Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Processing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

A Robust Power Remote Manipulator for Use in Waste Sorting, Processing, and Packaging - 12158

Disposition of radioactive waste is one of the Department of Energy's (DOE's) highest priorities. A critical component of the waste disposition strategy is shipment of Transuranic (TRU) waste from DOE's Oak Ridge Reservation to the Waste Isolation Plant Project (WIPP) in Carlsbad, New Mexico. This is the mission of the DOE TRU Waste Processing Center (TWPC). The remote-handled TRU waste at the Oak Ridge Reservation is currently in a mixed waste form that must be repackaged in to meet WIPP Waste Acceptance Criteria (WAC). Because this remote-handled legacy waste is very diverse, sorting, size reducing, and packaging will require equipment flexibility and strength that is not possible with standard master-slave manipulators. To perform the wide range of tasks necessary with such diverse, highly contaminated material, TWPC worked with S.A. Technology (SAT) to modify SAT's Power Remote Manipulator (PRM) technology to provide the processing center with an added degree of dexterity and high load handling capability inside its shielded cells. TWPC and SAT incorporated innovative technologies into the PRM design to better suit the operations required at TWPC, and to increase the overall capability of the PRM system. Improving on an already proven PRM system will ensure that TWPC gains the capabilities necessary to efficiently complete its TRU waste disposition mission. The collaborative effort between TWPC and S.A. Technology has yielded an extremely capable and robust solution to perform the wide range of tasks necessary to repackage TRU waste containers at TWPC. Incorporating innovative technologies into a proven manipulator system, these PRMs are expected to be an important addition to the capabilities available to shielded cell operators. The PRMs provide operators with the ability to reach anywhere in the cell, lift heavy objects, perform size reduction associated with the disposition of noncompliant waste. Factory acceptance testing of the TWPC Powered Remote Manipulators has completed at SAT's Colorado facility, and on-site training at TWPC is scheduled to start in early 2012. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The MIST /MIUS Integration and Subsystems Test/ laboratory - A testbed for the MIUS /Modular Integrated Utility System/ program

The MIUS (Modular Integrated Utility System) concept is to be an energy-conserving, economically feasible, integrated community utility system to provide five necessary services: electricity generation, space heating and air conditioning, solid waste processing, liquid waste processing, and residential water purification. The MIST (MIUS Integration and Subsystem Test) integrated system testbed constructed at the Johnson Space Center in Houston includes subsystems for power generation, heating, ventilation, and air conditioning (HVAC), wastewater management, solid waste management, and control and monitoring. The key design issues under study include thermal integration and distribution techniques, thermal storage, integration of subsystems controls and displays, incinerator performance, effluent characteristics, and odor control.

