Search NASA⌕ Search

SEARCH · Search NASA

Results for “Risk acceptability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Developing and Implementing Risk-Based Research Safety at Argonne National Laboratory

Facilities operated by the US Department of Energy (DOE) are required to have extensive worker safety and health programs by regulation. Here we describe how Argonne National Laboratory (ANL) has implemented the DOE requirements to bring the Laboratory’s multidisciplinary research risk to an acceptable level to safely execute ANL’s mission to perform cutting-edge research.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Integrated Medical Model Verification, Validation, and Credibility

The Integrated Medical Model (IMM) was designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic (stochastic process) model based on historical data, cohort data, and subject matter expert opinion. A probabilistic approach is taken since exact (deterministic) results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation. METHODS: In 2008, the IMM team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) was published, the IMM team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. RESULTS: IMM VVC updates are compiled recurrently and include 7009 Compliance and Credibility matrices, IMM VV Plan status, and a synopsis of any changes or updates to the IMM during the reporting period. Reporting tools have evolved over the lifetime of the IMM project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the NASA-STD-7009 Guidance Document. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including Operations, Science and Technology Planning, and Exploration Planning. CONCLUSIONS: The VVC approach established by the IMM project of combining the IMM VV Plan with 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Validation↗

Integrated Medical Model (IMM) Project Verification, Validation, and Credibility (VVandC)

The Integrated Medical Model (IMM) Project supports end user requests by employing the Integrated Medical Evidence Database (iMED) and IMM tools as well as subject matter expertise within the Project. The iMED houses data used by the IMM. The IMM is designed to forecast relative changes for a specified set of crew health and mission success risk metrics by using a probabilistic model based on historical data, cohort data, and subject matter expert opinion. A stochastic approach is taken because deterministic results would not appropriately reflect the uncertainty in the IMM inputs. Once the IMM was conceptualized, a plan was needed to rigorously assess input information, framework and code, and output results of the IMM, and ensure that end user requests and requirements were considered during all stages of model development and implementation, as well as lay the foundation for external review and application. METHODS: In 2008, the Project team developed a comprehensive verification and validation (VV) plan, which specified internal and external review criteria encompassing 1) verification of data and IMM structure to ensure proper implementation of the IMM, 2) several validation techniques to confirm that the simulation capability of the IMM appropriately represents occurrences and consequences of medical conditions during space missions, and 3) credibility processes to develop user confidence in the information derived from the IMM. When the NASA-STD-7009 (7009) [1] was published, the Project team updated their verification, validation, and credibility (VVC) project plan to meet 7009 requirements and include 7009 tools in reporting VVC status of the IMM. Construction of these tools included meeting documentation and evidence requirements sufficient to meet external review success criteria. RESULTS: IMM Project VVC updates are compiled recurrently and include updates to the 7009 Compliance and Credibility matrices. Reporting tools have evolved over the lifetime of the IMM Project to better communicate VVC status. This has included refining original 7009 methodology with augmentation from the HRP NASA-STD-7009 Guidance Document working group and the NASA-HDBK-7009 [2]. End user requests and requirements are being satisfied as evidenced by ISS Program acceptance of IMM risk forecasts, transition to an operational model and simulation tool, and completion of service requests from a broad end user consortium including operations, science and technology planning, and exploration planning. IMM v4.0 is slated for operational release in the FY015 and current VVC assessments illustrate the expected VVC status prior to the completion of customer lead external review efforts. CONCLUSIONS: The VVC approach established by the IMM Project of incorporating Project-specific recommended practices and guidelines for implementing the 7009 requirements is comprehensive and includes the involvement of end users at every stage in IMM evolution. Methods and techniques used to quantify the VVC status of the IMM Project represented a critical communication tool in providing clear and concise suitability assessments to IMM customers. These processes have not only received approval from the local NASA community but have also garnered recognition by other federal agencies seeking to develop similar guidelines in the medical modeling community.

