Search NASA⌕ Search

SEARCH · Search NASA

Results for “acceptance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Status of 22 GeV CEBAF Upgrade Using FFA Arcs

Jefferson Lab is exploring an upgrade to extend CEBAF’s energy to ~22 GeV within the existing tunnel by incorporating Fixed-Field Alternating-Gradient (FFA) arcs. In this scheme, the two lowest-energy electromagnetic arcs are removed, the remaining arcs are reassigned to lower energies, and a new pair of high-energy FFA arcs enables six additional recirculations using the existing SRF linacs. The non-scaling FFA lattice employs Halbach-derived permanent magnets with provisions for dipole, quadrupole, and higher-order components, offering large momentum acceptance and reduced operating cost. Implementing this concept requires updated linac optics, modifications to the remaining arcs, and a redesigned electromagnetic switchyard. Ongoing beam-dynamics studies address synchrotron-radiation–induced energy loss and emittance growth, along with strategies for their mitigation.

Ogur, S. [Thomas Jefferson National Accelerator Fa↗

Transport of 12 GeV positron beams at Ce+BAF

Jefferson Lab (JLab) is developing a concept to upgrade the Continuous Electron Beam Accelerator Facility (CEBAF) to additionally deliver spin-polarized continuous-wave positron beams for its nuclear physics program users (Ce+BAF 12 GeV). The concept involves repurposing the Low Energy Recirculator Facility (LERF) at JLab as a dual injector, first producing 100-300 MeV spin-polarized electron beams which are subsequently used for the generation and formation of 123 MeV continuous-wave positron beams. The positron beams are transported to CEBAF and injected for acceleration up to 12 GeV, tailored to the requirements of its four experimental halls. Given the higher emittance of the secondary positron beams, the CEBAF optics are optimized for low dispersion and low beta functions to enhance transmission within the Ce+BAF acceptance limits and with an R56 to manage the positron beams bunch length and energy spread. Potential bottlenecks are being investigated through both optical modeling and measurements using an electron beam, as well as degraded electron beams, to map the 6d acceptance of CEBAF as it is today. This presentation shares preliminary results from multi-particle tracking simulations of the positron beam up to 12 GeV, including spatial, momentum, and spin characteristics, and explores the feasibility of delivering beams simultaneously to multiple experimental halls via extraction optics.

Accelerator Physics↗

Building an EPA Class VI Permit Application

Summary To accelerate the commercialization of carbon capture and storage (CCS), the US Department of Energy (US DOE) is building on decades of characterization efforts and pilot-scale projects through their CarbonSAFE program. Administered through their National Energy Technology Laboratory, this program seeks to bring fully integrated projects to the sector that can store more than 50 million tonnes of CO2 over a 30-year period. The program, which was enacted before the enhancement of Internal Revenue Code Section 45Q, is in the capture assessment, characterization, and permitting phase. The objectives of this paper are to discuss (a) the injection permitting requirements of the CarbonSAFE projects; (b) information gathering in support of the permit; (c) the timelines of field development and permit-related activities; (d) the major technical components of the field development plan; and (e) early feedback from the regulators toward acceptance of the permit. In Mississippi, more than 30,000 acres have been characterized by six deep characterization wells, a deep groundwater well, and 92 line miles of 2D seismic as part of the CarbonSAFE Project ECO2S. During the acquisition of seismic data, all receiver lines were live, which resulted in the generation of a pseudo-3D seismic design. The incorporation of a 3D seismic survey was not included as part of this project due to logistical difficulties presented by the undulating, wooded surface terrain. A suite of openhole geophysical logs was taken from each well, allowing for a detailed interpretation of prospective storage reservoirs and confining intervals to complement the analysis carried out on the 290 ft of a whole core that was cut through the prospective confining zone and storage reservoir. The detailed geologic and reservoir data were assembled and entered into a 3D model to assess the injection capacity and the area of review (AoR). This information fed into the detailed corrective action, monitoring, testing, and postinjection site care (PISC) modeling. The results have been exceptional. The geologic assessment has revealed three primary storage targets, ranging in depth from 3,500 ft to 6,000 ft. These storage reservoirs net 1,300 ft of sandstone, with mean porosity and permeability of 29% and 3.6 darcies, respectively. Together, these reservoirs have storage capacities that may exceed 20 million tonnes per square mile, making this a gigatonne prospect. Forward modeling of the project resulted in an AoR of 16 sq miles, injecting about 8000 t/d, for 30 years, via two deep injection wells. The excellent confining characteristics of the caprock, relatively simple geologic structure, and lack of historical well drilling activity in this area provide excellent containment of the injected CO2. Based on this work, the project has proposed 20 years of PISC. To date, only two US CO2 injection permits have been granted. These projects relied on a singular capture point feeding a singular sequestration point (source to sink), and considerations have not been made to garner CO2 emissions from other industrial sources. The Kemper County Storage Complex is a first-of-its-kind storage hub concept that looks to develop an area capable of storing significant quantities of CO2 from the region. Also, this work will show how characterization efforts, geological and numerical modeling efforts, and plan development were constructed in support of permit and incentives acceptance.