Beckham, W. S., Jr.↗

Novel Foaming Solutions for High Level Waste (HLW) Processing - 20195

Foaming occurs during treatment of high level waste (HLW) at Savannah River Site's Defense Waste Processing Facility (DWPF) in the Chemical Process Cell (CPC) due to high gas generation from process steam and chemical offgas products [1]. The presence of amphiphilic particles in the waste slurry stabilizes the foam [2], [3]. Efficient processing of HLW requires foam control, as foam-overs lead to lower productivity and potential radioactive contamination of condensate streams. DWPF currently employs Siovation Antifoam 747, a surfactant produced by Momentive Performance Materials, as an antifoaming agent during waste treatment. Despite its ability to control foam generation, processing issues have arisen from its use [4]. During DWPF chemical processing, a chemical antifoam agent must be effective at temperatures up to 103 deg. C between pH 3-13. Antifoam 747 is effective at pH 7 but degrades as pH deviates [5]. Antifoam 747 is 90% by weight Momentive{sup TM} L77 and 10% by weight Momentive{sup TM} Y-17580. These ingredients are trisiloxane products, which are especially vulnerable to attack in acidic and caustic environments. Since Antifoam 747 readily degrades, periodic addition is required. Several processing concerns related to Antifoam 747 have affected DWPF operation. Its overuse warranted concern of potential flammable melter offgas under upset conditions due to the generation of carbon dioxide and hydrogen. As a result, a Potential Inadequacy in the Safety Analysis (PISA) was declared [6]. Antifoam contribution has been included in the melter offgas flammability strategy and the quantity of antifoam is monitored to ensure limits are not exceeded. Testing at Savannah River National Laboratory (SRNL) determined that propanal, tri-methylsilanol, and hexamethyldisiloxane are generated as Antifoam 747 degrades, leading to a second PISA [7]. The formation of these byproducts poses additional flammability risks. Furthermore, the methyl and ethyl groups of these compounds may be responsible for the formation of the methyl and ethyl mercury discovered in DWPF [8], [9]. The formation of organomercury has specifically been called out by DOE as a need for increased research. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoam agents were evaluated as part of an effort to improve HLW treatment operations at DWPF and to reduce, or eliminate, the flammability hazards associated with Antifoam 747 currently in use. Foaming of high-level waste (HLW) slurries is an issue at the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) which is currently mitigated with a chemical antifoam agent. The effectiveness of non-chemical methods for foam control and the efficiency of alternative antifoams were examined to improve HLW treatment at DWPF and to eliminate the flammability hazards associated with Siovation Antifoam 747 currently in use. Non-chemical foam control methods were deemed unviable for chemical processing at DWPF, as the spray/mist technique requires too much water and space limitations make installation and implementation of headspace agitators unfeasible. The use of ultrasonic energy thickened and further stabilized the foam. Two suitable alternative defoaming agents, Momentive{sup TM} Y- 17112 and Evonik Surfynol{sup R} MD-20, were identified. Both defoamers control foam over a pH range of 4- 13 at boiling, with no flammable degradation products, and only minimal quantities (100-200 mg/kg) are required under glycolic acid conditions. In order to validate the effectiveness of these defoaming agents, SRNL recommends irradiation testing and laboratory scale SRAT/SME experiments with actual radioactive waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of an advanced spacecraft water and waste materials processing system

An Integrated Waste Management-Water System (WM-WS) which uses radioisotopes for thermal energy is described and results of its trial in a 4-man, 180 day simulated space mission are presented. It collects urine, feces, trash, and wash water in zero gravity, processes the wastes to a common evaporator, distills and catalytically purifies the water, and separates and incinerates the solid residues using little oxygen and no chemical additives or expendable filters. Technical details on all subsystems are given along with performance specifications. Data on recovered water and heat loss obtained in test trials are presented. The closed loop incinerator and other projects underway to increase system efficiency and capacity are discussed.

Murray, R. W.↗

Development of Novel Foaming Solutions for High Level Waste (HLW) Processing

Foaming occurs during treatment of high level waste (HLW) at Savannah River Site’s Defense Waste Processing Facility (DWPF) in the Chemical Process Cell (CPC) due to high gas generation from process steam and chemical off gas products. The presence of amphiphilic particles in the waste slurry stabilizes the foam. Efficient processing of HLW requires foam control, as foamovers lead to lower productivity and potential radioactive contamination of condensate streams. DWPF currently employs Antifoam 747, a surfactant produced by Momentive Performance Materials, as an antifoaming agent during waste treatment. While it controls foam, processing issues have arisen from its use. During DWPF chemical processing, antifoam must be effective up to 103°C and between a pH range of 3-13. Antifoam 747 is efficient at pH 6-8 but degrades outside this optimal pH range. Savannah River National Laboratory (SRNL) has identified multiple flammable antifoam degradation products during laboratory scale experiments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 61: Challenges in the US DOE HLW Tank Management Program

