Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk Assessment Tool”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Updating the Building Science Advisor (BSA): A Tool to Assist in the Design of Durable Building Envelopes

Predicting the moisture durability of building envelope components remains challenging due to multiple influencing factors, including material selection, assembly positioning, local climate conditions, air tightness, interior environment, and construction quality. Building codes increasingly emphasize energy efficiency through enhanced insulation and tighter envelopes but offer limited guidance on moisture durability considerations. Consequently, builders face uncertainty, particularly as new materials and assemblies enter the market.The Building Science Advisor (BSA) is a free, web-based expert system developed to address these challenges by providing actionable insights into the moisture durability and energy efficiency of both new and retrofit wall designs. Recently updated, we are now providing version 3.0 of the tool. BSA features significant user interface improvements, enhancing navigation and user interaction through a refreshed, intuitive design. Additionally, the tool incorporates a newly developed database containing pre-simulated wall assembly cases, significantly reducing response times and improving the accuracy of moisture durability assessments. Furthermore, the updated BSA includes moisture content as a performance criterion, providing users with a more comprehensive understanding of moisture-related durability risks. These enhancements enable rapid, reliable assessments tailored to specific climate zones and local building practices. BSA continues to offer targeted guidance on wall retrofit scenarios and delivers access to an expanded library of location-specific building science resources.This paper describes these key updates, highlighting the enhanced features, expanded capabilities, and overall improvements to user experience and educational content. The paper includes a demonstration that illustrates how the revised BSA effectively supports practitioners in designing durable, energy-efficient building envelope assemblies.

Salonvaara, Mikael [ORNL] (ORCID:0000000318991554)↗

A Generic Advanced Computing Framework for Executing Windows-based Dynamic Contingency Analysis Tool in Parallel on Cluster Machines

Dynamic contingency analysis tool (DCAT) has been developed to assess the impact and likelihood of extreme contingencies and potential cascading events across their systems and interconnections. By including more customized protection models and corrective actions into the Windows-based commercial tools, DCAT can help operators understand the cascading behavior and find mitigation approaches to reduce the risk of cascading outages in a more realistic manner. In order to further enhance the capability of DCAT, this paper presents a design of an advanced computing framework that enables DCAT to run on a cluster machine to improve its computational performance. This framework is generic and can be applied to other Windows-based simulation tools to fill the technical gap of applying advanced computing technology to vendors' Windows-based tools. The preliminary tests using medium to large power systems have shown the effectiveness of this framework and its potential for accelerating the adoption of advanced computing in utilities.

Advanced computing, dynamic contingency analysis, ↗

Agent-based simulation and child protection systems: Rationale, implementation, and verification

Simulation models are an important tool used in health care and other disciplines to support operational research and decision-making. In the child protection literature, simulation models are an under-utilized source of research evidence. Here, in this paper, we describe the rationale for and the development of an agent-based simulation of a child protection system in the US. Using the investigation, prevention service, and placement histories of 600,000 children served in an urban child welfare system, we walk the reader through the development of a prototype known as OSPEDALE. The governing equations built into OSPEDALE probabilistically simulate the onset of investigations. Then, drawing from empirical survival distributions, the governing equations trace the probability of subsequent interactions with the system (recurrence of maltreatment, service referrals, and placement) conditional on the characteristics of children, their assessed risk level, and prior child protection system involvement. As an initial test of OSPEDALE's utility, we compare empirical admission counts with counts generated from OSPEDALE. Though the verification step is admittedly simple, the comparison shows that OSPEDALE replicates the empirical count of new admissions closely enough to justify further investment in OSPEDALE. Management of public child protection systems is increasingly research evidence-dependent. The emphasis on research evidence as a decision-support tool has elevated evidence acquired through randomized clinical trials. Though important, the evidence from clinical trials represents only one type of research evidence. Properly specified, simulation models are another source of evidence with real-world relevance.