Walton, M.↗

Cyber-Security Considerations for the Smart Grid

The electrical power grid is evolving into the “smart grid”. The goal of the smart grid is to improve efficiency and availability of power by adding more monitoring and control capabilities. These new technologies and mechanisms are certain to introduce vulnerabilities into the power grid. In this paper we provide an overview of the cyber security state of the electrical power grid. We highlight some of the vulnerabilities that already exist in the power grid including limited capacity systems, implicit trust and the lack of authentication. We also address challenges of complexity, scale, added capabilities and the move to multipurpose hardware and software as the power grid is upgraded. These changes create vulnerabilities that did not exist before and bring increased risks. We conclude the paper by showing that there are a number mitigation strategies that can help keep the risk at an acceptable level.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TIMELY DELIVERY OF LASER INERTIAL FUSION ENERGY (LIFE)

The National Ignition Facility (NIF), the world's largest and most energetic laser system, is now operational at Lawrence Livermore National Laboratory. A key goal of the NIF is to demonstrate fusion ignition for the first time in the laboratory. Its flexibility allows multiple target designs (both indirect and direct drive) to be fielded, offering substantial scope for optimization of a robust target design. In this paper we discuss an approach to generating gigawatt levels of electrical power from a laser-driven source of fusion neutrons based on these demonstration experiments. This 'LIFE' concept enables rapid time-to-market for a commercial power plant, assuming success with ignition and a technology demonstration program that links directly to a facility design and construction project. The LIFE design makes use of recent advances in diode-pumped, solid-state laser technology. It adopts the paradigm of Line Replaceable Units utilized on the NIF to provide high levels of availability and maintainability and mitigate the need for advanced materials development. A demonstration LIFE plant based on these design principles is described, along with the areas of technology development required prior to plant construction. A goal-oriented, evidence-based approach has been proposed to allow LIFE power plant rollout on a time scale that meets policy imperatives and is consistent with utility planning horizons. The system-level delivery builds from our prior national investment over many decades and makes full use of the distributed capability in laser technology, the ubiquity of semiconductor diodes, high volume manufacturing markets, and U.S. capability in fusion science and nuclear engineering. The LIFE approach is based on the ignition evidence emerging from NIF and adopts a line-replaceable unit approach to ensure high plant availability and to allow evolution from available technologies and materials. Utilization of a proven physics platform for the ignition scheme is an essential component of an acceptably low-risk solution. The degree of coupling seen on NIF between driver and target performance mandates that little deviation be adopted from the NIF geometry and beamline characteristics. Similarly, the strong coupling between subsystems in an operational power plant mandates that a self-consistent solution be established via an integrated facility delivery project. The benefits of separability of the subsystems within an IFE plant (driver, chamber, targets, etc.) emerge in the operational phase of a power plant rather than in its developmental phase. An optimized roadmap for IFE delivery needs to account for this to avoid nugatory effort and inconsistent solutions. For LIFE, a system design has been established that could lead to an operating power plant by the mid-2020s, drawing from an integrated subsystem development program to demonstrate the required technology readiness on a time scale compatible with the construction plan. Much technical development work still remains, as does alignment of key stakeholder groups to this newly emerging development option. If the required timeline is to be met, then preparation of a viable program is required alongside the demonstration of ignition on NIF. This will enable timely analysis of the technical and economic case and establishment of the appropriate delivery partnership.

42 ENGINEERING↗

RECOVERY ACT: DYNAMIC ENERGY CONSUMPTION MANAGEMENT OF ROUTING TELECOM AND DATA CENTERS THROUGH REAL-TIME OPTIMAL CONTROL (RTOC): Final Scientific/Technical Report

