Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Characterization of Filtration Scale-Up Performance

The scale-up performance of sintered stainless steel crossflow filter elements planned for use at the Pretreatment Engineering Platform (PEP) and at the Waste Treatment and Immobilization Plant (WTP) were characterized in partial fulfillment (see Table S.1) of the requirements of Test Plan TP RPP WTP 509. This test report details the results of experimental activities related only to filter scale-up characterization. These tests were performed under the Simulant Testing Program supporting Phase 1 of the demonstration of the pretreatment leaching processes at PEP. Pacific Northwest National Laboratory (PNNL) conducted the tests discussed herein for Bechtel National, Inc. (BNI) to address the data needs of Test Specification 24590-WTP-TSP-RT-07-004. Scale-up characterization tests employ high-level waste (HLW) simulants developed under the Test Plan TP-RPP-WTP-469. The experimental activities outlined in TP-RPP-WTP-509 examined specific processes from two broad areas of simulant behavior: 1) leaching performance of the boehmite simulant as a function of suspending phase chemistry and 2) filtration performance of the blended simulant with respect to filter scale-up and fouling. With regard to leaching behavior, the effect of anions on the kinetics of boehmite leaching was examined. Two experiments were conducted: 1) one examined the effect of the aluminate anion on the rate of boehmite dissolution and 2) another determined the effect of secondary anions typical of Hanford tank wastes on the rate of boehmite dissolution. Both experiments provide insight into how compositional variations in the suspending phase impact the effectiveness of the leaching processes. In addition, the aluminate anion studies provide information on the consequences of gibbsite in waste. The latter derives from the expected fast dissolution of gibbsite relative to boehmite. This test report concerns only results of the filtration performance with respect to scale-up. Test results for boehmite dissolution kinetics and filter fouling are reported elsewhere (see Table S.1). The primary goal of scale-up testing was to examine how filter length influenced permeate flux rates. To accomplish this, the existing cells unit filter system, which employs a 2-ft-long, 0.5-in. (inner) diameter sintered stainless steel filter element, was redesigned to accommodate an 8-ft. sintered stainless steel filter element of the same diameter. Testing was then performed to evaluate the filtration performance of waste simulant slurries. Scale-up testing consisted of two separate series of filtration tests: 1) scale-up axial velocity (AV)/transmembrane pressure (TMP) matrix tests and 2) scale-up temperature tests. The AV/TMP matrix tests examined filtration performance of two different waste simulant slurries in the 8-ft. cells unit filter system. Waste simulant slurry formulations for the 8-ft. scale-up test was selected to match simulant slurries for which filtration performance had been characterized on the 2-ft CUF. For the scale-up temperature tests, the filtration performance at three test temperatures (i.e., 25°C, 40°C, and 60°C) was determined to evaluate if filter flux versus temperature correlations developed using the 2-ft filters were also valid for the 8-ft filters.

36 MATERIALS SCIENCE↗

Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR)

2010 International Congress on Advances in Nuclear Power Plants (ICAPP’10) ANS Annual Meeting Imbedded Topical San Diego, CA June 13 – 17, 2010 Hydraulic Shuttle Irradiation System (HSIS) Recently Installed in the Advanced Test Reactor (ATR) Author: A. Joseph Palmer, Mechanical Engineer, Irradiation Test Programs, 208-526-8700, Joe.Palmer@INL.gov Affiliation: Idaho National Laboratory P.O. Box 1625, MS-3840 Idaho Falls, ID 83415 INL/CON-10-17680 ABSTRACT Most test reactors are equipped with shuttle facilities (sometimes called rabbit tubes) whereby small capsules can be inserted into the reactor and retrieved during power operations. With the installation of Hydraulic Shuttle Irradiation System (HSIS) this capability has been restored to the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). The general design and operating principles of this system were patterned after the hydraulic rabbit at Oak Ridge National Laboratory’s (ORNL) High Flux Isotope Reactor (HFIR), which has operated successfully for many years. Using primary coolant as the motive medium the HSIS system is designed to simultaneously transport fourteen shuttle capsules, each 16 mm OD x 57 mm long, to and from the B-7 position of the reactor. The B-7 position is one of the higher flux positions in the reactor with typical thermal and fast (>1 Mev) fluxes of 2.8E+14 n/cm2/sec and 1.9E+14 n/cm2/sec respectively. The available space inside each shuttle is approximately 14 mm diameter x 50 mm long. The shuttle containers are made from titanium which was selected for its low neutron activation properties and durability. Shuttles can be irradiated for time periods ranging from a few minutes to several months. The Send and Receive Station (SRS) for the HSIS is located 2.5 m deep in the ATR canal which allows irradiated shuttles to be easily moved from the SRS to a wet loaded cask, or transport pig. The HSIS system first irradiated (empty) shuttles in September 2009 and has since completed a Readiness Assessment in November 2009. The HSIS is a key component of the ATR National Scientific User Facility (NSUF) operated by Battelle Energy Alliance, LLC and is available to a wide variety of university researchers for nuclear fuels and materials experiments as well as medical isotope research and production.