60 APPLIED LIFE SCIENCES↗

Probabilistic Assessment of High-Renewables Power Systems: Current Work and Future Directions

In a future with higher penetrations of variable and energy-limited resources, the dominant sources of resource adequacy risk begin to shift from (assumed) independent thermal unit outages to spatially- and temporally-correlated weather-driven phenomena. Traditional resource adequacy assessment and planning methods can be ill-suited to such scenarios. This presentation will highlight aspects of NREL's work in adapting and developing new probabilistic methods and tools in anticipation of the needs of the power system planning exercises of tomorrow.

17 WIND ENERGY↗

Strategies for Flood Resilience and Grid Investment Among Iowa's Electric Distribution Utilities

Flooding poses a growing threat to Iowa's electric distribution system, yet utilities face significant data and modeling challenges in planning effective resilience investments. This report provides a foundational assessment of how distribution utilities in Iowa, investor-owned, municipal, and cooperative, approach resilience planning, with a focus on flood risk. It combines hazard characterization, review of state and utility practices, and application of NLR's Energy Resilience Analysis for Distribution Systems (ERAD) and Capacity Expansion Decision Support for Distribution Networks (CADET) tools. Using FEMA floodplains, Iowa Flood Center depth grids, and utility infrastructure data, the analysis quantifies asset exposure, simulates outage risks, and evaluates resilience strategies such as pole hardening, undergrounding, and substation protection. Results indicate that while feeder-level upgrades provide incremental benefits, the most significant reductions in outage risk are achieved through targeted substation interventions. The report highlights key data gaps, such as limited elevation data and fragility functions, and underscores the need for probability-weighted investment frameworks to address both frequent and catastrophic flood events. These insights aim to support utilities, state agencies, and federal partners in prioritizing resilience investments that safeguard Iowa's electric grid against future flooding.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interactive Mesh Generation and Comparison Tools for Nuclear Energy Advanced Modeling & Simulation Phase I. Final Report

The promise of computer simulations for nuclear reactor designs is the opportunity to speed up the design process while also improving safety, providing more detail and higher fidelity, reducing cost, minimizing schedule risk, and avoiding many other potential problems; because simulations have the potential to be much less expensive and time-consuming than traditional development – where scale models and physical tests require construction and long lead times – it is possible to consider more alternatives and complete more comprehensive assessments before the design is finalized and constructed. As more design scenarios are studied by simulation, the speed that simulations promise is only available as long as bottlenecks are addressed for these scenarios. A frequent bottleneck is the amount of human labor required to describe the shape of the objects being designed and decompose the shape into simple elements, such as hexahedra, that are small enough to capture the physical phenomena of interest without being so small that even fast computers cannot perform the simulation in a reasonable amount of time. Recently, techniques for creating all-hexahedral decompositions have been developed, but they require some human input. Many simulation codes prefer all-hexahedral decompositions, so we proposed to evaluate the feasibility of these techniques on nuclear reactor geometries to see whether they required too much human input to be commercially viable. Our study concluded that they can be made viable with some additional software tools to reduce the amount of user input required.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Smart manufacturing maturity models and their applicability: a review

The purpose of this paper is to review existing smart manufacturing (SM) maturity models' dimensions and maturity levels to assess their applicability and drawbacks. There are many maturity models available but many of them have not been validated or do not provide a useful guide or tool for applications. This gap creates the need for a review of the existing maturity model's applicability. Nineteen peer-reviewed maturity models related to “Digital Transformation,” “Industry 4.0” or “Smart Manufacturing” were selected based on a systematic literature review and five consulting firm models were selected based on the author's industry knowledge. The chosen models were analyzed to determine 10 categories of dimensions. Then they are assessed on a 1–5 scale for how applicable they are in the 10 categories of dimensions. The five “consulting firm” models have a first-mover advantage, are more widely used in industry and are more applicable, but some require payment, and they lack published details and validation. The 19 “peer reviewed” models are not as widely used, lack awareness in the industry and are not as easy to apply because of no web tool for self-assessment, but they are improving. The categories defined to characterize the models and facilitate comparisons for users include “Information Technology (IT) and Cyber-Physical System (CPS) and Data,” “Strategy and Organization,” “Supply Chain and Logistics,” “Products and Services,” “Culture and Employees,” “Technology and Capabilities,” “Customer and Market,” “Cybersecurity and Risk,” “Leadership and Management” and “Governance and Compliance.” The analyzed maturity models were particularly weak in the areas of cybersecurity, leadership and governance. Researchers and practitioners can use this review with consideration of their specific needs to determine if a maturity model is applicable or if a new model needs to be developed. The review can also aid in the development of maturity models through the discussion of each of the dimension categories. Finally, compared to existing reviews of SM maturity models, this research determines comprehensive dimension categories and focuses on applicability and drawbacks.

