Clause-by-Clause Summary of Requirements in IEEE Standard 1547-2018

The revised IEEE 1547 standard (IEEE Std 1547-2018) contains eleven chapters (clauses) and eight annexes that comprise 136 pages. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of distributed energy resources to the electric power system. Implementation of the requirements needs a careful study of the underlying technical concept and also needs the appropriate information that may be required to calculate various settings and configurations. This document aims to provide an introductory text to assist users of IEEE Std 1547-2018 in identifying the following questions: what is the primary audience of the clause/subclause? What knowledge is required to understand the technical subject matter? What information is required to apply/implement the requirements specified? What level of fluency with the subject matter is required to apply/implement the requirements?

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evidence of Processing Non-Idealities in 4H-SiC Integrated Circuits Fabricated With Two Levels of Metal Interconnect

The fabrication and prolonged 500 C electrical testing of 4H-SiC junction field effect transistor (JFET) integrated circuits (ICs) with two levels of metal interconnect is reported in another submission to this conference proceedings. While some circuits functioned more than 3000 hours at 500 C, the majority of packaged ICs from this wafer electrically failed after less than 200 hours of operation in the same test conditions. This work examines the root physical degradation and failure mechanisms believed responsible for observed large discrepancies in 500 C operating time. Evidence is presented for four distinct issues that significantly impacted 500 C IC operational yield and lifetime for this wafer.

JFET↗

Evidence of Processing Non-Idealities in 4H-SiC Integrated Circuits Fabricated with Two Levels of Metal Interconnect

The fabrication and prolonged 500 C electrical testing of 4H-SiC junction field effect transistor (JFET) integrated circuits (ICs) with two levels of metal interconnect is reported in another submission to this conference proceedings. While some circuits functioned more than 1000 hours at 500 C, the majority of packaged ICs from this wafer electrically failed after less than 200 hours of operation in the same test conditions. This work examines the root physical degradation and failure mechanisms believed responsible for observed large discrepancies in 500 C operating time. Evidence is presented for four distinct issues that significantly impacted 500 C IC operational yield and lifetime for this wafer.

Microelectronics↗

The Building ENergy Demand (BEND) Model: A Comprehensive Composite Building Energy Modeling Framework

The Building ENergy Demand (BEND) model was developed at Pacific Northwest National Laboratory (PNNL) to simulate climate-dependent hourly building energy demand with the ability to disaggregate down to or aggregate up to any geographic area of interest, including counties, states, electric utility service territories, and census regions. The BEND modeling framework is designed to study the effects of climate change, economics, technology advancement, and various mitigation policies on aggregate building energy demand. To make the process computationally feasible, BEND reduces granularity in building characteristics and weather forcing while maintaining enough detail to minimize systematic differences (biases) between BEND results and data from the Energy Information Administration (EIA). Based on the Commercial Building Energy Consumption Survey (CBECS) and Residential Energy Consumption Survey (RECS) databases, BEND establishes a set of representative buildings with predefined sets of building types, sizes, and vintages. These representative buildings are defined for each of the four U.S. census regions and the five climate zones used by the EIA for building surveys (hereafter “EIA climate zones”). BEND’s representative buildings are based on a statistical analysis of the CBECS and RECS databases that infers detailed parameters such as construction type, thermal properties, internal loads, equipment and mechanical systems, and operation schedules from the high-level descriptors in those databases (building type, vintage, size, and location). The representative buildings are simplified and consolidated into a set of prototype buildings for the purpose of simulating building energy demand. Combining the prototype buildings with weather files from selected locations and years, BEND creates a set of simulation-ready building models to be run using the EnergyPlus simulation engine (EnergyPlus). The base spatial unit of each BEND simulation is a subregion that is the intersection of an International Energy Conservation Code climate zone, a census region, and an EIA climate zone; analysis for each spatial unit is influenced by the weather file BEND selects to represent the climate-similar area. The major simulation outputs of interest to BEND are hourly energy consumption values for each simulated year, possibly for multiple fuel types. Based on building-stock weights derived from the CBECS/RECS data, the hourly output streams are aggregated to a single, 8760-hour load profile for each of the major building categories—residential and commercial—with the possibility of segregating by fuel types. To correct for biases inherent in the use of a limited suite of representative buildings, BEND is calibrated against observational targets of total annual building energy consumption and hourly load profiles (including peak demand) obtained for the decision-relevant geographic scales of interest (e.g., total electric load data for individual balancing authorities available from EIA). Based on available data such as population distribution, BEND is able to aggregate both up and down scales, allowing the study of building energy demand over a range of spatial scales (e.g., states or counties within the Western Electricity Coordinating Council, Eastern Interconnection, or the entire U.S.) and/or subsets of building types (e.g., office buildings with particular size ranges).

