Search NASA⌕ Search

SEARCH · Search NASA

Results for “Program management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Annual Report on Federal Government Energy Management and Conservation Programs (Fiscal Year 2012)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Annual Report on Federal Government Energy Management and Conservation Programs (Fiscal Year 2013)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Federal Government Energy Management and Conservation Programs (Fiscal Year 2009)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Risk Acceptance Personality Paradigm: How We View What We Don't Know We Don't Know

The purpose of integrated hazard analyses, probabilistic risk assessments, failure modes and effects analyses, fault trees and many other similar tools is to give managers of a program some idea of the risks associated with their program. All risk tools establish a set of undesired events and then try to evaluate the risk to the program by assessing the severity of the undesired event and the likelihood of that event occurring. Some tools provide qualitative results, some provide quantitative results and some do both. However, in the end the program manager and his/her team must decide which risks are acceptable and which are not. Even with a wide array of analysis tools available, risk acceptance is often a controversial and difficult decision making process. And yet, today's space exploration programs are moving toward more risk based design approaches. Thus, risk identification and good risk assessment is becoming even more vital to the engineering development process. This paper explores how known and unknown information influences risk-based decisions by looking at how the various parts of our personalities are affected by what they know and what they don't know. This paper then offers some criteria for consideration when making risk-based decisions.

Massie, Michael J.↗

Full-Scale Vessel Testing of the Standard High-Solids Vessel for the Hanford Waste Treatment Plant Pretreatment Facility - 17282

Concerns over the mixing performance of the planned pulse-jet mixed (PJM) vessels for high solids applications in the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment (PT) Facility, led to the development of a standard high-solids vessel (SHSV) design and full-scale vessel testing. The SHSV is intended as a potential replacement for several high-level waste feed receipt and lag storage vessels, ultrafiltration feed preparation vessels, and plant wash vessels. The SHSV design concept uses multiple smaller vessels (60 500 to 79 500 liters nominal batch size) to replace larger vessels, providing redundancy, improved mixing (PJM design and spargers), monitoring (multi-level bubblers), reduced material at risk, and improved structural features. The SHSV also requires qualification of a single vessel design for high solids Newtonian and non-Newtonian slurry processing, rather than earlier multiple vessel designs. Qualification of the SHSV design for mixing will be achieved through full-scale vessel testing (FSVT) with a prototypic SHSV under a set of most adverse design conditions in conjunction with additional engineering analyses. An Integrated Technical Team consisting of the U.S. Department of Energy (DOE), Bechtel National, Inc. (BNI), and independent experts was established to accelerate and provide oversight and direction to the test program and SHSV qualification. This paper will present an overview of the SHSV, full-scale vessel test and qualification program, and the management program to achieve closure of technical issues associated with PJM vessel mixing and control systems. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basis of Knowledge for Oxidizing Chemicals in TRU Waste - 18654

A new Waste Isolation Pilot Plant (WIPP) document for implementing new requirements in the WIPP Waste Acceptance Criteria (WAC) titled Basis of Knowledge for Evaluating Oxidizing Chemicals in the TRU waste was issued in July, 2017 and has now been implemented on several waste streams. The February 14, 2014, airborne radiation release in Room 7 of the WIPP underground disposal unit 7 was caused by an exothermic chemical reaction of nitrate oxidizing chemicals and organic materials in a single 55-gallon container. That event exposed hazards not previously evaluated in the WIPP safety basis. A new WIPP Documented Safety Analysis (DSA), Revision 5b, was developed that addressed potential hazards related to the airborne radiation release and evaluated and addressed new fire hazard scenarios. The revised hazards analysis within the DSA specifically included potential chemical exothermic reactions in waste containers and propagating fires. Compliance with WAC was credited as initial conditions to the hazards analysis, and Chapter 18 was added making the WIPP WAC compliance program a safety management program within the DSA. The WIPP DSA, Revision 5b, Chapter 18, and the WIPP WAC require the use of this document when performing the enhanced acceptable knowledge (AK) process on transuranic (TRU) waste determined to contain oxidizing chemicals. The WIPP WAC was revised to address the conditions and requirements of DSA Revision 5b. The use of this Basis of Knowledge (BoK) by WIPP Certified Programs is specified in the WIPP WAC, Appendix H, Enhanced Acceptable Knowledge. This document establishes criteria that must be used by the WIPP Certified Programs to evaluate TRU waste containing one or more oxidizing chemicals to determine acceptability at the WIPP as-is and to identify when additional evaluation or treatment is required. This BoK also includes options and requirements to be used by TRU waste sites when further evaluation, testing, and/or treatment are required. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) will review requests, plans, and technical justifications and provide written decisions prior to implementation by the TRU waste sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Federal Government Energy Management and Conservation Programs (Fiscal Year 2008)

