Search NASA⌕ Search

SEARCH · Search NASA

Results for “coordinated scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Adaptive Responses in Eye-Head-Hand Coordination Following Exposures to a Virtual Environment as a Possible Space Flight Analog

Virtual environments (VE) offer unique training opportunities, particularly for training astronauts and preadapting them to the novel sensory conditions of microgravity. Sensorimotor aftereffects of VEs are often quite similar to adaptive sensorimotor responses observed in astronauts during and/or following space flight. The purpose of this research was to compare disturbances in sensorimotor coordination produced by dome virtual environment display and to examine the effects of exposure duration, and repeated exposures to VR systems. The current study examined disturbances in eye-head-hand (EHH) and eye-head coordination. Preliminary results will be presented. Eleven subjects have participated in the study to date. One training session was completed in order to achieve stable performance on the EHH coordination and VE tasks. Three experimental sessions were performed each separated by one day. Subjects performed a navigation and pick and place task in a dome immersive display VE for 30 or 60 min. The subjects were asked to move objects from one set of 15 pedestals to the other set across a virtual square room through a random pathway as quickly and accurately as possible. EHH coordination was measured before, immediately after, and at 1 hr, 2 hr, 4 hr and 6 hr following exposure to VR. EHH coordination was measured as position errors and reaction time in a pointing task that included multiple horizontal and vertical LED targets. Repeated measures ANOVAs were used to analyze the data. In general, we observed significant increases in position errors for both horizontal and vertical targets. The largest decrements were observed immediately following exposure to VR and showed a fairly rapid recovery across test sessions, but not across days. Subjects generally showed faster RTs across days. Individuals recovered from the detrimental effects of exposure to the VE on position errors within 1-2 hours. The fact that subjects did not significantly improve across days suggests that in order to achieve dual adaptation of EHH coordination may require more than three training sessions. These findings provide some direction for developing training schedules for VE users that facilitate adaptation, support the idea that preflight training of astronauts may serve as useful countermeasure for the sensorimotor effects of space flight, and support the idea that VEs may serve as an analog for sensorimotor effects of spaceflight.

Harm, Deborah L.↗

Streamlining Payload Integration

Payload integration onto space transport vehicles and the International Space Station (ISS) is a complex process. Yet, cargo transport is the sole reason for any space mission, be it for ferrying humans, science, or hardware. As the largest such effort in history, the ISS offers a wide variety of payload experience. However, for any payload to reach the Space Station under the current process, Payload Developers face a list of daunting tasks that go well beyond just designing the payload to the constraints of the transport vehicle and its stowage topology. Payload customers are required to prove their payload s functionality, structural integrity, and safe integration - including under less than nominal situations. They must also plan for or provide training, procedures, hardware labeling, ground support, and communications. In addition, they must deal with negotiating shared consumables, integrating software, obtaining video, and coordinating the return of data and hardware. All the while, they must meet export laws, launch schedules, budget limits, and the consensus of more than 12 panel and board reviews. Despite the cost and infrastructure overhead, payload proposals have increased. Just in the span from FY08 to FY09, the NASA Payload Space Station Support Office budget rose from $78M to $96M in attempt to manage the growing manifest, but the potential number of payloads still exceeds available Payload Integration Management manpower. The growth has also increased management difficulties due to the fact that payloads are more frequently added to a flight schedule late in the flow. The current standard ISS template for payload integration from concept to payload turn-over is 36 months, or 18 months if the payload already has a preliminary design. Customers are increasingly requiring a turn-around of 3 to 6-months to meet market needs. The following paper suggests options for streamlining the current payload integration process in order to meet customer schedule needs and reduce costs for both the integration support teams and the developers, without reducing quality or compromising safety. Issues for the key integration areas of planning, training, verification, and safety are presented in a Root-Cause Analysis study, with plausible solutions provided that involve technology and tools already available to the ISS community. Although based upon the ISS process, the payload integration techniques outlined herein also offer an integration template for any space transport endeavor.

