Search NASA⌕ Search

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Deer Isle and Stonington Energy Reliability Opportunities

The towns of Deer Isle and Stonington, located on the island of Deer Isle in Maine, partnered with the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to examine options to enhance energy resilience, reduce dependence on imported fuels, and mitigate high energy costs. With technical support from the National Laboratory of the Rockies (NLR), Lawrence Berkeley National Laboratory (LBNL), and regional partner the Island Institute, the project focused on evaluation of the local electricity distribution infrastructure, examination of ongoing activities to reduce the frequency of outages, review of the applicable policy and regulatory environment, and identification of potential on-site energy solutions. Key findings revealed the island's reliance on a single distribution line, and limited hosting capacity for additional distributed energy resources. Solar photovoltaics (PV) technology, with and without battery storage, was found to be the most viable technology given economic, technical, and social considerations. While also technically feasible, wind energy faces more difficult siting and less public acceptance compared to PV. Marine energy technologies were determined to be infeasible due to technology immaturity and lengthy permitting timelines. Modeling of potential building-scale PV plus storage systems resulted in successful grant applications for installations at two local facilities. Analysis of community scale energy generation and storage options resulted the local utility, Versant, submitting a grant application for a proposed community-scale battery storage system to increase grid resilience and hosting capacity. This initiative has strengthened the communities' energy planning capabilities and laid the groundwork for future clean energy development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Next-Generation Electric Motors and Electromagnetic Devices (CRADA Final Report)

As part of the Cyclotron Road program, the Foli Research team investigated electric motors and other electromagnetic devices additively manufactured by depositing fine conducting wire onto a substrate. By leveraging modern motion control and efficient upstream manufacturing processes, the team explored using geometric control and turnkey production comparable to printed circuit board manufacturing, aiming at ten-fold improvements in signal density, while eliminating the material use, cost, and complexity overheads of subtractive processes at large scales. Owing to the achievable density and additive scaling, disparate components became monolithic, and disparate processes were combined with the aim of reducing development costs, uncertainties, and timelines. When applied to electric motors, this technology may enable agile manufacturing of next-generation designs, with dramatic increases in achievable power density and material utilization. Electric motors represent the single largest user of electricity in the U.S. and a critical component of decarbonized infrastructure. Despite this significance, the manufacturing of motors and other electromagnetic devices remains capital-intensive, labor-intensive, and performance-limiting. Advanced manufacturing processes were required to produce high-performance, low-cost, application-specific electric motors and electromagnetic devices to support an electrified future.

42 ENGINEERING↗

Feasibility and strategic implications of deploying nuclear power reactors in Africa