Energy & Fuels↗

Computational Tools and Workflows for Quantitative Risk Assessment and Decision Support for Geologic Carbon Storage Sites: Progress and Insights from the U.S. DOE’s National Risk Assessment Partnership

The 2005 Intergovernmental Panel on Climate Change (IPCC) Special Report on CCS raised the profile of CO2 capture and storage (CCS) as an important technology for reducing greenhouse gas (GHG) emissions. CCS is now recognized as a key component of most climate change mitigation scenarios. Since publication of that report the international research, development, and deployment (RD&D) community has advanced key technical aspects, clarified regulatory requirements, explored value chain and infrastructure solutions, and developed incentive paradigms to enable and promote large-scale deployment of CCS. These efforts have included research to better characterize geologic storage resources, to improve injection performance and storage efficiency, to assess and manage subsurface environmental risks, and to advance monitoring technologies to assure system conformance. These efforts have helped to build confidence in the viability of geologic carbon storage (GCS), but stakeholder concerns about long-term risks and liability associated with GCS remain a hurdle to broad acceptance and large-scale deployment of CCS. Since 2010, the U.S. DOE’s National Risk Assessment Partnership (NRAP) – a research collaboration between five contributing national laboratories – has worked to establish and demonstrate methods and tools to quantify and manage the subsurface environmental risks associated with GCS, amidst uncertainty. This work supports the Office of Fossil Energy and Carbon Management Carbon Transport and Storage Program’s goal of advancing safe and secure commercial-scale GCS deployment. To address the technical challenge of simulating the physical response of the GCS site to large-scale CO2 injection, NRAP has adopted an approach that relies on coupling computationally efficient reduced-order and/or data-driven proxy models of important system components (i.e., storage reservoir, sealing caprock, leakage pathways, intermediate formations, overlying groundwater aquifers, and the atmosphere) in integrated assessment framework. That integrated model of the physical system is complemented with fit-for purpose functionality to support site characterization and risk-related decisions. The recently released NRAP Phase II toolset includes the Open-Source Integrated Assessment Model (NRAP-Open-IAM) for evaluation of trends in leakage risk and potential impact, tools to support monitoring design optimization (Designs for Risk Evaluation and Management – DREAM v3.0 and Passive Seismic Monitoring Tool - PSMT), and tools for state of stress evaluation (State-of-Stress Analysis Tool - SOSAT) and forecasting induced seismicity risk. The NRAP team has also released a pair of reports describing conceptual workflows to incorporate physics-based, quantitative risk assessment into many of the design, planning, operation, and closure decisions for GCS projects. An online catalogue highlights published studies where these tools and methods are demonstrated. In this presentation, the utility of these products to assess risks and address key stakeholder questions will be highlighted through examples, and related insights about the safety and security of geologic carbon storage in qualified storage sites will be discussed. The prospect of rapid, large-scale deployment of GCS technology to aggressively reduce anthropogenic CO2 emissions requires careful consideration of interference between multiple commercial-scale storage projects within a basin. Going forward, NRAP is expanding and adapting site-scale risk quantification tools and methods to enable assessment of risks and inform management decisions for basin-scale deployment. Increasingly, this work will leverage next-generation approaches for surrogate modelling, fast prediction, and advanced visualization enabled by machine learning and artificial intelligence to promote virtual learning, scenario evaluation, and augment risk-based decision making.