07 ISOTOPE AND RADIATION SOURCES↗

Preliminary Test Design and Plan for a Canister Deposition Field Demonstration

This report provides a high-level test plan for deploying three commercial 32PTH2 spent nuclear fuel (SNF) canisters inside NUHOMS Advanced Horizontal Storage Modules (AHSM) from Orano (formerly Transnuclear Inc.). The details contained in this report represent the best designs and approaches explored for testing as of this publication. Given the rapidly developing nature of this test program, some of these plans may change to accommodate new objectives or adapt in response to conflicting requirements. The goal of the testing is to collect highly defensible and detailed surface deposition measurements from the surface of dry storage systems in a marine coastal environment to guide chloride-induced stress corrosion crack (CISCC) research. To facilitate surface sampling, the otherwise highly prototypic dry storage systems will not contain SNF but rather will be electrically heated to mimic the thermal-hydraulic environment. Instrumentation throughout the canister, storage module, and environment will provide an extensive amount of information for the use of model validation. Manual sampling over a comprehensive portion of the canister surface at regular time intervals will offer a high-fidelity quantification of the conditions experienced in a harsh yet realistic environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

JV Task - 129 Advanced Conversion Test - Bulgarian Lignite

The objectives of this Energy & Environmental Research Center (EERC) project were to evaluate Bulgarian lignite performance under both fluid-bed combustion and gasification conditions and provide a recommendation as to which technology would be the most technically feasible for the particular feedstock and also identify any potential operating issues (such as bed agglomeration, etc.) that may limit the applicability of a potential coal conversion technology. Gasification tests were run at the EERC in the 100-400-kg/hr transport reactor development unit (TRDU) on a 50-tonne sample of lignite supplied by the Bulgarian Lignite Power Project. The quality of the test sample was inferior to any coal previously tested in this unit, containing 50% ash at 26.7% moisture and having a higher heating value of 5043 kJ/kg after partial drying in preparation for testing. The tentative conclusion reached on the basis of tests in the TRDU is that oxygen-blown gasification of this high-ash Bulgarian lignite sample using the Kellogg, Brown, and Root (KBR) transport gasifier technology would not provide a syngas suitable for directly firing a gas turbine. After correcting for test conditions specific to the pilot-scale TRDU, including an unavoidably high heat loss and nitrogen dilution by transport air, the best-case heating value for oxygen-blown operation was estimated to be 3316 kJ/m{sup 3} for a commercial KRB transport gasifier. This heating value is about 80% of the minimum required for firing a gas turbine. Removing 50% of the carbon dioxide from the syngas would increase the heating value to 4583 kJ/m{sup 3}, i.e., to about 110% of the minimum requirement, and 95% removal would provide a heating value of 7080 kJ/m{sup 3}. Supplemental firing of natural gas would also allow the integrated gasification combined cycle (IGCC) technology to be utilized without having to remove CO{sub 2}. If removal of all nitrogen from the input gas streams such as the coal transport air were achieved, a heating value very close to that needed to fire a gas turbine would be achieved; however, some operational issues associated with utilizing recycled syngas or carbon dioxide as the transport gas would also have to be resolved. Use of a coal with a quality similar to the core samples provided earlier in the test program would also improve the gasifier performance. Low cold-gas efficiencies on the order of 20% calculated for oxygen-blown tests resulted in part from specific difficulties experienced in trying to operate the pilot-scale TRDU on this very high-ash lignite. These low levels of efficiency are not believed to be representative of what could be achieved in a commercial KRB transport