The Proposed Operations Master Plan of Cigeo - 17013
The proposed operations master plan of Cigeo describes the so-called 'reference progression' of the Cigeo project as envisaged by Andra at the end of the preliminary design studies. It aims at clarifying the objectives of the industrial pilot phase and present the choices offered by the reversibility for the management of the Cigeo project. The reference progression includes the inventory of the waste to be disposed of in Cigeo used for the dimensioning (73 600 m{sup 3} of ILW-LL and 10 100 m{sup 3} of HLW). Cigeo is designed to store the waste already produced and those that will be produced in the future by the existing nuclear installations and those whose creation was authorized, until the predictable end of their operation and their dismantling. All spent fuel is assumed to be reprocessed. The reference progression also includes the duration and the projected milestones of the construction and operation phases of Cigeo until termination. Across the operating life of Cigeo, the extensions of the Cigeo repository areas proceed by successive incremental phases, from the start of the industrial pilot phase (2025) to the final closure operations planned by 2150. Reversibility is defined as the ability to offer to the next generations different choices in terms of radioactive waste long-term management. The implementation of the reversibility principle is based on both governance and technical project management tools. (authors)