Search NASA⌕ Search

SEARCH · Search NASA

Results for “extended mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

United States microgravity programs

The U.S. Microgravity Program encompasses research initiatives of the NASA Office of Space Science and Applications and Office of Commercial Programs. NASA involvement in space missions extends to the U.S Microgravity Laboratory, the International Microgravity Laboratory, the Space Life Sciences Mission, and planned activities aboard the Japanese and German Spacelab missions. Flight programs under the aegis of NASA's Centers for the Commercial Development of Space will employ the Space Shuttle-based Commercial Middeck Augmentation Module and the Suborbital and Orbital Expendable Launch Vehicles. The projected Space Station will include a significant microgravity program.

Ott, Richard H.↗

Cassini Main Engine Assembly Cover Flight Management and Performance

The Cassini spacecraft has performed its four year Prime Mission at Saturn and is currently in orbit at Saturn performing a two year extended mission. 12Its main engine nozzles are susceptible to impact damage from micrometeoroids and on-orbit dust. The spacecraft has an articulating device known as the Main Engine Assembly (MEA) cover which can close and shield the main engines from these threats. The cover opens to allow for main engine burns that are necessary to maintain the trajectory. Periodically updated analyses of potential on-orbit dust hazard threats have resulted in the need to continue to use the MEA cover beyond its intended use and beyond its design life. This paper provides a detailed Systems-level overview of the flight management of the MEA cover device and its flight performance to date.

Somawardhana, Ruwan P.↗

Dermatitis during Spaceflight Associated with HSV-1 Reactivation

Human alpha herpesviruses herpes simplex virus (HSV-1) and varicella zoster virus (VZV) establish latency in various cranial nerve ganglia and often reactivate in response to stress-associated immune system dysregulation. Reactivation of Epstein Barr virus (EBV), VZV, HSV-1, and cytomegalovirus (CMV) is typically asymptomatic during spaceflight, though live/infectious virus has been recovered and the shedding rate increases with mission duration. The risk of clinical disease, therefore, may increase for astronauts assigned to extended missions (>180 days). Here, we report, for the first time, a case of HSV-1 skin rash (dermatitis) occurring during long-duration spaceflight. The astronaut reported persistent dermatitis during flight, which was treated onboard with oral antihistamines and topical/oral steroids. No HSV-1 DNA was detected in 6-month pre-mission saliva samples, but on flight day 82, a saliva and rash swab both yielded 4.8 copies/ng DNA and 5.3 × 104 copies/ng DNA, respectively. Post-mission saliva samples continued to have a high infectious HSV-1 load (1.67 × 107 copies/ng DNA). HSV-1 from both rash and saliva samples had 99.9% genotype homology. Additional physiological monitoring, including stress biomarkers (cortisol, dehydroepiandrosterone (DHEA), and salivary amylase), immune markers (adaptive regulatory and inflammatory plasma cytokines), and biochemical profile markers, including vitamin/mineral status and bone metabolism, are also presented for this case. These data highlight an atypical presentation of HSV-1 during spaceflight and underscore the importance of viral screening during clinical evaluations of in-flight dermatitis to determine viral etiology and guide treatment.

Satish K. Mehta↗

Dermatitis During Spaceflight Associated With HSV-1 Reactivation- A Case Study

Human alpha herpesviruses herpes simplex virus (HSV-1 or -2) and varicella zoster virus (VZV) establish latency in various cranial nerve ganglia, and often reactivate in response to stress-associated immune system dysregulation. Reactivation of Epstein Barr Virus (EBV), VZV, HSV-1 and Cytomegalovirus (CMV) is typically asymptomatic during spaceflight, though live/infectious virus has been recovered and the shedding rate increases with mission duration. The risk of clinical disease, therefore, may increase for astronauts assigned to extended missions (>180 days). Here, we report for the first time, a case of HSV-1 skin rash (dermatitis) occurring during a long duration spaceflight. The astronaut reported persistent dermatitis during flight, which was treated onboard with oral antihistamines and topical/oral steroids. No HSV-1 DNA was detected in 6-month pre-mission saliva samples, but on flight day 82, a saliva and rash swab both yielded 4.8 copies/ng DNA and 5.3×104 copies/ng DNA, respectively. Post-mission saliva samples continued to have high infectious HSV-1 load (1.67×107 copies/ng DNA). HSV-1 from both rash and saliva samples had 99.4% genotype homology. Additional physiological monitoring, including stress biomarkers (cortisol, dehydroepiandrosterone (DHEA), and salivary amylase), immune markers (adaptive regulatory and inflammatory plasma cytokines) and biochemical profile markers including vitamin/mineral status and bone metabolism are also presented for this case. These data highlight an atypical presentation of HSV-1 during spaceflight and underscore the importance of viral screening during clinical evaluations of in-flight dermatitis, to determine viral etiology and guide treatment.