This report assesses the feasibility and strategic implications of deploying nuclear power reactors, including large-scale plants, advanced small modular reactors (SMRs), and microreactors, in African countries. Case studies focus on South Africa, Egypt, Kenya, Ghana, and Nigeria, examining nuclear energy’s role in Africa’s rapidly evolving energy landscape, marked by fast-growing demand, significant electricity access gaps, increasing renewable penetration, and strong policy commitments to industrialization and energy security. Several U.S. reactor technologies and designs are considered based on their development status and readiness for deployment. The analysis finds that nuclear power can provide reliable, clean baseload and flexible generation, as well as high-temperature process heat for desalination, hydrogen production, and industrial applications. However, suitability is highly country-specific, depending on grid size and stability, transmission capacity, cooling water availability, regulatory readiness, and fuel supply chains. Near-term deployment opportunities are strongest for light-water reactors (such as NuScale, BWRX-300, AP300, and SMR-300) that use low-enriched uranium and build on proven technology. More advanced concepts, including gas-cooled, sodium-cooled, molten-salt cooled reactors, and microreactors, will likely be relevant for African deployment in the 2030s or later, contingent on demonstration projects, high-assay low-enriched uranium (HALEU) fuel availability, and mature international licensing frameworks. Economic analysis shows that SMRs are capital-intensive, with projected overnight costs for 300 MWe units in 2025 ranging from approximately 1.4 to 2.6 billion USD per module. The levelized cost of electricity (LCOE) is highly sensitive to the weighted average cost of capital (WACC). Given typically higher financing costs and utility balance-sheet weaknesses in many African countries, bankable project structures will require sovereign guarantees, robust offtake arrangements, and layered financing from export credit agencies, development finance institutions, and vendor nations. Comparisons with recent large nuclear projects in the United Arab Emirates (UAE) and Egypt underscore the central role of state-backed loans, long tenors, and concessional terms. Country case studies illustrate a spectrum of readiness and opportunity. South Africa operates two 920 MWe pressurized light water reactors (totaling 1,840 MWe) at Koeberg and has the most mature regulatory and industrial base, positioning it as a prime candidate for both large reactors and SMRs to replace coal, support desalination, and anchor industrial hubs. Egypt is constructing four VVER-1200 units at El Dabaa with strong state leadership and could later complement this fleet with SMRs for coastal and industrial applications. Kenya and Ghana are advancing through IAEA Milestones with growing institutional capacity and clear interest in SMRs that match their smaller grids and industrialization plans. Nigeria has the largest demand potential but faces acute constraints in grid reliability, project bankability, and regulatory capacity; targeted deployments of large reactors and SMRs near coastal or industrial sites could have high impact if accompanied by major grid upgrades and institutional reforms. The report identifies cross-cutting challenges such as financing, political continuity, public acceptance, nonproliferation and security, waste and back-end management, regulatory capacity, grid adequacy, and long deployment timelines for first-of-a-kind designs, and ANL/NSE-26/3 ii proposes broad directions for resolution. These include stronger multifaceted financing for nuclear, long-term national energy strategies that transcend electoral cycles, proactive stakeholder engagement, strengthened regional and national regulators, and systematic workforce development through centers of excellence and expanded training. The United States should develop partnerships with African countries and offer end-to-end nuclear package similar to those used effectively by competitors: coordinated project development, state-backed financing, long-term fuel services, and durable in-country support through regional offices and sustained workforce/regulatory training. With timely planning, sustained political commitment, and appropriate financing and institutional support, nuclear energy, both large reactors and advanced SMRs, can become a meaningful, though not dominant, pillar of Africa’s future power mix, enhancing energy security, enabling industrial growth, and supporting climate goals.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Securing the Modern Grid: Federal Investments, Digitization, and Supply Chain Strategy

Across the United States (U.S.) grid expansion and modernization is underway, paving the way for accelerated load growth and intelligent resource management. Digitization of the grid is supported by several state and federal programs, providing support for utilities installing advanced metering infrastructure (AMI), AI-powered analytics systems, battery energy storage systems (BESS), and distributed energy resource management systems (DERMS) to transform the grid from a one-way power delivery system into an intelligent, responsive network that will enable faster load growth and power expansion of data centers for advanced artificial intelligence (AI) applications. The digital transformation of America's grid presents opportunity for increased efficiency and resiliency but also introduces new digital risks that require careful management. Digital equipment often contains several vulnerabilities such as unencrypted communication protocols, and persistent remote access capabilities that could be exploited to manipulate device settings, coordinate service disruptions, or inject false data into grid operations. These digital risks become particularly important as the grid must rapidly scale to support AI-driven data centers, which the administration has identified as essential for maintaining U.S. technological leadership and economic competitiveness. These vulnerabilities are compounded by supply chain realities: Chinese manufacturers currently produce 70-90% of essential grid components including inverters, batteries, and control systems, with the U.S. lacking domestic manufacturing capacity for critical assets like extra-high voltage transformers. Recent federal legislation has established Foreign Entity of Concern (FEOC) restrictions to address these risks, requiring projects to achieve escalating thresholds of non-FEOC content to receive tax credits while utilities work to expand sourcing channels for their supply chains and strengthen security measures. These restrictions arrive precisely when utilities face unprecedented electricity demand growth driven by the rapid growth in data centers, creating a considerable challenge: rapidly expanding infrastructure while navigating complex compliance requirements while lacking viable alternatives for many critical components. Idaho National Laboratory (INL) and its partners have developed practical approaches to help utilities navigate these intersecting challenges as they leverage federal investment to strengthen and grow the grid. These solutions include Cyber-Informed Engineering (CIE) principles that build resilience directly into systems, the Cirrus tool for secure cloud migration, and enhanced procurement guidance that embeds security requirements throughout equipment lifecycles. Federal initiatives, such as the Technical Assistance for Digital Assurance (TADA) project, provide direct support to utilities implementing these approaches while facilitating knowledge sharing across the industry. While these tools and frameworks cannot eliminate all risks inherent in foreign supply chain dependencies, they offer pragmatic pathways for strengthening security posture without sacrificing the deployment momentum essential to meeting surging electricity demand. Ultimately, securing America's digital energy infrastructure demands dedicated coordination across multiple fronts: building domestic supply chains, implementing robust digital assurance practices, and maintaining the aggressive modernization timeline necessary for reliability, resilience, and energy independence.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Microstructure & Mechanical Properties of Scaled Thermally Aged LPBF 316H SS Builds

