Search NASA⌕ Search

SEARCH · Search NASA

Results for “RF SYSTEMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Development of an Accelerator Mass Spectrometer based on a Cyclotron

An accelerator mass spectrometer based on a cyclotron has been developed, and a prototype of the injection beam line has been constructed. Mass resolution of the cyclotron is designed to be over 4000. A sawtooth RF buncher in the beam line and a flat-topping RF system for the cyclotron were utilized to enhance beam transmission efficiency, which is a primary factor for improvement compared to previous cyclotron mass spectrometers. The injection beam line comprises an ion source, Einzel lens, RF buncher, 90 deg. dipole magnet and a slit box containing beam diagnostic devices. A carbon beam was measured at the location of the slit box, and beam phase spaces will be measured. The design of a cyclotron magnet was done, and orbit tracking was carried out using cyclotron optics codes. A scheme of radial injection was chosen to place a beam on the equilibrium orbit of the cyclotron. The injection scheme will be optimized after the beam measurements are completed.

43 PARTICLE ACCELERATORS↗

BEAM BUNCH LEAKAGE AND CONTROL IN THE SNS RING

In the previous neutron production operations at the SNS, the longitudinal extraction gap of the accumulator ring was contaminated as a result of the linac chopper limitations. This caused significant beam loss and activation in the ring and in the extraction beam line. Simulations with computer models and measurements showed that proper use of the ring RF systems, with additional storage turns after the necessary beam accumulation turns in the ring, effectively reduced beam loss in the accelerator systems. Simulations and beam measurement results will be discussed.

43 PARTICLE ACCELERATORS↗

Studies and optimization of Pohang Light Source-II superconducting radio frequency system at stable top-up operation with beam current of 400 mA

After three years of upgrading work, the Pohang Light Source-II (PLS-II) is now successfully operating. The final quantitative goal of PLS-II is a top-up user-service operation with beam current of 400 mA to be completed by the end of 2014. During the beam store test up to 400 mA in the storage ring (SR), it was observed that the vacuum pressure around the radio frequency (RF) window of the superconducting cavity rapidly increases over the interlock level limiting the availability of the maximum beam current storing. Although available beam current is enhanced by setting a higher RF accelerating voltage, it is better to keep the RF accelerating voltage as low as possible in the long time top-up operation. We investigated the cause of the window vacuum pressure increment by studying the changes in the electric field distribution at the superconducting cavity and waveguide according to the beam current. In our simulation, an equivalent physical modeling was developed using a finite-difference time-domain code. The simulation revealed that the electric field amplitude at the RF window is exponentially increased as the beam current increases, thus this high electric field amplitude causes a RF breakdown at the RF window, which comes with the rapid increase of window vacuum pressure. The RF accelerating voltage of PLS-II RF system was set to 4.95 MV, which was estimated using the maximum available beam current that works as a function of RF voltage, and the top-up operation test with the beam current of 400 mA was successfully carried out.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Thermo mechanical design of normal-conducting deflecting cavities at the Advanced Photon Source for short x-ray pulse generation.

A normal-conducting deflecting cavity is being designed at the Advanced Photon Source (APS) as a part of the short x-ray pulse project intended to provide users with approximately 2 picosecond x-rays. The system will use two pairs of 3-cell cavities in sectors 6ID and 7ID for the generation of the x-ray pulse in the 7ID beamline. The 3-cell cavities are designed to provide the desired beam deflection while absorbing in excess of 4 kW of power from a pulsed rf system and up to 2.6 kW in the damper system of high-order mode (HOM) and low-order mode (LOM) waveguides. Since the cavity frequency is very sensitive to thermal expansion, the cooling water system is designed so that it is able to control cavity temperature to within 0.1 C. This paper describes the optimization of the thermomechanical design of the cavity based on calculation of thermal stresses and displacement caused by the generated heat loads, and presents the design of a cooling water system required for the proper operation of the cavities.

43 PARTICLE ACCELERATORS↗

Changing the PEP-II Center-of-Mass Energy Down to 10 GeV and up to 11 GeV

PEP-II, the SLAC, LBNL, LLNL B-Factory was designed and optimized to run at the Upsilon 4S resonance (10.580 GeV with an 8.973 GeV e- beam and a 3.119 GeV e+ beam). The interaction region (IR) used permanent magnet dipoles to bring the beams into a head-on collision. The first focusing element for both beams was also a permanent magnet. The IR geometry, masking, beam orbits and beam pipe apertures were designed for 4S running. Even though PEP-II was optimized for the 4S, we successfully changed the center-of-mass energy (E{sub cm}) down to the Upsilon 2S resonance and completed an E{sub cm} scan from the 4S resonance up to 11.2 GeV. The luminosity throughout most of these changes remained near 1 x 10{sup 34} cm{sup -2}s{sup -1}. The E{sub cm} was changed by moving the energy of the high-energy beam (HEB). The beam energy differed by more than 20% which produced significantly different running conditions for the RF system. The energy loss per turn changed 2.5 times over this range. We describe how the beam energy was changed and discuss some of the consequences for the beam orbit in the interaction region. We also describe some of the RF issues that arose and how we solved them as the high-current HEB energy changed.