Lufkin, Susan N.↗

Direct Feed Low Activity Waste Integrated Permitting - 16642

An overall Hanford permitting strategy for the U. S. Department of Energy (DOE) Office of River Protection (ORP) is being developed to support the Direct Feed Low- Activity Waste (DFLAW) Program. The strategy identifies new permits and modifications of existing permits, as well as major regulatory approvals to support the startup and operation of nuclear systems necessary to feed low activity tank waste, pretreat the waste, operate the Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) facility to treat tank waste, and dispose of waste streams. Types of permits include hazardous waste, toxic air, and radiological air licenses. Four different Contractors manage operations at Tank Farms, WTP, Utilities/Infrastructure, and Waste Disposal. Due to this complexity and the number of interfaces required, the need to have a strategic overview of all permits was evident. Approximately 25 permits and 4 major regulatory approvals are identified to implement DFLAW. The strategy will help guide integrated planning, scheduling and sequencing of permits and regulatory approvals to support DOE ORP's overall schedule for construction, commissioning and operation of DFLAW. Development of the strategy included extensive collaboration and coordination of an Integrated Permitting Team with staff and management representation from DOE, CH2M Hill Plateau Remediation Contractor (CHPRC), Washington River Protection Solutions LLC (WRPS), and Bechtel National Inc. (BNI). Information sessions and briefings have been conducted with the Washington State Department of Ecology (Ecology) and Washington State Department of Health (DOH) in the development of this overall strategy. Additionally, interface meetings are held with Ecology and DOH on specific projects early in the design phase to validate the permitting approach, identify key issues and information, and discuss requirements and assumptions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Planning and Implementation of Test Facility Improvements

As engineering programs develop, and product testing begins, ideas for process improvement soon become obvious. Engineers envision new holding and handling fixtures. Additional custom-made support equipment may be needed. Perhaps modifications to the building or modifications to facility hardware are the order of the day. This is where a flexible creative test organization is needed. We need not be content with the status quo. All of these desired test innovations can make the difficult easy and improve the work flow. At times, implementing these new ideas demands more time or specialized expertise than test team members have. Through the coordinated use of labor resources, the needed improvements can still be made and in a timely fashion that supports program schedules. This presentation provides practical advice and a method whereby test personnel can creatively develop facility improvements and manage them from start to finish. You can control just how much time you invest and what part of your concepts you will personally design. By wisely defining the requirements and presenting them to the appropriate help sources (vendors, contractors, coworkers, and support departments), you can get the help you need to bring the improvements you have conceived, into fruition. Aspects of this presentation include defining requirements for test facility improvements, choosing labor resources, writing a statement of work, determining cost and benefits, securing department approval, coordinating procurement, managing the project, and training the end users. The process of successfully implementing test facility improvements is thoroughly explained. It has been tried, proven and improved over nearly 25 years of use. Whether considering a $50 improvement or a $50 million dollar improvement, this discussion will provide helpful pointers. Examples of improvements made through this process and their illustration will be included.

Oberlander, Larry↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Scheduling logic for Miles-In-Trail traffic management

This paper presents an algorithm which can be used for scheduling arrival air traffic in an Air Route Traffic Control Center (ARTCC or Center) entering a Terminal Radar Approach Control (TRACON) Facility . The algorithm aids a Traffic Management Coordinator (TMC) in deciding how to restrict traffic while the traffic expected to arrive in the TRACON exceeds the TRACON capacity. The restrictions employed fall under the category of Miles-in-Trail, one of two principal traffic separation techniques used in scheduling arrival traffic . The algorithm calculates aircraft separations for each stream of aircraft destined to the TRACON. The calculations depend upon TRACON characteristics, TMC preferences, and other parameters adapted to the specific needs of scheduling traffic in a Center. Some preliminary results of traffic simulations scheduled by this algorithm are presented, and conclusions are drawn as to the effectiveness of using this algorithm in different traffic scenarios.