42 ENGINEERING↗

A Pathway for the Development of Advanced Reactor Mechanistic Source Term Modeling and Simulation Capabilities

Source term analysis, or the estimation of the potential radionuclide release to the environment during reactor events, is a central focus of the reactor licensing process and a vital part of risk-informed reactor design approaches. A mechanistic source term (MST) analysis is designed to realistically model the release and transport of radionuclides from the source to the environment for specific scenarios, while accounting for retention or transmutation phenomena and associated uncertainties. The objective of MST analyses, in comparison to bounding or conservative source term assessments, is to provide a non-biased representation of reactor risk and improve the information available for siting, emergency planning, and reactor design decisions. In support of the advanced reactor community in its pursuit of MST analysis capabilities, this work outlines a recommended research pathway for the development of MST modeling and simulation (mod/sim) tools.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Securing Solar for the Grid (S2G) (Final Project Report) [Slides]

This is the final technical report for the SETO-funded project Securing Solar for the Grid (S2G) from FY22-24. The project scope included development and dissemination of standards' requirements, best practices, equipment testing procedures, assessment tools, as well as education and training materials for cyber defense, posture and maturity tailored to solar technologies. The outcomes for this work include: co-led the development of cybersecurity certification standard (UL2941), co-led the development of cybersecurity guide (IEEE1547.3), development of recommendations for supply chain cybersecurity, and development of cybersecurity risk profiles and recommendations for DERMS.

14 SOLAR ENERGY↗

Wind Energy Accomplishments and Year-End Performance Report: Fiscal Year 2023

As the United States' largest source of renewable energy, wind is already playing a vital role in the nation's shift to electricity generated from sustainable resources. Scientists, engineers, and analysts at the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) are propelling our country closer to this clean energy future with new efficient, reliable, and cost-competitive wind technologies and deployment strategies. In Fiscal Year 2023 (FY 2023), NREL received national acclaim for recent wind technology breakthroughs, applauded sustained decades of progress in wind energy research, and heralded new initiatives to support the next generation of wind development. This report and NREL's achievements of the last year set the stage for innovative research to come. Two NREL software innovations used to assess wind technology options were recognized with R&D 100 Awards. The Renewable Energy Potential (reV) model helps planners, developers, and researchers calculate wind energy capacity, generation, and cost for specific facilities, fleets and scenarios. NREL's Simulation and Emulation for Advanced Systems validates transmission and distribution solutions to minimize implementation risks. Both of these tools can be applied to a range of renewable solutions to cut costs and improve the reliability of systems in even the most remote locations. The laboratory commemorated landmark anniversaries for wind energy research facilities and programs managed by NREL. The National Wind Technology Center (NWTC) celebrated 30 years as a world-class hub for renewable energy research. An important component of the NWTC on NREL's Flatirons Campus, the one-of-a-kind 7-megawatt (MW) Controllable Grid Interface wind energy research apparatus, turned 10 this year. The Collegiate Wind Competition completed its tenth annual competition in May 2023. Six years after the grand challenges in wind energy science were first compiled, NREL brought together more than 100 wind energy experts from 15 countries to revisit the field's most pressing research needs. Other key new research initiatives examined ways to simultaneously address the needs for skilled wind energy workers and equitable job opportunities. NREL released the first national-level report evaluating offshore wind industry workforce gaps and ways to build a large, diverse pool of job candidates. The lab also co-hosted the International Partnering Forum's Offshore Wind Workforce Summit as part of its ongoing efforts to address the special challenges of that industry sector. NREL research and development (R&D) for the DOE Wind Energy Technologies Office (WETO) continues to build momentum in its efforts to combat climate change, create clean energy jobs, and promote energy justice. This report provides more detail on these top achievements and other accomplishments made by NREL and its partners during FY 2023 (between Oct. 1, 2022, and Sept. 30, 2023).