This final scientific report documents the Industrial Technology Program (ITP) Stage 2 Concept Development effort on Data Center Energy Reduction and Management Through Real-Time Optimal Control (RTOC). Society is becoming increasingly dependent on information technology systems, driving exponential growth in demand for data center processing and an insatiable appetite for energy. David Raths noted, 'A 50,000-square-foot data center uses approximately 4 megawatts of power, or the equivalent of 57 barrels of oil a day1.' The problem has become so severe that in some cases, users are giving up raw performance for a better balance between performance and energy efficiency. Historically, power systems for data centers were crudely sized to meet maximum demand. Since many servers operate at 60%-90% of maximum power while only utilizing an average of 5% to 15% of their capability, there are huge inefficiencies in the consumption and delivery of power in these data centers. The goal of the 'Recovery Act: Decreasing Data Center Energy Use through Network and Infrastructure Control' is to develop a state of the art approach for autonomously and intelligently reducing and managing data center power through real-time optimal control. Advances in microelectronics and software are enabling the opportunity to realize significant data center power savings through the implementation of autonomous power management control algorithms. The first step to realizing these savings was addressed in this study through the successful creation of a flexible and scalable mathematical model (equation) for data center behavior and the formulation of an acceptable low technical risk market introduction strategy leveraging commercial hardware and software familiar to the data center market. Follow-on Stage 3 Concept Development efforts include predictive modeling and simulation of algorithm performance, prototype demonstrations with representative data center equipment to verify requisite performance and continued commercial partnering agreement formation to ensure uninterrupted development, and deployment of the real-time optimal control algorithm. As a software implementable technique for reducing power consumption, the RTOC has two very desirable traits supporting rapid prototyping and ultimately widespread dissemination. First, very little capital is required for implementation. No major infrastructure modifications are required and there is no need to purchase expensive capital equipment. Second, the RTOC can be rolled out incrementally. Therefore, the effectiveness can be proven without a large scale initial roll out. Through the use of the Impact Projections Model provided by the DOE, monetary savings in excess of $100M in 2020 and billions by 2040 are predicted. In terms of energy savings, the model predicts a primary energy displacement of 260 trillion BTUs (33 trillion kWh), or a 50% reduction in server power consumption. The model also predicts a corresponding reduction of pollutants such as SO2 and NOx in excess of 100,000 metric tonnes assuming the RTOC is fully deployed. While additional development and prototyping is required to validate these predictions, the relative low cost and ease of implementation compared to large capital projects makes it an ideal candidate for further investigation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Proliferation Resistant Nuclear Reactor Fuel

Global appetite for fission power is projected to grow dramatically this century, and for good reason. Despite considerable research to identify new sources of energy, fission remains the most plentiful and practical alternative to fossil fuels. The environmental challenges of fossil fuel have made the fission power option increasingly attractive, particularly as we are forced to rely on reserves in ecologically fragile or politically unstable corners of the globe. Caught between a globally eroding fossil fuel reserve as well as the uncertainty and considerable costs in the development of fusion power, most of the world will most likely come to rely on fission power for at least the remainder of the 21st century. Despite inevitable growth, fission power faces enduring challenges in sustainability and security. One of fission power's greatest hurdles to universal acceptance is the risk of potential misuse for nefarious purposes of fissionable byproducts in spent fuel, such as plutonium. With this issue in mind, we have discussed intrinsic concepts in this report that are motivated by the premise that the utility, desirability, and applicability of nuclear materials can be reduced. In a general sense, the intrinsic solutions aim to reduce or eliminate the quantity of existing weapons usable material; avoid production of new weapons-usable material through enrichment, breeding, extraction; or employ engineering solutions to make the fuel cycle less useful or more difficult for producing weapons-usable material. By their nature, these schemes require modifications to existing fuel cycles. As such, the concomitants of these modifications require engagement from the nuclear reactor and fuel-design community to fully assess their effects. Unfortunately, active pursuit of any scheme that could further complicate the spread of domestic nuclear power will probably be understandably unpopular. Nevertheless, the nonproliferation and counterterrorism issues are paramount, and we posit that the exploration, development, and implementation of intrinsic mechanisms such as discussed here are part of a balanced approach aimed at preventing the misuse of nuclear material for nuclear-energy applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NPDES Permit No. NM0028355, Final Report for DQA Study 38

The United States Environmental Protection Agency (USEPA) kicked off Discharge Monitoring Report-Quality Assurance (DMR-QA) Study 38 on March 1, 2018. The study was concluded on July 6, 2018. DMR-QA Study 38 results is included in Enclosure 1 and include the results for New Mexico Water Testing Laboratory, GEL, Los Alamos National Laboratory, and Pacific Eco Risk. Non-acceptable results are noted and a corrective action plan is being developed to address deficiencies associated with the testing and will be submitted once completed.