Synnestvedt, Robert G.↗

Clearance Analysis of CTC2 (on ELC4) to S-TRRJ HRS Radiator Rotation Envelope

In response to the planned retirement of the Space Shuttle Program, International Space Station (ISS) management began stockpiling spare parts on the ISS. Many of the larger orbital replacement units were stored on the Expedite the Processing of Experiments to Space Station (EXPRESS) Logistics Carriers (ELCs) mounted on the end of the S3 and P3 truss segments, immediately outboard of the Thermal Radiator Rotary Joints (TRRJs) and their attached radiators. In an August 2009 computer-aided design (CAD) assessment, it was determined that mounting the Cargo Transport Container (CTC) 2 on the inboard face of ELC4 as planned would create insufficient clearance between the CTC2 and the rotational envelope of the radiators when the TRRJs were rotated to a gamma angle of 35.0 degrees. The true clearance would depend on how the Unpressurized Cargo Carrier Attachment System (UCCAS) was mounted to the S3 truss and how the ELC4 was attached to it. If the plane of the UCCAS attachment points were tilted even slightly inboard, it would significantly change the clearance between CTC2 and the Starboard TRRJ (S-TRRJ) radiators. Additionally, since CTC2 would be covered in multilayer insulation (MLI), the true outer profile of CTC2 was not captured in the CAD models used for the clearance assessment. It was possible that, even if the S-TRRJ radiators cleared CTC2, they could snag the MLI covering. In the fall of 2010, the Image Science and Analysis Group (ISAG) was asked to perform an on-orbit clearance analysis to determine the location of CTC2 on ELC4 and the S-TRRJ radiators at the angle of closest approach so that a positive clearance could be assured. To provide the measurements as quickly as possible to aid in the assessment, it was decided that the clearance analysis would be broken into two phases. Phase I: The location and orientation of the UCCAS fittings, which support and hold the ELC4 in place, would be measured relative to the ISS Analytical Coordinate System (ISSACS) as defined by nine preexisting Space Vision System (SVS) targets affixed to the forward/zenith side of the S1 and S3 truss segments. The location of the outboard edge of the S-TRRJ radiator would also be measured when positioned at the angle of closest approach to CTC2 (gamma = 35.0 degrees). This data would allow the Digital Pre-Assembly Group to predict how the ELC4 would sit on the UCCAS and how that would translate into the clearance between CTC2 and the S-TRRJ radiators. Phase II: After the ELC4 was delivered and installed into the UCCAS, the position of the CTC2 mounting plate on the inboard face of ELC4, would be measured in the ISSACS coordinate system relative to the SVS control points used in Phase I. Although CTC2 would not yet be mounted on ELC4, the working envelope of CTC2 could be mathematically added to the measured position of ELC4 to produce a best estimate for CTC2's mounted location. Comparing CTC2's best estimated location to the S-TRRJ radiator (measured in Phase I); relative to the ISSACS coordinate system, would provide a direct measurement of the expected clearance. Due to the impending delivery of ELC4 (scheduled for January 2011), planning for the Phase I clearance analysis began immediately. Using the Dynamic Onboard Ubiquitous Graphics (DOUG) program, ISAG designed a way to acquire images of the SVS control points on truss segments S1 and S3, the aft facing edge of the S-TRRJ Heat Rejection Subsystem (HRS) radiator, and the three UCCAS latch mechanisms mounted on the zenith face of the S3 truss using the Space Station Remote Manipulator System (SSRMS). To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which they are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which the majority of the needed imagery could be acquired. Five additional images would be acquired using the CP-3 external ISS camera mounted on the S1 truss immediately inboard of ELC4. Based on a photogrammetric simulation, it was estimated that the measured location of the HRS radiator and UCCAS latch points would be accurate to about 0.3 in. in each of the three axes relative to ISSACS. Working with ROBO, ISAG collected 78 images of the ISS December 29, 2010. From this imagery, the best 40 were selected for use in the analysis process. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for the nine SVS targets on the S1 and S3 trusses in the ISSACS coordinate system.

Liddle, Donn↗

Using cross-layer adaptations for dynamic data management in large scale coupled scientific workflows, In: SC '13 Proceedings of the International Conference on High Performance Computing, Networking, Storage and Analysis

As system scales and application complexity grow, managing and processing simulation data has become a significant challenge. While recent approaches based on data staging and in-situ/in-transit data processing are promising, dynamic data volumes and distributions, such as those occurring in AMR-based simulations, make the efficient use of these techniques challenging. In this paper we propose cross-layer adaptations that address these challenges and respond at runtime to dynamic data management requirements. Specifically we explore (1) adaptations of the spatial resolution at which the data is processed, (2) dynamic placement and scheduling of data processing kernels, and (3) dynamic allocation of in-transit resources. We also exploit coordinated approaches that dynamically combine these adaptations at the different layers. We evaluate the performance of our adaptive cross-layer management approach on the Intrepid IBM-BlueGene/P and Titan Cray-XK7 systems using Chombo-based AMR applications, and demonstrate its effectiveness in improving overall time-to-solution and increasing resource efficiency.

