Search NASA⌕ Search

SEARCH · Search NASA

Results for “Update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Update of Earthquake Strong-Motion Instrumentation at Lawrence Livermore National Laboratory

Following the January 1980 earthquake that was felt at Lawrence Livermore National Laboratory (LLNL), a network of strong-motion accelerographs was installed at LLNL. Prior to the 1980 earthquake, there were no accelerographs installed. The ground motion from the 1980 earthquake was estimated from USGS instruments around the Laboratory to be between 0.2 – 0.3 g horizontal peak ground acceleration. These instruments were located at the Veterans Hospital, 5 miles southwest of LLNL, and in San Ramon, about 12 miles west of LLNL. In 2011, the Department of Energy (DOE) requested to know the status of our seismic instruments. We conducted a survey of our instrumentation systems and responded to DOE in a letter. During this survey, it was found that the recorders in Buildings 111 and 332 were not operational. The instruments on Nova had been removed, and only three of the 10 NIF instruments installed in 2005 were operational (two were damaged and five had been removed from operation at the request of the program). After the survey, it was clear that the site seismic instrumentation had degraded substantially and would benefit from an overhaul and more attention to ongoing maintenance. LLNL management decided to update the LLNL seismic instrumentation system. The updated system is documented in this report.

42 ENGINEERING↗

RELAP-7 Pressurizer Component Development Updates

RELAP-7 is a nuclear systems safety analysis code being developed at the Idaho National Laboratory (INL). RELAP-7 development began in 2011 to support the Risk Informed Safety Margins Characterization (RISMC) Pathway of the Light Water Reactor Sustainability (LWRS) program. The overall design goal of RELAP-7 is to take advantage of the previous thirty years of advancements in computer architecture, software design, numerical methods, and physical models in order to provide capabilities needed for the RISMC methodology and to support nuclear power safety analysis. The code is being developed based on Idaho National Laboratory’s modern scientific software development framework – MOOSE (the Multi-Physics Object-Oriented Simulation Environment). The initial development goal of the RELAP-7 approach focused primarily on the development of an implicit algorithm capable of strong (nonlinear) coupling of the dependent hydrodynamic variables contained in the 1-D/2-D flow models with the various 0-D system reactor components that compose various boiling water reactor (BWR) and pressurized water reactor nuclear power plants (NPPs). As part of the efforts to expand the capability for PWR simulation, an equilibrium single-region pressurizer model has been implemented in RELAP-7. The pressurizer component can simulate pressure and water level change through insurge, spray, and heating processes. Two simple tests – one for insurge process and another for outsurge process – have been reported to demonstrate and verify the functions of the pressurizer model. The typical single-phase PWR system model presented in the first RELAP-7 milestone report has been updated, as part of system level test for the new pressurizer model. The updated PWR system model with the pressurizer component can be used for more realistic transient simulations. The addition of the equilibrium single-region pressurizer model represents the first step of developing a suite of pressurizer models with different levels of fidelities. Non-equilibrium two-region two-zone model and non-equilibrium five-region three zone model will be implemented in the near future. Cross comparison and validation will be pursued when higher fidelity pressurizer models are completed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FY16 ASC ATDM L2 Milestone: PARTISN Research and FleCSI Updates

These are slides for a presentation on PARTISN Research and FleCSI Updates. The following topics are covered: SNAP vs PARTISN, Background Research, Production Code (structural design and changes, kernel design and implementation, lessons learned), NuT IMC Proxy, FleCSI Update (design and lessons learned). It can all be summarized in the following manner: Kokkos was shown to be effective in FY15 in implementing a C++ version of SNAP's kernel. This same methodology was applied to a production IC code, PARTISN. This was a much more complex endeavour than in FY15 for many reasons; a C++ kernel embedded in Fortran, overloading Fortran memory allocations, general language interoperability, and a fully fleshed out production code versus a simplified proxy code. Lessons learned are Legion. In no particular order: Interoperability between Fortran and C++ was really not that hard, and a useful engineering effort. Tracking down all necessary memory allocations for a kernel in a production code is pretty hard. Modifying a production code to work for more than a handful of use cases is also pretty hard. Figuring out the toolchain that will allow a successful implementation of design decisions is quite hard, if making use of "bleeding edge" design choices. In terms of performance, production code concurrency architecture can be a virtual showstopper; being too complex to easily rewrite and test in a short period of time, or depending on tool features which do not exist yet. Ultimately, while the tools used in this work were not successful in speeding up the production code, they helped to identify how work would be done, and provide requirements to tools.