As part of the US Department of Energy’s Advanced Materials and Manufacturing Technologies program’s mission to accelerate qualification of advanced manufacturing pathways for nuclear applications, laser powder bed fusion (LPBF) 316H stainless steel (SS) has been selected as a model system to develop a rapid code case framework. This effort directly addresses the grand challenges of (1)expanding the limited portfolio of materials currently codified for elevated-temperature nuclear structural service under Section III, Division 5of the American Society of Mechanical Engineers’ Boiler and Pressure Vessel Code; and (2) significantly reducing qualification timelines that traditionally exceed a decade. The strategic importance of LPBF 316H lies in its immediate industrial relevance, existing data foundation from wrought 316H, and alignment with ongoing code case development for LPBF 316L.Prior work revealed accelerated precipitation of deleterious secondary phases and reduced creep ductility in as-printed LPBF 316H. Building on that prior research, FY2025activities focused on establishing an understanding of the key failure mechanisms of crept 316H specimens to aid in code case development and on evaluating stress relief (SR) parameters on the high-temperature performance and thermal aging-induced degradation of tensile and fracture behavior in LPBF316H.

36 MATERIALS SCIENCE↗

Irradiation Testing Plan for Long Term Accident Tolerant Fuels

Many potential Accident Tolerant Fuel (ATF) technologies with the potential for making substantive improvements to the performance of Light Water Reactors (LWRs) in accident scenarios will require development and qualification timelines longer than 4 years. These technologies are named “Long Term” ATF. The attached report summarizes the irradiation testing capabilities available for use in the development and qualification of these technologies and presents a nominal test sequence.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PermitTEC v0.1: Standardized Metadata Corpus of NEPA Litigation Documents

The National Environmental Policy Act of 1969, as amended (NEPA), mandates that federal agencies assess and document potential environmental impacts before deciding on proposed actions. While significant progress has been made in cataloging and standardizing NEPA documents themselves, the legal challenges that frequently arise from these decisions remain poorly cataloged and largely inaccessible for systematic analysis. Litigation challenging NEPA compliance can substantially delay project timelines, reshape agency decision-making, and establish precedents that influence future environmental reviews — yet no standardized, machine-readable corpus exists that links litigation records to the NEPA projects they contest.

54 ENVIRONMENTAL SCIENCES↗

Development and Evaluation of Embrittlement Resistant Alloys for Advanced LWR Cladding

