At least 289 records · Page 16

Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish-Engine Solar Power Generation

This final report summarizes the final results of the Phase II Innovative Application of Maintenance-Free Phase-Change Thermal Energy Storage for Dish-Engine Solar Power Generation project being performed by Infinia Corporation for the U.S. Department of Energy under contract DE-FC36-08GO18157 during the project period of September 1, 2009 - August 30, 2012. The primary objective of this project is to demonstrate the practicality of integrating thermal energy storage (TES) modules, using a suitable thermal salt phase-change material (PCM) as its medium, with a dish/Stirling engine; enabling the system to operate during cloud transients and to provide dispatchable power for 4 to 6 hours after sunset. A laboratory prototype designed to provide 3 kW-h of net electrical output was constructed and tested at Infinia's Ogden Headquarters. In the course of the testing, it was determined that the system's heat pipe network - used to transfer incoming heat from the solar receiver to both the Stirling generator heater head and to the phase change salt - did not perform to expectations. The heat pipes had limited capacity to deliver sufficient heat energy to the generator and salt mass while in a charging mode, which was highly dependent on the orientation of the device (vertical versus horizontal). In addition, the TES system was only able to extract about 30 to 40% of the expected amount of energy from the phase change salt once it was fully molten. However, the use of heat pipes to transfer heat energy to and from a thermal energy storage medium is a key technical innovation, and the project team feels that the limitations of the current device could be greatly improved with further development. A detailed study of manufacturing costs using the prototype TES module as a basis indicates that meeting DOE LCOE goals with this hardware requires significant efforts. Improvement can be made by implementing aggressive cost-down initiatives in design and materials, improving system performance by boosting efficiencies, and by refining cost estimates with vendor quotes in lieu of mass-based approaches. Although the prototype did not fully demonstrate performance and realize projected cost targets, the project team believes that these challenges can be overcome. The test data showed that the performance can be significantly improved by refining the heat pipe designs. However, the project objective for phase 3 is to design and test on sun the field ready systems, the project team feels that is necessary to further refine the prototype heat pipe design in the current prototype TES system before move on to field test units, Phase 3 continuation will not be pursued.

14 SOLAR ENERGY↗

Outcomes of the full scale seal experiment: a seal industrial prototype for the Cigeo project - 15207

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the French HLW and IL-LLW Deep Geological Repository Project (aka Cigeo) development, to demonstrate the technical feasibility and check the performance of the seals which will be constructed in the shafts, ramps, drifts and disposal vaults, at time of Cigeo underground facilities progressive closure. The FSS experimental objectives, principles and rationale were presented at WM'2013 (Paper 1306): FSS is a technological demonstrator built on surface, inside a concrete made horizontal drift model (also called the 'test box'). FSS is part of the European DOPAS (Demonstration of Plugs and Seals) [2] project, under the umbrella of the Implementing Geological Disposal - Technology Platform (IGD-TP) [3] project. FSS construction activities started in July 2012 and were completed in September 2014. The construction compliance assessment work activities are now ongoing (and will be continued until mid-2015). This paper presents the construction and monitoring story of the FSS components, starting with the construction of a first containment wall based on a low pH self-compacting concrete (SCC), followed by the swelling clay core backfilling sequence and finishing with the erection of a second containment wall based on a low pH shotcrete. The FSS experiment also enabled to qualify the commissioning methods applicable to an industrial sealing work at time of underground operations in the Repository. These commissioning methods are described and the results discussed. The equipment and methods used for the purpose of seal component construction and monitoring are presented. The physical characteristics obtained for each component of the seal are detailed and the compliance of measured values with the initial requirements is commented. The post-mortem work planned (e.g. coring and wire sawing of low pH concrete containment walls, use of penetrometer for the swelling clay core...) is also explained. FSS is a first of a kind experiment, by its size, by the technical choices made. The first technical outcomes were presented to the French Nuclear Authority and to its Technical Support Organization. The successful implementation of the work carried out in the FSS drift model was positively assessed by the evaluators and deemed representative of the real underground conditions (industrial feasibility is proven). This article concludes with a critical analysis of the methods and equipment used, of the results obtained and provides some perspectives of improvement for the construction of the first Cigeo industrial prototype seals scheduled around 2030 in ramps and horizontal drifts (provided the Cigeo construction is authorized in late 2020, and following the licensing request filing scheduled in late 2017). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of a Seismic Air Gun to Reduce Survival of Nonnative Lake Trout Embryos: A Tool for Conservation?