24 POWER TRANSMISSION AND DISTRIBUTION↗

A review of the potential impacts of climate change on bulk power system planning and operations in the United States

In this paper, climate change might impact various components of the bulk electric power system, including electricity demand; transmission; and thermal, hydropower, wind, and solar generators. Most research in this area quantifies impacts on one or a few components and does not link these impacts to effects on power system planning and operations. Here, we advance the understanding of how climate change might impact the bulk U.S. power system in three ways. First, we synthesize recent research to capture likely component-level impacts of climate change in the United States. Second, given the interconnected nature of the electric power system, we assess how aggregated component-level impacts might affect power system planning and operations. Third, we outline an agenda for future research on climate change impacts on power system planning and operations. Although component-level impacts vary in their magnitude, collectively they might significantly affect planning and operations. Most notably, increased demand plus reduced firm capacity across generation types might require systems to procure significant additional capacity to maintain planning reserve margins, and regional declines in renewable resources might need to be offset by increasing zero-carbon investment to meet decarbonization targets. Aggregated impacts might also affect operations, e.g., through shifts in dispatching and increased operational reserve requirements. Future research should aggregate component-level impacts at operational timescales, quantify impacts on wind and solar variability, and contextualize climate change impacts within ongoing shifts in the electric power system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Influence on Fracture and Delamination of Electrically Conductive Adhesives

This paper presents our continued work on developing a degradation model for electrically conductive adhesive (ECA) interconnects in photovoltaic modules. Here, we characterize the fracture mechanics properties of an epoxy based ECA, for both critical and subcritical loading conditions. Emphasis is put on the influence of different environmental conditions such as temperature and humidity. We found that high levels of humidity not only weaken the adhesive joint but also promote subcritical debonding at significantly lower driving forces than in dry environments.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Additional EIPC Study Analysis: Interim Report on High Priority Topics

Between 2010 and 2012 the Eastern Interconnection Planning Collaborative (EIPC) conducted a major long-term resource and transmission study of the Eastern Interconnection (EI). With guidance from a Stakeholder Steering Committee (SSC) that included representatives from the Eastern Interconnection States Planning Council (EISPC) among others, the project was conducted in two phases. Phase 1 involved a long-term capacity expansion analysis that involved creation of eight major futures plus 72 sensitivities. Three scenarios were selected for more extensive transmission- focused evaluation in Phase 2. Five power flow analyses, nine production cost model runs (including six sensitivities), and three capital cost estimations were developed during this second phase. The results from Phase 1 and 2 provided a wealth of data that could be examined further to address energy-related questions. A list of 13 topics was developed for further analysis; this paper discusses the first five.

Electricity Grid↗

Comparison of Thermal Management Approaches for Integrated Traction Drives in Electric Vehicles

The continuous push to increase power densities of electric vehicle (EV) traction drive systems necessitates combining electric motor and power electronics into one unit. A single, compact traction drive unit with fewer interconnecting components also facilitates fast, automated assembly of electric vehicles, driving production costs down and enabling wider adoption of EVs. There are a number of challenges associated with the integration of power electronics with the electric machine, including thermal management of the combined traction drive system. However, one important benefit of integration from the thermal management system perspective is the potential for using a single fluid loop instead of two separate cooling systems for the electric machine and the power electronics/inverter. This paper reviews several integration approaches and, employing finite element analysis (FEA), compares thermal management solutions for the combined electric machine and power electronics systems. Namely, three different scenarios are modeled: (1) independent component (motor and power electronics) cooling, which is compared to the combined cooling system approach for (2) radially and (3) axially integrated power electronics modules into the motor enclosure. Temperature distributions for selected thermal loads and thermal resistances from the key heat-generating components to the cooling fluid are compared for each scenario.