The primary challenge preventing the deployment of reactor designs that leverage wrought FeCrAl as an advanced light-water reactor (LWR) cladding is irradiation hardening and embrittlement. Wrought FeCrAl alloys experience a loss of post-irradiation ductility and fracture toughness under low-temperature neutron irradiation (< 350°C) resulting from the combined effects of dislocation loop formation and the irradiation-enhanced precipitation of Cr-rich alpha-prime precipitates throughout the microstructure. Over the past decade, significant improvements in our understanding regarding the effect of Cr and Al content have been enabled through neutron irradiations, but even optimized wrought alloys such as C26M remain vulnerable to brittle failure during storage, transportation, and handling following irradiation. This report summarizes multiple irradiation campaigns initiated over the past 7 years and provides recent insights into the effect of (1) minor alloying composition, (2) alloy processing strategy, (3) crystal structure, and (4) the use of advanced oxide dispersion strengthened (ODS) alloys. The first irradiation campaign irradiated body-centered cubic FeCrAl alloy C26M with and without elements such as Mo and Y. It also included face-centered cubic alumina-forming austenitic (AFA) alloys that have a steeper neutronic penalty but that have far superior high-temperature strength than wrought FeCrAl. Finally, this campaign compared conventional wrought C26M with the same material produced using modern powder metallurgical hotisostatic pressing (PM-HIP). The second irradiation campaign, initiated in 2018, irradiated wrought and FeCrAl-ODS materials up to 50 dpa to assess their irradiation resistance to high-doses. The results of this work indicate that wrought C26M suffers significant degradation following neutron irradiation at LWR-relevant temperatures regardless of Mo and Y content. The PM-HIP variant appears to be more resilient to irradiation-induced ductility loss in comparison with wrought variants but still loses almost all ductility by 8 dpa. Notably, the AFAs retained at least 5% total elongation after irradiation at the same dose and temperature condition, although additional deterioration may be expected at higher fluence levels. FeCrAl-ODS materials show the greatest promise as a transformative longer-term accident-tolerant fuel (LT-ATF) cladding material. The extruded 106ZY10C alloy retained 10% total elongation after 16 dpa irradiation and retained 8% total elongation after 50 dpa. Additional challenges with FeCrAl-ODS alloys also remain, including optimization of end cap joining methodologies, enhancement of fracture toughness, scaling production to prove economic viability, and optimizing post-pilger heat treatments to maximize ductility and irradiation resistance. This series of irradiations demonstrates the efficacy of the LWR testbed available within the United States for the rapid irradiation and down-selection of LT-ATF candidates. As the country rapidly accelerates its timeline for the deployment of advanced reactor concepts, the effective utilization of the High Flux Isotope Reactor for separate-effects style irradiations should continue to be prioritized to answer the final questions pertaining to LT-ATF candidates necessary for the deployment of advanced boiling water reactors and small modular reactors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Microstructure and Mechanical Properties of Scaled Thermally Aged LPBF 316H SS Builds

As part of the US Department of Energy’s Advanced Materials and Manufacturing Technologies program’s mission to accelerate qualification of advanced manufacturing pathways for nuclear applications, laser powder bed fusion (LPBF) 316H stainless steel (SS) has been selected as a model system to develop a rapid code case framework. This effort directly addresses the grand challenges of (1) expanding the limited portfolio of materials currently codified for elevated-temperature nuclear structural service under Section III, Division 5 of the American Society of Mechanical Engineers’ Boiler and Pressure Vessel Code; and (2) significantly reducing qualification timelines that traditionally exceed a decade. The strategic importance of LPBF 316H lies in its immediate industrial relevance, existing data foundation from wrought 316H, and alignment with ongoing code case development for LPBF 316L. Prior work revealed accelerated precipitation of deleterious secondary phases and reduced creep ductility in as-printed LPBF 316H. Building on that prior research, FY 2025 activities focused on establishing an understanding of the key failure mechanisms of crept 316H specimens to aid in code case development and on evaluating stress relief (SR) parameters on the high-temperature performance and thermal aging induced degradation of tensile and fracture behavior in LPBF 316H.

36 MATERIALS SCIENCE↗

Weighing the Future: Strategic Options for U.S. Space Nuclear Leadership

We believe in speed, strength, and sovereignty. The government’s job is to unlock private sector investment, not micromanage it. Our approach shifts from endless studies to operational deployment, from bureaucratic gridlock to clear timelines and accountability. If done right, this strategy will unleash private capital, create high-tech American jobs, and put the United States back in the lead, not just in space, but in the future of energy and defense.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Draft Feasibility Assessment for Use of AI in Preparing Transportation Safety Analysis Reports

Preparing transportation safety analysis reports for microreactors is time and labor intensive, requiring extensive cross referencing to Federal regulations, previously approved documents, and expert review comments across structural, thermal, criticality, shielding, containment, and security. These burdens are magnified by the novelty of microreactor technologies and the evolving regulatory landscape, as well as current workforce constraints. Generative AI and supporting machine learning tools present an opportunity to accelerate drafting timelines, lift generalized writing burdens, and systematically enforce regulatory adherence through retrieval augmented generation and other knowledge retrieval and mapping methods. This draft report presents a preliminary feasibility assessment of the use of AI to expedite the preparation of microreactor transportation safety analysis reports and proposes an initial methodology for doing so.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Microchannel-based Membrane-less Extraction of Li from Unconventional Lithium Sources & the Separation of REE