Abstract The detrimental impacts of nonnative lake trout Salvelinus namaycush in the western USA have prompted natural resource management agencies in several states to implement lake trout suppression programs. Currently, these programs rely on mechanical removal methods (i.e., gill nets, trap nets, and angling) to capture subadult and adult lake trout. We conducted a study to explore the potential for using high-intensity sound from a relatively small (655.5 cm3 [40 in3]) seismic air gun to reduce survival of lake trout embryos. Lake trout embryos at multiple stages of development were exposed to a single discharge of the seismic air gun at two depths (5 and 15 m) and at two distances from the air gun (0.1 and 2.7 m). Control groups for each developmental stage, distance, and depth were treated identically except that the air gun was not discharged. Mortality in lake trout embryos treated at 0.1 m from the air gun was 100% at 74 daily temperature units in degrees Celsius (TU°C) at both depths. Median mortality in lake trout embryos treated at 0.1 m from the air gun at 207 TU°C (93%) and 267 TU°C (78%) appeared to be higher than that of controls (49% and 48%, respectively) at 15-m depth. Among the four lake trout developmental stages, exposure to the air gun at 0.1 m resulted in acute mortality up to 60% greater than that of controls. Mortality at a distance of 2.7 m did not appear to differ from that of controls at any developmental stage or at either depth. Our results indicate that seismic air guns have potential as an alternative tool for controlling nonnative lake trout, but further investigation is warranted. Received September 13, 2011; accepted January 3, 2012

Cox, Benjamin S.↗

V409 Tau as another AA Tau: Photometric observations of stellar occultations by the circumstellar disk

AA Tau is a well studied young stellar object (YSO) that presents many of the photometric characteristics of a Classical T Tauri star (CTTS), including short-timescale stochastic variability attributed to spots and/or accretion as well as long-duration dimming events attributed to occultations by vertical features (e.g., warps) in its circumstellar disk. We present new photometric observations of AA Tau from the Kilodegree Extremely Little Telescope North (KELT-North) which reveal a deep, extended dimming event in 2011, which we show supports the interpretation by Bouvier et al. of an occultation by a high-density feature in the circumstellar disk located >8 AU from the star. We also present KELT-North observations of V409 Tau, a relatively unstudied YSO also in Taurus–Auriga, showing short timescale erratic variability, along with two separate long and deep dimming events, one from 2009 January through late 2010 October, and the other from 2012 March until at least 2013 September. We interpret both dimming events to have lasted more than 600 days, each with a depth of ∼1.4 mag. From a spectral energy distribution analysis, we propose that V409 Tau is most likely surrounded by a circumstellar disk viewed nearly edge-on, and using Keplerian timescale arguments we interpret the deep dimmings of V409 Tau as occultations from one or more features within this disk ≳10 AU from the star. In both AA Tau and V409 Tau, the usual CTTS short-timescale variations associated with accretion processes close to the stars continue during the occultations, further supporting the distant occulting material interpretation. Like AA Tau, V409 Tau serves as a laboratory for studying the detailed structure of the protoplanetary environments of T Tauri disks, specifically disk structures that may be signposts of planet formation at many AU out in the disk. We also provide a table of all currently known disk-occulting young stars as a convenient reference for future work on such objects.

