Search NASASearch

SEARCH · Search NASA

Results for “Turbine Engine Test Facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

748 records · Page 16

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Hubble Space Telescope nickel-hydrogen battery testing: An update

The Marshall Space Flight Center (MSFC) began testing the HST Ni-H2 Six Battery Test and the 'Flight Spare Battery' Tests approximately one year before the launch of the HST. These tests are operated and reported on by the MSFC, but are managed and funded by Goddard Space Flight Center in direct support of the HST program. The HST Ni-H2 batteries are built from Eagle Picher RNH-90-3 cells. The HST EPS (electrical power system) is a direct energy transfer power system. The HST Ni-H2 Six Battery Test is a breadboard of the HST EPS. The batteries in the test are composed of test module cells and packaged into three battery modules identical to the flight modules. This test is the HST EPS testbed. The 'Flight Spare Battery' Test is a simulation of one of the six battery channels on the HST. The cells in the test are from the flight spare lot of cells, which are the same lot of cells that three of the six HST flight batteries are made from. This test is the battery life test for the HST program.

Whitt, Thomas H.

Nickel-hydrogen battery testing for Hubble Space Telescope

The authors identify objectives and provide data from several nickel-hydrogen battery tests designed to evaluate the possibility of launching Ni-H2 batteries on the Hubble Space Telescope (HST). Test results from a 14-cell battery, a 12-cell battery, and a 4-cell pack are presented. Results of a thermal vacuum test to verify the battery-module/bay heat rejection capacity are reported. A 6-battery system simulation breadboard is described, and test results are presented.

Baggett, Randy M.

Parametric tests of a 40-Ah bipolar nickel-hydrogen battery

A series of tests were performed to characterize battery performance relating to certain operating parameters which include charge current, discharge current, temperature, and pressure. The parameters were varied to confirm battery design concepts and to determine optimal operating conditions.

Cataldo, R. L.

Overview of Past and Future EVA Suit Testing and Training in Chamber B at NASA JSC

The Crew and Thermal System Division’s Chamber B has received an increase in demand for next generation suit testing. Chamber B is the National Aeronautics and Space Administration (NASA) Johnson Space Center’s only human-rated thermal vacuum (TVAC) chamber. Historically it was used in Gemini, Apollo, Skylab, Shuttle, and the International Space Station (ISS) suit tests. Recently, the chamber has been returned to service with new capabilities for suit testing. In 2023, The Exploration Extravehicular Mobility Unit (xEMU) underwent a 5-day, extensive thermal vacuum test that included both a full-bodied Exploration Pressure Garment Suit (xPGS) as well as a high fidelity Short xEMU. SpaceX has also used the chamber for human-in-the-loop (HITL) qualification and acceptance testing on their flight Polaris Dawn suits for the first-ever commercial extravehicular activity (EVA). Current chamber Manlock B2 upgrades include the support of two test subjects at the same time with updated chamber interface and support systems for the next generation of suits. This paper will discuss the history of spacesuit testing in the chamber, the recent testing for commercial and NASA suits, and upgrades to accommodate new test requirements.

Polaris Dawn

Overview of Past and Future EVA Suit Testing and Training in Chamber B at NASA JSC

The Crew and Thermal System Division’s Chamber B has received an increase in demand for next generation suit testing. Chamber B is the National Aeronautics and Space Administration (NASA) Johnson Space Center’s only human-rated thermal vacuum (TVAC) chamber. Historically it was used in Gemini, Apollo, Skylab, Shuttle, and the International Space Station (ISS) suit tests. Recently, the chamber has been returned to service with new capabilities for suit testing. In 2023, The Exploration Extravehicular Mobility Unit (xEMU) underwent a 5-day, extensive thermal vacuum test that included both a full-bodied Exploration Pressure Garment Suit (xPGS) as well as a high fidelity Short xEMU. SpaceX has also used the chamber for human-in-the-loop (HITL) qualification and acceptance testing on their flight Polaris Dawn suits for the first-ever commercial extravehicular activity (EVA). Current chamber Manlock B2 upgrades include the support of two test subjects at the same time with updated chamber interface and support systems for the next generation of suits. This paper will discuss the history of spacesuit testing in the chamber, the recent testing for commercial and NASA suits, and upgrades to accommodate new test requirements.