47 OTHER INSTRUMENTATION↗

Minnesota Solar Pathways: Illuminating Pathways to 10% Solar (Final Technical Report)

The Minnesota Solar Pathways project, funded in part by the Department of Energy’s Solar Energy Technologies Office, was a three-year project designed to explore least-risk, best-value strategies for meeting the State of Minnesota’s solar goals. As part of this aim, the Pathways Team modeled renewable generation costs, examined ways to streamline interconnection, and evaluated technologies that can increase solar hosting capacity on the distribution grid. Midway through the project period, the Pathways Team expanded the scope of study using the same modeling framework from the Minnesota Solar Potential Analysis to estimate and compare generation costs for high renewables penetration scenarios across the Midcontinent Independent System Operator (MISO) region. The analysis concludes that it can be cheaper to overbuild solar + wind and curtail surplus than to store all generation. In addition, the analysis of individual MISO subregions compared with the whole region highlights the opportunities of enabling market potential compared with impact of ongoing transmission constraints. Beyond the analysis of future scenarios, the partnerships initiated and supported through this project underscored the ongoing need for work with stakeholders to address key issues, particularly around siting, and leverage symbiotic strategies to meet state goals.

14 SOLAR ENERGY↗

An Overview of Inverter-based Resource Interconnection Standards

For the past century, electric power systems have primarily been bulk power systems consisting of generation, transmission, and distribution networks. Now the rapid expansion of distributed renewable power sources (RESs) and the shift from large, conventional synchronous machine resources to smaller-sized resources with diverse generation characteristics become the most significant change in modern power systems. With the increasing penetration of RESs, which are inverter-based resources (IBRs), it is important to develop interconnection standards that define performance and capability criteria for these IBRs. This is necessary to ensure the stable and reliable operation of power systems. This report summarizes the standards for IBRs interconnection in North America.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Standard Inverter Interface and Compliance Framework

Electric Power Research Institute, Inc. (EPRI) and Sandia National Laboratories (SNL) collaborated to develop and demonstrate a standard communication interface for solar inverters as well as a compliance framework to verify proper product operation via that interface. This activity filled a key void in the needs of California in relation to revisions to California’s Electric Tariff Rule 21 interconnection guidelines. Rule 21 is a CPUC-approved tariff based on IEEE 1547 technical requirements that describes the interconnection, operating, and metering requirements for generation facilities to be connected to a utility’s distribution system, over which the CPUC has jurisdiction. These guidelines, as presently being developed, anticipate a requirement for future inverters to have a standard communication interface and to be testable to verify their proper operation prior to deployment.

14 SOLAR ENERGY↗

Grid-Ready Energy Analytics Training with Data (“GREAT with Data”)

GridEd is a collaborative educational initiative consisting of the Electric Power Research Institute (EPRI), 5 Partner Universities (Stony Brook University, The University of Texas at Austin, University of California – Riverside, Virginia Tech, Washington State University), and participating industry sponsors. This educational initiative focuses on developing and training the next generation of power engineers so they can help shape the electric grid of the future by anticipating and fulfilling the needs of changing electric industry requirements. GridEd is leveraging electric industry research to educate a future electric grid workforce by empowering new and continuing education students, not only to become competent and well-informed engineers, but also to participate and influence major technological, social, and policy decisions that address critical global challenges. GridEd’s activities are centered around four core pillars: Enhancement of university power systems engineering curricula; Professional development and training for a diverse electric industry workforce; Stimulating students to join the movement for the next generation of power engineers, and; Improve workforce development efforts in the electric utility industry. Major accomplishments over the course of the project were: Over 50 unique professional short courses were delivered by more than 30 instructors across the GridEd network; Over 3,600 unique learners, many who took multiple courses, received more than 27,000 professional development hours (PDH) and over 1,000 certificates of completion; Approximately 2,900 unique learners undertook a course that was offered LIVE online or in-person; Approximately 700 unique learners undertook a course that was offered as computer-based training (CBT); Over 35 unique university courses were delivered by more than 30 instructors to 1,500 university students across the GridEd network; One-hundred-and-fifty-seven (157) students were funded to completed 43 student projects in topics of power systems and data science, and; Six (6) Historically Black Colleges and Universities (HBCUs) recruited as Affiliate Universities via Utility Partners. The professional training initiative and workforce development activities launched by this project will be sustained through EPRI’s collaborative business model with industry. Stimulating students to join the power engineering workforce of the future and the enhancement of tertiary training may continue to need government support.