79 ASTRONOMY AND ASTROPHYSICS↗

Combinations of Earth Orientation Measurements: SPACE2011, COMB2011, and POLE2011

Independent Earth orientation measurements taken by the space-geodetic techniques of lunar and satellite laser ranging, very long baseline interferometry, and the Global Positioning System have been combined using a Kalman filter. The resulting combined Earth orientation series, SPACE2011, consists of values and uncertainties for Universal Time, polar motion, and their rates that span from September 28, 1976, to July 13, 2012, at daily intervals and is available in versions with epochs given at either midnight or noon. The space-geodetic measurements used to generate SPACE2011 have then been combined with optical astrometric measurements to form two additional combined Earth orientation series: (1) COMB2011, consisting of values and uncertainties for Universal Time, polar motion, and their rates that span from January 20, 1962, to July 13, 2012, at daily intervals and which are also available in versions with epochs given at either midnight or noon; and (2) POLE2011, consisting of values and uncertainties for polar motion and its rate that span from January 20, 1900, to June 21, 2012, at 30.4375-day intervals.

Ratcliff, J. T.↗

Impact of Ionospheric Scintillation on Spaceborne SAR Observations Studied Using GNSS

A survey of artifacts seen in JAXA's Phase Array type L-band synthetic aperture radar (PALSAR) data over South America during a low solar activity year is reported in this paper. A significant impact on the radar data is revealed: about 14% of the surveyed PALSAR images (totally 2779) are affected by the artifacts during a month and the artifacts occur on 74.2% of the surveyed days. The characteristics of the artifacts have led to a consideration that the artifacts are the effects of ionospheric scintillation. This raises not only a concern about scintillation effects on radar but also a question about active scintillation conditions during a low solar activity year. To assess and verify the scintillation conditions, GPS data collected from the constellation of FORMOSAT-3/COSMIC satellites and three ground-based GPS networks are processed and analyzed. The GPS data provides a global context and regional dense converge, respectively, of ionospheric irregularity and scintillation measurements. It is concluded tat even during a low solar activity year, L-band scintillation at low latitudes can occur frequently and affect L-band SAR significantly.

remote sensing↗

Solar Activity Studies using Microwave Imaging Observations

We report on the status of solar cycle 24 based on polar prominence eruptions (PEs) and microwave brightness enhancement (MBE) information obtained by the Nobeyama radioheliograph. The north polar region of the Sun had near-zero field strength for more than three years (2012-2015) and ended only in September 2015 as indicated by the presence of polar PEs and the lack of MBE. The zero-polar-field condition in the south started only around 2013, but it ended by June 2014. Thus the asymmetry in the times of polarity reversal switched between cycle 23 and 24. The polar MBE is a good proxy for the polar magnetic field strength as indicated by the high degree of correlation between the two. The cross-correlation between the high- and low-latitude MBEs is significant for a lag of approximately 5.5 to 7.3 years, suggesting that the polar field of one cycle indicates the sunspot number of the next cycle in agreement with the Babcock-Leighton mechanism of solar cycles. The extended period of near-zero field in the north-polar region should result in a weak and delayed sunspot activity in the northern hemisphere in cycle 25.

microwave radio emission↗

Combinations of Earth Orientation Measurements: SPACE2011, COMB2011, and POLE2011

Independent Earth orientation measurements taken by the space-geodetic techniques of lunar and satellite laser ranging, very long baseline interferometry, and the Global Positioning System have been combined using a Kalman filter. The resulting combined Earth orientation series, SPACE2011, consists of values and uncertainties for Universal Time, polar motion, and their rates that span from September 28, 1976, to July 13, 2012, at daily intervals and is available in versions with epochs given at either midnight or noon. The space-geodetic measurements used to generate SPACE2011 have then been combined with optical astrometric measurements to form two additional combined Earth orientation series: (1) COMB2011, consisting of values and uncertainties for Universal Time, polar motion, and their rates that span from January 20, 1962, to July 13, 2012, at daily intervals and which are also available in versions with epochs given at either midnight or noon; and (2) POLE2011, consisting of values and uncertainties for polar motion and its rate that span from January 20, 1900, to June 21, 2012, at 30.4375-day intervals.

