples. A heavy design with weight approaching infinity could be produced for a near-zero rate of failure that corresponded to unity for reliability. Weight can be reduced to a small value for the most failure-prone design with a compromised reliability approaching zero. The stochastic design optimization (SDO) capability for an industrial problem was obtained by combining three codes: MSC/Nastran code was the deterministic analysis tool, fast probabilistic integrator, or the FPI module of the NESSUS software, was the probabilistic calculator, and CometBoards became the optimizer. The SDO capability requires a finite element structural model, a material model, a load model, and a design model. The stochastic optimization concept is illustrated considering an academic example and a real-life airframe component made of metallic and composite materials.

Patnaik, Surya N.↗

Cost and Throughput Analysis for the NASA Ames Arc Jet Modernization Program

NASA Ames Center is currently evaluating alternatives to modernize the Arc Jet Complex, a critical part of testing for NASA’s planetary missions. NASA’s Arc Jet Complex facilities “are used to simulate the aerothermodynamic heating that a spacecraft endures throughout hypersonic atmospheric entry, and to test candidate thermal protection system (TPS) materials and systems. “Because planetary mission schedules often have tight windows due to planetary alignment constraints, a small increase in schedule could result in a two-year delay. Such a delay could increase the cost of a $1billionmissionbyhundreds of millions of dollars due to project personnel pay and clean room storage. To avoid these costs, the authors support NASA Ames in evaluating return on investment (ROI) and effectiveness of alternatives for modernizing the complex. The first input into the ROI is the deconstruction and construction cost estimates, which are developed using independent research on highly specialized subsystems, vendor quotes, and Unified Facilities Criteria (UFC), depending on the facility and work package. One of the measures of effectiveness is throughput analysis of the test bays, as a main goal of the modernization is to increase the number of possible test runs per year. This analysis is conducted via a probabilistic simulation and accounts for a variety of stochastic factors that influence the sequence of test runs, such as the facility availability; test complexity; the need to pause to assess test results; test failure; and the possibility of a system failure. The methodologies for both these analyses are discussed, along with the challenges presented due to the unique nature of the highly specialized test equipment.

Jennifer Scheel↗

Accounting for Point Estimate Uncertainty in Space Systems Reliability and Risk Analysis

Understanding and accounting for uncertainty in risk analysis is a critical step in the management and communication of risk in engineered systems. The component and system-level analysis to determine the probability of a negative outcome and its consequence is often quantified by a point estimate. Many Program and Enterprise decisions involving technical concerns and issues rely on reliability engineering activities to produce quantified risk analysis to inform the decision making process. At NASA, it is common to use a Probabilistic Risk Analysis (PRA) to inform the overall risk to Loss of Mission or Loss of Crew that involves integration across all spacecraft subsystem fault trees to produce an overall probability of mission failure. The point estimate is an estimate of this overall probability and is an immediate result of a fault tree model. It is the result of a model where the probability of each event is taken to be equal to its mean. The value provides an approximation of the overall mean without running any uncertainty calculations (e.g., no sampling). Using only the point estimate can lead to a false sense of precision and the point estimate may not match the resulting mean when uncertainty is taken into consideration. This paper will explore five conditions that can cause the PRA model mean to diverge from the point estimate and will provide engineers and managers insight into the importance of understanding uncertainty in the elements of PRA models.

Paul J Collier↗

Passive Safety System Reliability Analysis: Methodology, Application, and Results

Many advanced reactor designs rely on passive systems to provide assurance that certain safety functions, such as reactivity control and reactor heat removal, are maintained during transient scenarios. The performance of these systems is sensitive to boundary and environmental conditions and can lead to functional failure, which is the inability of the system to perform as intended even without any physical failures. Additionally, conditions can cause the passive systems to operate in an intermediate or degraded state. These operational modes of passive systems and their overall reliability can be difficult to capture in traditional probabilistic frameworks where discrete operating modes are assumed or time-dependent boundary conditions are not accounted for. Novel strategies and methods are needed to be able to capture the reliability of these passive systems and their impact on facility safety. The current abstract provides a summary of such a methodology and examples of its use in a case study, the GE Hitachi (GEH) PRISM probabilistic safety assessment (PSA), and the U.S. Department of Energy (USDOE) Versatile Test Reactor (VTR) PSA.

Bucknor, M.↗

Advanced Test Reactor Safety Basis Update for Gas-Cooled Experiments

The Advanced Test Reactor (ATR) supports neutron irradiation of several types of experiments. One such experiment type is referred to as a gas leadout. Gas leadout experiments actively flow gas through the experiment which allows for active temperature control. It also allows for in-situ data of the experiment. For example, fission gas migration through a fuel sample can be monitored via activity of the sweep gas. Historically, ex-pile equipment and fission product monitors were housed in shielded ATR cubicles. Due to other facility updates, cubicle space is no longer available for gas leadout experiment equipment. To support continued operation of gas leadout experiments, ATR completed a safety basis update that supports a new housing for leadout equipment that may process potentially contaminated gas. In addition to the structure and associated equipment, technical safety requirements regarding handling and storage of experiments needed to be revised to support fueled gas leadout experiments and associated outage configurations. The safety basis update addressed the full lifecycle of these experiments, including experiment movement and interim storage, and credible abnormal events such as failures or leaks in contaminated gas tubing in occupied areas. This paper discusses the completed analyses performed to support the safety basis update associated with gas leadout experiments, including thermal-hydraulic evaluation, probabilistic analysis, and dose consequence analyses.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabilistic risk analysis of flying the space shuttle with and without fuel turbine discharge temperature redline protection

