Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Risk Assessment of Carbon Fiber Composite in Surface Transportation

The vulnerability of surface transportation to airborne carbon fibers and the national risk associated with the potential use of carbon fibers in the surface transportation system were evaluated. Results show airborne carbon fibers may cause failure rates in surface transportation of less than one per year by 1995. The national risk resulting from the use of carbon fibers in the surface transportation system is discussed.

Hathaway, W. T.↗

Renal-Stone Risk Assessment During Space Shuttle Flights

The metabolic and environmental factors influencing renal stone formation before, during, and after Space Shuttle flights were assessed. We established the contributing roles of dietary factors in relationship to the urinary risk factors associated with renal stone formation. 24-hr urine samples were collected prior to, during space flight, and following landing. Urinary factors associated with renal stone formation were analyzed and the relative urinary supersaturation ratios of calcium oxalate, calcium phosphate (brushite), sodium urate, struvite and uric acid were calculated. Food and fluid consumption was recorded for a 48-hr period ending with the urine collection. Urinary composition changed during flight to favor the crystallization of stone-forming salts. Factors that contributed to increased potential for stone formation during space flight were significant reductions in urinary pH and increases in urinary calcium. Urinary output and citrate, a potent inhibitor of calcium-containing stones, were slightly reduced during space flight. Dietary intakes were significantly reduced for a number of variables, including fluid, energy, protein, potassium, phosphorus and magnesium. This is the first in-flight characterization of the renal stone forming potential in astronauts. With the examination of urinary components and nutritional factors, it was possible to determine the factors that contributed to increased risk or protected from risk. In spite of the protective components, the negative contributions to renal stone risk predominated and resulted in a urinary environment that favored the supersaturation of stone-forming salts. The importance of the hypercalciuria was noted since renal excretion was high relative to the intake.

Whitson, Peggy A.↗

SMART: A Propositional Logic-Based Trade Analysis and Risk Assessment Tool for a Complex Mission

This paper introduces a new trade analysis software called the Space Mission Architecture and Risk Analysis Tool (SMART). This tool supports a high-level system trade study on a complex mission, such as a potential Mars Sample Return (MSR) mission, in an intuitive and quantitative manner. In a complex mission, a common approach to increase the probability of success is to have redundancy and prepare backups. Quantitatively evaluating the utility of adding redundancy to a system is important but not straightforward, particularly when the failure of parallel subsystems are correlated.

Ono, Masahiro↗

NASA Space Radiation Protection Strategies: Risk Assessment and Permissible Exposure Limits

Permissible exposure limits (PELs) for short-term and career astronaut exposures to space radiation have been set and approved by NASA with the goal of protecting astronauts against health risks associated with ionizing radiation exposure. Short term PELs are intended to prevent clinically significant deterministic health effects, including performance decrements, which could threaten astronaut health and jeopardize mission success. Career PELs are implemented to control late occurring health effects, including a 3% risk of exposure induced death (REID) from cancer, and dose limits are used to prevent cardiovascular and central nervous system diseases. For radiation protection, meeting the cancer PEL is currently the design driver for galactic cosmic ray and solar particle event shielding, mission duration, and crew certification (e.g., 1-year ISS missions). The risk of cancer development is the largest known long-term health consequence following radiation exposure, and current estimates for long-term health risks due to cardiovascular diseases are approximately 30% to 40% of the cancer risk for exposures above an estimated threshold (Deep Space one-year and Mars missions). Large uncertainties currently exist in estimating the health risks of space radiation exposure. Improved understanding through radiobiology and physics research allows increased accuracy in risk estimation and is essential for ensuring astronaut health as well as for controlling mission costs, optimization of mission operations, vehicle design, and countermeasure assessment. We will review the Space Radiation Program Element's research strategies to increase accuracy in risk models and to inform development and validation of the permissible exposure limits.

Huff, J. L.↗

Constellation Probabilistic Risk Assessment (PRA): Design Consideration for the Crew Exploration Vehicle

Managed by NASA's Office of Safety and Mission Assurance, a pilot probabilistic risk analysis (PRA) of the NASA Crew Exploration Vehicle (CEV) was performed in early 2006. The PRA methods used follow the general guidance provided in the NASA PRA Procedures Guide for NASA Managers and Practitioners'. Phased-mission based event trees and fault trees are used to model a lunar sortie mission of the CEV - involving the following phases: launch of a cargo vessel and a crew vessel; rendezvous of these two vessels in low Earth orbit; transit to th$: moon; lunar surface activities; ascension &om the lunar surface; and return to Earth. The analysis is based upon assumptions, preliminary system diagrams, and failure data that may involve large uncertainties or may lack formal validation. Furthermore, some of the data used were based upon expert judgment or extrapolated from similar components~systemsT. his paper includes a discussion of the system-level models and provides an overview of the analysis results used to identify insights into CEV risk drivers, and trade and sensitivity studies. Lastly, the PRA model was used to determine changes in risk as the system configurations or key parameters are modified.