Annual reports on Federal energy management respond to section 548 of the National Energy Conservation Policy Act (NECPA, Pub. L. No. 95-619), as amended, and provide information on energy consumption in Federal buildings, operations, and vehicles. Compiled by the Federal Energy Management Program, these reports document activities conducted by Federal agencies under the: Energy management and energy consumption requirements of section 543 of NECPA, as amended (42 U.S.C. § 8253); Energy savings performance contract authority of section 801 of NECPA, Pub. L. No. 95-619, as amended (42 U.S.C. §§ 8287-8287d); Renewable energy purchase goal of section 203 of the Energy Policy Act (EPAct) of 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 15852); Federal building performance standard requirements under Section 109 of EPAct 2005, Pub. L. No. 109-58 (codified at 42 U.S.C. § 6834(a)); Requirements on the procurement and identification of energy efficient products under section 161 of EPAct 1992, Pub. L. No. 102-486 (codified at 42 U.S.C. § 8262g); Sections 431, 432, and 434 of the Energy Independence and Security Act of 2007 (EISA), Pub. L. No. 110-140 (42 U.S.C. § 8253) and section 527 of EISA (42 U.S.C. § 17143); Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management, 72 Fed. Reg. 3,919 (Jan. 26, 2007); Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance, 74 Fed. Reg. 52,117 (Oct. 5, 2009).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Graphic visualization of program performance aids management review

Chart technique /PERTREE/ which displays the essential status elements of a PERT system in a vertical flow array, of high graphic quality, enables visual review by management of program performance. Since the display is versatile, it can accommodate any aspect of the program which the presenter wishes to accent.

Eisenhart, G. N.↗

Technical facilities catalog, volume II

This Technical Facilities Catalog has been developed in response to an increasing demand for general and specific information on NASA technical facilities. The Catalog is intended to: a)provide NASA management, facilities managers, program and project managers, individual research engineers and scientists, and other agencies of the Government with knowledge of existing NASA research, development, test and evaluation facilities and b)provide the reader with a basic concept of the capabilities and functions of the wide variety of NASA technical facilities and the technological areas they support.

Wind tunnel↗

Managing Risk to Ensure a Successful Cassini/Huygens Saturn Orbit Insertion (SOI)

I. Design: a) S/C designed to be largely single fault tolerant; b) Operate in flight demonstrated envelope, with margin; and c) Strict compliance with requirements & flight rules. II. Test: a) Baseline, fault & stress testing using flight system testbeds (H/W & S/W); b) In-flight checkout & demos to remove first time events. III. Failure Analysis: a) Critical event driven fault tree analysis; b) Risk mitigation & development of contingencies. IV) Residual Risks: a) Accepted pre-launch waivers to Single Point Failures; b) Unavoidable risks (e.g. natural disaster). V) Mission Assurance: a) Strict process for characterization of variances (ISAs, PFRs & Waivers; b) Full time Mission Assurance Manager reports to Program Manager: 1) Independent assessment of compliance with institutional standards; 2) Oversight & risk assessment of ISAs, PFRs & Waivers etc.; and 3) Risk Management Process facilitator.