Approximately 50 people attended this panel session which focused on the successes and challenges in DOE high-level radioactive tank waste management with special emphasis on tank waste processing and waste disposition. Panelists discussed approaches, results, and lessons learned in addressing challenges in construction, start-up, and processing of tank waste and its ultimate disposition that is critical to tank waste management at Hanford, Savannah River, and Idaho sites. Presentations proposed include: 1 - Liquid Waste Program at the Savannah River Site (James Folk, US DOE (USA)); 2 - Progress on Hanford's Tank Waste Treatment Mission (Tom Fletcher, US DOE (USA)); 3 - Idaho Tank Waste Program (Joel Case, US DOE (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DWPF CATALYTIC HYDROGEN GENERATION PROGRAM - REVIEW OF CURRENT STATUS

Significant progress has been made in the past two years in improving the understanding of acid consumption and catalytic hydrogen generation during the Defense Waste Processing Facility (DWPF) processing of waste sludges in the Sludge Receipt and Adjustment Tank (SRAT) and Slurry Mix Evaporator (SME). This report reviews issues listed in prior internal reviews, describes progress with respect to the recommendations made by the December 2006 external review panel, and presents a summary of the current understanding of catalytic hydrogen generation in the DWPF Chemical Process Cell (CPC). Noble metals, such as Pd, Rh, and Ru, are historically known catalysts for the conversion of formic acid into hydrogen and carbon dioxide. Rh, Ru, and Pd are present in the DWPF SRAT feed as by-products of thermal neutron fission of {sup 235}U in the original waste. Rhodium appears to become most active for hydrogen as the nitrite ion concentration becomes low (within a factor of ten of the Rh concentration). Prior to hydrogen generation, Rh is definitely active for nitrite destruction to N{sub 2}O and potentially active for nitrite to NO formation. These reactions are all consistent with the presence of a nitro-Rh complex catalyst, although definite proof for the existence of this complex during Savannah River Site (SRS) waste processing does not exist. Ruthenium does not appear to become active for hydrogen generation until nitrite destruction is nearly complete (perhaps less nitrite than Ru in the system). Catalytic activity of Ru during nitrite destruction is significantly lower than that of either Rh or Pd. Ru appears to start activating as Rh is deactivating from its maximum catalytic activity for hydrogen generation. The slow activation of the Ru, as inferred from the slow rate of increase in hydrogen generation that occurs after initiation, may imply that some species (perhaps Ru itself) has some bound nitrite on it. Ru, rather than Rh, is primarily responsible for the hydrogen generation in the SME cycle when the hydrogen levels are high enough to be noteworthy. Mercury has a role in catalytic hydrogen generation. Two potentially distinct roles have been identified. The most dramatic effect of Hg on hydrogen generation occurs between runs with and without any Hg. When a small amount of Hg is present, it has a major inhibiting effect on Rh-catalyzed H{sub 2} generation. The Rh-Ru-Hg matrix study showed that increasing mercury from 0.5 to 2.5 wt% in the SRAT receipt total solids did not improve the inhibiting effect significantly. The next most readily identified role for Hg is the impact it has on accelerating NO production from nitrite ion. This reaction shifts the time that the ideal concentration of nitrite relative to Rh occurs, and consequently causes the most active nitro-Rh species to form sooner. The potential consequences of this shift in timing are expected to be a function of other factors such as amount of excess acid, Rh concentration, etc. Graphical data from the Rh-Ru-Hg study suggested that Hg might also be responsible for partially inhibiting Ru-catalysis initially, but that the inhibition was not sustained through the SRAT and SME cycles. Continued processing led to a subsequent increase in hydrogen generation that was often abrupt and that frequently more than doubled the hydrogen generation rate. This phenomenon may have been a function of the extent of Hg stripping versus the initial Ru concentration in these tests. Palladium is an active catalyst, and activates during (or prior to) nitrite destruction to promote N{sub 2}O formation followed by a very small amount of hydrogen. Pd then appears to deactivate. Data to date indicate that Pd should not be a species of primary concern relative to Rh and Ru for hydrogen generation. Pd was a very mild catalyst for hydrogen generation compared to Rh and Ru in the simulated waste system. Pd was comparable to Rh in enhancing N{sub 2}O production when present at equal concentration. Pd, however, is almost always present at less than a quarter of the Rh concentration in SRS sludge waste. Ag did not appear to ever become active for hydrogen generation. Data from two tests spiked with silver were comparable to the data from two tests with no noble metals. All significant technical gaps and inconsistencies with historical data in the prior two internal reviews of catalytic hydrogen generation work at SRS have been resolved. About 90% of the recommended work from the external technical review panel has been completed. Work planned or in progress could bring progress on the review panel recommendations up to about 95% by the end of calendar 2009. This primarily covers the sludge simulant matrix study on bulk compositional factors plus some follow-up work on X-ray absorption spectroscopy and improved acid equations.