Human-in-the-loop

Softening the Gap between Wöhler and Paris – New Approaches for Fatigue Analysis –

Fatigue analysis tools can vary across industries. For example, automotive engineers often use the Wöhler (S-N) approach to design for safe-life, while aerospace engineers prioritize damage tolerance and inspection intervals, relying instead on crack growth models such as Paris’ law. Although both approaches may deal with the control of cracks in similar materials, their analysis tools and material characterizations are fundamentally distinct. This divide mirrors the classic split between stress-based strength analysis and linear elastic fracture mechanics. However, modern nonlinear models that incorporate material softening, such as cohesive laws, blur this boundary and capture fracture behaviors across scales. This presentation describes the CF23 fatigue model, which uses cohesive softening to link S-N crack initiation with crack propagation rates. CF23 spans the full fatigue spectrum, from initial propagation transients to steady-state growth and threshold conditions, offering a unified framework that bridges Wöhler and Paris-based methodologies. Example applications include fatigue crack propagation transients in adhesive interfaces and skin/stiffener separation.

cohesive elements

EMU Ag-Zn battery wet-life extension test

The Extravehicular Mobility Unit (EMU) silver/zinc (Ag/Zn) battery is an 11 cell battery of approximately 30 AH. The Ag/Zn battery is comprised of two 4-cell monoblocks and one 3-cell monoblock. A discussion of a wet-life extension test performed on the battery is given in viewgraph form.

Bragg, Bobby J.

Battery life test using reconditioning

A discussion is presented on nickel cadmium battery life tests using reconditioning and some comparative tests not using reconditioning. The discussion is aimed at the program application part of the testing. The goals of the program were to get an increased utilization out of the battery system in geosynchronous orbit. An attempt was made to push the depth of discharge operation up around 80 to 85 percent and the intent with the reconditioning program was to extend this type of utilization out towards a 10-year life and attune the voltage regulation.

Sparks, R. H.

Hubble Space Telescope nickel-hydrogen flight spare battery test

For several years, MSFC has been engaged in a series of battery tests in support of the Hubble Space Telescope (HST) Program. Now that the HST is in orbit, many of these tests will continue in order to give those responsible for the HST a reasonable prediction on the performance of the flight batteries. These tests will also be a source of needed low earth orbit (LEO) data for nickel hydrogen (Ni-H2) batteries and cells. One of the tests currently in progress at MSFC is a mission simulation test on a 22-cell Ni-H2 battery. This battery is composed of spare cells taken from the lot of cells out of which the Flight Spare Module was assembled. This module is one of two modules launched on the HST. This battery has been on test since Jun. 1989 and has completed nearly 8000 LEO cycles. A series of characterization tests were run prior to the start of the mission simulation and a launch scenario test was run in Feb. and Mar. 1990 to test the behavior of the cells through a simulated launch. The results from these tests as well as the overall performance of the battery as it continues to cycle are reported.

Brewer, Jeffrey C.

Air-Breathing Aerospace Plane Development Essential: Hypersonic Propulsion Flight Tests

Hypersonic airbreathing propulsion utilizing scramjets can change transatmospheric accelerators for low earth-to-orbit and return transportation. The value and limitation of ground tests, of flight tests, and of computations are presented, and scramjet development requirements are discussed. It is proposed that near full-scale hypersonic propulsion flight tests are essential for developing computational design technology so that it can be used for designing this system. In order to determine how these objectives should be achieved, some lessons learned from past programs are presented. A conceptual two-stage-to-orbit (TSTO) prototype/experimental aerospace plane is recommended as a means of providing access-to-space and for conducting flight tests.

Unmeel B Mehta

Final Thermal Design and Thermal Vacuum Testing of the StarBurst Instrument

The StarBurst Multimessenger Pioneer is a small satellite mission serving as a wide-field gamma-ray observatory designed to capture the initial emissions of short gamma-ray bursts, electromagnetic signatures of neutron star mergers. This paper presents the final thermal design and analysis of the StarBurst Instrument, comprising the bus-to-instrument interface plate, control electronics, and twelve crystal detector units, which form the core of the mission’s science capability. The passive thermal control system design requires consideration of restrictive keep-out zones, unknown orbital parameters, and narrow temperature limits of the detectors. Also summarized is the instrument level thermal vacuum cycle test, correlated model refinements, and updated model results. Following successful completion of the instrument test campaign, the hardware was integrated with the spacecraft bus for spacecraft level testing, including additional thermal vacuum testing. The results from the spacecraft level thermal vacuum test will further inform the instrument thermal model, ensuring accurate flight temperature predictions. StarBurst launches as a secondary payload in 2027 and has a mission duration of at least one year.

StarBurst