Prassinos, Peter G.↗

Visual Impairment/Intracranial Pressure Risk Assessment

Since 2006 there have been 6 reported cases of altered visual acuity and intracranial pressure (ICP) in long duration astronauts. In order to document this risk and develop an integrated approach to its mitigation, the NASA Space Life Sciences Directorate (SLSD) and Human Research Program (HRP) have chosen to use the Human System Risk Board (HSRB) and the risk management analysis tool (RMAT). The HSRB is the venue in which the stakeholders and customers discuss and vet the evidence and the RMAT is the tool that facilitates documentation and comparison of the evidence across mission profiles as well as identification of risk factors, and documentation of mitigation strategies. This process allows for information to be brought forward and dispositioned so that it may be properly incorporated into the RMAT and contribute to the design of the research and mitigation plans. The evidence thus far has resulted in the identification of a visual impairment/intracranial pressure (VIIP) project team, updating of both short and long duration medical requirements designed to assess visual acuity, and a research plan to characterize this issue further. In order to understand this issue more completely, a plan to develop an Accelerated Research Collaboration (ARC) has been approved by the HSRB. The ARC is a novel research model pioneered by the Myelin Repair Foundation. It is a patient centered research model that brings together researchers and clinicians, under the guidance of a scientific advisory panel, to collaborate and produce results much quickly than accomplished through traditional research models. The data and evidence from the updated medical requirements and the VIIP ARC will be reviewed at the HSRB on a regular basis. Each review package presented to the HSRB will include an assessment and recommendation with respect to continuation of research, countermeasure development, occupational surveillance modalities, selection criteria, etc. This process will determine the course of the VIIP project and ultimately how SLSD and HRP mitigate this emerging human health and performance risk.

Fogarty, Jennifer A.↗

A Software Quality Model and Metrics for Risk Assessment

A software quality model and its associated attributes are defined and used as the model for the basis for a discussion on risk. Specific quality goals and attributes are selected based on their importance to a software development project and their ability to be quantified. Risks that can be determined by the model's metrics are identified. A core set of metrics relating to the software development process and its products is defined. Measurements for each metric and their usability and applicability are discussed.

L Hyatt↗

A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

Putcha, Chandra S.↗

Assessing Risk Due to Small Sample Size in Probability of Detection Analysis Using Tolerance Intervals

Small sample size (e.g.6-30) poses risk in results of probability of detection (POD) analysis using tolerance intervals. This method is also called as the limited sample or LS POD. The analysis is performed either during NDE procedure qualification or for assessment of reliability of an NDE procedure. The risk is primarily due to sampling error. Smaller samples are not likely to be random to the population or representative of the population. The small samples are likely to be biased. Biased samples have smaller standard deviation compared to the population. POD analysis with small biased sample can lead to overestimation of POD. Many sampling schemes are available in statistics to mitigate sampling risk. Primary objective of POD analysis is to determine a decision threshold from signal response measurements of a sample such that it is less than or equal to population decision threshold for 90% POD. Sampling error implies that this NDE reliability condition is violated. One of sampling types is called a representative sample. Representative samples reduce variance in POD estimates but also reduce magnitude of the error. Sampling sensitivity analysis for some sampling types is performed here using repetitive random sampling or Monte Carlo method. Six sampling types are considered for comparison. Some of the sampling types are similar to drawing a representative sample. LS POD model assumes random sampling. Therefore, random sampling is used as a basis for comparison with each sampling type. The sampling types used in the analysis are, A. Nominal and worst-case sampling, B. Worst-case sampling, C. Nominal case sampling, D. Random sampling, E. Random target, and sub-target sampling. F. Nominal target and sub-target sampling. Results of Monte Carlo simulation indicate that type F sampling can mitigate sampling risk and is also more practical to implement. Type A sampling may also mitigate the sampling risk, but it may be less practical to implement.

Ajay M Koshti↗

Advanced risk assessment of the effects of graphite fibers on electronic and electric equipment, phase 1

A model was developed to generate quantitative estimates of the risk associated with the release of graphite fibers during fires involving commercial aircraft constructed with graphite fiber composite materials. The model was used to estimate the risk associated with accidents at several U.S. airports. These results were then combined to provide an estimate of the total risk to the nation.