08 HYDROGEN↗

ADVANCED MIXING MODELS

The process of recovering and processing High Level Waste (HLW) the waste in storage tanks at the Savannah River Site (SRS) typically requires mixing the contents of the tank with one to four mixers (pumps) located within the tank. The typical criteria to establish a mixed condition in a tank are based on the number of pumps in operation and the time duration of operation. To ensure that a mixed condition is achieved, operating times are typically set conservatively long. This approach results in high operational costs because of the long mixing times and high maintenance and repair costs for the same reason. A significant reduction in both of these costs might be realized by reducing the required mixing time based on calculating a reliable indicator of mixing with a suitably validated computer code. The focus of the present work is to establish mixing criteria applicable to miscible fluids, with an ultimate goal of addressing waste processing in HLW tanks at SRS and quantifying the mixing time required to suspend sludge particles with the submersible jet pump. A single-phase computational fluid dynamics (CFD) approach was taken for the analysis of jet flow patterns with an emphasis on the velocity decay and the turbulent flow evolution for the farfield region from the pump. Literature results for a turbulent jet flow are reviewed, since the decay of the axial jet velocity and the evolution of the jet flow patterns are important phenomena affecting sludge suspension and mixing operations. The work described in this report suggests a basis for further development of the theory leading to the identified mixing indicators, with benchmark analyses demonstrating their consistency with widely accepted correlations. Although the indicators are somewhat generic in nature, they are applied to Savannah River Site (SRS) waste tanks to provide a better, physically based estimate of the required mixing time. Waste storage tanks at SRS contain settled sludge which varies in height from zero to 10 ft. The sludge has been characterized and modeled as micron-sized solids, typically 1 to 5 microns, at weight fractions as high as 20 to 30 wt%, specific gravities to 1.4, and viscosities up to 64 cp during motion. The sludge is suspended and mixed through the use of submersible slurry jet pumps. To suspend settled sludge, water is added to the tank as a slurry medium and stirred with the jet pump. Although there is considerable technical literature on mixing and solid suspension in agitated tanks, very little literature has been published on jet mixing in a large-scale tank. One of the main objectives in the waste processing is to provide feed of a uniform slurry composition at a certain weight percentage (e.g. typically {approx}13 wt% at SRS) over an extended period of time. In preparation of the sludge for slurrying, several important questions have been raised with regard to sludge suspension and mixing of the solid suspension in the bulk of the tank: (1) How much time is required to prepare a slurry with a uniform solid composition? (2) How long will it take to suspend and mix the sludge for uniform composition in any particular waste tank? (3) What are good mixing indicators to answer the questions concerning sludge mixing stated above in a general fashion applicable to any waste tank/slurry pump geometry and fluid/sludge combination?