gasifier. Combustion tests were also performed in the EERC's circulating fluidized-bed combustor (CFBC) to evaluate this alternative technology for use of this fuel. It was demonstrated that this fuel does have sufficient heating value to sustain combustion, even without coal drying; however, it will be challenging to economically extract sufficient energy for the generation of steam for electrical generation. The boiler efficiency for the dried coal was 73.5% at 85% sulfur capture (21.4% moisture) compared to 55.3% at 85% sulfur capture (40% moisture). Improved boiler efficiencies for this coal will be possible operating a system more specifically designed to maximize heat extraction from the ash streams for this high-ash fuel. Drying of the coal to approximately 25% moisture probably would be recommended for either power system. Fuel moisture also has a large impact on fuel feedability. Pressurized gasifiers generally like drier fuels than systems operating at ambient pressures. The commercially recommended feedstock moisture for a pressurized transport reactor gasifier is 25% moisture. Maximum moisture content for a CFB system could be approximately 40% moisture as has been demonstrated on the Alstom CFB operating on Mississippi lignite. A preliminary economic evaluation for CO{sub 2} was performed on the alternatives of (1) precombustion separation of CO{sub 2} in an IGCC using the KBR transport gasifier and (2) postcombustion CO{sub 2} capture using a CFBC. It appears that the capture of CO{sub 2} from the high-pressure IGCC precombustion system would be less costly than from the low-pressure postcombustion CFBC system by a factor of 1.5, although the cost difference is not directly comparable because of the model input being limited to a higher coal quality than the Bulgarian lignite. While the decision to pursue precombustion removal of carbon dioxide has been technically proven with the Rectisol{reg_sign} and Selexol{trademark} processes, General Electric and Siemens have not sold any gas turbine systems running on the high-hydrogen syngas. They have successfully demonstrated a gas turbine on syngases containing up to 95% hydrogen. The technological hurdles should not be too difficult given this experience in the gas turbine industry.

01 COAL, LIGNITE, AND PEAT↗

THE IMPACT OF OZONE ON THE LOWER FLAMMABLE LIMIT OF HYDROGEN IN VESSELS CONTAINING SAVANNAH RIVER SITE HIGH LEVEL WASTE

The Savannah River Site, in conjunction with AREVA Federal services, has designed a process to treat dissolved radioactive waste solids with ozone. It is known that in this radioactive waste process, radionuclides radiolytically break down water into gaseous hydrogen and oxygen, which presents a well defined flammability hazard. Flammability limits have been established for both ozone and hydrogen separately; however, there is little information on mixtures of hydrogen and ozone. Therefore, testing was designed to provide critical flammability information necessary to support safety related considerations for the development of ozone treatment and potential scale-up to the commercial level. Since information was lacking on flammability issues at low levels of hydrogen and ozone, a testing program was developed to focus on filling this portion of the information gap. A 2-L vessel was used to conduct flammability tests at atmospheric pressure and temperature using a fuse wire ignition source at 1 percent ozone intervals spanning from no ozone to the Lower Flammable Limit (LFL) of ozone in the vessel, determined as 8.4%(v/v) ozone. An ozone generator and ozone detector were used to generate and measure the ozone concentration within the vessel in situ, since ozone decomposes rapidly on standing. The lower flammability limit of hydrogen in an ozone-oxygen mixture was found to decrease from the LFL of hydrogen in air, determined as 4.2 % (v/v) in this vessel. From the results of this testing, Savannah River was able to develop safety procedures and operating parameters to effectively minimize the formation of a flammable atmosphere.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Advanced Remote Cutting Technology for Reactor Internals Segmentation - 18274