quantitative risk assessment, geologic carbon stor↗

Analysis Of The Sludge Batch 7b (Macrobatch 9) DWPF Pour Stream Glass Sample (Rev. 1)

The Defense Waste Processing Facility (DWPF) began processing Sludge Batch 7b (SB7b), also referred to as Macrobatch 9 (MB9), in January 2012. SB7b is a blend of the heel of Tank 40 from Sludge Batch 7a (SB7a) and the SB7b material that was transferred to Tank 40 from Tank 51. SB7b was processed using Frit 418. During processing of each sludge batch, the DWPF is required to take at least one glass sample to meet the objectives of the Glass Product Control Program (GPCP), which is governed by the DWPF Waste Form Compliance Plan, and to complete the necessary Production Records so that the final glass product may be disposed of at a Federal Repository. Two pour stream glass samples were collected while processing SB7b. The samples were transferred to the Savannah River National Laboratory (SRNL) where one was analyzed and the other was archived. The following conclusions were drawn from the analytical results provided in this report: The sum of oxides for the official SB7b pour stream glass is within the Product Composition Control System (PCCS) limits (95-105 wt%); The average calculated Waste Dilution Factor (WDF) for SB7b is 2.3. In general, the measured radionuclide content of the official SB7b pour stream glass is in good agreement with the calculated values from the Tank 40 dried sludge results from the SB7b Waste Acceptance Program Specification (WAPS) sample; As in previous pour stream samples, ruthenium and rhodium inclusions were detected by Scanning Electron Microscopy-Electron Dispersive Spectroscopy (SEM-EDS) in the SB7b pour stream sample; The Product Consistency Test (PCT) results indicate that the official SB7b pour stream glass meets the waste acceptance criteria for durability with a normalized boron release of 0.8 g/L, which is an order of magnitude less than the Environmental Assessment (EA) glass; The measured density of the SB7b pour stream glass was 2.70 g/cm 3 ; The Fe 2+ /ΣFe ratio of the SB7b pour stream samples was 0.07.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low Level Waste in the 200 East Area Burial Grounds (FY2019 Annual Status Report)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730) and are compared with U.S. Department of Energy requirements (DOE O 435.1 and performance objectives defined in companion documents DOE M 435.1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations, indicating that potential impacts are well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. A new PA study has been initiated in this fiscal year (FY) 2019 for evaluation of active disposal sites within the 200 West and East Areas (Trenches 31 and 34 in 200 West; Trench 94 in 200 East) because extended time has elapsed between the current annual status report and the original PA (WHC-SD-WM-TI-370) for the active disposal sites. The new PA for the active disposal sites is expected to be completed in FY 2021.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low Level Waste in the 200 West Area Burial Grounds (FY2019 Annual Statius Report)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645) and are compared with performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations, indicating that potential impacts are well below performance objectives; therefore, future compliance with DOE O 435.1 is expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BEE - FY20 P6-3: Release BEEWorkflowManager, BEETaskManager, and client application 2.3.6.01 – LANL ATDM ST / STNS01-4 P6 Milestone Completion Documentation

Release BEEWorkflowManager, BEETaskManager, and client software. The BEEWorkflowManager daemon runs on the HPC cluster login node. It accepts workflows submitted by the BEE client. These workflows are specified using the Common Workflow Language (CWL) standard. The BEEWorkflowManager loads workflows into the Neo4j graph database to create the workflow directed acyclic graph (DAG), and submits the workflow tasks to the BEETaskManager for execution. The BEEWorkflowManager records the state of the workflow and its tasks, and communicates this state to the BEE client. The BEEWorkflowManager will start, pause, and cancel a running workflow and its tasks at the command of the BEE client. The BEETaskManager daemon runs on the HPC cluster login node. It accepts tasks from the BEEWorkflowManager, turns those tasks into HPC resource manager jobs (e.g. a slurm job script), and submits the job to the cluster resource manager. The BEETaskManager then tracks the status of the job (pending, running, complete) and updates the BEEWorkflowManager. The BEETaskManager will also cancel a queued or running job when commanded to do so by the BEEWorkflowManager. The first release of the BEETaskManager will support the Slurm resource manager and the Charliecloud linux container runtime.

