Performance Testing of the 4kW ESR 2 Refrigerator at JLab
Abstract The End Station Refrigerator 2 (ESR2), a refurbished cryoplant, will replace the ESR1. ESR2 is comprised of the cold box and compressors from the Superconducting Super Collider’s 4 kW, 4.5 K ASST-A plant. It also features a new 10 kL liquid helium dewar, a cryogenic distribution system and new control and utility systems. This plant was reconfigured to provide a cold helium supply at 15 K, 12 K, and 8 K for the experimental hall’s hydrogen targets. The most significant load will be during the MOLLER experiment, which will see a total hydrogen target load of 5 kW at 15 K. This paper details the commissioning results of the 4.5 K refrigeration system in various modes (maximum refrigeration, maximum liquefaction, and a 50/50 mix) at both 100 % and 50 % capacity. We will also evaluate the performance with an expected MOLLER load. Current performance will be compared with the historical commissioning data from the ASST-A plant.