54 ENVIRONMENTAL SCIENCES↗

Wood-to-Fuel Demonstration Project for California's Transportation Sector using Autothermal Pyrolysis (Non-Proprietary Summary Process Hazard Assessment)

Frontline has prioritized personnel safety, equipment preservation, and environmental protection throughout the design process of the autothermal pyrolysis unit. To facilitate a safe design, Frontline completed an informal hazards and operability (HAZOP) study and a formal HAZOP study, and employ management of change procedures. The result of these safety procedures is a plant that will function in a safe manner with a limited and acceptable amount of risk. Frontline took an approach it used in previous projects to execute a preliminary, internally facilitated hazards and operability (HAZOP) study. While this HAZOP study was performed without any subsequent change tracking, it enables a group of well-trained engineers to consider the safety implications of each part of the plant in a thorough and methodical manner. Frontline chose to bring in a pyrolysis consultant (Daren Daugaard of Burning Oak Energy) to participate in the review. Following the preliminary HAZOP and once the detailed design work was nearing completion, Frontline performed a formal HAZOP with a third-party facilitator, Jason Stittleburg of Novetus Engineering. Although the plant is not subject to process safety management (PSM) requirements, this formal HAZOP was performed in accordance with OSHA regulations deemed reasonable for PSM. Finally, after the formal HAZOP was conducted, Frontline maintained a safe system by implementing and following management of change procedures on each substantial change to the process. Frontline has kept a record of each subsequent change made to the formal HAZOP P&IDs. The process hazard assessment process allowed Frontline to find and correct several unacceptable configurations within the plant.

09 BIOMASS FUELS↗

Numerical aerodynamic simulation facility feasibility study, executive summary

There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability, reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year.

Source record↗

Numerical aerodynamic simulation facility feasibility study

There were three major issues examined in the feasibility study. First, the ability of the proposed system architecture to support the anticipated workload was evaluated. Second, the throughput of the computational engine (the flow model processor) was studied using real application programs. Third, the availability reliability, and maintainability of the system were modeled. The evaluations were based on the baseline systems. The results show that the implementation of the Numerical Aerodynamic Simulation Facility, in the form considered, would indeed be a feasible project with an acceptable level of risk. The technology required (both hardware and software) either already exists or, in the case of a few parts, is expected to be announced this year. Facets of the work described include the hardware configuration, software, user language, and fault tolerance.

Source record↗

Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Final ACT configuration evaluation

The Final ACT Configuration Evaluation Task of the Integrated Application of Active Controls (IAAC) technology project within the energy efficient transport program is summarized. The Final ACT Configuration, through application of Active Controls Technology (ACT) in combination with increased wing span, exhibits significant performance improvements over the conventional baseline configuration. At the design range for these configurations, 3590 km, the block fuel used is 10% less for the Final ACT Configuration, with significant reductions in fuel usage at all operational ranges. Results of this improved fuel usage and additional system and airframe costs and the complexity required to achieve it were analyzed to determine its economic effects. For a 926 km mission, the incremental return on investment is nearly 25% at 1980 fuel prices. For longer range missions or increased fuel prices, the return is greater. The technical risks encountered in the Final ACT Configuration design and the research and development effort required to reduce these risks to levels acceptable for commercial airplane design are identified.

Source record↗

Understanding and avoiding potential problems in implementing automation

Technology-driven efforts to implement automation often encounter problems due to lack of acceptance or begrudging acceptance by the personnel involved. It is argued in this paper that the level of automation perceived by an individual heavily influences whether or not the automation is accepted by that individual. The factors that appear to affect perceived level of automation are discussed. Issues considered include the impact of automation on the system and the individual, correlates of acceptance, problems and risks of automation, and factors influencing alienation. Based on an understanding of these issues, a set of eight guidelines is proposed as a possible means of avoiding problems in implementing automation.

Rouse, W. B.↗

Group Task Force on Satellite Rescue and Repair

The Group Task Force was chartered by the Administrator of NASA to recommend 'a policy outlining the criteria, the design standards, and the pricing model to guide NASA in assessing the responsibilities for government and nongovernment Satellite Rescue and Repair Missions.' Criteria for accepting such missions, risks, and benefits to all sectors of our economy involved in satellite services, adequacy of planning and training, and the impact on NASA's primary mission were reviewed. The Group began by asking a more fundamental question; is satellite rescue and repair a logical element of NASA's mission? Factors considered were: (1) the probability of rescue or repair opportunities arising; (2) the economic justification for such attempts; (3) the benefits to NASA, both from such ad hoc learning experiences in space operations and the impact on the public perception of NASA; (4) the effect of such unanticipated missions on NASA's scheduled activities; (5) any potential effect on NASA's technical capability to work in space; and (6) any potential effect on U.S. economic competitiveness.