97 MATHEMATICS AND COMPUTING↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Extraction, Scrub, and Strip Test Results for the Salt Waste Processing Facility Caustic Side Solvent Extraction Solvent Sample

An Extraction, Scrub, and Strip (ESS) test was performed on a sample of Salt Waste Processing Facility (SWPF) Caustic-Side Solvent Extraction (CSSX) solvent and salt simulant to determine cesium distribution ratios (D (Cs) ), and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Parsons to help determine if the solvent is qualified for use at the SWPF. The ESS test showed acceptable performance of the solvent for extraction, scrub, and strip operations. The extraction D (Cs) measured 13.2, exceeding the required value of 8. This value is consistent with results from previous ESS tests using similar solvent formulations. Similarly, scrub and strip cesium distribution ratios fell within acceptable ranges

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Foundations of an Electric Mobility Strategy for the City of Mexicali

The Foundations of an Electric Mobility Strategy for the city of Mexicali aligns with numerous energy, environmental, and transport plans and will help Mexicali meet multiple related goals. Mexicali’s energy mix, with 28% renewables, already enables plugin electric vehicles (PEVs) to reduce the mass of greenhouse gases (GHGs) per km driven 2/3 below that of their conventional counterparts. This GHG benefit will increase should Mexicali take steps to further increase their share of renewables in their electricity supply. Beyond increasing renewables, Mexicali could possibly deploy PEVs so that electric load is added in the right location (depending on further analysis of substations and feeders) and at the right time (between 21:00 and 11:00) in order to minimize grid upgrade costs. There are a handful of charge timing control mechanisms –at various stages of development– that Mexicali could implement. Transport electrification can facilitate mass transit by powering buses, trains, and small vehicles that get people from their homes or work to the transit stations and vice versa. Mexicali could utilize fleets as early PEV adopters in order to gain acceptance and add electric vehicle supply equipment (EVSE). Recommended prioritization of different types of fleets are suggested in this report: transit buses, school buses, airport ground support equipment (GSE), refuse trucks, taxis, shuttle buses, campus vehicles, delivery trucks, utility trucks, and finally semitrailers. There are a handful of policy options that Mexicali could use to incentivize fleets to purchase PEVs, including mandates, economic incentives, energy performance contracts, waivers to access restrictions, electricity discounts, and EVSE requirements in building codes. Mexicali’s taxi fleet was an early adopter of PEVs and had experienced some challenges—mostly related to the insufficient range of the taxis due to hot weather. In this report, we strategize ways to extend the range of the current electric taxis, including ways to make charging more convenient to the drivers, and more suggestions for appropriate vehicles to purchase in the future. This report also includes the groundwork of geotracking Mexicali’s taxi fleet so that more detailed recommendations can be made in the future. Once fleets have increased PEV acceptance and EVSE installations, the market will be ready to expand to private vehicle owners. In order to do this, more EVSE needs to be installed in the right locations. This mobility strategy lays out general local areas where EVSE could be well utilized, based on traffic patterns, land use, and demographic data. Mexicali could approach businesses within these areas that would likely make suitable hosts, based on how well they can profit from the additional business that EVSE would bring. Mexicali could then adopt a series of purchase incentives (including sales tax waivers or access to high-occupancy vehicles [HOV] lanes) that would encourage private vehicle owners to purchase PEVs. Purchase incentives run the risk of creating equity issues, which can be countered by promoting electrification in mass transit, creating more HOV lanes that have PEV exemptions, and installing EVSEs in underserved communities. Private PEV ownership will require a set of experts that Mexicali can help train, including PEV repair technicians, EVSE installation electricians, and first responders.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