14 SOLAR ENERGY↗

Silicon solar cells with a total power capacity of 30 kilowatts

The bulk of the contract effort was carried out in the following two phases: Phase 1 -- module design, Pre-production module fabrication, inspection and test. Phase 2 -- Production, test and delivery. Effort during the first two months of the contract concentrated on design of a solar module to meet specification. Basic module design resulting from this effort is as follows: (1) frame design; (2) cell pan design; (3) cell interconnection; (4) encapsulation; (5) electrical performance.

Source record↗

Environmental requirements for flat plate photovoltaic modules for terrestrial applications

The environmental test requirements that have been developed for flat plate modules purchased through Department of Energy funding are described. Concurrent with the selection of the initial qualification tests from space program experience - temperature cycling and humidity - surveys of existing photovoltaic systems in the field revealed that arrays were experiencing the following failure modes: interconnect breakage, delamination, and electrical termination corrosion. These coupled with application-dependent considerations led to the development of additional qualification tests, such as cyclic pressure loading, warped mounting surface, and hail. Rationale for the selection of tests, their levels and durations is described. Comparisons between field-observed degradation and test-induced degradation show a positive correlation with some of the observed field effects. Also, the tests are proving useful for detecting design, process, and workmanship deficiencies. The status of study efforts for the development of environmental requirements for field-related problems is reviewed.

Hoffman, A. R.↗

A Module Experimental Process System Development Unit (MEPSDU)

Subsequent to the design review, a series of tests was conducted on simulated modules to demonstrate that all environmental specifications (wind loading, hailstone impact, thermal cycling, and humidity cycling) are satisfied by the design. All tests, except hailstone impact, were successfully completed. The assembly sequence was simplified by virtue of eliminating the frame components and assembly steps. Performance was improved by reducing the module edge border required to accommodate the frame of the preliminary design module. An ultrasonic rolling spot bonding technique was selected for use in the machine to perform the aluminum interconnect to cell metallization electrical joints required in the MEPSDU module configuration. This selection was based on extensive experimental tests and economic analyses.

Source record↗

First-Order SPICE Modeling of Extreme-Temperature 4H-SiC JFET Integrated Circuits

A separate submission to this conference reports that 4H-SiC Junction Field Effect Transistor (JFET) digital and analog Integrated Circuits (ICs) with two levels of metal interconnect have reproducibly demonstrated electrical operation at 500 C in excess of 1000 hours. While this progress expands the complexity and durability envelope of high temperature ICs, one important area for further technology maturation is the development of reasonably accurate and accessible computer-aided modeling and simulation tools for circuit design of these ICs. Towards this end, we report on development and verification of 25 C to 500 C SPICE simulation models of first order accuracy for this extreme-temperature durable 4H-SiC JFET IC technology. For maximum availability, the JFET IC modeling is implemented using the baseline-version SPICE NMOS LEVEL 1 model that is common to other variations of SPICE software and importantly includes the body-bias effect. The first-order accuracy of these device models is verified by direct comparison with measured experimental device characteristics.

JFET↗

Concentrator-type photovoltaic (CPV) modules, receiver and sub-receivers and methods of forming same

CPV modules include a back plate having an array of 1 mm2 or smaller solar cells thereon. A backplane interconnect network is also provided on the back plate. This backplane interconnect network operates to electrically connect the array of solar cells together. A front plate, which is spaced-apart from the back plate, is provided. This front plate includes an array of primary lenses thereon that face the array of solar cells. The front plate can be configured to provide a greater than 1000× lens-to-cell light concentration to the array of solar cells. To achieve this 1000× lens-to-cell light concentration, the primary lenses can be configured as plano-convex lenses having a lens sag of less than about 4 mm. An array of secondary optical elements may also be provided, which extend between the array of primary lenses and the array of solar cells.

14 SOLAR ENERGY↗

Cassette less SOFC stack and method of assembly

A cassette less SOFC assembly and a method for creating such an assembly. The SOFC stack is characterized by an electrically isolated stack current path which allows welded interconnection between frame portions of the stack. In one embodiment electrically isolating a current path comprises the step of sealing a interconnect plate to a interconnect plate frame with an insulating seal. This enables the current path portion to be isolated from the structural frame an enables the cell frame to be welded together.

30 DIRECT ENERGY CONVERSION↗