accomplishments↗

Risk Importance Ranking of Fire Data Parameters to Enhance Fire PRA Model Realism

Fire is historically and analytically a significant contributor to nuclear power plant risk. The level of fire risk and the methods, tools and data for modeling this risk is highly debated by experts. One area of debate is the input data used in fire modeling and how to deal with this data’s high uncertainty. This report outlines initial work performed for determining the key parameters causing this uncertainty and how it propagates into nuclear power plant models. This research paves the way for the development of methods to reduce fire data uncertainty used in modeling. The Nuclear Regulatory Commission has mandated that nuclear power plants perform fire risk modeling. However, there are several issues with the current risk modeling implementation that affect the results. Approved modeling methods can be overly conservative and often do not match plant experience. Also, the data used in the modeling can have high uncertainties and is influenced by expert judgement. To evaluate input data uncertainty, researchers performed an initial review of several fire experiments done at Sandia National Laboratories. Uncertainties for fire data can come from many sources, such as experiment design constraints, environmental conditions, or other plant-specific aspects. There are many different significant and insignificant parameters driving the uncertainty. Additionally, the uncertainty of the different input data used in the fire modeling could have a significant or insignificant effect on the entire plant risk. A four-step methodology was developed to perform Integrated Probabilistic Risk Assessment Importance Ranking. A demonstration case using these steps was set up and three of the four steps were completed in fiscal year (FY) 2019 and the fourth step done FY 2020. These steps are: 1. The qualitative analysis of potential sources was conducted with the following items identified for the demonstration. • Maximum heat release rate • Time to maximum heat release rate • Duration of max heat release rate • Time to decay • Thermal conductivity of concrete • Specific heat of concrete • Density of concrete • Cable jacket thickness 2. A quantitative characterization of dominant sources of uncertainty was performed. A list of distributions and determined values of the dominant sources is shown in Appendix A. 3. A quantitative screening of the potential sources of uncertainty using Morris Elementary Effects Analysis was completed. An experimental model using the physics-based fire modeling tool Fire Dynamics Simulator was developed and coupled with the Risk Analysis Virtual Environment. The Morris analysis identified at least two parameters that can be eliminated as significant contributors (specific heat of concrete and cable jacket thickness). 4. Global importance measure (Global IM) analysis to generate a comprehensive ranking based on their influence on the plant risk. In this research, a moment-independent Global IM is used since it can address (a) uncertainty in the input parameters of the fire model, (b) uncertainty in the risk outputs, and (c) non-linearity and interactions among input parameters in the fire model, more accurately than the correlation-based and variance-based global methods. The observations from the research showed that, depending on the initial and boundary conditions of the fire scenarios, fire-induced damage could have a very small probability and could be dominated by the tail of the uncertainty distribution; hence, the accuracy of the correlation-based and variance-based methods is questionable. The moment-independent Global IM analysis in this research provides a better understanding of how experimental uncertainty data affects industry’s plant models and where improvements in that data will have the largest benefit for improving fire modeling accuracy in causing core damage. Among the five unscreened parameters obtained from the Morris EE analysis, the Global IM analysis results for the case study indicated that max heat release rate and fire location are the most important parameters. The report also outlines benefits of using a unified computational platform that integrates the underlying simulations (e.g., a fire progression model), quantitative screening (using the Morris EE method), and the Global IM analysis. A unified platform can (i) facilitate the ranking of input parameters considering multiple key fire scenarios simultaneously, rather than considering one scenario at a time, (ii) contribute to more explicit and accurate treatment of dependencies at multiple levels of Fire PRA, (iii) facilitate the sampling-based uncertainty quantification for Fire PRA, and (iv) help generating both “industry-wide” and "plant-specific" ranking of uncertainty sources in Fire PRA. Future research should be done to include additional parameters such as detection/suppression or cable fire spread. Adding a PRA software such as SAPHIRE to the RAVEN platform would help with plant model integration and improve treatment of fire-induced dependency. The I-PRA risk importance ranking methodology offered in this report can provide valuable information for efficiently (a) enhancing the realism of Fire PRA for existing plants and (b) supporting the development of Dynamic Fire PRA for advanced reactors and new plants.