99 GENERAL AND MISCELLANEOUS↗

Anaerobic Co-Digestion of Vegetable and Fruit Market Waste in LBR + CSTR Two-Stage Process for Waste Reduction and Biogas Production

Vegetable and fruit waste (VFW) is becoming a heavy burden of municipal waste disposal because of its huge amount, but it is a potentially valuable resource that can be developed into high value products such as methane. Conventional anaerobic digestion processes are not suitable for solving the problem of easy acidification of VFW. Thus, a two-stage laboratory-scale anaerobic digestion system was assembled for waste reduction and biogas production of VFW in the mesophilic temperatures. The biphasic system consists of a 70-L leach bed reactor (LBR) and a 35-L continuous stirred tank reactor (CSTR). Water is sprinkled over the material to enhance the extraction process of acidification phase. The leachate was then transferred to the CSTR for biogas production. Batch digestion was lasted 120 h until no biogas was produced. Leachate with a volatile fatty acid (VFA) concentration of 7.6 g/L was obtained within 10 h. The results showed that overall 70.9% of the volatile solids (VS) was removed in the solid-phase system. Over 90% of VFAs were reduced in the methanogenic reactor, and it has been observed that the maximum biogas production rate was 51.26 mL/(d gVS). The maximum methane concentration in the produced biogas was 71%.

60 APPLIED LIFE SCIENCES↗

Benchmarking of DFLAW Solid Secondary Wastes and Processes with UK/Europe Counterparts

This report provides information and background on UK solid wastes and waste processes that are similar to those which will be generated by the Direct-Feed Low Activity Waste (DFLAW) facilities at Hanford. The aim is to further improve the design case for stabilizing and immobilizing of solid secondary wastes, establish international benchmarking and review possibilities for innovation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges and Solutions in Operation and Lay-Up of the Modular Caustic- Side Solvent Extraction Unit - 20078

The Modular Caustic-Side Solvent Extraction (CSSX) Unit (MCU) was designed and constructed to provide interim salt waste processing so that the Liquid Waste Disposition Program (LWDP) could continue waste removal and tank closure until start-up of the Salt Waste Processing Facility (SWPF). MCU processes Clarified Salt Solution (CSS), or salt solution (SS) that has undergone actinide removal/filtration, to produce two waste streams: the cesium laden Strip Effluent (SE), which is incorporated into glass at the Defense Waste Processing Facility (DWPF), and the cesium depleted Decontaminated SS (DSS), which is incorporated into grout at the Saltstone Production Facility (SPF). MCU completed start-up in 2008 with an initial operating life of 3 years and design life of 5 years. Prior to reaching the end of the design life, multiple critical components were upgraded and/or replaced to mitigate risks associated with any delays in SWPF start-up. During the remainder of operation (until June 2019), MCU was challenged to maximize processing with minimal additional modifications to repair/improve aging infrastructure, while maintaining low levels of risk to workers and the environment. Notable challenges during the extended operating life of the facility involved both mechanical and operational issues. Two of the most significant issues were the increased frequency of Process Vessel Ventilation (PVV) High Efficiency Particulate Air (HEPA) filter change-outs and the biofouling of the SE coalescer (SEC). The major impacts of both issues were that replacement of these components 1) resulted in high exposure to workers, and 2) required substantial downtime, thus hindering achievement of processing goals. PVV HEPA filter replacements are required based on dose rate and differential pressure (dP) limits. After introducing a higher-curie feed to MCU, the operating time between change outs was reduced by approximately half. SEC replacements are required based on dP limits. After restarting from an extended outage, the operating life of the SEC was significantly reduced by more than half due to biofouling. As a result of extensive troubleshooting and process improvements, the facility was able to recover performance and extend the operating life of the PVV HEPA filters and the SEC media. Through troubleshooting both of these issues, the facility was also able to learn from prior experience and adapt in order to minimize down time and maintain throughput. Although the facility took advantage of short periods of downtime to perform nonintrusive troubleshooting and minor corrective/preventative maintenance activities, longer outages were periodically required for corrective maintenance involving process cell entry. During these outages, remote tools and specialized shield plates were employed to minimize dose to workers. Mock-ups of non-routine maintenance activities were critical to early identification of potential issues and improvements, which shortened outage duration. Consistent with the facility's operational strategy, evolutions needed for MCU layup were identified and sequenced to ensure safe conditions within the facility, meet pre-defined criteria for lay-up configuration, and protect workers, while minimizing the impact to SWPF integration. De-inventory and flushing of process areas was prioritized so that the total residual inventory was reduced as efficiently as possible. This paper discusses lessons learned and best practices from troubleshooting unique issues, performing complex maintenance activities, and implementing a layup strategy that best supports the overall system mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement Acceptance Region (MAR) Assessment Results Based On Sludge Batch 10 Projections from December 2021, February 2022 and August 2022