MPI Session: External Network Transport Implementation (V.1.0)

The MPI Sessions extensions to the MPI standard have been accepted by the MPI Forum and will be included in the upcoming MPI 4 version of the standard. MPI Sessions has the potential to address several limitations of MPI’s current specification: MPI cannot be initialized within an MPI process from different application components without a priori knowledge or coordination; MPI cannot be initialized more than once; and, MPI cannot be reinitialized after MPI finalization. MPI Sessions also offers the possibility for more flexible ways for individual components of an application to express the capabilities they require from MPI at a finer granularity than is presently possible. A prototype of MPI Sessions, based on the Open MPI implementation of the MPI standard, was developed to facilitate acceptance of the Sessions proposal by the Forum. The initial implementation had some limitations, one of the more significant ones being that it was limited in its ability to fully exploit modern network APIs such as OFI libfabric and OpenUCX and underlying network hardware. This report presents enhancements to the prototype implementation of MPI Sessions that removes this restriction for the networks to be used in the next generation of DOE exa–scale systems. Open MPI was used as the implementation vehicle, but results here are also relevant to other middleware stacks.

97 MATHEMATICS AND COMPUTING↗

Assessment of EPRI’s Tan Delta Approach to Manage Cables in Submerged Environments: Statistical Review of EPRI Data

Research conducted by the Electric Power Research Institute (EPRI) and other research institutions have concluded that water-trees are one of the leading degradation mechanisms that contribute to the loss of dielectric insulation strength in medium-voltage cable insulating materials in wet or submerged environments. The electrochemical reactions are caused by the combined effect of water presence and relatively high electrical stress. Records of cable failures provided by the licensees in response to Generic Letter (GL) 2007-01 (NRC 2007) have called into question the reliability of medium voltage cables in wetted or submerged environments. EPRI’s dissipation factor or Tan Delta testing guidelines and acceptance criteria have been adopted by most nuclear power plant operators as the primary tool for condition monitoring of medium voltage cables in wet or submerged environments. EPRI has been collecting member data since late 2009 to analyze and provide feedback to members, validate the EPRI-developed acceptance criteria guidelines, support analysis of test results, recommend appropriate actions for the "action required" category, and gather candidate cables for EPRI-sponsored forensic research on causes for insulation degradation. EPRI has collected data from 37 nuclear sites, which represent 44 operating units. The test results have been organized by insulation type, such as cross-linked polyethylene (XLPE); butyl rubber; black, pink, and brown ethylene-propylene rubber (EPR); and compact insulation (black and pink EPR)1. The data have been analyzed, and follow-up information was obtained from members for “action required” test results. EPRI has also performed correlations between Tan Delta tests and the information gathered under the EPRI forensic research on medium-voltage cables. In addition, EPRI has developed guidance by cable insulation type on how to systematically analyze Tan Delta test results. The analysis described here reviewed the two primary EPRI reports (EPRI 3002000557 and EPRI 3002005321) as well as two precedent EPRI reports (EPRI 1028262 and EPRI 1021070) that were cited in the primary reports. The principal results and conclusions from the project analyses are provided.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Evaluation of ASCE 4-16 and AISC 43-18 (Draft) for use in the Risk-Informed Performance-Based Seismic Design of Nuclear Power Plant Structures, Systems, and Components