Since the Three Mile Island decommissioning in the 1980's, Westinghouse has been involved in dismantling and segmentation of commercial reactors. With dozens of components segmented and packaged across the globe, Westinghouse has continued to evaluate the state of the art cutting technologies for their applications in the nuclear industry. While there have been well documented issues of certain cutting technologies in field applications, there are advancements of these technologies which prove them applicable for specific areas of the decommissioning process. During 2017, Westinghouse embarked on a revision of its plasma arc cutting (PAC) technology as part of an extensive innovation program for reactor internals segmentation. While these systems were used in Yankee Rowe and Three Mile Island, new plasma arc cutting systems improve the versatility and have much better precision of cutting. While bringing this technology into the future, Westinghouse is adapting the mounting and application so that it is compatible with the existing mechanical cutting portfolio. This means that in the event that a mechanical cutting technique is unable to perform as intended, a plasma cutting alternative will be available with minimal time to switch cutting methods. A test program for underwater PAC was performed, and the test gave a good reference of cutting speed and handling in different plate thicknesses which can be used when evaluating the use of the new cutting technology for future projects. PAC technology has proven that it could have a future in reactor vessel internals segmentation projects as a complement to the existing mechanical cutting methods under water. Thicknesses up to at least 25 mm can be cut with a much higher speed than the existing mechanical cutting methods in use. This and other cutting technology developments as part of the innovation program provide exciting new possibilities for dismantling and segmentation projects. While each of the techniques presents definite benefits for operators and, more importantly, customers, there are risks that need to be mitigated through engineered processes and controls. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FFTF main heat transport system/dump heat exchanger testing and performance evaluation (initial pub date April 1978)

This report covers testing of a Main Heat Transport System/Dump Heat Exchanger (MHTS/DHX) for the Fast Flux Test Facility. The primary objective of the test program was to verify the design and generate experience in the installation, operation, and control of the DHX for FFTF. This report discusses test results related to erection, preoperational testing, in-service inspections, and steady-state and transient performance. Emphasis is placed on the effect of the test results on successful DHX operation at FFTF. 36 figures, 9 tables.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Simulated execution of hybrid quantum computing systems

We use modeling and simulation to study the behavior and performance of hybrid quantum computing systems. Our approach is based on a layered design with abstract machine models, which identify the key components and interfaces for quantum processing units, quantum programming models, and hybrid execution models. We use discrete-event simulating to track the dynamical state of hierarchical abstract machine models while executing test programs, and we collect statistics on time and energy consumption to forecast the resources required by quantum processors for future scientific computation.

Humble, Travis↗

Cooperation Reliability Testing of the Clipper Windpower Liberty 2.5 MW Turbine: Cooperative Research and Development Final Report

Clipper Windpower (CWP) has developed the Liberty 2.5 MW wind turbine. The development, manufacturing, and certification process depends heavily on being able to validate the full-scale system design and performance under load in both an accredited structural test facility and through accredited field testing. CWP requested that DOE/ NREL upgrade blade test capabilities to perform a scope of workincluding structural testing of the C-96 blade used on the CWP Liberty turbine. This funds-in CRADA was developed to upgrade NREL blade test capability, while enabling certification testing of the C-96 blade through the facility and equipment upgrades. NREL shared resource funds were used to develop hardware necessary to structurally attach a large wind turbine to the test stand at the NWTC.Participant funds-in monies were used for developing the test program.

17 WIND ENERGY↗

Empirically Derived Strength of Residential Roof Structures for Solar Installations

Engineering certification for the installation of solar photovoltaic (PV) modules on wood roofs is often denied because existing wood roofs do not meet structural design codes. This work is intended to show that many roofs are actually sufficiently strong given the conservatism in codes, documented allowable strengths, roof structure system effects, and beam composite action produced by joist-sheathing interaction. This report provides results from a testing program to provide actual load carrying capacity of residential rooftops. The results reveal that the actual load carrying capacity of structural members and systems tested are significantly stronger than allowable loads provided by the International Residential Code (IRC 2009) and the national structural code found in Minimum Design Loads for Buildings and Other Structures (ASCE 7-10). Engineering analysis of residential rooftops typically ignores the system affects and beam composite action in determining rooftop stresses given a potential PV installation. This extreme conservatism combined with conservatism in codes and published allowable stress values for roof building materials (NDS 2012) lead to the perception that well built homes may not have adequate load bearing capacity to enable a rooftop PV installation. However, based on the test results presented in this report of residential rooftop structural systems, the actual load bearing capacity is several times higher than published values (NDS 2012).