This final report provides an overview of the Project's entire duration, covering July 1, 2021 to December 31, 2023. It primarily focuses on the achievements, technological developments, and unique challenges the team faced while working on separating and extracting Lithium from produced waters. The project's primary aim was to create an integrated, high-throughput, membrane-less, and modular microfluidic platform that could extract Lithium from unconventional sources. We have successfully met all goals and milestones envisioned in the SOPO document. The most critical primary milestones, including the Go-No-Go milestone (refer to the Gantt chart in the Appendices), were successfully accomplished. We demonstrated phase separation (>90%) and extraction (>85%) performance in the MPSE using synthetic, and representative produced water composition feed at 50 ml/min total flow through MPSE 36. We have also performed a parametric study of the MPSE operations, beyond the scope of SOPO, exploring operating conditions of current and broader interest. The extended investigation of operational parameters is concurrent with our efforts to seek further development of the MPSE technology beyond the scope of the Project. Along these lines of development, we have made efforts to be responsive to DOE calls for technological developments of other types of resources (beyond PW) for the recovery of Critical Materials and higher TRL development (beyond TRL 4). During the work on this Project, we developed and implemented three innovative technical approaches that emerged from our efforts to successfully meet the Project milestones. The innovative & original technical approaches developed and implemented in this Project are now the contributions to process engineering that could be clearly credited to the Project. First, Convergent Design Approach is a comprehensive feedforward & feedback loop of four design phases: i) design for functionality, ii) design for manufacturing, iii) design for sustainability, and iv) design for market. Next was Process Intensification. A major aim of this Project was to create an innovative phase separation & extraction microscale-based technology for Li separation – thus the words microchannel-based in the Project title. A microscale-based technology is intrinsically in the center of the Process Intensification domain as defined by its unique principles. Therefore, Process Intensification was implicitly envisioned in the Project’s SOPO. Lastly, Time Scale Analysis is a novel tool for discovering the needs and directions of Process Intensification implementations in any process technology. This Project is fully credited for developing and implementing the three novel technical approaches mentioned above. These are general contributions to process engineering that emerged from this Project. Beyond the original SOPO scope, the OSU-U.Pitt research group utilized a Convergent Design methodology, integrating first-principles mathematical modeling with experimental validation on the Minimum Development Vehicle. By creating these Digital Twins, the team rapidly assessed manufacturing iterations to support TEA analysis. This framework further enabled the development of advanced Surface Modification Techniques, where hydrophobic and oleophobic coating strategies were optimized via Digital Twin tools and validated through rigorous 100-hour longevity testing. TEA Analysis: The closing efforts of this Project were focused on the TEA analysis. TEA analysis had two primary functions: i) enabling critical assessments of design variations withing 10 the Concurrent Design Approach, thus enabling evolution of the MPSE design to reach faster- better-cheaper alternatives; and ii) to create a bridge between the accomplishments of this Project and future projects of higher TRL, beyond TRL 6 level. It is important to note that the TEA model created in the Project stirred the technological solutions for the recovery of critical materials toward a vision of a very profitable modular plant that has unique zero-waste water discharge signature. More importantly, thanks to our experimental performance data and conservative assumptions, the TEA model predicts minimal technological and investment risks. Low cost of a modular unit of a nominal capacity of [1000 tons of Li 2 CO 3 /year] positions the MPSE based technology within the reach of community investors, thus offering a paradigm shift in the development of critical technologies. The project successfully navigated two primary challenges: solvent selection and manufacturing adaptation. Restricted by the SOPO to existing literature for lithium recovery, the team identified a critical need for a "material excellence program" to develop next-generation solvents, eventually concluding with a preliminary investigation into promising Ionic Liquids (ILs). Simultaneously, COVID-19 supply chain disruptions forced a pivot from traditional manufacturing to advanced additive methods at ATAMI-OSU. By transitioning from stainless steel to 3D-printed polymer substrates, the team achieved a transformative three-order-of- magnitude reduction in manufacturing costs and compressed prototyping timelines from several months to just two days. The MPSE technology offers significant energy, environmental, and economic advantages by overcoming the traditional bottlenecks of phase-separation hardware and contactor size. Unlike conventional mixer-settlers or membrane-based systems, MPSE operates without moving parts or fouling-prone membranes, achieving robust performance even with challenging, viscous, or particulate-heavy feeds. Key performance metrics include an energy intensity reduction of 5–50x (3–40 kJ/m 3 ) compared to incumbent technologies and a dramatic reduction of processing time to under 60 seconds, which drastically reduces the physical plant footprint. These technical efficiencies translate into superior economic outcomes; for a 100 t/year Li 2 CO 3 facility, implementing MPSE is projected to nearly halve contactor CAPEX (from $\$$6.08M to $\$$3.01M) and significantly increase the project's Net Present Value (NPV), derisking new investment and enabling distributed critical-mineral processing configurations. The commercialization of MPSE technology is being spearheaded by Vigsur Dynamics Inc., which has adopted a structured, parallel approach to technical and business development since its formation in January 2026. Following extensive customer discovery and engagement with the Oregon State University accelerator, Vigsur Dynamics is working to establish a business model that transitions from pilot demonstrations to modular hardware sales, ultimately aiming for a "build-own-operate" service strategy. Current technical milestones—including 100 hours of continuous operation, superior energy efficiency, and successful 6-unit modular scale-up— provide a foundation for this transition. Backed by ongoing IP licensing and a growing network of industrial and venture advisors, the company is actively de-risking the platform to replace conventional mixer-settler systems in the critical minerals market.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