Computer Science↗

Dax v. 1.0

The Dax Toolkit enables the fine-grained concurrency for data analysis and visualization required to drive multi-core processors, many-core GPU accelerators, and emerging architectures for exascale computing. Dax simplifies the design of finely threaded algorithms by characterizing them in per element operations, which we call worklets. Worklets simplify design because they can behave as serial processes without the complications of memory clashes or other race conditions. Yet worklets can be scheduled on a practically unlimited number of threads, thereby making effective utilization of many processing cores. Operations coordinated across elements are encapsulated in a few versatile communicative operations that are adapted to the specifics of computing devices.

SciDAC↗

FASTSAT-HSV01 Synergistic Observations of the Magnetospheric Response During Active Periods: MINI-ME, PISA and TTI

Understanding the complex processes within the inner magnetosphere of Earth particularly during storm periods requires coordinated observations of the particle and field environment using both in-situ and remote sensing techniques. In fact in order to gain a better understanding of our Heliophysics and potentially improve our space weather forecasting capabilities, new observation mission approaches and new instrument technologies which can provide both cost effective and robust regular observations of magnetospheric activity and other space weather related phenomenon are necessary. As part of the effort to demonstrate new instrument techniques and achieve necessary coordinated observation missions, NASA's Fast Affordable Science and Technology Satellite Huntsville 01 mission (FASTSAT-HSVOI) scheduled for launch in 2010 will afford a highly synergistic solution which satisfies payload mission opportunities and launch requirements as well as contributing iri the near term to our improved understanding of Heliophysics. NASA's FASTSAT-HSV01 spacecraft on the DoD Space Test Program-S26 (STP-S26) Mission is a multi-payload mission executed by the DoD Space Test Program (STP) at the Space Development and Test Wing (SDTW), Kirtland AFB, NM. and is an example of a responsive and economical breakthrough in providing new possibilities for small space technology-driven and research missions. FASTSAT-HSV is a unique spacecraft platform that can carry multiple small instruments or experiments to low-Earth orbit on a wide range of expendable launch vehicles for a fraction of the cost traditionally required for such missions. The FASTSAT-HSV01 mission allows NASA to mature and transition a technical capability to industry while increasing low-cost access to space for small science and technology (ST) payloads. The FASTSAT-HSV01 payload includes three NASA Goddard Space Flight Center (GSFC) new technology built instruments that will study the terrestrial space environment and potentially contribute to space weather research in a synergistic manner. MINI-ME, a neutral atom imager, will observe the neutral atom inputs to ionospheric heating which can be important during high levels of magnetospheric activity. PISA, a plasma impedance spectrometer, will measure simultaneously the local electron densities and temperatures as well as measure small scale density structure (500 m spatial scale) during these active periods. TTI, a thermospheric imager, will remotely determine the thermospheric temperature response to this magnetospheric activity. Together, these observations will contribute significantly to a comprehensive understanding of the flow of energy through and the response of the storm-time terrestrial magnetosphere.

Casas, Joseph C.↗

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

An MILP-Based Distributed Energy Management for Coordination of Networked Microgrids

An MILP-based distributed energy management for the coordination of networked microgrids is proposed in this paper. Multiple microgrids and the utility grid are coordinated through iteratively adjusted price signals. Based on the price signals received, the microgrid controllers (MCs) and distribution management system (DMS) update their schedules separately. Then, the price signals are updated according to the generation–load mismatch and distributed to MCs and DMS for the next iteration. The iteration continues until the generation–load mismatch is small enough, i.e., the generation and load are balanced under agreed price signals. Through the proposed distributed energy management, various microgrids and the utility grid with different economic, resilient, emission and socio-economic objectives are coordinated with generation–load balance guaranteed and the microgrid customers’ privacy preserved. In particular, a piecewise linearization technique is employed to approximate the augmented Lagrange term in the alternating direction method of multipliers (ADMM) algorithm. Thus, the subproblems are transformed into mixed integer linear programming (MILP) problems and efficiently solved by open-source MILP solvers, which would accelerate the adoption and deployment of microgrids and promote clean energy. The proposed MILP-based distributed energy management is demonstrated through various case studies on a networked microgrids test system with three microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Harmonia: A Globally Coordinated Garbage Collector for Arrays of Solid-state Drives