97 MATHEMATICS AND COMPUTING↗

Flexible Plant Operation and Generation Technical Program Plan for FY2023

This report presents the Technical Program Plan for Fiscal Years 2023-2027 (FY2023 to FY2027) for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program—Flexible Plant Operation and Generation Research Pathway. The objective of this pathway is to carry out the research needed to help nuclear power plants diversify revenue generation for the life of these plants. The purpose of these research and development activities is two fold: (1) to reduce the technical and economic risks of implementing FPOG applications and (2) to provide guidance on relevant safety and environmental operating license reviews, amendments, and renewals. This pathway provides a clear understanding of the benefits of nuclear energy beyond electricity markets. A detailed description of the research and development activities that have been completed and that are planned for FY2023—FY2027 are presented in this report. These activities include completing the development of analysis tools to perform technical and economic assessments of realistic market opportunities for producing secondary energy products near nuclear power plants. They also include developing and demonstrating engineering systems and control concepts to dispatch thermal and electrical power to an industrial user. Additionally, this plan includes developing guidance for addressing potential regulatory and licensing requirements. In addition, the formation, purpose, and activities of a group referred to as the Hydrogen Regulatory Research and Review Group is discussed. An overview is also provided on the potential benefits of the Infrastructure Investment and Jobs Act (IIJA) Bill that will support the commencement of Regional Clean Hydrogen Hubs, and the Inflation Reduction Act (IRA) that provides compelling production tax credits for nuclear electricity and clean hydrogen using nuclear energy.

08 HYDROGEN↗

Risk Analysis of Various Design Architectures for High Safety-significant Safety-related Digital Instrumentation and Control Systems of Nuclear Power Plants during Accident Scenarios

This report documents the plus-up activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2022 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing advanced risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems to support system design decisions and diversity and redundancy applications, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the LWRS-developed framework instructs nuclear vendors and utilities on how to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). Adding diversity within system or components is the main means to eliminate and mitigate CCFs, but diversity also increases plant complexity and errors and may not address all sources of systematic failures. How to optimize the diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in HSSSR DI&C systems of NPPs and supporting relevant design optimization, the framework provides: ? An integrated best-estimate, risk-informed capability to address new technical digital issues quantitatively, accurately, and efficiently in plan modernization progress, such as software CCFs in HSSSR DI&C systems of NPPs ? A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to efficiently predict and prevent risk in the early design stage of DI&C systems ? Technical bases and risk-informed insights to assist U.S. Nuclear Regulatory Commission (NRC) and industry to address and fulfill the risk-informed alternatives for evaluation of CCFs in HSSSR DI&C systems of NPPs ? An integrated risk-informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The plus-up research and development efforts of this project in FY 2022 are focused on methodology improvement of software CCF modeling and estimation, prevention analysis, importance analysis and risk analysis of various design architectures of HSSSR DI&C systems. This work greatly enhances the capability of the LWRS-developed framework for the risk assessment and design optimization of safety-critical DI&C systems. It should be noted that all the analyses are performed for the demonstration of the LWRS-developed framework, not for the evaluation of relevant systems. Results are obtained based on very limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reference Station Risk Assessment for Refueling Heavy-Duty Vehicles Using HyRAM+

The deployment of heavy-duty (HD) hydrogen fuel cell vehicles that are entering the market now is driving the need for expanded HD hydrogen refueling station infrastructure to meet demand. This expansion must prioritize safety and reliability, necessitating careful consideration of the associated risks. In this study, we use a light-duty (LD) hydrogen refueling station as a comparative tool to quantify the risks for a HD station, which is essentially a scaled-up version of a LD station.