This report describes the assessment of ASCE Standards 4-16 and 43-18 (Draft) for use in the Risk-Informed Performance-Based (RIPB) seismic design of structures, systems, and components (SSCs) at nuclear power plants. This work was performed for the U.S. Nuclear Regulatory Commission (NRC) Office of Regulatory Research (RES), to support potential endorsement of these industry standards for the design of nuclear power plants based on the RIPB approach. Currently, the NRC endorses a deterministic design approach for demonstrating the design adequacy of SSCs based on the Standard Review Plan (NUREG-0800) and NRC Regulatory Guides. In the RIPB approach, the design criteria are developed to achieve a target performance goal, which is defined by the annual frequency of occurrence of the design basis earthquake (i.e., Seismic Design Category) and the acceptable level of structural performance (i.e., Limit State) for the SSCs. ASCE 4-16 provides methods for performing a seismic analysis of structures to obtain the seismic response of these structures (e.g., building displacements, accelerations, in-structure response spectra) which are used in the design of the SSCs. It also provides methods for performing seismic analysis of SSCs to determine the seismic demands (e.g. member forces and displacements) needed to design individual SSCs. ASCE 43-18 (Draft) provides the criteria for the seismic design of SSCs using the seismic demands developed in ASCE 4-16. The use of ASCE Standard 43-18 (Draft), along with ASCE 4-16, provides the criteria for the seismic design of the SSCs. ASCE 43-18 (DRAFT) relies on other consensus codes and standards such as ACI 349 for reinforced concrete, AISC/N690 for steel structures, ASME Section III for pressure-retaining mechanical components and Containments, and IEEE-344 for Class 1E equipment. The goal of this technical review was to assess the adequacy of the provisions in these standards for use by the NRC in developing regulatory guidance for design of SSCs in nuclear power plants, based on the RIPB approach. The research reported herein describes the basis for acceptance of the new standards and identifies areas where additional staff guidance is needed for the seismic design of SSCs at nuclear power plants. This technical review has determined that ASCE 4-16 and ASCE 43-18 (Draft) provide an appropriate framework for the seismic design of SSCs at nuclear power plants using a Risk-Informed Performance-Based approach. However, some of the criteria therein warrant exceptions, qualifications, and/or clarifications.

42 ENGINEERING↗

Sierra/SolidMechanics Verification Report

This document presents the Sierra/SolidMechanics (Sierra/SM) verification plan. This plan centers on the tests in the Sierra/SM verification test suite, a subset of which are documented in the Sierra/SM Verification Tests Manual. Most of these tests are run nightly with the Sierra/SM code suite, and the results of the tests are checked against analytic solutions. For each of the tests presented in the Verification Tests Manual, the test setup, a description of the analytic solution, and comparison of the Sierra/SM code results to the analytic solution is provided. Mesh convergence is also checked on a nightly basis for several of these tests. This verification plan discusses these various types of tests and what they mean for Sierra/SM verification. Many other activities also contribute to Sierra/SM quality. These address code and solution quality and range from low-level unit tests, run nightly, up to full-fidelity acceptance tests, used to verify release stability. This acceptance test suite checks that new versions of Sierra/SM continue to yield the same answers for high-resolution analyst problems. Further code quality measures include an extensive suite of intermediate-size regression tests and automated nightly code quality checks. While these additional activities do not fall under a strict definition of verification, they greatly add to the quality, stability, and reliability of Sierra/SM, and are discussed here as well.

97 MATHEMATICS AND COMPUTING↗

LA-R43S6-L1 Postshot Report [Slides]