Source record↗

Risk-based Spacecraft Fire Safety Experiments

Viewgraphs on risk-based spacecraft fire safety experiments are presented. Spacecraft fire risk can never be reduced to a zero probability. Probabilistic risk assessment is a tool to reduce risk to an acceptable level.

Apostolakis, G.↗

Estimating Lives Of Space Shuttle Parts

SSPOC (Space Shuttle Probabilistic Optimization Code) computer program, implements probabilistic mathematical model, accepts defined distributions of parameters controlling life of Space Shuttle main engine. Used to perform tradeoff studies to optimize between service life and acceptable level of risk, with greater accuracy. Also includes probability of removal and failure of parts, along with number of surviving parts for each interval of inspections. Written in FORTRAN 77, and user interface written in PASCAL(R).

Watkins, Tommie, Jr.↗

General Public Space Travel and Tourism: Executive Summary - Volume 1

Travel and tourism is one of the world's largest businesses. Its gross revenues exceed $400 billion per year in the U.S. alone, and it is our second largest employer. U.S. private sector business revenues in the space information area now approximate $10 billion per year, and are increasing rapidly. Not so in the human spaceflight area. After spending $100s of billions (1998 dollars) in public funds thereon, and continuing to spend over $5 billion per year, the government is still the only customer for human spaceflight goods and services. Serious and detailed consideration was first given to the possibility of space being opened up to trips by the general public three decades ago, and some initial attempts to do so were made a dozen years ago. But the difficulties were great and the Challenger disaster put an end to them. In recent years professional space tourism studies have been conducted in the United Kingdom, Germany and, especially, Japan. In the U.S., technological progress has been pronounced; we have had nearly a decade's experience in seeing our astronauts travel to-from low Earth orbit (LEO) safely, and we expect to commence assembly of a LEO space station housing a half-dozen people this year. Too, NASA and our space industry now have new and promising space transportation development programs underway, especially the X-33 and X-34 programs, and some related, further generation, basic technology development programs. And five private companies are also working on the design of new surface - LEO vehicles. The first professional space tourism market studies have been conducted in several countries in the past few years, especially in Japan and here. The U.S. study makes it clear that, conceptually, tens of millions of us would like to take a trip to space if we could do so with reasonable safety, comfort and reliability, and at an acceptable price. Initial businesses will address the desires of those willing to pay a greater price and accept a greater risk. A two-year cooperative Space Act agreement study has been conducted by our National Aeronautics and Space Administration and the Space Transportation Association. It was conducted by NASA and STA study leaders drawing upon the competence, experience and hard-nosed imagination of a national Steering Group and scores of attendees at a multi-day Workshop. The study has involved scores of professionals and business people from various areas: astronauts; space booster technology and operations professionals; a hotel architect and a hotel operator; an airline planner; insurance underwriters; space sickness experts; space theme park designers; space and travel and tourism association and business executives; a space-related financier; university tourism and space policy experts; present and former space-responsible government officials; space entrepreneurs; space writers; This study concludes that serious national attention should now be given to activities that would enable the expansion of today's terrestrial space tourism businesses, and the creation of in-space travel and tourism businesses. Indeed, it concludes that, in time, it should become a very important part of our Country's overall commercial and civil space business-program structure.

ONeil, Daniel↗

Cardiovascular Countermeasures for Exploration-Class Space Flight Missions

Astronaut missions to Mars may be many years or even decades in thc future but current and planned efforts can be extrapolated to required treatments and prophylaxis for delerious efforts of prolonged space flight on the cardiovascular system. The literature of candidate countermeasures was considered in combination with unpublished plans for countermeasure implementation. The scope of cardiovascular countermeasures will be guided by assessments of the efficacy of mechanical, physiological and pharmacological approaches in protecting the cardiovascular capacities of interplanetary crewmembers. Plans for countermeasure development, evaluation and validation will exploit synergies among treatment modalities with the goal of maximizing protective effects while minimizing crew time and in-flight resource use. Protection of the cardiovascular capacity of interplanetary crewmembers will become more effective and efficient over the next few decades, but trade-offs between cost and effectiveness of efficiency are always possible if the increased level of risk can be accepted.

Charles, John B.↗