Gross, R. S.↗

Project Independence: Construction of an Integrated Biorefinery for Production of Renewable Biofuels at an Existing Pulp and Paper Mill

Project Independence proposed to construct a demonstration biomass-to-liquids (BTL) biorefinery in Wisconsin Rapids, isconsin. The biorefinery was to be co-located at the existing pulp and paper mill, NewPage Wisconsin System Incorporated’s Wisconsin Rapids Mill, and when in full operation would both generate renewable energy for Wisconsin Rapids Mill and produce liquid fuels from abundant and renewable lignocellulosic biomass. The biorefinery would serve to validate the thermochemical pathway and economic models for BTL production using forest residuals and wood waste, providing a basis for proliferating BTL conversion technologies throughout the United States. It was a project goal to create a compelling new business model for the pulp and paper industry, and support the nation’s goal for increasing renewable fuels production and reducing its dependence on foreign oil. NewPage Corporation planned to replicate this facility at other NewPage Corporation mills after this first demonstration scale plant was operational and had proven technical and economic feasibility. An overview of the process begins with biomass being harvested, sized, conditioned and fed into a ThermoChem Recovery International (TRI) steam reformer where it is converted to high quality synthetic gas (syngas). The syngas is then cleaned, compressed, scrubbed, polished and fed into the Fischer-Tropsch (F-T) catalytic reactors where the gas is converted into two, sulfur-free, clean crude products which will be marketed as revenue generating streams. Additionally, the Fischer-Tropsch products could be upgraded for use in automotive, aviation and chemical industries as valuable products, if desired. As the Project Independence project set out to prove forest products could be used to commercially produce biofuels, they planned to address and mitigate issues as they arose. In the early days of the Project Independence project, the plant was sized to process 500 dry tons of biomass per day but would generate a blend of synthesis gas for the lime kiln and a minimum of Fischer-Tropsch liquids for sale. This was to be done using a single stage of Fischer-Tropsch reaction at roughly a 70% yield. The capability of the Wisconsin Rapids Mill lime kiln to run on the relatively low heating value of the product synthesis gas was problematic. The design was then changed to maximize Fischer-Tropsch liquids production using a two stage Fischer-Tropsch process. Project Independence progressed with the design of the mill as ThermoChem Recovery International worked on the technical details of the project as well as develop information from their pilot plant. The pilot plant work uncovered several problems with the synthesis gas clean-up that solutions. ThermoChem Recovery International found these solutions and developed a very good path forward on the technical side. The technical solutions were demonstrated in the pilot plant to everyone’s satisfaction. In July 2010, NewPage Corporation had been severely affected by the downturn in the economy and actively went to find a strategic partner. By April 2011 the Abell Foundation entered the picture as this strategic partner. The Abell Foundation would join forces as Project Independence Inc. to build the 500 dry ton per day Project Independence plant. The design of this facility progress even after NewPage Corporation declared Chapter 11 Bankruptcy protection in September, 2011. This continued until April 2012 when NewPage Corporation determined that continued work on Project Independence Inc. presented too much risk with little reward for NewPage Corporation. The project was terminated at this point.

09 BIOMASS FUELS↗

Sandia National Laboratories, California Environmental Management System Program Manual

Sandia National Laboratories, California (SNL/CA) has maintained environmental functions to assist with regulatory compliance for more than 30 years. During 2005, these existing functions were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009 and 2012. SNL/CA’s EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA’s EMS Program benefits from two corporate functional programs (Facilities Energy & Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New Mexico (SNL/NM). Although these groups, from an organizational perspective, are part of Division 8000, they are managed locally and fall under the environmental requirements specific to their New Mexico location. The New Mexico groups in Division 8000 follow the corporate EMS Program for New Mexico operations.

Larsen, Barbara L.↗

Parallel analysis tools and new visualization techniques for ultra-large climate data set

ParVis was a project funded under LAB 10-05: “Earth System Modeling: Advanced Scientific Visualization of Ultra-Large Climate Data Sets”. Argonne was the lead lab with partners at PNNL, SNL, NCAR and UC-Davis. This report covers progress from January 1st, 2013 through Dec 1st, 2014. Two previous reports covered the period from Summer, 2010, through September 2011 and October 2011 through December 2012, respectively. While the project was originally planned to end on April 30, 2013, personnel and priority changes allowed many of the institutions to continue work through FY14 using existing funds. A primary focus of ParVis was introducing parallelism to climate model analysis to greatly reduce the time-to-visualization for ultra-large climate data sets. Work in the first two years was conducted on two tracks with different time horizons: one track to provide immediate help to climate scientists already struggling to apply their analysis to existing large data sets and another focused on building a new data-parallel library and tool for climate analysis and visualization that will give the field a platform for performing analysis and visualization on ultra-large datasets for the foreseeable future. In the final 2 years of the project, we focused mostly on the new data-parallel library and associated tools for climate analysis and visualization.

