Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Cryogenic Fluid Management Technology for Moon and Mars Missions

In support of the U.S. Space Exploration Policy, focused cryogenic fluid management technology efforts are underway within the National Aeronautics and Space Administration. Under the auspices of the Exploration Technology Development Program, cryogenic fluid management technology efforts are being conducted by the Cryogenic Fluid Management Project. Cryogenic Fluid Management Project objectives are to develop storage, transfer, and handling technologies for cryogens to support high performance demands of lunar, and ultimately, Mars missions in the application areas of propulsion, surface systems, and Earth-based ground operations. The targeted use of cryogens and cryogenic technologies for these application areas is anticipated to significantly reduce propellant launch mass and required on-orbit margins, to reduce and even eliminate storage tank boil-off losses for long term missions, to economize ground pad storage and transfer operations, and to expand operational and architectural operations at destination. This paper organizes Cryogenic Fluid Management Project technology efforts according to Exploration Architecture target areas, and discusses the scope of trade studies, analytical modeling, and test efforts presently underway, as well as future plans, to address those target areas. The target areas are: liquid methane/liquid oxygen for propelling the Altair Lander Ascent Stage, liquid hydrogen/liquid oxygen for propelling the Altair Lander Descent Stage and Ares V Earth Departure Stage, liquefaction, zero boil-off, and propellant scavenging for Lunar Surface Systems, cold helium and zero boil-off technologies for Earth-Based Ground Operations, and architecture definition studies for long term storage and on-orbit transfer and pressurization of LH2, cryogenic Mars landing and ascent vehicles, and cryogenic production via in situ resource utilization on Mars.

Doherty, Michael P.↗

An “EPIIC” Vision to Evolve Project Integration, Innovation, and Collaboration with Broad Impact for How NASA Executes Complex Projects

Evolving Project Integration, Innovation, and Collaboration (EPIIC) is a vision defined to transform the way projects manage information to support real-time decisions, capture best practices and lessons learned, perform assessments, and manage risk across a portfolio of projects. The foundational project management needs for data and information will be revolutionized through innovations on how we manage and access that data, implement configuration control, and certify compliance. The embedded intelligence of new interactive data interfaces integrate technical and programmatic data such that near real time analytics can be accomplished to more efficiently and accurately complete systems engineering and project management tasks. The system-wide data analytics that are integrated into customized data interfaces allows the growing team of engineers and managers required to develop and implement major NASA missions the ability to access authoritative source(s) of system information while greatly reducing the labor required to complete system assessments. This would allow, for example, much of what is accomplished in a scheduled design review to take place as needed, between any team members, at any time. An intelligent data interface that rigorously integrates systems engineering and project management information in near real time can provide substantially greater insight for systems engineers, project managers, and the large diverse teams required to complete a complex project. System engineers, programmatic personnel (those who focus on cost, schedule, and risk), the technical engineering disciplines, and project management can realize immediate benefit from the shared vision described herein. Implementation of the vision also enables significant improvements in the performance of the engineered system being developed.

Moreland, Robert J.↗

Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481

DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived from the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing MDO Software Development Projects

Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

Townsend, J. C.↗

Shared Voyage: Learning and Unlearning from Remarkable Projects

Shared Voyage is about four remarkable projects: the Advanced Composition Explorer (NASA), the Joint Air-to-Surface Standoff Missile (U.S. Air Force), the Pathfinder Solar-Powered Airplane (NASA), and the Advanced Medium Range Air-to-Air Missile (U.S.Air Force). Each project is presented as a case study comprised of stories collected from key members of the project teams. The stories found in the book are included with the purpose of providing an effective learning source for project management, encouraging the unlearning of outdated project management concepts, and enhancing awareness of the contexts surrounding different projects. Significantly different from project concepts found in most project management literature, Shared Voyage highlights concepts like a will to win, a results-oriented focus, and collaboration through trust. All four project teams researched in this study applied similar concepts; however, they applied them differently, tailoring them to fit the context of their own particular projects. It is clear that the one best way approach which is still the prevailing paradigm in project management literature should be replaced by a new paradigm: Even though general project management principles exist, their successful application depends on the specifics of the situation.