Pocinki, L. S.↗

Impact of Non-Gaussian Error Volumes on Conjunction Assessment Risk Analysis

An understanding of how an initially Gaussian error volume becomes non-Gaussian over time is an important consideration for space-vehicle conjunction assessment. Traditional assumptions applied to the error volume artificially suppress the true non-Gaussian nature of the space-vehicle position uncertainties. For typical conjunction assessment objects, representation of the error volume by a state error covariance matrix in a Cartesian reference frame is a more significant limitation than is the assumption of linearized dynamics for propagating the error volume. In this study, the impact of each assumption is examined and isolated for each point in the volume. Limitations arising from representing the error volume in a Cartesian reference frame is corrected by employing a Monte Carlo approach to probability of collision (Pc), using equinoctial samples from the Cartesian position covariance at the time of closest approach (TCA) between the pair of space objects. A set of actual, higher risk (Pc >= 10 (exp -4)+) conjunction events in various low-Earth orbits using Monte Carlo methods are analyzed. The impact of non-Gaussian error volumes on Pc for these cases is minimal, even when the deviation from a Gaussian distribution is significant.

Ghrist, Richard W.↗

Effects of microgravity on renal stone risk assessment

Physiologic changes induced during human exposure to the microgravity environment of space may contribute to an increased potential for renal stone formation. Renal stone risk factors obtained 10 days before flight and immediately after return to earth indicated that calcium oxalate and uric acid stone-forming potential was increased after space flights of 4-10 days. These data describe the need for examining renal stone risk during in-flight phases of space missions. Because of limited availability of space and refrigerated storage on spacecraft, effective methods must be developed for collecting urine samples in-flight and for preserving (or storing) them at temperatures and under conditions commensurate with mission constraints.

Pietrzyk, R. A.↗

Risk Assessment and Control through Countermeasure System Iplementation for Long-term Crew Exposure to Microgravity

Experience with the International Space Station (ISS) program demonstrates the degree to which engineering design and operational solutions must protect crewmembers from health risks due to long-term exposure to the microgravity environment. Risks to safety and health due to degradation in the microgravity environment include crew inability to complete emergency or nominal activities, increased risk of injury, and inability to complete safe return to the ground due to reduced strength or embrittled bones. These risks without controls slowly increase in probability for the length of the mission and become more significant for increasing mission durations. Countermeasures to microgravity include hardware systems that place a crewmember s body under elevated stress to produce an effect similar to daily exposure to gravity. The ISS countermeasure system is predominately composed of customized exercise machines. Historical treatment of microgravity countermeasure systems as medical research experiments unintentionally reduced the foreseen importance and therefore the capability of the systems to function in a long-term operational role. Long-term hazardous effects and steadily increasing operational risks due to non-functional countermeasure equipment require a more rigorous design approach and incorporation of redundancy into seemingly non- mission-critical hardware systems. Variations in the rate of health degradation and responsiveness to countermeasures among the crew population drastically increase the challenge for design requirements development and verification of the appropriate risk control strategy. The long-term nature of the hazards and severe limits on logistical re-supply mass, volume and frequency complicates assessment of hardware availability and verification of an adequate maintenance and sparing plan. Design achievement of medically defined performance requirements by microgravity countermeasure systems and incorporation of adequate failure tolerance significantly reduces these risks. Future implementation of on-site monitoring hardware for critical health parameters such as bone mineral density would allow greater responsiveness, efficiency, and optimized design of the countermeasures system.

Gernand, Jeremy M.↗

Shuttle Risk Progression: Use of the Shuttle Probabilistic Risk Assessment (PRA) to Show Reliability Growth

It is important to the Space Shuttle Program (SSP), as well as future manned spaceflight programs, to understand the early mission risk and progression of risk as the program gains insights into the integrated vehicle through flight. The risk progression is important to the SSP as part of the documentation of lessons learned. The risk progression is important to future programs to understand reliability growth and the first flight risk. This analysis uses the knowledge gained from 30 years of operational flights and the current Shuttle PRA to calculate the risk of Loss of Crew and Vehicle (LOCV) at significant milestones beginning with the first flight. Key flights were evaluated based upon historical events and significant re-designs. The results indicated that the Shuttle risk tends to follow a step function as opposed to following a traditional reliability growth pattern where risk exponentially improves with each flight. In addition, it shows that risk can increase due to trading safety margin for increased performance or due to external events. Due to the risk drivers not being addressed, the risk did not improve appreciably during the first 25 flights. It was only after significant events occurred such as Challenger and Columbia, where the risk drivers were apparent, that risk was significantly improved. In addition, this paper will show that the SSP has reduced the risk of LOCV by almost an order of magnitude. It is easy to look back afte r 30 years and point to risks that are now obvious, however; the key is to use this knowledge to benefit other programs which are in their infancy stages. One lesson learned from the SSP is understanding risk drivers are essential in order to considerably reduce risk. This will enable the new program to focus time and resources on identifying and reducing the significant risks. A comprehensive PRA, similar to that of the Shuttle PRA, is an effective tool quantifying risk drivers if support from all of the stakeholders is given.