08 HYDROGEN↗

Assessing Solar Cybersecurity: Questions for States to Ask Electric Utilities

To help State Energy Officials and Public Utility Commissions engaging investor-and consumer-owned utilities and the solar industry in topical discussions about their cybersecurity practices and priorities in general, and for interconnected solar systems, specifically, this report outlines discussions prompts for these discussions. By using the questions in this tool states can explore aspects of utilities’ cybersecurity risk management programs that target solar devices, systems, and communication pathways. Such discussions help states identify cybersecurity gaps and assist in emergency response planning, as well as general risk awareness.

14 SOLAR ENERGY↗

Cost‐benefit assessment framework for robotics‐driven inspection of floating offshore wind farms

Abstract Operations and maintenance (O&M) of floating offshore wind farms (FOWFs) poses various challenges in terms of greater distances from the shore, harsher weather conditions, and restricted mobility options. Robotic systems have the potential to automate some parts of the O&M leading to continuous feature‐rich data acquisition, operational efficiency, along with health and safety improvements. There remains a gap in assessing the techno‐economic feasibility of robotics in the FOWF sector. This paper investigates the costs and benefits of incorporating robotics into the O&M of a FOWF. A bottom‐up cost model is used to estimate the costs for a proposed multi‐robot platform (MRP). The MRP houses unmanned aerial vehicle (UAV) and remotely operated vehicle (ROV) to conduct the inspection of specific FOWF components. Emphasis is laid on the most conducive O&M activities for robotization and the associated technical and cost aspects. The simulation is conducted in Windfarm Operations and Maintenance cost‐Benefit Analysis Tool (WOMBAT), where the metrics of incurred operational expenditure (OPEX) and the inspection time are calculated and compared with those of a baseline case consisting of crew transfer vessels, rope‐access technicians, and divers. Results show that the MRP can reduce the inspection time incurred, but this reduction has dependency on the efficacy of the robotic system and the associated parameterization e.g., cost elements and the inspection rates. Conversely, the increased MRP day rate results in a higher annualized OPEX. Residual risk is calculated to assess the net benefit of incorporating the MRP. Furthermore, sensitivity analysis is conducted to find the key parameters influencing the OPEX and the inspection time variation. A key output of this work is a robust and realistic framework which can be used for the cost‐benefit assessment of future MRP systems for specific FOWF activities.

17 WIND ENERGY↗

Cybersecurity Platform and Certification Framework Development for Extreme Fast Charging (XFC)-Integrated Charging Ecosystem (Final Project Report)