Dwyer, Stephen F.↗

Identification and mitigation of memory block timing issue in ITk ABCStar during ASIC production

The ABCStar is a mixed-signal front-end readout ASIC for the strips sensor portion of the ATLAS ITk detector being developed as part of the High-Luminosity LHC upgrade. In pre-production testing, a subtle design flaw was uncovered in the ABCStar that was reducing wafer yields in some manufactured lots from the expected 90% to as low as 2%. The root cause was determined to be a timing issue in the logic synthesized to control previously silicon proven memory blocks re-used for this ASIC. The solutions proposed included manufacturing process changes by the wafer foundry, changes to the operating parameters for the ABCStar in the detector, and the possibility that a redesign might be required. The two mitigation efforts were undertaken in parallel, with the process modification route a less desirable solution since already manufactured wafers would need to be scrapped in favour of the new ones. Based on a knowledge of the existing process, and testing done on the worst performing wafers, it was proposed that raising the core operating voltage of the ABCStar from 1.20V to 1.25V could address the timing issue by sufficiently speeding up its transistors. An extensive testing program that included the effects of temperature and radiation expected over the lifetime of the ITk detector was conducted to validate that approach. Those tests and studies proved that even the worst performing wafers would have yields over 80% with the 1.25V core voltage, and neither the modified process nor redesign would be required for ensuring reliable operation of the ITk. Based on testing, a further timing mitigation was implemented to provide an additional margin of reliability by increasing the duty cycle of the clock to the ABCStar. Testing of all ABCStar wafers has been completed and the production of the detector modules using these ASICs is now well underway as a result of the efforts detailed herein.

FOS: Physical sciences↗

Effects of Electric Vehicle Fast Charging on Battery Life and Vehicle Performance

As part of the U.S. Department of Energy’s Advanced Vehicle Testing Activity, four new 2012 Nissan Leaf battery electric vehicles were instrumented with data loggers and operated over a fixed on-road test cycle. Each vehicle was operated over the test route, and charged twice daily. Two vehicles were charged exclusively by AC level 2 EVSE, while two were exclusively DC fast charged with a 50 kW charger. The vehicles were performance tested on a closed test track when new, and after accumulation of 50,000 miles. The traction battery packs were removed and laboratory tested when the vehicles were new, and at 10,000-mile intervals. Battery tests include constant-current discharge capacity, electric vehicle pulse power characterization test, and low peak power tests. The on-road testing was carried out through 70,000 miles, at which point the final battery tests were performed. The data collected over 70,000 miles of driving, charging, and rest are analyzed, including the resulting thermal conditions and power and cycle demands placed upon the battery. Battery performance metrics including capacity, internal resistance, and power capability obtained from laboratory testing throughout the test program are analyzed. Results are compared within and between the two groups of vehicles. Specifically, the impacts on battery performance, as measured by laboratory testing, are explored as they relate to battery usage and variations in conditions encountered, with a primary focus on effects due to the differences between AC level 2 and DC fast charging. The contrast between battery performance degradation and the effect on vehicle performance is also explored.