risk managment↗

The Waste Factory at the East Tennessee Technology Park - 17424

To successfully support the U.S. DOE Oak Ridge Office of Environmental Management (OREM) in its cleanup at the East Tennessee Technology Park (ETTP), URS - CH2M Oak Ridge LLC (UCOR) recognized the need for the timely disposition of large amounts of waste. To achieve cleanup goals, UCOR implemented the 'Waste Factory' concept. The Waste Factory requires a centralized waste management program, waste management-deployed staff, and numerous outlets for the various waste streams that move the waste from generation to disposition in a timely, compliant manner. Because no waste can be double handled or stored, characterization has to be sound, the disposition path selected based on the characterization, packaging determined, the Waste Acceptance Criteria (WAC) evaluated for the selected repository, and the waste shipped immediately upon generation. Since inception of the UCOR contract, a total of 509,703.24 m{sup 3} (18 million ft{sup 3}) have been dispositioned, totaling more than 60,000 waste loads and 6.5 million safe kilometers (4 million safe miles) driven. The generated waste has been dispositioned onsite and offsite based on the waste characterization and the UCOR waste management hierarchy. Without the timely disposition of the large amounts of waste generated from a massive cleanup project like ETTP, the project could not have achieved the aggressive schedule and performance that has been accomplished to date. The Waste Factory concept can serve as a model for waste management operations across the DOE complex and in other industries where significant quantities of waste must be disposed of. Without the availability of secure, onsite disposal, UCOR would have been forced to send hundreds of millions of pounds of waste by truck to repositories around the country, increasing risks and costs and slowing the overall progress of cleanup. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Management and Leadership Training Can Impact a Health System: Evaluation Findings From a Public Health Management Training Program in Cambodia

In 2017, the National Institute of Public Health in Cambodia collaborated with the U.S. Centers for Disease Control and Prevention to provide management and leadership training for 20 managers and senior staff from 10 health centers. We conducted a mixed methods evaluation of the program's outcomes and impact on the graduates and health centers. From June 2018 (baseline) to January 2019 (endpoint), we collected data from a competency assessment, observational visits, and interviews. From baseline to endpoint, all 20 participants reported increased competence in seven management areas. Comparing baseline and endpoint observational visits, we found improvements in leadership and governance, health workforce, water, sanitation, and hygiene, and health centers' use of medical products and technologies. When evaluating the improvements made by participants against the World Health Organization's key components of a well-functioning health system, the program positively contributed toward building four of the six components—leadership and governance, health information systems, human resources for health, and service delivery. While these findings are specific to the context of Cambodian health centers, we hope this evaluation adds to the growing body of research around the impact of skilled public health management on health systems.

60 APPLIED LIFE SCIENCES↗

The february 2014 accidents at WIPP - 15024 (What Happened and What We Know About Why)

With almost 15 years of successful and safe operations, the WIPP facility was suddenly shutdown in February 2014 due to two unrelated accidents underground. A fire burned the front tires and engine of a salt haul truck, creating significant soot and forced evacuation of the mine. A second unrelated incident occurred 9 days later when at least one drum of non-compliant waste from Los Alamos National Laboratory burst, introducing airborne radioactivity into the underground ventilation air. Some radioactivity was released to the atmosphere at the surface. Bioassay showed that 22 workers received low internal doses, with no long-term adverse health effects expected for these employees. Independent environmental monitoring indicated very low levels off-site and dose reconstruction modeling indicated no members of the public were exposed. Comprehensive accident investigations resulted in significant planned changes to enhance safety management programs at WIPP, and a recovery plan was developed. In addition to safety management program augmentation, recovery involves new and enhanced underground ventilation systems and decontamination of affected areas underground. Resumption of initial waste disposal operations is scheduled for early in FY16, with a return to normal operations (17 shipments per week) within about three years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A

A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

Edward J. Hoffman↗

Guidelines for development of NASA (National Aeronautics and Space Administration) computer security training programs

The report presents guidance for the NASA Computer Security Program Manager and the NASA Center Computer Security Officials as they develop training requirements and implement computer security training programs. NASA audiences are categorized based on the computer security knowledge required to accomplish identified job functions. Training requirements, in terms of training subject areas, are presented for both computer security program management personnel and computer resource providers and users. Sources of computer security training are identified.

Tompkins, F. G.↗

Advanced program development management software system. Software description and user's manual

The objectives of this project were to apply emerging techniques and tools from the computer science discipline of paperless management to the activities of the Space Transportation and Exploration Office (PT01) in Marshall Space Flight Center (MSFC) Program Development, thereby enhancing the productivity of the workforce, the quality of the data products, and the collection, dissemination, and storage of information. The approach used to accomplish the objectives emphasized the utilization of finished form (off-the-shelf) software products to the greatest extent possible without impacting the performance of the end product, to pursue developments when necessary in the rapid prototyping environment to provide a mechanism for frequent feedback from the users, and to provide a full range of user support functions during the development process to promote testing of the software.

Source record↗