43 PARTICLE ACCELERATORS↗

50 KW Multi-beam Klystron

Statement of problem or situation that is being addressed: microwave power sources (such as klystrons) offering an increased efficiency (80% or above) are needed for various applications. Of a particular interest is a source at 952.6 MHz delivering 50kW (continuous) CW for the RF systems for ion acceleration in the Energy Electron Ion Collider EIC being developed at Thomas Jefferson National Accelerator Facility. General statement of how this problem is being addressed: A novel tube (klystron) concept with efficiency in excess of 80%, delivering 50 kW CW at 952.6 MHz MHz is proposed. It is a combination of proven technologies put together: its uses multiple beams to have its perveance low to boost beam-power to RF efficiency. It uses a partially grounded depressed collector (as invented by Omega P R&D) with a carefully tailored beam distribution after the cavity chain to recover energy thereby increasing the overall efficiency even more. A low operating voltage makes the tube more user-friendly avoiding need for costly modulators and oil insulation. A sectioned solenoid is used to insure superb beam-matching to all components downstream of the electron gun, increasing the tube performances. What is to be done in Phase I: The overall goal of this project is to develop, design, engineer, manufacture and test a multi-beam klystron operating in CW regime, delivering 50kW CW of power at 952.6 MHz. The effort is to be coordinated with TJNAF to insure excellent compatibility with the facility. The device will have a high efficiency >80% (operating at 12kV). The main goals during Phase I are to numerically simulate and optimize the klystron main components, namely the gun, the RF cavity chain, the multi-channel-channel partially grounded depressed collector, and the magnetic system. Preliminary engineering issues will be coordinated by Omega-P R&D with its strategic alliance partner Calabazas Creek Research Inc., which expected to participate formally during Phase II in final design and fabrication. Commercial Applications and Other Benefits: The klystrons of this type can serve as the main RF-energy source of in RF-systems for accelerators which have found their applications both in science and industry, and is of high interest to Thomas Jefferson National Accelerator Facility.

RF power sources, klystron, high efficiency, CW, e↗

Radiofrequency Ablation of Osteoid Osteoma: Initial Experience with a New Monopolar Ablation Device

The purpose of this article is to report our initial experience with the 'off-label' use of a new monopolar radiofrequency (RF) probe for percutaneous ablation of osteoid osteomas. Seventeen patients (12 male and 5 female, mean age 24.8 [range 9-49]) with osteoid osteoma were treated by computed tomography (CT)-guided RF ablation (RFA). All procedures were performed with the patient under general aesthesia. After localization of the nidus, a 13G hollow drill was introduced into the nidus through a 7F introducer sheath. A monopolar 16.5G RF probe with a 9-mm active tip (Soloist; Boston Scientific, Natick, MA) was inserted through the introducer sheath and connected to the RF generator. Energy application was started at 2 W and subsequently increased every 2 min by 1 W to a maximum of 8 W. The procedure ended if impedance increased by 500 Ohm-Sign . Mean duration of energy deposition was 14.2 {+-} 3.3 min. Fourteen of 17 patients (82%) were free of symptoms at 29.9 {+-} 14.8 (range 4 to 47) months of follow-up. The primary and secondary success rates were 83% and 100%, respectively. In 3 patients, recurrence of pain at 6 (n = 1) and 15 (n = 2) months after the initial procedure was successfully treated by reablation. There were no complications. Monopolar RFA using the Soloist probe is effective and safe for the treatment of osteoid osteoma. It results in comparable success rates as other monopolar or bipolar RF systems in the treatment of osteoid osteoma.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

LLRF System for the Fermilab PIP-II Superconducting LINAC

PIP-II is an 800 MEV superconducting linac that is in the initial acceleration chain for the Fermilab accelerator complex. The RF system consists of a warm front-end with an ion source, RFQ and buncher cavities along with 25 superconducting cryo-modules comprised of five different acceleration \(\beta\). The LLRF system for the LINAC has to provide field and resonance control for a total of 125 RF cavities.The LLRF system design is in the final design review phase and will enter the production phase next year. The PIP-II project is an international collaboration with various partner labs contributing subsystems. The LLRF system design for the PIP-II Linac is presented and the specification requirements and system performance in various stages of testing are described in this paper.

