Quiet engine program preliminary engine design and aircraft integration
Design considerations for integration of turbofan engine with reduced noise output in jet aircraft
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Design considerations for integration of turbofan engine with reduced noise output in jet aircraft
Engine design constraints for optimal noise reduction of turbofan jet aircraft
Design and development of quiet subsonic aircraft engine
Inlet pressure oscillation effects on turbofan engine compressor
Nuclear science and nuclear power systems engineering - IEEE Conference, San Francisco, October 1969
Human factors engineering data for equipment design including anthropometry, environmental conditions, and physiological and behavioral factors
Design, development, and characteristics of open cycle, gas core nuclear rocket engine
The investigation was made on a 1/18-scale model of a twin-engine light airplane. Static longitudinal, lateral, and directional characteristics were obtained at 0 deg and plus or minus 5 deg sideslip at a Mach number of about 0.2. The angle of attack varied from about 20 deg at a Reynolds number of 0.39 times one million to 13 deg at a Reynolds number of 3.7 times one million, based on the reference chord. The effect of fixed transition, vertical and horizontal tails, and nacelle fillets was studied.
The performance testing and analytical teardown of CF6-6D engine serial number 451-380 which was recently removed from a DC-10 aircraft is summarized. The investigative test program was conducted inbound prior to normal overhaul/refurbishment. The performance testing included an inbound test, a test following cleaning of the low pressure turbine airfoils, and a final test after leading edge rework and cleaning the stage one fan blades. The analytical teardown consisted of detailed disassembly inspection measurements and airfoil surface finish checks of the as-received deteriorated hardware. Aspects discussed include the analysis of the test cell performance data, a complete analytical teardown report with a detailed description of all observed hardware distress, and an analytical assessment of the performance loss (deterioration) relating measured hardware conditions to losses in both specific fuel comsumption and exhaust gas temperature.
The ESS-EDS and EDS-Sigma interfaces within the standalone engine simulator are described. The operation of these interfaces, including the definition and use of special function signals and data flow paths within them during data transfers, is presented along with detailed schematics and circuit layouts of the described equipment.
The initial phase of testing of the under the wing engine and boilerplate nacelle components is discussed. The aerodynamics and performance are outlined.
The design and testing of high bypass geared turbofan engines with nacelles forming the propulsion systems for short haul passenger aircraft are considered. The test results demonstrate the technology required for externally blown flap aircraft for introduction into passenger service in the 1980's. The equipment tested is described along with the test facility and instrumentation. A chronological history of the test and a summary of results are given.
Results of tests conducted on preliminary design polymeric-composite fan blade for the under the wing (UTW) OCSEE engine are presented. During this phase of the program a total of 17preliminary OCSEE UTW composite fan blades were manufactured for various component tests including frequency characteristics, strain distribution, bench fatigue, dovetail pull, whirligig overspeed and whirligig impact. All tests were successfully completed with the exception of whirligig impact tests. Improvements in local impact capability are being evaluated for the OCSEE blade under other NASA and related programs.
Four fully disclosed reference engines and five design methods are discussed. So far, the agreement between theory and experiment is about as good for the simpler calculation methods as it is for the more complicated methods, that is, within 20%. For the simpler methods, a one number adjustable constant can be used to reduce the error in predicting power output and efficiency over the entire operating map to less than 10%.
The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.
Main elements of the design are identified and explained, and the rationale behind them was reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are presented, and the engineering issues that should be reexamined are identified. The latest (1980-1981) information from the MHD technology program is integrated with the elements of a conventional steam power electric generating plant.
The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating
Cost benefit studies were conducted on six advanced materials and processes technologies applicable to commercial engines planned for production in the 1985 to 1990 time frame. These technologies consisted of thermal barrier coatings for combustor and high pressure turbine airfoils, directionally solidified eutectic high pressure turbine blades, (both cast and fabricated), and mixers, tail cones, and piping made of titanium-aluminum alloys. A fabricated titanium fan blisk, an advanced turbine disk alloy with improved low cycle fatigue life, and a long-life high pressure turbine blade abrasive tip and ceramic shroud system were also analyzed. Technologies showing considerable promise as to benefits, low development costs, and high probability of success were thermal barrier coating, directionally solidified eutectic turbine blades, and abrasive-tip blades/ceramic-shroud turbine systems.