The Ranchero LA-R43S6-L1 test (formerly referred to as LA-43S-L1. The R specifically designates it is a Ranchero device and the 6 indicates a 6” high explosive charge diameter in anticipation of using larger diameters in the future.) was conducted on 3/8/17 with good success. The experiment was the first test of a “Swooped” Ranchero flux compression generator (FCG), and the load for the test was an aluminum imploding liner. In addition to the swoop, the stator was anodized to provide an insulating layer instead of one or more layers of polyethylene as had been the case for all earlier Ranchero tests. Using the Firing point TA-39-88 capacitor bank, 3.5 MA was delivered to the FCG for the initial magnetic field, and 36.4 MA were delivered to the load having an initial inductance of 2.5 nH. Implosion speeds over 1.1 cm/us were recorded, which exceeds previous LANL solid liner experimental results. The test was diagnosed with 18 PDV channels, 12 of which recorded liner implosion data, and the other 6 of which tracked the FCG armature during flux compression. These armature expansion data recorded during flux compression are the first of their kind, and it was previously unknown, due to unknown effects of the SF 6 in the flux compression volume, whether or not the expansion could be recorded using the PDV technique. Post shot 2D MHD calculations employed a complete external circuit model, and an improved flux diffusion model not available prior to the test. Results from these simulations show very good agreement with the experimental result. Four PDV channels recorded the liner implosion viewed radially outward from the center of the liner. All four of these probes recorded implosion velocities greater that 1 cm/µs, with the cylindrical center displaced by ~2 mm from actual center. Four PDV channels looked at +10° angles from the CMU wall, and four looked at -10° angles. A glide plane interaction is shown moving toward the center of the liner in MHD calculations, and PDV probes provide confirmation. The high explosive (HE) in the LA-R43S6-L1 test was PBX 9501 which had to be glued together in many pieces, and the test was preceded by a camera test to verify that the PBX 9501 could be assembled with acceptable tolerance in glue joints to prevent severing the armature during expansion. The camera test verified an acceptable armature performance, and results are given in complete detail in a post shot report LA-UR-19-20124, and summarized here. This report provides complete detail of the considerable body of data obtained on the test and in the post shot calculations. It is prepared in Power Point for ease of preparation and future review. Shot documentation available in the LANL on-line library are included as references, and non-referenceable documents will be cited and stored in an LA- R43S6-L1 post shot folder stored on an M-6 shared drive. Fabrication drawings are also maintained in an M-6 shared drive and paper files are available from M-6 personnel. This report will be maintained as a PowerPoint document on the shared drive, as well, since included movies will play and graphs from Excel files retain information in the PowerPoint versions. PDF versions are required for clearance and are not to large to send by e-mail.

42 ENGINEERING↗

Field Validation of a Smart Energy Recovery Ventilation System Using Low-Cost Indoor Air Quality Sensors

This project is a field validation, using low-cost indoor air quality (IAQ) sensors, of a smart ventilation system that can help low-load homes in humid environments maintain acceptable indoor humidity conditions while providing adequate ventilation according to ASHRAE 62.2. The objectives of this research were to (1) address builders’ concerns with mechanical ventilation in humid environments and (2) answer the question of whether smart control logic helps with occupant comfort and the creation of a more acceptable indoor environment. To address the objectives of the study, the Southface team collected field data for one year in four Charleston, South Carolina, new construction homes in order to determine the differences in occupant comfort; comfort metrics; IAQ; and heating, ventilating, and air-conditioning (HVAC) energy consumption when toggling biweekly between an energy recovery ventilator (ERV) operating continuously and an ERV operating with smart, time-varying humidity control logic. The smart ventilation algorithm under consideration in this field test did create a less humid indoor environment on an annual basis as quantitatively measured through temperature and relative humidity (T/RH) readings, expressed most discernably as “percentage of time above 60% RH” and “percentage of time above 55°F dewpoint.” However, the difference it made was inconsistent during the spring, summer, and fall months, and it was only directionally consistent during the winter months. We suspect that this is primarily due to the long runtimes and concomitant dehumidification activity of the air-conditioning (A/C) units in response to the high sensible loads in Charleston. The effect of the smart ventilation algorithm was not discernable to the occupants in this study, as recorded through seasonal surveys.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

MCC On Boarding Section J-2 (Exhibit H) Quality Assurance Requirements [Slides]

Upon MATOC Award, SUBCONTRACTOR shall submit a Quality Assurance Program for evaluation in accordance with subcontract technical and quality requirements. This may be the Subcontractors corporate QA program. Acceptance by Triad of the SUBCONTRACTORS Quality Assurance Program (QAP), as prescribed in Exhibit H, QC-01A and 01B, allows the SUBCONTRACTOR to execute this contract using their approved QAP. SUBCONTRACTORS QAP as approved by CONTRACTOR must meet the applicable requirements of DOE Order 414.1D (see next slide) and must address flow down of the quality requirements to lower tier subcontractors. Triad acceptance of SUBCONTRACTOR’s QAP approval is required prior to Notice to Proceed with on-site work. A Project Specific QA plan may on rare occasions be required for a specific task

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