Electric Vehicle↗

Advancement of Functional Expansion Tallies Capabilities in Serpent 2

The need for accident tolerant fuels (ATFs) became self-evident after the series of unfortunate nuclear events at Fukushima Daiichi in 2011. Restarting the Transient Reactor Test Facility (TREAT) at INL is one component in this concerted effort to establish the ATF development and testing program under the United States Department of Energy. Prior to the closure of TREAT in 1994, each experiment required multiple low-power calibration tests before and after each run. Since then, computing advancements have set computer-based modeling and simulation (M and S) as the preferred calibration method. The anticipated savings are both temporal and monetary. MAMMOTH, a collection of M and S tools built from the finite element-based MOOSE Framework, has been established to support the designed experiments intended for TREAT. This collection of tools includes: 1) Rattlesnake, a striking diffusion-based neutronics code, 2) BISON, an advanced materials and fuels performance code, and 3) RELAP-7, a powerful thermal-hydraulics solver. Each is capable of independently performing its function accurately and effectively; unified, they create a powerful multiphysics reactor core M and S application. One unfortunate weakness in this configuration lies in the unique geometry and design of TREAT's core. Although simple to model, this poses a challenge to the diffusion solver in Rattlesnake. One alternative is to replace Rattlesnake with Serpent, a fully-fledged Monte Carlo (MC) neutronics code. Coincidentally, Rattlesnake calculations are frequently validated against Serpent simulations.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Likelihood-based interactive local docking into cryo-EM maps in ChimeraX

The interpretation of cryo-EM maps often includes the docking of known or predicted structures of the components, which is particularly useful when the map resolution is worse than 4 Å. Although it can be effective to search the entire map to find the best placement of a component, the process can be slow when the maps are large. However, frequently there is a well-founded hypothesis about where particular components are located. In such cases, a local search using a map subvolume will be much faster because the search volume is smaller, and more sensitive because optimizing the search volume for the rotation-search step enhances the signal to noise. A Fourier-space likelihood-based local search approach, based on the previously published em_placement software, has been implemented in the new emplace_local program. Tests confirm that the local search approach enhances the speed and sensitivity of the computations. An interactive graphical interface in the ChimeraX molecular-graphics program provides a convenient way to set up and evaluate docking calculations, particularly in defining the part of the map into which the components should be placed.

59 BASIC BIOLOGICAL SCIENCES↗

CARBON BED MERCURY EMISSIONS CONTROL FOR MIXED WASTE TREATMENT

Mercury has had various uses in nuclear fuel reprocessing and other nuclear processes, and so is often present in radioactive and mixed (both radioactive and hazardous according tohe Resource Conservation and Recovery Act) wastes. Depending on regulatory requirements, the mercury in the off-gas must be controlled with sometimes very high efficiencies. Compliance to the Hazardous Waste Combustor (HWC) Maximum Achievable Control Technology (MACT) standards can require off-gas mercury removal efficiencies up to 99.999% for thermally treating some mixed waste streams. Several test programs have demonstrated this level of off-gas mercury control using fixed beds of granular sulfur-impregnated activated carbon. Other results of these tests include: (a) The depth of the mercury control mass transfer zone was less than 15-30 cm for the operating conditions of these tests, (b) MERSORB® carbon can sorb Hg up to 19 wt% of the carbon mass, and (c) the spent carbon retained almost all (98 – 99.99%) of the Hg; but when even a small fraction of the total Hg dissolves, the spent carbon can fail the TCLP test when the spent carbon contains high Hg concentrations. Localized areas in a carbon bed that become heated through heat of adsorption, to temperatures where oxidation occurs, are referred to as “bed hot spots.” Carbon bed hot spots must be avoided in processes that treat radioactive and mixed waste. Key to carbon bed hot spot mitigation are (a) designing for sufficient gas velocity, for avoiding gas flow maldistribution, and for sufficient but not excessive bed depth, (b) monitoring and control of inlet gas flowrate, temperature, and composition, (c) monitoring and control of in-bed and bed outlet gas temperatures, and (d) most important, monitoring of bed outlet CO concentrations. An increase of CO levels in the off-gas downstream of the carbon bed to levels about 50-100 ppm higher than the inlet CO concentration indicate CO formation in the bed, caused by carbon bed hot spots. Corrective actions must be implemented quickly if bed hot spots are detected, using a graded approach and sequence starting with corrective actions that are simple, quick, cause the least impact to the process, and are easiest to recover from. Multiple high and high-high alarm levels should be used, with appropriate corrective actions for each level.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2016 Status Report: CIRFT Testing Data Analyses and Updated Curvature Measurements