54 ENVIRONMENTAL SCIENCES↗

Effects of Coronal Magnetic Field Configuration on Particle Acceleration and Release during the Ground Level Enhancement Events in Solar Cycle 24

Ground level enhancements (GLEs) are extreme solar energetic particle (SEP) events that are of particular importance in space weather. In solar cycle 24, two GLEs were recorded on 2012 May 17 (GLE 71) and 2017 September 10 (GLE 72), respectively, using a range of advanced modern instruments. Here we conduct a comparative analysis of the two events by focusing on the effects of large-scale magnetic field configuration near active regions on particle acceleration and release. Although the active regions are both located near the western limb, temporal variations of SEP intensities and energy spectra measured in situ display different behaviors at early stages. By combining a potential field model, we find the coronal mass ejection (CME) in GLE 71 originated below the streamer belt, while in GLE 72 it originated near the edge of the streamer belt. We reconstruct the CME shock fronts with an ellipsoid model based on nearly simultaneous coronagraph images from multiple viewpoints and further derive the 3D shock geometry at the GLE onset. The highest-energy particles are primarily accelerated in the shock–streamer interaction regions, i.e., likely at the nose of the shock in GLE 71 and the eastern flank in GLE 72, due to quasi-perpendicular shock geometry and confinement of closed fields. Subsequently, they are released to the field lines connecting to near-Earth spacecraft when the shocks move through the streamer cusp region. This suggests that magnetic structures in the corona, especially shock–streamer interactions, may have played an important role in the acceleration and release of the highest-energy particles in the two events.

79 ASTRONOMY AND ASTROPHYSICS↗

Sea Ice

During 2013, Arctic sea ice extent remained well below normal, but the September 2013 minimum extent was substantially higher than the record-breaking minimum in 2012. Nonetheless, the minimum was still much lower than normal and the long-term trend Arctic September extent is -13.7 per decade relative to the 1981-2010 average. The less extreme conditions this year compared to 2012 were due to cooler temperatures and wind patterns that favored retention of ice through the summer. Sea ice thickness and volume remained near record-low levels, though indications are of slightly thicker ice compared to the record low of 2012.

Ice↗

Audit Report on "The Department of Energy's American Recovery and Reinvestment Act -- Florida State Energy Program"