The Defense Waste Processing Facility (DWPF) is currently preparing to initiate processing of Sludge Batch 10 (SB10), which is comprised of material from Tanks 11H, 13H, 15H, and 26F, Alternate Feed Stock-2 and Sodium Reactor Experiment material from H-Canyon. Frit 473 (8B 2 O 3 -8Li 2 O-5Na 2 O-79SiO 2 , in weight percent) was recommended for sludge-only (SO) and coupled processing with the Salt Waste Processing Facility (SWPF) based on previous assessments of SB10 projections with the DWPF Product Composition Control System (PCCS) glass property models and their associated Measurement Acceptance Region (MAR) constraints. Due to the lower processing rate of Sludge Batch 9 (SB9), the heel in Tank 40 is anticipated to be greater than 40 inches at the projected start of SB10 processing to meet the upcoming Accelerated Basin Deinventory addition dates in Tank 51 for Sludge Batch 11. In December 2021 and February 2022, Savannah River Remediation System Planning provided updated SB10 Tank 40 blend projections based on heels of 74 inches, 84 inches, 94 inches and 103.4 inches. Savannah River Mission Completion (SRMC) subsequently pursued Wash Cycle Y to further reduce the total sulfur in the sludge batch and increase processing flexibility at DWPF. In August 2022, SRMC System Planning provided an updated SB10 Tank 40 blend projection with a 76 inch-heel representing Decant Y2 and 60 kilogallons of bearing water inleakage that is anticipated during the Tank 51 to Tank 40 transfer. The objectives of this task were to: • Determine the impact on the operating windows for SO and coupled processing • Determine whether any composition gaps exist between the already completed SB10 variability study and the reprojected SB10 glass composition region • Compare the SB10 reprojected glass composition region to the DWPF PCCS model development and validation ranges to ensure that compositional gaps do not exist between the data sets. This report documents the results of these evaluations. Calculation-based frit assessments were performed using the DWPF PCCS glass property models and their associated MAR constraints. Evaluated parameters for coupled processing included the following transfer volumes per Sludge Receipt and Adjustment Tank batch: 5700 gallons of Tank 40 sludge, 2400-4500 gallons of the SWPF monosodium titanate (MST) and sludge solids stream, and 15,000 gallons of strip effluent. Based on these MAR assessment results, Frit 473 remains viable for SB10 processing. A target waste loading (WL) of 36% is possible for SO operation and single strike (0.4 g/L MST) coupled processing up to 600 mg/L of SB9 insoluble sludge solids at a nominal transfer volume of ~2800 gallons. Increasing the single strike transfer volume to 4500 gallons may reduce the maximum WL below 40%. Operating windows are 12 percentage points for SO processing and 14-16 percentage points for coupled processing. Frit 625 allows for a target WL of 36% and is acceptable for use during the SB9 to SB10 transition to deplete remaining inventory as needed. Operating windows are 8 percentage points for SO processing and 12-14 percentage points for coupled processing. Predictive PCCS evaluations performed at DWPF will provide insight into batch-specific acceptability at desired WLs for compositions having expected oxide ratios during processing versus the extreme vertices (corner points) evaluated in this study. The reprojected SB10 glass composition region generally overlaps the previously evaluated SB10 variability study composition region. Thus, the minor composition shift of these updated SB10 projections indicates that no additional glasses are necessary to demonstrate acceptability relative to the chemical durability of the Environmental Assessment benchmark glass and predictability using the current PCCS models for durability. Based on a comparison of the PCCS model development and validation data to the reprojected SB10 glass composition region, the viscosity and liquidus temperature models will reliably predict SB10 compositions. No additional glasses are necessary to demonstrate predictability of these models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decomposition of Select Volatile Organic Compounds by Caustic Hydrolysis for Effluent Management Facility (Rev. 0)