Hamlin, Teri L.↗

An Analysis of Exploration Capability Gaps for Future Habitation Systems to Inform Risk Assessment and Development Priorities

Within NASA, exploration capability gaps are defined as the difference between the current state-of-the-art in capabilities and the anticipated needs of future human spaceflight architectures. As NASA and its partners’ capabilities for human exploration of deep space continue to mature, it is necessary to understand the capability gaps that require closure to support future habitation systems, such as the Lunar Surface Habitat (SH) and Mars Transit Habitat (TH) currently in concept development. This paper will identify high-priority capability gaps for exploration habitation and show potential options for gap closure through investment in technology, development, and testing. High-priority capability gaps are divided into the following general taxonomy areas: human health/life support/habitation systems, flight computing and avionics, power and energy storage, communications and navigation, thermal management systems, human exploration destination systems, autonomous systems, sensors and instruments, GNC (guidance, navigation, and control), robotic systems, ground and uncrewed surface systems, and materials/structures/mechanical systems/manufacturing. In the gap identification process, teams of discipline experts from across NASA reviewed the latest habitation architecture needs against current capabilities to understand where gaps may exist. The results of the assessment established a basis for the current state-of-the-art within each gap and identified the capability needs of the proposed exploration missions the gap links to. An assessment of how each test platform (e.g., Ground, International Space Station (ISS), Commercial Low Earth Orbit (LEO) Destinations, Gateway) may be leveraged to mature capabilities and potentially provide a route to gap closure will be discussed. The notional timeline for gap closure to support reference missions and impacts to overall schedule are also assessed where appropriate. Based on the capability gap analysis described above, the paper summarizes important technology maturation considerations for human exploration architectures, with a focus on the Mars TH. The previously published NASA habitation ground rules and assumptions document is used as the basis to classify gaps as enabling, enhancing, or “push” opportunities for a particular architecture. Stepwise technology maturation plans/considerations are presented for some selected critical gaps. Overall, the analysis in this paper is intended to help influence development priorities for habitation systems, where high-priority, critical gaps are those currently assessed as having a low probability of closure by the anticipated need date. Capability gap analysis also informs the risk register for exploration habitation systems and mitigation strategies to ensure readiness of key technologies to support future mission timelines. Linkage between capability gaps for Moon and Mars is noted, as closure of a gap at a Lunar destination may subsequently enable or enhance Mars TH architectures.

technology development↗

An Analysis of Exploration Capability Gaps for Future Habitation Systems to Inform Risk Assessment and Development Priorities

Within NASA, exploration capability gaps are defined as the difference between the current state-of-the-art in capabilities and the anticipated needs of future human spaceflight architectures. As NASA and its partners’ capabilities for human exploration of deep space continue to mature, it is necessary to understand the capability gaps that require closure to support future habitation systems, such as the Lunar Surface Habitat (SH) and Mars Transit Habitat (TH) currently in concept development. This paper will identify high-priority capability gaps for exploration habitation and show potential options for gap closure through investment in technology, development, and testing. High-priority capability gaps are divided into the following general taxonomy areas: human health/life support/habitation systems, flight computing and avionics, power and energy storage, communications and navigation, thermal management systems, human exploration destination systems, autonomous systems, sensors and instruments, GNC (guidance, navigation, and control), robotic systems, ground and uncrewed surface systems, and materials/structures/mechanical systems/manufacturing. In the gap identification process, teams of discipline experts from across NASA reviewed the latest habitation architecture needs against current capabilities to understand where gaps may exist. The results of the assessment established a basis for the current state-of-the-art within each gap and identified the capability needs of the proposed exploration missions the gap links to. An assessment of how each test platform (e.g., Ground, International Space Station (ISS), Commercial Low Earth Orbit (LEO) Destinations, Gateway) may be leveraged to mature capabilities and potentially provide a route to gap closure will be discussed. The notional timeline for gap closure to support reference missions and impacts to overall schedule are also assessed where appropriate. Based on the capability gap analysis described above, the paper summarizes important technology maturation considerations for human exploration architectures, with a focus on the Mars TH. The previously published NASA habitation ground rules and assumptions document is used as the basis to classify gaps as enabling, enhancing, or “push” opportunities for a particular architecture. Stepwise technology maturation plans/considerations are presented for some selected critical gaps. Overall, the analysis in this paper is intended to help influence development priorities for habitation systems, where high-priority, critical gaps are those currently assessed as having a low probability of closure by the anticipated need date. Capability gap analysis also informs the risk register for exploration habitation systems and mitigation strategies to ensure readiness of key technologies to support future mission timelines. Linkage between capability gaps for Moon and Mars is noted, as closure of a gap at a Lunar destination may subsequently enable or enhance Mars TH architectures.

technology development↗