43 PARTICLE ACCELERATORS↗

Studies of RF Noise Induced Bunch Lengthening at the LHC

Radio Frequency (RF) noise induced bunch lengthening can strongly affect the Large Hadron Collider (LHC) performance through luminosity reduction, particle loss, and other effects. This work presents measurements from the LHC that better quantify the relationship between the RF noise and longitudinal emittance blowup and identify the performance limiting RF components. The experiments presented in this paper confirmed the predicted effects on the LHC bunch length growth. Dedicated measurements were conducted in the LHC to gain insight in the effect of RF noise to the longitudinal beam diffusion. It was evident that the growth rate of the bunch length is strongly related to the accelerating voltage phase noise power spectral density around f{sub s} + kf{sub rev}, as predicted in [4]. The noise threshold for 2.5 ps/hr growth was estimated to -101 dBc/Hz (SSB flat noise spectral density from f{sub s} to the edge of the closed loop bandwidth). A 9 dB margin is achieved with the current RF configuration and the BPL on. With this formalism it is now possible to estimate the effect of different operational and technical RF configurations on the LHC beam diffusion. This formalism could also be useful for the design of future RF systems and the budgeting of the allowed noise.

43 PARTICLE ACCELERATORS↗

Conceptual MEIC electron ring injection scheme using CEBAF as a full energy injector

The Medium-energy Electron-Ion Collider (MEIC) proposed by Jefferson Lab is planning to use the newly upgraded 12 GeV CEBAF 1497 MHz SRF CW recirculating linac as a full-energy injector for the electron collider ring. The electron collider ring is proposed to reuse the 476 MHz PEP-II RF system to achieve high installed voltage and high beam power. The MEIC electron injection requires 3-10 (or 12) GeV beam in 3-4µs long bunch trains with low duty factor and high peak current, resulting in strong transient beam loading for the CEBAF. In this paper, we propose an injection scheme that can match the two systems' frequencies with acceptable injection time, and also address the transient beam loading issue in CEBAF. The scheme is compatible with future upgrade to 952.6 MHz SRF system in the electron ring.

43 PARTICLE ACCELERATORS↗

MFE/Magnolia - A joint CNES/NASA mission for the earth magnetic field investigation

The joint phase B study in the CNES/NASA MFE/Magnolia mission to study the earth's magnetic field are reported. The scientific objectives are summarized and the respective responsibilities of NASA and CNES are outlined. The MFE/Magnolia structure and power systems, mass and power budgets, attitude control system, instrument platform and boom, tape recorders, rf system, propellant system, and scientific instruments are described.

Runavot, Josette↗

Multi-channel high-speed converter clock synchronization with autonomous coherent deterministic latency

A system and corresponding method that achieves coherency and deterministic latency (CDL) autonomously upon power on is disclosed. The system, for example, a multi-channel RF system, may require CDL with respect to the digital-to-analog converters (DACs) and analog-to-digital converters (ADCs) assigned to the channels in the system. CDL is achieved through a timed combination of external reference and synchronization signals, resetting and disabling of various clock dividers, and enabling clock generation. In addition to synchronizing all of the clocks, the data acquisition sequence must be synchronized across all of the channels, whether they are on chips, cards, or chassis. Data acquisition synchronization may be implemented using an initiator/target or a wired OR mode configuration.

Brady, Charles E.↗

Simulation Study Using an Injection Phase-locked Magnetron as an Alternative Source for SRF Accelerators

As a drop-in replacement for the CEBAF CW klystron system, a 1497 MHz, CW-type high-efficiency magnetron using injection phase lock and amplitude variation is attractive. Amplitude control using magnetic field trimming and anode voltage modulation has been studied using analytical models and MATLAB/Simulink simulations. Since the 1497 MHz magnetron has not been built yet, previously measured characteristics of a 2.45GHz cooker magnetron are used as reference. The results of linear responses to the amplitude and phase control of a superconducting RF (SRF) cavity, and the expected overall benefit for the current CEBAF and future MEIC RF systems are presented in this paper.