An exact mathematical model is presented of the Space Shuttle Main Engine computer voting logic in the presence of High Pressure Fuel Turbine (HPFT) overtemperature events and fuel turbine temperature sensor failures. The model provides estimates of the probability of erroneous engine shutdown and the probability of not detecting a HPFT overtemperature event. Because it is believed that the likelihood of sensor failures and overtemperature events in the HPFT greatly overshadows those in the High Pressure Oxygen Turbine (HPOT), this modeling effort focused on the HPFT. However, because the redline protection logic is the same for both turbines, estimation of the model parameters using relevant HPOT data would provide estimates of the risk of erroneous engine shutdown and an undetected overtemperature event in the HPOT. Because of the complexity of the model, it was necessary to program the solution which thus makes it feasible to accommodate a changing data base. This is considered to be of great interest because of the subjective nature in determining the relevancy of certain failures and the fact that the data base is constantly changing as a result of the frequent engine tests.

Howell, Leonard↗

A Probabilistic Tool that Aids Logistics Engineers in the Establishment of High Confidence Repair Need-Dates at the NASA Shuttle Logistics Depot

The NASA Shuttle Logistics Depot (NSLD) is tasked with the responsibility for repair and manufacture of Line Replaceable Unit (LRU) hardware and components to support the Space Shuttle Orbiter. Due to shrinking budgets, cost effective repair of LRU's becomes a primary objective. To achieve this objective, is imperative that resources be assigned to those LRU's which have the greatest expectation of being needed as a spare. Forecasting the times at which spares are needed requires consideration of many significant factors including: failure rate, flight rate, spares availability, and desired level of support, among others. This paper summarizes the results of the research and development work that has been accomplished in producing an automated tool that assists in the assignment of effective repair start-times for LRU's at the NSLD. This system, called the Repair Start-time Assessment System (RSAS), uses probabilistic modeling technology to calculate a need date for a repair that considers the current repair pipeline status, as well as, serviceable spares and projections of future demands. The output from the system is a date for beginning the repair that has significantly greater confidence (in the sense that a desired probability of support is ensured) than times produced using other techniques. Since an important output of RSAS is the longest repair turn-around time that will ensure a desired probability of support, RSAS has the potential for being applied to operations at any repair depot where spares are on-hand and repair start-times are of interest. In addition, RSAS incorporates tenants of Just-in-Time (JIT) techniques in that the latest repair start-time (i.e., the latest time at which repair resources must be committed) may be calculated for every failed unit This could reduce the spares inventory for certain items, without significantly increasing the risk of unsatisfied demand.

Bullington, J. V.↗

Evaluation of detectability and distinguishability of aircraft control element failures using flight test data

This paper examines the detectability and distinguishability of control element failures on the B-737 aircraft. The results of Weiss (1985) are used to define decentralized residuals from analytic redundancy relationships, and the results of Weiss et al. (1984) are used to define the probabilistic distance measures which provide bounds on the minimum achievable probabilities or error. The residual signals are then generated using data which were recorded during a landing approach of the NASA-Langley Advanced Transport Operations (ATOPS) transportation systems research vehicle (TSRV). The distance measures are computed using estimates of the statistics of these residual signals.

Weiss, J. L.↗

Stochastic damage evolution in textile laminates

A probabilistic model utilizing random material characteristics to predict damage evolution in textile laminates is presented. Model is based on a division of each ply into two sublaminas consisting of cells. The probability of cell failure is calculated using stochastic function theory and maximal strain failure criterion. Three modes of failure, i.e. fiber breakage, matrix failure in transverse direction, as well as matrix or interface shear cracking, are taken into account. Computed failure probabilities are utilized in reducing cell stiffness based on the mesovolume concept. A numerical algorithm is developed predicting the damage evolution and deformation history of textile laminates. Effect of scatter of fiber orientation on cell properties is discussed. Weave influence on damage accumulation is illustrated with the help of an example of a Kevlar/epoxy laminate.

Dzenis, Yuris A.↗

Negative Selection Algorithm for Aircraft Fault Detection

We investigated a real-valued Negative Selection Algorithm (NSA) for fault detection in man-in-the-loop aircraft operation. The detection algorithm uses body-axes angular rate sensory data exhibiting the normal flight behavior patterns, to generate probabilistically a set of fault detectors that can detect any abnormalities (including faults and damages) in the behavior pattern of the aircraft flight. We performed experiments with datasets (collected under normal and various simulated failure conditions) using the NASA Ames man-in-the-loop high-fidelity C-17 flight simulator. The paper provides results of experiments with different datasets representing various failure conditions.

Dasgupta, D.↗

Performance and economic risk evaluation of dispersed solar thermal power systems by Monte Carlo simulation

A preliminary comparative evaluation of dispersed solar thermal power plants utilizing advanced technologies available in 1985-2000 time frame is under way at JPL. The solar power plants of 50 KWe to 10 MWe size are equipped with two axis tracking parabolic dish concentrator systems operating at temperatures in excess of 1000 F. The energy conversion schemes under consideration include advanced steam, open and closed cycle gas turbines, stirling, and combined cycle. The energy storage systems include advanced batteries, liquid metal, and chemical. This paper outlines a simple methodology for a probabilistic assessment of such systems. Sources of uncertainty in the development of advanced systems are identified, and a computer Monte Carlo simulation is exercised to permit an analysis of the tradeoffs of the risk of failure versus the potential for large gains. Frequency distribution of energy cost for several alternatives are presented.

Manvi, R.↗