Herpes, Viral Reactivation, Spaceflight, Dermatiti↗

TESS Revisits WASP-12: Updated Orbital Decay Rate and Constraints on Atmospheric Variability

After observing WASP-12 in the second year of the primary mission, the Transiting Exoplanet Survey Satellite (TESS) revisited the system in late 2021 during its extended mission. In this paper, we incorporate the new TESS photometry into a reanalysis of the transits, secondary eclipses, and phase curve. We also present a new Ks-band occultation observation of WASP-12b obtained with the Palomar/Wide-field Infrared Camera instrument. The latest TESS photometry spans three consecutive months, quadrupling the total length of the TESS WASP-12 light curve and extending the overall time baseline by almost two years. Based on the full set of available transit and occultation timings, we find that the orbital period is shrinking at a rate of −29.81 ± 0.94 ms yr−1. The additional data also increase the measurement precision of the transit depth, orbital parameters, and phase-curve amplitudes. We obtain a secondary eclipse depth of 466 ± 35 ppm, a 2σ upper limit on the nightside brightness of 70 ppm, and a marginal 6°.2 ± 2°.8 eastward offset between the dayside hotspot and the substellar point. The voluminous TESS data set allows us to assess the level of atmospheric variability on timescales of days, months, and years. We do not detect any statistically significant modulations in the secondary eclipse depth or day–night brightness contrast. Likewise, our measured Ks-band occultation depth of 2810 ± 390 ppm is consistent with most ∼2.2 μm observations in the literature.

Ian Wong↗

Lunar Reconnaissance Orbiter (LRO) Thermal On-Orbit Performance

The Lunar Reconnaissance Orbiter (LRO) was launched on June 18, 2009. The nominal mission ended on September 15, 2010 and LRO is now on a four-year extended mission. The LRO performances in hot and cold cases are compared to pre-launch analysis predicts, and operational lessons learned are discussed. One instrument has required tighter-than-anticipated thermal control, and two others have frequently requested unanticipated calibration maneuvers that had to be evaluated for their thermal performance. A series of off nadir thermal analyses of the entire orbiter were performed prior to launch, and these predictions are compared to actual maneuvers, with a discussion of the process by which maneuvers can be rapidly evaluated for thermal concerns. On December 21st, 2010, LRO experienced its first severe Lunar Eclipse. Operationally, this required the Spacecraft to pre-heat its main avionics panel in order to minimize control heater power during the period when the Earth blocks the sun from the moon. The operational design and in-flight performance are summarized.

Baker, Charles↗

Operating the Dual-Orbtier GRAIL Mission to Measure the Moon's Gravity

The GRAIL mission is on track to satisfy all prime mission requirements. The performance of the orbiters and payload has been exceptional. Detailed pre-launch operations planning and validation have paid off. Prime mission timeline has been conducted almost exactly as laid out in the mission plan. Flight experience in the prime mission puts the flight team in a good position for completing the challenges of the extended mission where the science payoff is even greater

Moon's interior structure↗

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter ( MRO ) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low -altitude science orbit. The spacecraft has been on station in its 255 x 320 k m, sun -synchronous (approximately 3 am -pm ), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

The Mars Reconnaissance Orbiter Mission: 10 Years of Exploration from Mars Orbit

The Mars Reconnaissance Orbiter (MRO) entered Mars orbit on March 10, 2006. After five months of aerobraking, a series of propulsive maneuvers were used to establish the desired low-altitude science orbit. The spacecraft has been on station in its 255 x 320 km, sun-synchronous (~3 am-pm), primary science orbit since September 2006 performing both scientific and Mars programmatic support functions. This paper will provide a summary of the major achievements of the mission to date and the major flight activities planned for the remainder of its third Extended Mission (EM3). Some of the major flight challenges the flight team has faced are also discussed.

MRO↗

DS1 Technology Validation Report

Deep Space 1 (DS1) launched from Cape Canaveral on October 24, 1998. During a highly successful primary mission, it tested 12 advanced, high-risk technologies in space. In an extremely successful extended mission, it encountered Comet Borrelly and returned the best images and other science data ever from a comet. During its fully successful hyperextended mission, it conducted further technology tests. The spacecraft was retired on December 18, 2001.