Laufer, Alexander↗

LESSONS LEARNED Biosurveillance Mobile App Development Intern Competition (Summer 2013)

The purpose of the lessons learned document for the BEOWulf Biosurveillance Mobile App Development Intern Competition is to capture the project’s lessons learned in a formal document for use by other project managers on similar future projects. This document may be used as part of new project planning for similar projects in order to determine what problems occurred and how those problems were handled and may be avoided in the future. Additionally, this document details what went well with the project and why, so that other project managers may capitalize on these actions. Project managers may also use this document to determine who the project team members were in order to solicit feedback for planning their projects in the future. This document will be formally communicated with the organization and will become a part of the organizational assets and archives.

97 MATHEMATICS AND COMPUTING↗

FY25 Ion Exchange Processing for the West Area Risk Management (WARM) Project

The West Area Risk Management (WARM) Project was established to enable near-term retrieval and pretreatment of tank waste from Hanford’s 200 West Area and to support deployment of an ion exchange (IX) system capable of producing cesium-depleted supernate suitable for offsite treatment and disposal. The WARM experimental campaign was designed to provide key data for design and operational planning of the 200 W IX system, which plans to utilize crystalline silicotitanate (CST) as the active media for cesium removal. This report documents a comprehensive FY25 experimental campaign designed to produce key technical data required for design and operational planning of the WARM IX system. Testing includes assessing Cs and Sr breakthrough performance in a 4-column system, Cs capacity batch contact testing, phosphate precipitation assessments, reduced-hydroxide feed displacement evaluation, and Sr speciation impacts on Sr removal. The experimental results provide detailed trends in Cs and Sr loading behavior, breakthrough performance across a 4-column staged IX system, distribution profiles within CST beds, and projections of operational flowrates relative to Waste Acceptance Criteria (WAC) limits. Batch contact testing established equilibrium partitioning behavior for the S1–S5 simulants and characterized how matrix chemistry influenced Cs sorption onto CST. Additionally, further evaluations on waste matrix as it pertains to precipitation potential were also determined. Collectively, these datasets support engineering design choices for WARM system throughput and pretreatment planning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Configuration Management Helps Projects Innovate and Communicate

This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

Cioletti, Louis A.↗

Managing the mariner mars project.

Mariner Mars project management noting role in system design, launch period establishment, parts procurement, etc

MARINER IV SPACE PROBE↗

Using Project Complexity Determinations to Establish Required Levels of Project Rigor

The concepts discussed in this paper 1) focus on using technical competencies and skills in making objective determinations regarding project complexity based on objective scoring criteria and 2) then using the complexity determinations to establish the level of rigor required in initiating, planning, executing, monitoring and controlling, and closing projects to maximize process efficiency. This paper presents a project complexity analysis methodology for defining the levels of project management process rigor a project team needs to employ to maximize project delivery efficiencies without compromising quality and performance. Methods for making project complexity determinations based on project lifecycle size, duration, organizational complexity, requirements, technology readiness, risk, and visibility are discussed. The paper correlates the levels of rigor needed by project management process groups given the determined level of project complexity. Next, the paper presents a graded approach to defining extent of team formation, planning documentation rigor, stakeholder communication rigor, requirements management rigor, acquisition planning, risk management, executing, and monitoring and controlling rigor dependent on project complexity determinations. Methods for integrating and aligning the project complexity determination methods into existing project management procedures and processes are also discussed as well as methods for training personnel in the use of the method and facilitating and monitoring effectiveness of implementation within an organization in which project delivery is a mission focus.