97 MATHEMATICS AND COMPUTING↗

Uncertainty for Part Density Determination: An Update

Accurate and precise density measurements by hydrostatic weighing requires the use of an analytical balance, configured with a suspension system, to both measure the weight of a part in water and in air. Additionally, the densities of these liquid media (water and air) must be precisely known for the part density determination. To validate the accuracy and precision of these measurements, uncertainty statements are required. The work in this report is a revision of an original report written more than a decade ago, specifically applying principles and guidelines suggested by the Guide to the Expression of Uncertainty in Measurement (GUM) for determining the part density uncertainty through sensitivity analysis. In this work, updated derivations are provided; an original example is revised with the updated derivations and appendix, provided solely to uncertainty evaluations using Monte Carlo techniques, specifically using the NIST Uncertainty Machine, as a viable alternative method.

47 OTHER INSTRUMENTATION↗

PF-WFS Shell Inspection Update December 2016

Since the last project update in FY16:Q2, PF-WFS personnel have advanced in understanding of shell inspection on Coordinate Measuring Machines {CMM} and refined the PF-WFS process to the point it was decided to convert shell inspection from the Sheffield #1 gage to Lietz CM Ms. As a part of introspection on the quality of this process many sets of data have been reviewed and analyzed. This analysis included Sheffield to CMM comparisons, CMM inspection repeatability, fixturing differences, quality check development, probing approach changes. This update report will touch on these improvements that have built the confidence in this process to mainstream it inspecting shells. In addition to the CMM programming advancements, the continuation in refinement of input and outputs for the CMM program has created an archiving scheme, input spline files, an output metafile, and inspection report package. This project will continue to mature. Part designs may require program modifications to accommodate "new to this process" part designs. Technology limitations tied to security and performance are requiring possible changes to computer configurations to support an automated process.

42 ENGINEERING↗

Update of Continuous-Energy Data for Hydrogen and SiO 2 Thermal Scattering

The Nuclear Data Team has released updated continuous-energy neutron data files for: 1) hydrogen, and 2) S (α; β) (thermal scattering) on SiO 2 . A list of new ZAIDs and the data that is updated (Old ZAID) is given in Table 1. The old data are still accessible, but are not the default.

38 RADIATION CHEMISTRY, RADIOCHEMISTRY, AND NUCLEA↗

General Separations Area (GSA) Groundwater Flow Model Update: Hydrostratigraphic Data

This document describes the assembly, selection, and interpretation of hydrostratigraphic data for input to an updated groundwater flow model for the General Separations Area (GSA; Figure 1) at the Department of Energy’s (DOE) Savannah River Site (SRS). This report is one of several discrete but interrelated tasks that support development of an updated groundwater model (Bagwell and Flach, 2016).

54 ENVIRONMENTAL SCIENCES↗

Evaluation of Lower East Fork Poplar Creek Mercury Sources - Model Update

The purpose of this report is to assess new data that has become available and provide an update to the evaluations and modeling presented in the Oak Ridge National Laboratory (ORNL) Technical Manuscript Evaluation of lower East Fork Poplar Creek (LEFPC) Mercury Sources (Watson et al., 2016). Primary sources of field and laboratory data for this update include multiple US Department of Energy (DOE) programs including Environmental Management (EM; e.g., Biological Monitoring and Abatement Program, Mercury Remediation Technology Development [TD], and Applied Field Research Initiative), Office of Science (Mercury Science Focus Areas [SFA] project), and the Y-12 National Security Complex (Y-12) Compliance Department.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Q2/Q3 2017 Solar Industry Update

This technical presentation provides an update on the major trends that occurred in the solar industry in Q2 and Q3 of 2017. Major topics of focus include global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Summary Analysis: Hanford Site Composite Analysis Update

The Hanford Site’s currently maintained Composite Analysis, originally completed in 1998, requires an update. A previous update effort was undertaken by the U.S. Department of Energy (DOE) in 2001-2005, but was ended before completion to allow the Tank Closure & Waste Management Environmental Impact Statement (TC&WM EIS) (DOE/EIS-0391) to be prepared without potential for conflicting sitewide models. This EIS was issued in 2012, and the deferral was ended with guidance in memorandum “Modeling to Support Regulatory Decision Making at Hanford” (Williams, 2012) provided with the aim of ensuring subsequent modeling is consistent with the EIS.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Q3/Q4 2017 Solar Industry Update

This technical presentation provides an update on the major trends that occurred in the solar industry in the Q3 and Q4 of 2017. Major topics of focus include global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Q4 2017/Q1 2018 Solar Industry Update

This technical presentation provides an update on the major trends that occurred in the solar industry in Q4 2017 and Q1 2018. Major topics of focus include global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Truly horizontal finite difference scheme in the WRF model FY18 Q1 Update