Solid-State Drives (SSDs) offer significant performance improvements over hard disk drives (HDD) on a number of workloads. The frequency of garbage collection (GC) activity is directly correlated with the pattern, frequency, and volume of write requests, and scheduling of GC is controlled by logic internal to the SSD. SSDs can exhibit significant performance degradations when garbage collection (GC) conflicts with an ongoing I/O request stream. When using SSDs in a RAID array, the lack of coordination of the local GC processes amplifies these performance degradations. No RAID controller or SSD available today has the technology to overcome this limitation. This paper presents Harmonia, a Global Garbage Collection (GGC) mechanism to improve response times and reduce performance variability for a RAID array of SSDs. Our proposal includes a high-level design of SSD-aware RAID controller and GGC-capable SSD devices, as well as algorithms to coordinate the global GC cycles. Our simulations show that this design improves response time and reduces performance variability for a wide variety of enterprise workloads. For bursty, write dominant workloads response time was improved by 69% while performance variability was reduced by 71%.

99 GENERAL AND MISCELLANEOUS↗

Robust Scheduling of Microgrids Considering Unintentional Islanding Conditions

This paper proposes a robust scheduling model for microgrids considering the stochastic unintentional islanding conditions. The proposed model minimizes the total operating cost of the microgrid by efficiently coordinating the supply of power from local distributed energy resources and the main grid. To capture the prevailing uncertainties in renewable generation and demand as well as unintentional islanding conditions, a two-stage adaptive robust optimization model is formulated to minimize the total operating cost under the worst realization of the modeled uncertainties. The column and constraint generation (C&CG) method is used to solve the problem in an iterative manner. The solution of the proposed scheduling model ensures robust microgrid operation in consideration of all possible realization of renewable generation, demand and unintentional islanding condition. Numerical simulations on a microgrid consisting of a wind turbine, a PV panel, a fuel cell, two micro-turbines, a diesel generator and a battery demonstrate the effectiveness of the proposed approach.

Liu, Guodong↗

Bridging paradigms: Designing for HPC-Quantum convergence

Here, this paper presents a comprehensive software stack architecture for integrating quantum computing (QC) capabilities with High-Performance Computing (HPC) environments. While quantum computers show promise as specialized accelerators for scientific computing, their effective integration with classical HPC systems presents significant technical challenges. We propose a hardware-agnostic software framework that supports both current noisy intermediate-scale quantum devices and future fault-tolerant quantum computers, while maintaining compatibility with existing HPC workflows. The architecture includes a quantum gateway interface, standardized APIs for resource management, and robust scheduling mechanisms to handle both simultaneous and interleaved quantum–classical workloads. Key innovations include: (1) a unified resource management system that efficiently coordinates quantum and classical resources, (2) a flexible quantum programming interface that abstracts hardware-specific details, (3) A Quantum Platform Manager API that simplifies the integration of various quantum hardware systems, and (4) a comprehensive tool chain for quantum circuit optimization and execution. We demonstrate our architecture through implementation of quantum–classical algorithms, including the variational quantum linear solver, showcasing the framework’s ability to handle complex hybrid workflows while maximizing resource utilization. This work provides a foundational blueprint for integrating QC capabilities into existing HPC infrastructures, addressing critical challenges in resource management, job scheduling, and efficient data movement between classical and quantum resources.

97 MATHEMATICS AND COMPUTING↗

Observation, Analysis, and Recommendations for ND Management Reviews (W88-0/Mk5 ALT 370 Program Report)

Progress and status reviews allow teams to provide updates and targeted information designed to inform the customer of progress and to help the customer understand current risks and challenges. Both presenters and the customer should have well-calibrated expectations for the level of content and information. However, what needs to be covered in systems-level management reviews can too often be poorly defined. These unclear expectations can lead teams to overpreparing or attempting to guess what information the customer considers as most critical. This aspect of the review process is stressful, disruptive, and bad for morale – and time spent overpreparing reports is time spent not focusing on the technical work necessary to stay on schedule. To define and address these issues, this report was designed to observe various aspects of development program coordination and review activities for NNSA and Navy customers, and then to conduct unbiased, independent Human Factors observation and analysis from an outside perspective. The report concludes with suggestions and recommendations for improving the efficiency of information flow related to reviews, with the goals of increasing productivity and benefitting both Sandia and the customer.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