complexity, project, determination, management, tr↗

ASK Magazine

Not everyone looks forward to reviews. Dog and pony shows I've heard them called. Exercises in putting together Power Point charts. Other less tasteful descriptions abound, but I won't bother to summarize these. This is a tasteful magazine after all. In this issue, we've assembled a number of articles on the subject of reviews, particularly as they occur in the NASA project world (although we cover the subject from other perspectives too). Veteran NASA Project Manager Marty Davis, in his article Tangled Up in Reviews, writes, "Many people regard reviews as something onerous, but if we can tailor them so that they're not as bad as they have to be, it can be a great benefit to a project manager." Great benefits to the project manager is what you'll find in Marty's story as he describes not only tailoring a single review but the entire lifecycle of reviews in his project. In Jo Gunderson's story, Calling Down the Fire on Yourself, she describes a young NASA Project Manager who does just that because, as he tells her, I needed to know if there was anything that I had overlooked." How he brings fire down on himself at his project review will inspire other young Project Managers, seasoned managers, and anyone else who reads this powerful story. Leave Your Ego at the Door, by Jenny Baer-Reidhart and Ray Morgan, uses reviews to highlight the creative collaboration that existed between NASA and one of its industry partners. The protagonist of this story is a company who took advantage of NASAs expert advice during reviews and accomplished amazing feats as a result. The story also examines how disasters might well have been avoided by two other NASA partners had they been as open-minded as the first company during their reviews. In Roy Malone's story, Standing Offer, a NASA Project Manager describes how he used a crack review team to help him pass a critical certification inspection while he was a Combat Systems Officer in the Navy. Malone invited the reviewers to come back several times so that they would be able to focus in detail on the many areas of the program that would be scrutinized during the certification inspection. These are just a sampling of some of the articles you'll find in this issue of ASK. We believe this issue offers ample evidence that talented Project Managers know how to use reviews to the great benefit of their projects. A talented Project Manager will typically figure out a way to turn any onerous task into a useful learning exercise. These Project Managers demonstrate that the real value of reviews is that they provide a chance to learn something. No dog and pony shows here.

Laufer, Alexander↗

Integrated Traction Drive Thermal Management: Keystone Project 3

Current poster provides update on research progress on Integrated Traction Drive Thermal Management project for Department of Energy's 2021 Annual Merit Review. NREL's support in thermal management system design for integrated traction drives of two Electric Drive Technologies Consortium teams (led by Oak Ridge National Lab and University of Wisconsin) is highlighted.

ADVANCED PROPULSION SYSTEMS↗

Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

Brothers, Mary Ann↗

Delta II/Geotail Pre-Launch Press Conference

This video presents a live coverage of a pre-launch press conference on the Delta II/Geotail Mission. George Diller, NASA Public Affairs, presents the panel. The panel consists of James Womack, NASA Launch Manager, Kennedy Space Center; Mario Acuna, Project Scientist, Goddard Space Flight Center; Atsuiro Nishida, Project Manager, ISAS (Institute of Space and Astronautical Science) Tokyo; Michael Calabrese, Program Manager, NASA Headquarters; Kenneth Sizemore, Project Manager, GSFC; Tono Uesugi, Project Manager, ISAS; John Beckham, Delta Launch Manager, GSFC; and Joel Tumbiolo, Launch Weather Officer, CCAFS (Cape Canaveral Air Force Station). Atsuiro Nishida presents the objectives of the Geotail Mission which are: 1) To determine the characteristics of the Geomagnetic Tail; 2) To understand the internal instability that leads to sudden energy releases; 3) To clarify the source of plasma in the tail; and 4) To study the structure of important interfaces such as the Magnetopause. Mario Acuna gives illustrations of the Magnetosphere. James Womack discusses the countdown and status of the mission. Tono Uesugi discusses spacecraft readiness for the July 24, 1992 launch, and Joel Tumbiolo gives the weather forecast for the launch. The press conference concludes with a question and answer period. See NONP-NASA-VT-200078605 for additional questions and footage.

