Search NASA⌕ Search

SEARCH · Search NASA

Results for “assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Assembly considerations for large reflectors

The technologies developed at LaRC in the area of erectable instructures are discussed. The information is of direct value to the Large Deployable Reflector (LDR) because an option for the LDR backup structure is to assemble it in space. The efforts in this area, which include development of joints, underwater assembly simulation tests, flight assembly/disassembly tests, and fabrication of 5-meter trusses, led to the use of the LaRC concept as the baseline configuration for the Space Station Structure. The Space Station joint is linear in the load and displacement range of interest to Space Station; the ability to manually assemble and disassemble a 45-foot truss structure was demonstrated by astronauts in space as part of the ACCESS Shuttle Flight Experiment. The structure was built in 26 minutes 46 seconds, and involved a total of 500 manipulations of untethered hardware. Also, the correlation of the space experience with the neutral buoyancy simulation was very good. Sections of the proposed 5-meter bay Space Station truss have been built on the ground. Activities at LaRC have included the development of mobile remote manipulator systems (which can traverse the Space Station 5-meter structure), preliminary LDR sun shield concepts, LDR construction scenarios, and activities in robotic assembly of truss-type structures.

Bush, H.↗

Operations considerations in Space Station Freedom assembly

The importance of planning the on-orbit operations inherent in the Space Station Freedom assembly sequence is discussed. Any solution to the assembly puzzle requires the simultaneous satisfaction of many diverse constraints, including: on-orbit assembly operations, NSTS (National Space Transportation System) payload bay constraints, NSTS performance capabilities, and provision of the requisite functionality for each on-orbit configuration. Because operations are in the critical path SSFP (Space Station Freedom Program) has chosen to carefully assess assembly operations as each launch manifest is developed and evaluated.

Doering, Stephen C.↗

Strut-node joint conjugates for the assembly of semi-permanent or reusable truss structures

When strut and node components are used for truss construction an assembly problem occurs if a strut must be fitted between nodes whose separation distance is either closer or farther than the design intended. This condition is the result of normal dimensional variations that occur in any manufacturing process. In such circumstances two actions would permit continued assembly: change the effective strut length, and move the nodes. Assuming continued assembly is the most attractive alternative, attention is focused on accomplishing these actions as part of the assembly process.

Brewer, W. V.↗

Moments applied in the manual assembly of space structures - Ease biomechanics results from STS-61B

Measurements of the level and pattern of moments applied in the manual assembly of a space structure were made in extravehicular activity (EVA) and neutral buoyancy simulation (NBS). The Experimental Assembly of Structures in EVA program included the repeated assembly of a 3.6 m tetrahedral truss structure in EVA on STS-61B after extensive neutral buoyancy crew training. The flight and training structures were of equivalent mass and geometry to allow a direct correlation between EVA and NBS performance. A stereo photographic motion camera system was used to reconstruct in three dimensions rotational movements of structural beams during assembly. Moments applied in these manual handling tasks were calculated on the basis of the reconstructed movements taking into account effects of inertia, drag and virtual mass. Applied moments of 2.0 Nm were typical for beam rotations in EVA. Corresponding applied moments in NBS were typically up to five times greater. Moments were applied as impulses separated by several seconds of coasting in both EVA and NBS. Decelerating impulses were only infrequently observed in NBS.

Cousins, D.↗

Component model reduction via the projection and assembly method

This paper explains the projection and assembly model reduction method which has been used to derive reduced order component models for the Galileo spacecraft. Assembly of reduced order component models produces a reduced order system model which can then be used in multibody simulation codes for efficient run times. The methodology is explained and a proof is given showing the exact reproduction of selected significant system modes. Frequency bounds are obtained for all modes produced when the reduced order components are assembled. The projection and assembly method is demonstrated on two examples. The first example is a simplified model of the Galileo spacecraft, while the second example is the model of the Galileo spacecraft in its early mission configuration. When articulation of components is allowed, the method may not reproduce all system modes precisely. Remedies for this problem are suggested.

Kissel, Glen J.↗

A mobile transporter concept for EVA assembly of future spacecraft

This paper details the ground test program for the NASA Langley Research Center Mobile Transporter concept. The Mobile Transporter would assist EVA astronauts in the assembly of the Space Station Freedom. 1-g and simulated O-g (neutral buoyancy) tests were conducted to evaluate the use of the Mobile Transporter. A three-bay (44 struts) orthogonal tetrahedral truss configuration with a 15-foot-square cross section was repeatedly assembled by a single pair of pressure suited test subjects working from the Mobile Transporter astronaut positioning devices. The average unit assembly time was 28 seconds/strut. The results of these tests indicate that the use of a Mobile Transporter for EVA assembly of Space Station size structure is viable and practical. Additionally, the Mobile Transporter could be used to construct other spacecraft such as the submillimeter astronomical laboratory, space crane, and interplanetary (i.e., Mars and lunar) spacecraft.