43 PARTICLE ACCELERATORS↗

Overview of High Power Vacuum Dry RF Load Designs

A specific feature of RF linacs based on the pulsed traveling wave (TW) mode of operation is that only a portion of the RF energy is used for the beam acceleration. The residual RF energy has to be terminated into an RF load. Higher accelerating gradients require higher RF sources and RF loads, which can stably terminate the residual RF power. RF feeders (from the RF source though the accelerating section to the load) are vacuumed to transmit multi-megawatt high power RF. This overview will outline vacuumed RF loads only. A common method to terminate multi-MW RF power is to use circulated water (or other liquid) as an absorbing medium. A solid dielectric interface (a high quality ceramic) is required to separate vacuum and liquid RF absorber mediums. Using such RF load approaches in TW linacs is troubling because there is a fragile ceramic window barrier and a failure could become catastrophic for linac vacuum and RF systems. Traditional loads comprising of a ceramic disk have limited peak and average power handling capability and are therefore not suitable for high gradient TW linacs. This overview will focus on ''vacuum dry'' or ''all-metal'' loads that do not employ any dielectric interface between vacuum and absorber. The first prototype is an original design of RF loads for the Stanford Two-Mile Accelerator.

43 PARTICLE ACCELERATORS↗

The Injection System of the INFN-SuperB Factory Project: Preliminary Design

The ultra high luminosity B-factory (SuperB) project of INFN requires a high performance and reliable injection system, providing electrons at 4 GeV and positrons at 7 GeV, to fulfil the very tight requirements of the collider. Due to the short beam lifetime, continuous injection of electron and positron bunches in both LER and HER rings is necessary to maintain an high average luminosity. Polarized electrons are required for experiments and must be delivered by the injection system, due to the beam lifetime shorter than the ring polarization build-up: they will be produced by means of a SLAC-SLC polarized gun. The emittance and the energy spread of the e{sup -}/e{sup +} beams are reduced in a 1 GeV Damping Ring (DR) before injection in the main rings. Two schemes for positron production are under study, one with e{sup -}/e{sup +} conversion at low energy (< 1 Gev) and one with conversion at 6 GeV and a recirculation line to bring the positrons back to the DR. Acceleration through the Linac is provided by a 2856 MHz RF system made of travelling wave (TW), room temperature accelerating structures.

43 PARTICLE ACCELERATORS↗

An L-Band Superconducting Traveling Wave Accelerating Structure With Feedback

The most severe problem of the International Linear Collider is its high cost, resulting in part from the enormous length of the collider. This length is determined mainly by the achievable accelerating gradient in the RF system of the ILC. In the ILC project the required accelerating gradient is higher than 30 MeV/m. Further improvement of the coupling to the beam may be achieved by using a Traveling Wave SC structure [1]. We have demonstrated that an additional gradient increase of up to 46% may be possible if a {pi}/2 TW SC structure is employed. However, a TW SC structure requires a SC feedback waveguide to return the few GW of circulating RF power from the structure output back to the structure input. The test cavity with feedback is designed to demonstrate the possibility of achieving a significantly higher gradient than existing SC structures. The double-coupler powering excitation and tuning have been studied numerically and the corresponding model results are presented. The proposed double-coupler powering scheme significantly reduces the tuning requirements as long as any of the partial modes of given magnitude and phase are excited independently, providing a clear traveling wave regime of structure operation.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Quench dynamics in SRF cavities: can we locate the quench origin with 2nd sound?

A newly developed method of locating quenches in SRF cavities by detecting second-sound waves has been gaining popularity in SRF laboratories. The technique is based on measurements of time delays between the quench as determined by the RF system and arrival of the second-sound wave to the multiple detectors placed around the cavity in superfluid helium. Unlike multi-channel temperature mapping, this approach requires only a few sensors and simple readout electronics; it can be used with SRF cavities of almost arbitrary shape. One of its drawbacks is that being an indirect method it requires one to solve an inverse problem to find the location of a quench. We tried to solve this inverse problem by using a parametric forward model. By analyzing the data we found that the approximation where the second-sound emitter is a near-singular source does not describe the physical system well enough. A time-dependent analysis of the quench process can help us to put forward a more adequate model. We present here our current algorithm to solve the inverse problem and discuss the experimental results.

43 PARTICLE ACCELERATORS↗

The Design of a Large Booster Ring for the Medium Energy Electron-Ion Collider at Jlab

In this paper, we present the current design of the large booster ring for the Medium energy Electron-Ion Collider at Jefferson Lab. The booster ring takes 3 GeV protons or ions of equivalent rigidity from a pre-booster ring, and accelerates them to 20 GeV for protons or equivalent energy for light to heavy ions before sending them to the ion collider ring. The present design calls for a figure-8 shape of the ring for superior preservation of ion polarization. The ring is made of warm magnets and shares a tunnel with the two collider rings. Acceleration is achieved by warm RF systems. The linear optics has been designed with the transition energy above the highest beam energy in the ring so crossing of transition energy will be avoided. Preliminary beam dynamics studies including chromaticity compensation are presented in this paper.

43 PARTICLE ACCELERATORS↗