This report summarizes a pioneering effort in Electric Vehicle charging infrastructure ecosystem cybersecurity requirements, assessment methodologies, functional verification, as well as embodiment of the key technologies in the form of hardware and software tools being made available to the public. EPRI led a team of experts, as well as a stakeholder coalition encompassing all key actors in the EV charging infrastructure ecosystem that includes eXtreme Fast Charging (XFC) equipment (defined as 200kW or above). EV charging infrastructure in the United States is a patchwork of networks that have continued to grow organically and have been designed to serve the charging needs of the EV owners, who are their customers. In doing so, each network provider, as well as their connected entities such as the cloud Electric Vehicle Service Providers or EVSPs, utility back office, utility AMI networks, payment networks, as well as Original Equipment Manufacturer (EV manufacturer) telematics networks, have designed systems that may work well individually, but no single entity is responsible for the entire ecosystem to be secure in terms of data exchange. Furthermore, there is no uniformity in how each actor has implemented the cybersecurity requirements since no system-wide cybersecurity requirements existed prior to this project. The final project report describes the technical approach guided by the EV charging infrastructure cybersecurity working group, convened specifically for this project. The technical approach included definition of requirements at the ecosystem level, treated as a ‘system of systems’, and then passed down to individual systems (EVSE, EV, cloud EVSP, utility, and the payment networks), followed by developing the cybersecurity risk and vulnerability assessment methods, that were later applied to real-world cyber-physical systems at EPRI, ANL, and NREL laboratories, to validate both the process and the results. Finally, in a spotlight over the most vulnerable equipment, which is the EV charge station (AC or DC), the team developed a multi-layer cybersecurity implementation in the embedded domain embodied by the open-source Secure Network Interface Card (SNIC) demonstrating the various ways in which the infrastructure can be secured protecting against the identified attack surfaces. Finally, the entire process of EV infrastructure cybersecurity assessment was encapsulated in the Electric Vehicle Charging Cybersecurity Management (EVC2M) online GUI-based tool, that is expected to be released to the public. The report presents the objectives, the technical approach, the key results, and recommendations for future work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recommended Practices for Managing Induced Seismicity Risk Associated with Geologic Carbon Storage

The geologic storage of carbon dioxide (CO 2 ) is one method to help reduce or eliminate atmospheric CO 2 emissions. The sequestered CO 2 is originally captured from the atmosphere or from a stationary industrial source and subsequently injected into a deep subsurface porous rock formation. To facilitate the successful deployment of field scale carbon storage projects, the U.S. Department of Energy (DOE) is developing tools and protocols for defensible, science-based frameworks to quantify and mitigate risks associated with the long-term storage of CO 2 . This protocol specifically addresses the risk of induced seismicity due to injection in a geologic carbon storage (GCS) site. This integrated and risk-based protocol is a product of the U.S. DOE Fossil Energy’s National Risk Assessment Partnership (NRAP), a multi-year collaborative research effort of Los Alamos National Laboratory (LANL), Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), National Energy Technology Laboratory (NETL), and Pacific Northwest National Laboratory (PNNL). These recommended practices describe a set of 7 steps to evaluate, manage, communicate, and mitigate the risk of induced seismicity at GCS sites. The base methodology of the recommended practices follows a framework similar to the Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems (Majer et al., 2012), developed for the Geothermal Technology Office of the U.S. DOE. These recommended practices present a framework to systematically assess the induced seismicity risk and quantify the associated uncertainties. These recommendations are based on current research and are sufficiently general to allow for modification and application to a variety of different types of sites. The substance of the recommended practices contained herein includes both technical and non-technical issues, and covers all operational stages of the GCS project lifecycle. They start at the preliminary risk assessment phase, continue through site assessment and characterization, include best practice communication and seismic monitoring plan methodologies, discuss the evaluation and mitigation of seismic hazard and risk, and closes with an exploration of operational management plans, which conclude when the induced seismicity risk abates back to background level. The focus of these recommendations is on actively managing the risks associated with induced seismicity by developing an actionable risk management plan that starts at the project proposal stage and continues through site closure through an iterative assessment and improvement process. The audience of this document is expected to include all interested stakeholders (e.g., operators, project developers, regulators, and the general public) and is expressly written to be accessible to this broad range of partners. This document is intended to disseminate knowledge gained through recent advances in the science of induced seismicity hazard and risk assessments, to provide updates based on recent experience gained by similar corollary injection-induced seismicity cases, and most importantly to establish a uniform framework to carry out a successful induced seismicity risk management plan for carbon storage projects in the future. These recommendations do not directly address any domestic or international regulations or standards. A complementary NRAP report makes recommendations for the assessment and management of environmental subsurface risks associated with unwanted fluid migration at GCS sites (Thomas et al., 2021) and should be referred to in order to address those additional GCS site risks.

54 ENVIRONMENTAL SCIENCES↗