Watson, Judith J.↗

AND/OR graph representation of assembly plans

A compact representation of all possible assembly plans of a product using AND/OR graphs is presented as a basis for efficient planning algorithms that allow an intelligent robot to pick a course of action according to instantaneous conditions. The AND/OR graph is equivalent to a state transition graph but requires fewer nodes and simplifies the search for feasible plans. Three applications are discussed: (1) the preselection of the best assembly plan, (2) the recovery from execution errors, and (3) the opportunistic scheduling of tasks. An example of an assembly with four parts illustrates the use of the AND/OR graph representation in assembly-plan preselection, based on the weighting of operations according to complexity of manipulation and stability of subassemblies. A hypothetical error situation is discussed to show how a bottom-up search of the AND/OR graph leads to an efficient recovery.

Homem De Mello, Luiz S.↗

Ground controlled robotic assembly operations for Space Station Freedom

A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

Parrish, Joseph C.↗

Automated assembly of large space structures

A research program to evaluate telerobotic methods for inspace assembly of large truss structures has been initiated at the NASA Langley Research Center. A commercial robot is mounted on a carriage positioning system and a tetrahedral truss, which is composed of 102 members each 2 m long, is assembled on a rotating motion-base. The facility system is described including details of characterization tests on the truss structure. The current status of the assembly tests is discussed and observations from these tests indicate that no problems have been encountered that would prohibit automated telerobotic assembly from being a viable inspace construction method.

Rhodes, Marvin D.↗

Software design for automated assembly of truss structures

Concern over the limited intravehicular activity time has increased the interest in performing in-space assembly and construction operations with automated robotic systems. A technique being considered at LaRC is a supervised-autonomy approach, which can be monitored by an Earth-based supervisor that intervenes only when the automated system encounters a problem. A test-bed to support evaluation of the hardware and software requirements for supervised-autonomy assembly methods was developed. This report describes the design of the software system necessary to support the assembly process. The software is hierarchical and supports both automated assembly operations and supervisor error-recovery procedures, including the capability to pause and reverse any operation. The software design serves as a model for the development of software for more sophisticated automated systems and as a test-bed for evaluation of new concepts and hardware components.

Herstrom, Catherine L.↗

Design of a prototype secondary mirror assembly for the Space Infrared Telescope Facility

The design of a liquid helium temperature prototype secondary mirror assembly (PSMA) under development for the NASA Space Infrared Telescope Facility (SIRTF) program is described. The SIRTF assembly must operate below 4 K and provide the functions of highly precise two-axis periodic tilting ('chopping') in addition to the conventional functions of focus and collimation adjustment. The PSMA design employs a fused quartz mirror kinematically attached at its center to an aluminum cruciform. The mirror/cruciform assembly is driven in tilt about its combined center of mass using an aluminum flexure pivot of unique design and a four-actuator control system with feedback provided by pairs of differential position sensors. The voice coil actuators are mounted on a second flexure-pivoted mass to enhance servosystem stability and isolate the telescope from vibration-induced disturbances. The mirror/cruciform and reaction mass are attached to opposite sides of an aluminum mounting plate whose position relative to the outer housing is controlled by a six-degree-of-freedom focus and centering mechanism using pivoted actuation levers driven by lead screw/harmonic drive/stepper motor assemblies.

Stier, Mark T.↗

CFD modeling of turbulent flows around the SSME main injector assembly using porosity formulation

Hot gas turbulent flow distribution around the main injector assembly of the Space Shuttle Main Engine (SSME) and LOX flow distribution through the LOX posts have a great effect on the combustion phenomena inside the main combustion chamber. In order to design a CFD model to be an effective engineering analysis tool with good computational turn-around time (especially for 3-D flow problems) and still maintain good accuracy in describing the flow features, the concept of porosity was employed to describe the effects of blockage and drag force due to the presence of the LOX posts in the turbulent flow field around the main injector assembly of the SSME. Two-dimensional numerical studies were conducted to identify the drag coefficients of the flows, both through tube banks and round the shielded posts, over a wide range of Reynolds numbers. Empirical, analytical expressions of the drag coefficients as a function of local flow Reynolds number were then deduced. The porosity model was applied to the turbulent flow around the main injector assembly of the SSME, and analyses were performed. The 3-D CFD analysis was divided into three parts: LOX dome, hot gas injector assembly, and hydrogen cavity. The numerical results indicate that the mixture ratio at the downstream of injector face was close to stoichiometric around baffle elements.

Cheng, Gary C.↗

Structurally adaptive space crane concept for assembling space systems on orbit

Many future human space exploration missions will probably require large vehicles that must be assembled on orbit. Thus, a device that can move, position, and assemble large and massive spacecraft components on orbit becomes essential for these missions. A concept is described for such a device: a space crane concept that uses erectable truss hardware to achieve high-stiffness and low-mass booms and uses articulating truss joints that can be assembled on orbit. The hardware has been tested and shown to have linear load-deflection response and to be structurally predictable. The hardware also permits the crane to be reconfigured into different geometries to satisfy future assembly requirements. A number of articulating and rotary joint concepts have been sized and analyzed, and the results are discussed. Two strategies were proposed to suppress motion-induced vibration: placing viscous dampers in selected truss struts and preshaping motion commands. Preliminary analyses indicate that these techniques have the potential to greatly enhance structural damping.