The Role of the U.S. Electric Distribution System in Serving Data Center and Other Large Loads

The rapid expansion of data centers in the United States is reshaping how the electric distribution system must plan for and accommodate large load interconnections. This report evaluates the role of the distribution grid in serving these loads, from small edge facilities to hyperscale campuses. Using national datasets, utility filings, and industry studies, we assess demand growth, reliability requirements, interconnection thresholds, and infrastructure needs at substations and feeders. The analysis highlights the mismatch between fast data center development timelines and slower utility planning and construction cycles, as well as strategies such as phased energization, on-site generation, hosting capacity maps, and structured interconnection frameworks. While focused on data centers, the insights also apply to other high-density loads such as advanced manufacturing, hydrogen production, and electrified transportation. The report concludes with approaches to align planning processes, transparency tools, and regulatory frameworks so utilities can manage new large loads in ways that support a reliable and resilient grid.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stepped hosting capacity for maximizing distributed solar on Guam

Guam Power Authority (GPA) sought national lab assistance through the Energy Technology Innovations Partnership Project as part of the second cohort of applicants (i.e. the program’s second year). GPA is leading an effort to evolve the island’s energy generation portfolio to 50% renewable by 2030, and 100% renewable by 2040. These goals for renewable penetration are a function of public law and GPA is legally required to comply, though GPA’s timeline is more aggressive by five years in each case than the law requires.

14 SOLAR ENERGY↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

Novel PV Array System Design to Accelerate Solar Deployment, Reduce LCOE, Reduce Land Use Competition, and Increase Siting Flexibility

The increasing demand for solar energy faces significant barriers, including inefficient construction processes, high project costs limiting LCOE reductions, and diminishing availability of "good" sites with favorable interconnection. Conventional solar installations are often constrained by long construction timelines and the need for flat, large plots. Furthermore, the industry struggles with a shortage of skilled labor. Planted Solar aims to address these challenges by fundamentally transforming solar deployment from a construction project into a streamlined manufacturing process. Our novel approach combines high-density racking, integrated terrain-following design software, and installation automation. Unlike competing solutions that either assist with standard array assembly or offer dense packing without terrain adaptability or automation, Planted's technology uniquely brings together a new array product with in-place automated manufacturing to achieve the lowest possible cost, greater site flexibility, and accelerated deployment.

14 SOLAR ENERGY↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations. This report summarizes the Fiscal Year 2024 (FY24) ARM radar-related activities and outlines the strategic plan for FY25. It presents a comprehensive radar plan that includes detailed activities, priorities, and a projected timeline aligned with the ARM radar roadmap. Key tasks, detailed in Table 1, cover various radar operational stages and coordinated efforts among ARM teams.

54 ENVIRONMENTAL SCIENCES↗