Hydrolysis is a proposed treatment method for organic constituents at the Effluent Management Facility during the Direct-Feed Low-Activity Waste process at the Waste Treatment and Immobilization Plant. Four compounds, acetonitrile, acrylonitrile, acetone, and methylene chloride, comprise a significant portion of the organic constituents identified in the Waste Treatment and Immobilization Plant Effluent Composition Estimate. In support of the Direct-Feed Low-Activity Waste process, the Washington River Protection Solutions Organic Studies Group at the 222-S Laboratory completed a laboratory test of caustic hydrolysis reactions of these four compounds.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary Report For The Analysis Of The Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample For Canister S04023 (Rev. 1)

In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for Sluldge Batch 7b, Savannah River National Laboratory (SRNL) personnel characterized the Defense Waste Processing Facility (DWPF) pour stream (PS) glass sample collected while filling canister S04023. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary Report for the Analysis of the Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample for Canister S04023

In order to comply with the Defense Waste Processing Facility (DWPF) Waste Form Compliance Plan for Sludge Batch 7b, Savannah River National Laboratory (SRNL) personnel characterized the Defense Waste Processing Facility (DWPF) pour stream (PS) glass sample collected while filling canister S04023. This report summarizes the results of the compositional analysis for reportable oxides and radionuclides and the normalized Product Consistency Test (PCT) results. The PCT responses indicate that the DWPF produced glass that is significantly more durable than the Environmental Assessment glass. Results and further details are documented in SRNL-STI-2013-00462, Revision 1 “Analysis of the DWPF Sludge Batch 7b (Macrobatch 9) Pour Stream Glass Sample.”

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Waste Trade Study: Lunar Surface to Deep Space

The Logistics Reduction Project is one of NASA's technology development projects that is preparing humanity for deep space missions. Reducing the mass and volume of logistical supplies that must be carried from Earth to support the missions and their crews is the primary goal of the project. Effective ways to achieve this goal include reducing, reusing, or recycling wastes generated throughout the mission. Due to the goal of the project, waste processing technologies were analyzed for Lunar surface missions at various lengths and an 850-day Mars transit mission to evaluate the potential benefits of waste processing pertaining to each mission. The technologies assessed include trash compaction, trash-to-gas and human metabolic waste processing technologies, integrated with the baseline architectures of each mission’s habitat. The fully integrated systems were analyzed using an equivalent system mass, which is a metric that encompasses the mass, volume, power and cooling of a system, resulting in an estimate of launch mass and serving as a proxy for cost. Each system’s equivalent system mass was compared to that of the baseline waste processing system of the respective habitat, hand compaction with storage for Lunar surface missions and hand compaction with jettisoning for Mars transit, to evaluate whether the traded waste processing technology was beneficial. This analysis identifies a general trend that more sophisticated waste processing can be beneficial depending on the mission duration. For Lunar surface missions, the water recovery from waste processing can pay off over consecutive missions, due to offsetting the losses from the system via extravehicular activities. In contrast for Mars transit, the primary objective is mass removal from the spacecraft, so technologies like trash-to-gas are competitive with the baseline. Furthermore, the technologies which can recover resources from waste, such as water, may present additional advantages to an ever-changing Mars mission architecture.