A main goal of the Wind Forecasting Improvement Project 2 (WFIP2) is to improve performance of the Weather Research and Forecasting (WRF) model over complex terrain. Two methods for improving model performance were outlined in the LLNL WFIP 2 annual operating plan. The first is modification to WRF’s horizontal finite difference scheme to utilize an improved numerical stencil. A second proposed model improvement is use of the immersed boundary method within the WRF model to facilitate improved simulations over complex terrain. In Q1, work focused on implementing an alternative finite difference scheme, with a deliverable of a project update. The alternative finite difference method was implemented for the temperature variable and shown to improve our selected test case, and recommendations are made to continue the work in Q2. In Q2 the focus should be on extending the method to additional model variables, mainly pressure, as well as to real test cases, such as the WFIP 2 cold pool test case. Additionally, use of the immersed boundary method will be pursed in Q2 and Q3, with a second project update due at the end of Q3.

17 WIND ENERGY↗

An Update to the SWiFT V27 Reference Model

A revised Sandia V27 reference model is provided for use with the wind turbine analysis code, FAST, incorporating refined parameters based on blade geometry measurements and performance data collected during the 2017 wake steering campaign at the Scaled Wind Farm Technology (SWiFT) site. The chord, twist, and airfoil section shapes were measured at five span locations on the blades of wind turbine WTGb1. The V27 AeroDyn file was updated with values equal to the measured chord and twist. The measured airfoil shapes deviated over the aft half of the chord compared to the original blade model NACA profiles. Differences in trailing edge camber were converted to an equivalent trailing edge flap effect calculated with thin airfoil theory. These mod- ified airfoil polars were updated in the V27 FAST model. The tip-speed-ratio and root bending moment were measured experimentally in the wake steering campaign at SWiFT on wind turbine WTGa1. The torque constant and collective pitch of the model were tuned so that the model output tip-speed-ratio and thrust, root bending moment matched the experiment across all wind speeds in region 2 operation with minimum error.

17 WIND ENERGY↗

Updated Groundwater Flow Simulations of the Savannah River Site General Separations Area

The groundwater flow model supporting Performance Assessments (PAs) and Composite Analyses (CAs) at the Savannah River Site was significantly revised in 2016 and 2017 using new hydrostratigraphic surfaces, updated well water level calibration targets, and semi-automated model calibration with the PEST optimization code. This model is referred to as “GSA_2016”. This report documents further refinement of the GSA_2016 model in 2018 to incorporate updates to model calibration targets, closure of the H-Area Ash Basin, construction of E-Area Slit Trench operational covers, and plume information from the Mixed Waste Management Facility and Low-Level Radioactive Waste Disposal Facility. Another objective was to lower hydraulic head residuals by adding another calibration zone. The resulting model is referred to as “GSA_2018”.

54 ENVIRONMENTAL SCIENCES↗

Q3/Q4 2018 Solar Industry Update

Each quarter, the National Renewable Energy Laboratory (NREL) conducts the Quarterly Solar Industry Update, a presentation of technical trends within the solar industry, to the solar office staff. Each presentation focuses on global and U.S. supply and demand, module and system price, investment trends and business models, and updates on U.S. government programs supporting the solar industry.

14 SOLAR ENERGY↗

Special Analysis: Impact of Updated GSA Flow Model on E-Area Low-Level Waste Facility Groundwater Performance

In March 2018, the Savannah River National Laboratory (SRNL) notified Solid Waste Management (SWM) of new information that could potentially impact groundwater (GW) disposal limits and possibly require temporary protective measures (Crowley 2018). GW flow directions in the E-Area Low-Level Waste Facility (LLWF) Slit Trenches (STs), Engineered Trenches (ETs), and the Low Activity Waste Vault (LAWV) have notably changed in the new 2018 General Separations Area (GSA) flow model (Flach 2018a). The 2018 GSA flow model had been updated using 20 years of new hydrologic field data and model calibration methods that employed mathematical optimization software. It was later determined that the primary reason for the change in GW flow directions was due to the influence of low permeability caps that had been placed over the Old Burial Grounds and the Low Level Radioactive Waste Disposal Facility (LLRWDF). Updated flow directions in the model produce a higher degree of plume overlap for disposal units (DU’s) in the southeastern portion of E-Area than had been predicted in the 2008 E-Area LLWF Performance Assessment (PA). SWM and SRNL outlined the scope for this Special Analysis (SA) and proposed a set of interim measures (IM’s) to protect trench operations from exceeding Performance Objectives (PO’s) during the preparation of this SA, both of which were approved by the SWM Performance Assessment Review Committee (PARC) (Mooneyhan 2018).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