Dorsey, John T.↗

SHARC: Space Habitat, Assembly and Repair Center

Integrated Space Systems (ISS) has taken on the task of designing a Space Habitat, Assembly and Repair Center (SHARC) in Low Earth Orbit to meet the future needs of the space program. Our goal is to meet the general requirements given by the 1991/1992 AIAA/LORAL Team Space Design competition with an emphasis on minimizing the costs of such a design. A baseline structural configuration along with preliminary designs of the major subsystems was created. Our initial mission requirements, which were set by AIAA, were that the facility be able to: support simultaneous assembly of three major vehicles; conduct assembly operations and minimal extra vehicular activity (EVA); maintain orbit indefinitely; and assemble components 30 feet long with a 10 foot diameter in a shirtsleeve environment.

Colangelo, Todd↗

Automated assembly of large space structures

Viewgraphs and discussion on automated assembly of large space structures are presented. The program research objective is to develop technology and demonstrate the potential for automated inspace assembly of large erectable structures. This is accomplished by merging experience in structural assembly and robotics at LaRC into an interdisciplinary program with focused effort on automated assembly of a generic structural configuration with a standard cell and by building into the system the capability to do expanded research with complex configurations.

Rhodes, Marvin D.↗

Systems engineering studies of on-orbit assembly operation

While the practice of construction has a long history, the underlying theory of construction is relatively young. Very little has been documented as to techniques of logistic support, construction planning, construction scheduling, construction testing, and inspection. The lack of 'systems approaches' to construction processes is certainly one of the most serious roadblocks to the construction of space structures. System engineering research efforts at CSC are aimed at developing concepts and tools which contribute to a systems theory of space construction. The research is also aimed at providing means for trade-offs of design parameters for other research areas in CSC. Systems engineering activity at CSC has divided space construction into the areas of orbital assembly, lunar base construction, interplanetary transport vehicle construction, and Mars base construction. A brief summary of recent results is given. Several models for 'launch-on-time' were developed. Launch-on-time is a critical concept to the assembly of such Earth-orbiting structures as the Space Station Freedom, and to planetary orbiters such as the Mars transfer vehicle. CSC has developed a launch vehicle selection model which uses linear programming to find optimal combinations of launch vehicles of various sizes (Atlas, Titan, Shuttles, HLLV's) to support SEI missions. Recently, the Center developed a cost trade-off model for studying on orbit assembly logistics. With this model it was determined that the most effective size of the HLLV would be in the range of 120 to 200 metric tons to LEO, which is consistent with the choices of General Stafford's Synthesis Group Report. A second-generation Dynamic Construction Activities Model ('DYCAM') process model has been under development, based on our past results in interruptability and our initial DYCAM model. This second-generation model is built on the paradigm of knowledge-based expert systems. It is aimed at providing answers to two questions: (1) what are some necessary or sufficient conditions for judging conceptual designs of spacecraft?, and (2) can a methodology be formulated such that these conditions may be used to provide computer-aided tools for evaluating conceptual designs and planning for space assembly sequences? Early simulation results indicate that the DYCAM model has a clear ability to emulate and simulate human orbital construction processes.

Morgenthaler, George W.↗

Performance analysis of a robotic system for space-based assembly

A dual arm system for space-based assembly has been under development and experimentation at the Center of Intelligent Robotic Systems for Space Exploration. This paper will describe the components of this system and will then focus on the specific problem of predicting response time of the integrated system. This hierarchical system consists of a task representation and planning level, a coordination level, and an execution level to carry out the desired assembly task. A common modeling methodology based on Petri nets was used to model the various subtasks throughout the levels of the hierarchy. The Petri net model can then be analyzed for liveness and boundedness that, in turn, are used to detect the existence of deadlock or conflict in the system. The model can also be used to calculate the time it will take to complete an assembly task once an operator issues a command. These modeling results are compared with the actual experimental results obtained from carrying out the assembly task.

Desrochers, Alan↗

Automated assembly of large space structures using an expert system executive

NASA LaRC has developed a unique testbed for investigating the practical problems associated with the assembly of large space structures using robotic manipulators. The testbed is an interdisciplinary effort which considers the full spectrum of assembly problems from the design of mechanisms to the development of software. This paper will describe the automated structures assembly testbed and its operation, detail the expert system executive and its development, and discuss the planned system evolution. Emphasis will be placed on the expert system development of the program executive. The executive program must be capable of directing and reliably performing complex assembly tasks with the flexibility to recover from realistic system errors. By employing an expert system, information pertaining to the operation of the system was encapsulated concisely within a knowledge base. This lead to a substantial reduction in code, increased flexibility, eased software upgrades, and realized a savings in software maintenance costs.

Allen, Cheryl L.↗