This report provides a detailed description of FY15 test result corrections/analysis based on the FY16 Cyclic Integrated Reversible-Bending Fatigue Tester (CIRFT) test program methodology update used to evaluate the vibration integrity of spent nuclear fuel (SNF) under normal transportation conditions. The CIRFT consists of a U-frame testing setup and a real-time curvature measurement method. The three-component U-frame setup of the CIRFT has two rigid arms and linkages to a universal testing machine. The curvature of rod bending is obtained through a three-point deflection measurement method. Three linear variable differential transformers (LVDTs) are used and clamped to the side connecting plates of the U-frame to capture the deformation of the rod. The contact-based measurement, or three-LVDT-based curvature measurement system, on SNF rods has been proven to be quite reliable in CIRFT testing. However, how the LVDT head contacts the SNF rod may have a significant effect on the curvature measurement, depending on the magnitude and direction of rod curvature. It has been demonstrated that the contact/curvature issues can be corrected by using a correction on the sensor spacing. The sensor spacing defines the separation of the three LVDT probes and is a critical quantity in calculating the rod curvature once the deflections are obtained. The sensor spacing correction can be determined by using chisel-type probes. The method has been critically examined this year and has been shown to be difficult to implement in a hot cell environment, and thus cannot be implemented effectively. A correction based on the proposed equivalent gauge-length has the required flexibility and accuracy and can be appropriately used as a correction factor. The correction method based on the equivalent gauge length has been successfully demonstrated in CIRFT data analysis for the dynamic tests conducted on Limerick (LMK) (17 tests), North Anna (NA) (6 tests), and Catawba mixed oxide (MOX) (10 tests) SNF samples. These CIRFT tests were completed in FY14 and FY15. Specifically, the data sets obtained from measurement and monitoring were processed and analyzed. The fatigue life of rods has been characterized in terms of moment, curvature, and equivalent stress and strain..

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Analysis and Design of Ex-Service Garter Spring Irradiation Capsules in the High Flux Isotope Reactor

Nickel-based super alloys such as Inconel X-750 are used to fabricate internal components for various reactor systems. Recent efforts to research and understand the effects of long-term neutron radiation damage on this material are crucial for quantifying the performance (radiation-induced creep and embrittlement) of such materials under extended use. The CANDU® ex-service garter spring irradiation program was instituted to investigate such effects on various types of Inconel X-750 garter springs, tensile specimens, and fatigue specimens. Conventional irradiation programs use rabbits, which are capsules that are generally loaded with non radioactive irradiation specimens. These rabbits are designed to realize various specimen temperatures while irradiated to high neutron fluences in the Oak Ridge National Laboratory (ORNL) High Flux Isotope Reactor (HFIR). To accelerate the irradiation schedule of this program, two types of material — unirradiated and previously irradiated ex-service garter spring material — were both included in the irradiation program test matrix. These two material conditions are expected to provide intermediate and end-of-life neutron dose experimental results concurrently to accelerate the overall irradiation program schedule. This document describes the B8J18 garter spring design and the supporting work required to successfully fabricate, assemble, and qualify subsequent irradiation capsules.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Specifics of Chemical Toxilogical Analyses in the Russian Federation for the Purpose of Identification of Narcotics in Biological Matters

The Russian Federation (RF) is committed to implementing a comprehensive drug testing program under its Personnel Reliability Program (PRP) for military personnel involved in handling sensitive nuclear materials. This commitment leads to a number of mandatory requirements for the laboratory conducting the confirmation testing to ensure the legitimacy and integrity of the testing process. These requirements are established by the RF Duma to ensure that individuals conducting these tests have adequate training, certifications, and experience to conduct narcotic confirmation tests. This paper describes the facility requirements and personnel qualifications needed for conducting comprehensive drug abuse confirmation testing. Details regarding the personnel training and laboratory experience in the theory and practice of analytical forensic toxicology of drugs of abuse will be presented, as well as the facility requirements for the laboratory conducting such tests. Chain-of-custody, from sample receipt through completion of testing, reporting of results, and continuing until final disposition of specimens will be addressed.

59 BASIC BIOLOGICAL SCIENCES↗