Waste processing↗

Deployment of Performance Management Methodology as part of Liquid Waste Program at Savannah River Site - 12178

In 2009, Savannah River Remediation LLC (SRR) assumed the management lead of the Liquid Waste (LW) Program at the Savannah River Site (SRS). The four SRR partners and AREVA, as an integrated subcontractor are performing the ongoing effort to safely and reliably: - Close High Level Waste (HLW) storage tanks; - Maximize waste throughput at the Defense Waste Processing Facility (DWPF); - Process salt waste into stable final waste form; - Manage the HLW liquid waste material stored at SRS. As part of these initiatives, SRR and AREVA deployed a performance management methodology based on Overall Equipment Effectiveness (OEE) at the DWPF in order to support the required production increase. This project took advantage of lessons learned by AREVA through the deployment of Total Productive Maintenance and Visual Management methodologies at the La Hague reprocessing facility in France. The project also took advantage of measurement data collected from different steps of the DWPF process by the SRR team (Melter Engineering, Chemical Process Engineering, Laboratory Operations, Plant Operations). Today the SRR team has a standard method for measuring processing time throughout the facility, a reliable source of objective data for use in decision-making at all levels, and a better balance between engineering department goals and operational goals. Preliminary results show that the deployment of this performance management methodology to the LW program at SRS has already significantly contributed to the DWPF throughput increases and is being deployed in the Saltstone facility. As part of the liquid waste program on Savannah River Site, SRR committed to enhance production throughput of DWPF. Beyond technical modifications implemented at different location of the facility, SRR deployed performance management methodology based on OEE metrics. The implementation benefited from the experience gained by AREVA in its own facilities in France. OEE proved to be a valuable tool in order to support the enhancement program in DWPF by providing unified metrics to measure plant performances, identify bottleneck location, and rank the most time consuming causes from objective data shared between the different groups belonging to the organization. Beyond OEE, the Visual Management tool adapted from the one used at La Hague were also provided in order to further enhance communication within the operating teams. As a result of all the initiatives implemented on DWPF, achieved production has been increased to record rates from FY10 to FY11. It is expected that thanks to the performance management tools now available within DWPF, these results will be sustained and even improved in the future to meet system plan targets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A novel defoamer for processing nuclear waste: Testing and performance

Abstract Legacy radioactive waste from nuclear weapons material processing is the biggest environmental challenge in the state of South Carolina, and one of the biggest in the United States. Although substantial progress has been made in processing and vitrifying high‐level radioactive waste at the Savannah River site, approximately 35 million gallons remains to be treated and dispositioned. In this article, we show the development of a new defoamer for use in the processing of high‐level radioactive waste. The application of the new defoamer is not only more effective at controlling foam but will shorten the batch processing time leading to safer and more efficient processing. This has the potential to help shorten the overall site mission lifetime, saving the federal government hundreds of millions of dollars. The novel aspect of the new defoamer is its effectiveness and stability in the harsh conditions needed for processing high‐level radioactive waste: high temperatures, pH 4–13, strong oxidizing and reducing agents, and numerous metal catalysts. The defoamer will replace an existing antifoam agent that decomposes to form multiple flammable gases. Because the existing antifoam agent decomposes quickly, processing changes increased processing time. Statement of novelty We demonstrate that a new defoamer has been developed for use in processing high‐level radioactive waste. This novel defoamer is effective and stable in the harsh processing conditions with no detectable flammable by‐products. Because the existing antifoam agent decomposes quickly, processing changes, including lowering acid addition rates and evaporation rates, increased processing time. The new defoamer is not only more effective at controlling foam but will shorten the batch processing time and lead to safer and more efficient processing by eliminating the production of flammable gases. Statement of industrial relevance Foaming is of great concern in many industrial processes involving three‐phase gas/liquid/fine‐solids systems, like in water evaporation, mineral floatation, air sparging in situ remediation techniques, and in those found in the paper industry.