The Department of Energy's Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories, and the District of Columbia to support their energy priorities through the State Energy Program (SEP). The SEP provides Federal financial assistance to carry out energy efficiency and renewable energy projects that meet each state's unique energy needs while also addressing national goals such as energy security. Federal funding is based on a grant formula that takes into account population and energy consumption. The SEP emphasizes the state's role as the decision maker and administrator for the program. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP, authorizing $3.1 billion in grants. Based on existing grant formulas and after reviewing state-level plans, EERE made awards to states. The State of Florida's Energy Office (Florida) was allocated $126 million - a 90-fold increase over Florida's average annual SEP grant of $1.4 million. Per the Recovery Act, this funding must be obligated by September 30, 2010, and spent by April 30, 2012. As of March 10, 2010, Florida had expended $13.2 million of the SEP Recovery Act funds. Florida planned to use its grant funds to undertake activities that would preserve and create jobs; save energy; increase renewable energy sources; and, reduce greenhouse gas emissions. To accomplish Recovery Act objectives, states could either fund new or expand existing projects. As a condition of the awards, EERE required states to develop and implement sound internal controls over the use of Recovery Act funds. Based on the significant increase in funding from the Recovery Act, we initiated this review to determine whether Florida had internal controls in place to provide assurance that the goals of the SEP and Recovery Act will be met and accomplished efficiently and effectively. We identified weaknesses in the implementation of SEP Recovery Act projects that have adversely impacted Florida's ability to meet the goals of the SEP and the Recovery Act. Specifically: (1) Florida used about $8.3 million to pay for activities that did not meet the intent of the Recovery Act to create new or save existing jobs. With the approval of the Department, Florida used these funds to pay for rebates related to solar energy projects that had been completed prior to passage of the Recovery Act; (2) State officials did not meet Florida's program goals to obligate all Recovery Act funds by January 1, 2010, thus delaying projects and preventing them from achieving the desired stimulative economic impact. Obligations were delayed because Florida officials selected a number of projects that either required a lengthy review and approval process or were specifically prohibited. In June 2009, the Department notified Florida that a number of projects would not be approved; however, as of April 1, 2010, the State had not acted to name replacement projects or move funds to other projects; (3) Florida officials had not ensured that 7 of the 18 award requirements for Recovery Act funding promulgated by the Department had been passed down to sub-recipients of the award, as required; and, (4) Certain internal control weaknesses that could jeopardize the program and increase the risk of fraud, waste and abuse were identified in the Solar Energy System Incentives Program during our September 2009 visit to Florida. These included a lack of separation of duties related to the processing of rebates and deficiencies in the written procedures for grant managers to review and approve rebates. From a forward looking perspective, absent aggressive corrective action, these weaknesses threaten Florida's efforts to meet future Recovery Act goals. In response to our review, Florida took corrective action to incorporate the additional award requirements in sub-recipient documents. It also instituted additional controls to correct the internal control weaknesses we identified. More, however, needs to be done with respect to Department oversight. This report details the circumstances surrounding these program issues and outlines actions that, in our opinion, will help Florida achieve its SEP Recovery Act-funded goals.

14 SOLAR ENERGY↗

Analysis Tools for Next-Generation Hadron Spectroscopy Experiments

The series of workshops on New Partial-Wave Analysis Tools for Next-Generation Hadron Spectroscopy Experiments was initiated with the ATHOS 2012 meeting, which took place in Camogli, Italy, June 20-22, 2012. It was followed by ATHOS 2013 in Kloster Seeon near Munich, Germany, May 21-24, 2013. The third, ATHOS3, meeting is planned for April 13-17, 2015 at The George Washington University Virginia Science and Technology Campus, USA. The workshops focus on the development of amplitude analysis tools for meson and baryon spectroscopy, and complement other programs in hadron spectroscopy organized in the recent past including the INT-JLab Workshop on Hadron Spectroscopy in Seattle in 2009, the International Workshop on Amplitude Analysis in Hadron Spectroscopy at the ECT*-Trento in 2011, the School on Amplitude Analysis in Modern Physics in Bad Honnef in 2011, the Jefferson Lab Advanced Study Institute Summer School in 2012, and the School on Concepts of Modern Amplitude Analysis Techniques in Flecken-Zechlin near Berlin in September 2013. The aim of this document is to summarize the discussions that took place at the ATHOS 2012 and ATHOS 2013 meetings. We do not attempt a comprehensive review of the field of amplitude analysis, but offer a collection of thoughts that we hope may lay the ground for such a document.

43 PARTICLE ACCELERATORS↗

AGR-1, AGR-2, AGR-3/4, and AGR-5/6/7 DimensionalChange Analysis

A series of fuel irradiation experiments have been planned in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) to support the licensing and operation of the Advanced Reactor Technologies high temperature gas-cooled reactor. The advanced gas reactor (AGR) experiments are comprised of multiple independent capsules containing multiple cylindrical fuel compacts, placed inside of a graphite cylinder in ATR. The purpose of the AGR experiments is to provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for accident testing, and support the development of fuel performance and fission product transport models. The advanced graphite creep (AGC) experiments provide irradiation creep data for design and licensing. To date, six irradiation campaigns have been completed: AGR-1 (December, 2006 – November, 2009); AGR-2 (June, 2010 – October, 2013); AGR-3/4 (December, 2011 – April, 2014); AGC-1 (September, 2009 – January, 2011); AGC-2 (April, 2011 – May, 2012); and AGC-3 (November, 2012 – April, 2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Gravity Recovery and Interior Laboratory Mission