Source record↗

Ares I-X Roll Control System Development

Project Managers often face challenging technical, schedule and budget issues. This presentation will explore how the Ares I-X Roll Control System Integrated Product Team (IPT) mitigated challenges such as concurrent engineering requirements and environments and evolving program processes, while successfully managing an aggressive project schedule and tight budget. IPT challenges also included communications and negotiations among inter- and intra-government agencies, including the US Air Force, NASA/MSFC Propulsion Engineering, LaRC, GRC, KSC, WSTF, and the Constellation Program. In order to successfully meet these challenges it was essential that the IPT define those items that most affected the schedule critical path, define early mitigation strategies to reduce technical, schedule, and budget risks, and maintain the end-product focus of an "unmanned test flight" context for the flight hardware. The makeup of the IPT and how it would function were also important considerations. The IPT consisted of NASA/MSFC (project management, engineering, and safety/quality) and contractors (Teledyne Brown Engineering and Pratt and Whitney Rocketdyne, who supplied heritage hardware experience). The early decision to have a small focused IPT working "badgelessly" across functional lines to eliminate functional stove-piping allowed for many more tasks to be done by fewer people. It also enhanced a sense of ownership of the products, while still being able to revert back to traditional roles in order to provide the required technical independence in design reviews and verification closures. This presentation will highlight several prominent issues and discuss how they were mitigated and the resulting Lessons Learned that might benefit other projects.

Unger, Ronald J.↗

A Comparison of Social and Economic Engagement Approaches: Lessons from Recent International Radioactive Waste Projects - 17478

The central challenge of any proposed radioactive waste management project is securing not only regulatory permissions, but also a social license to operate. 'Social license' generally refers to a community's acceptance or approval of a specific project. Oftentimes development of social license occurs outside of, or in parallel to, formal regulatory or permitting processes, and requires sustained commitment and proposed economic benefits to communities by proponents to acquire, build, and sustain social capital in the context of trust-based relationships. Historically, radioactive waste management projects have defaulted to demagoguery and 'siege warfare' modes of thinking and action by both proponents and opponents. While radioactive waste management projects are always inherently controversial, it is only recently that project owners and developers have experimented with alternative forms of social engagement outside of, or in addition to, formal regulatory processes. This paper compares and contrasts recent projects in Canada, Australia, the United Kingdom, and the United States, by examining distinct approaches to social engagement, with a focus on new methods that have been used to promote mutual understanding, foster rational debate, build confidence, promote economic development, and secure social license. The projects examined span the life-cycle of radioactive waste management development, from ones that are purely aspirational, to ones in early planning stages, to ones seeking a host community, to one that is focused on sustainment of existing social license. Several notable lessons and innovative practices are identified that will be of interest to radioactive waste management project owners and developers, non-governmental organizations, potential host communities, and political decision-makers for such projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Outyear Budgeting Tool

OBTool performs the following: • Consistent method and tool to develop/estimate fiscal year (FY) 2010 and outyear budget/estimates • Maintain configuration control on resource rates and changes to outyear budget estimates, while allowing for accessibility, accountability, and tracking shared access between program managers, facility managers (FMs), project managers (PMs), cost account managers (CAMs), and project controls engineers (PCEs) • Consistency in budget estimating methodology, including scope, requirements, basis of estimates, resources, activities, escalation, and presentation of documentation in tasks and execution plans and reports • Ability to sync (i.e. export) and import data into Primavera and Cobra to the lifecycle baseline file

Carlos Castillo, Jerel Nelson↗

Integrated Traction Drive Thermal Management: Keystone Project 3

The project addresses thermal management solutions for integrated traction drives for electric vehicles. It's objectives include research and evaluation of motor-integrated power electronics packaging technologies and thermal management approaches using numerical modeling; experimental characterization of convective cooling heat transfer coefficients for jet impingement with automatic transmission fluid.

30 DIRECT ENERGY CONVERSION↗