The Gravity Recovery and Interior Laboratory (GRAIL) mission, launched in September 2011, successfully completed its Primary Science Mission in June 2012 and is currently in Extended Mission operations. Competitively selected under a NASA Announcement of Opportunity in December 2007, GRAIL is a Discovery Program mission subject to a mandatory project cost cap. The purpose of the mission is to precisely map the gravitational field of the Moon to reveal its internal structure from crust to core, determine its thermal evolution, and extend this knowledge to other planets. The mission uses twin spacecraft flying in tandem to provide the gravity map. The GRAIL Flight System, consisting of the spacecraft and payload, was developed based on significant heritage from previous missions such an experimental U.S. Air Force satellite, the Mars Reconnaissance Orbiter (MRO) mission, and the Gravity Recovery and Climate Experiment (GRACE) mission. The Mission Operations System (MOS) was based on high-heritage multimission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin. Both the Flight System and MOS were adapted to meet the unique challenges posed by the GRAIL mission design. This paper summarizes the implementation challenges and accomplishments of getting GRAIL ready for launch. It also discusses the in-flight challenges and experiences of operating two spacecraft, and mission results.

GRAIL↗

District Energy Corporation SW 40th Street Thermal Energy Plant

The overall deliverable from the project is the design, construction and commissioning of a detention facility heating and cooling system that minimizes ownership costs and maximizes efficiency (and therefore minimizes environmental impact). The primary deliverables were the proof of concept for the application of geothermal systems for an institutional facility and the ongoing, quarterly system operating data downloads to the Department of Energy . The primary advantage of geothermal based heat pump systems is the higher efficiency of the system compared to a conventional chiller, boiler, cooling tower based system. The higher efficiency results in a smaller environmental foot print and lower energy costs for the detention facility owner, Lancaster County. The higher efficiency for building cooling is primarily due to a more constant compressor condensing temperature with the geothermal well field acting as a thermal “sink” (in place of the conventional system’s cooling tower). In the heating mode, Ground Couple Heat Pump (GCHP) systems benefits from the advantage of a heat pump Coefficient of Performance (COP) of approximately 3.6, significantly better than a conventional gas boiler. The geothermal well field acting as a thermal “source” allows the heat pumps to operate efficiently in the heating mode regardless of ambient temperatures. The well field is partially located in a wetland with a high water table so, over time, the project will be able to identify the thermal loading characteristics of a well field located in a high water table location. The project demonstrated how a large geothermal well field can be installed in a wetland area in an economical and environmentally sound manner. Finally, the SW 40th Street Thermal Energy Plant project demonstrates the benefits of providing domestic hot water energy, as well as space heating, to help balance well filed thermal loading in a cooling dominated application. During the period of August 2012 thru March 2014, with the detention facility occupied for the final seven months, the well field supply water temperatures to the heat pumps dropped to a minimum of 39°F and reached a maximum temperature of 68 °F while providing 15,819 MMBtu of cooling energy and 27,467 MMBtu of heating energy. During this period the peak recorded system cooling load was 610 tons and the peak heating load was 8.4 MMBtu. The DEC is currently evaluating the most beneficial electric rate for plant operations. Total project cost of $16.9 million was approximately $3.2 million less than the estimate provided in the grant application. The reduction in project costs were primarily due to favorable construction material prices as well as strong competition in the local construction contractor market. The DEC plant reached the substantial completion milestone in December 2011 and began providing thermal service to the detention facility in January 2012 when the building’s HVAC system was ready to accept heating service. The plant reached commercial operating status on August 1, 2012. However, due to construction delays, the detention facility was not occupied until September of 2013. The detention facility construction delays also impacted the installation and commissioning of the project’s dedicated domestic hot water heat pump. Final coordination with the detention facility’s building management system vendor to establish network links for the exchange of date is currently being completed. This will allow the development of control sequences for the optimal operation of the domestic hot water system.

15 GEOTHERMAL ENERGY↗