UNKNOWN↗

Manifest - Payloads and accommodations

Developing a long-range manifest begins with the assessment of flight rate capability for the next 6 years. Payloads priorities, launch readiness, and service needs are reviewed and compatible mixed cargo flights are determined and integrated with the dedicated missions to become the manifest. Manifest development must also address Orbiter upgrades to assure that payload-related enhancements meet need dates and that new hardware integration does not adversely affect flight rate capability. A series of Space Shuttle upgrades and new capabilities are in development driven by a continuing effort to improve safety margins, support recognized payload needs, and unique SSF requirements. These enhancements include extended mission duration capability, ASRM development, extended middeck payload support capability, and improved attitude control systems.

Hedin, Dan↗

Lunar and Planetary Science XXXV: Missions and Instruments: Hopes and Hope Fulfilled

The titles in this section include: 1) Mars Global Surveyor Mars Orbiter Camera in the Extended Mission: The MOC Toolkit; 2) Mars Odyssey THEMIS-VIS Calibration; 3) Early Science Operations and Results from the ESA Mars Express Mission: Focus on Imaging and Spectral Mapping; 4) The Mars Express/NASA Project at JPL; 5) Beagle 2: Mission to Mars - Current Status; 6) The Beagle 2 Microscope; 7) Mars Environmental Chamber for Dynamic Dust Deposition and Statics Analysis; 8) Locating Targets for CRISM Based on Surface Morphology and Interpretation of THEMIS Data; 9) The Phoenix Mission to Mars; 10) First Studies of Possible Landing Sites for the Phoenix Mars Scout Mission Using the BMST; 11) The 2009 Mars Telecommunications Orbiter; 12) The Aurora Exploration Program - The ExoMars Mission; 13) Electron-induced Luminescence and X-Ray Spectrometer (ELXS) System Development; 14) Remote-Raman and Micro-Raman Studies of Solid CO2, CH4, Gas Hydrates and Ice; 15) The Compact Microimaging Spectrometer (CMIS): A New Tool for In-Situ Planetary Science; 16) Preliminary Results of a New Type of Surface Property Measurement Ideal for a Future Mars Rover Mission; 17) Electrodynamic Dust Shield for Solar Panels on Mars; 18) Sensor Web for Spatio-Temporal Monitoring of a Hydrological Environment; 19) Field Testing of an In-Situ Neutron Spectrometer for Planetary Exploration: First Results; 20) A Miniature Solid-State Spectrometer for Space Applications - Field Tests; 21) Application of Laser Induced Breakdown Spectroscopy (LIBS) to Mars Polar Exploration: LIBS Analysis of Water Ice and Water Ice/Soil Mixtures; 22) LIBS Analysis of Geological Samples at Low Pressures: Application to Mars, the Moon, and Asteroids; 23) In-Situ 1-D and 2-D Mapping of Soil Core and Rock Samples Using the LIBS Long Spark; 24) Rocks Analysis at Stand Off Distance by LIBS in Martian Conditions; 25) Evaluation of a Compact Spectrograph/Detection System for a LIBS Instrument for In-Situ and Stand-Off Detection; 26) Analysis of Organic Compounds in Mars Analog Samples; 27) Report of the Organic Contamination Science Steering Group; 28) The Water-Wheel IR (WIR) - A Contact Survey Experiment for Water and Carbonates on Mars; 29) Mid-IR Fiber Optic Probe for In Situ Water Detection and Characterization; 30) Effects of Subsurface Sampling & Processing on Martian Simulant Containing Varying Quantities of Water; 31) The Subsurface Ice Probe (SIPR): A Low-Power Thermal Probe for the Martian Polar Layered Deposits; 32) Deploying Ground Penetrating Radar in Planetary Analog Sites to Evaluate Potential Instrument Capabilities on Future Mars Missions; 33) Evaluation of Rock Powdering Methods to Obtain Fine-grained Samples for CHEMIN, a Combined XRD/XRF Instrument; 34) Novel Sample-handling Approach for XRD Analysis with Minimal Sample Preparation; 35) A New Celestial Navigation Method for Mars Landers; 36) Mars Mineral Spectroscopy Web Site: A Resource for Remote Planetary Spectroscopy.

Source record↗

Lunar Prospector Mission Design

The National Aeronautics and Space Administration (NASA) has selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and will be launched in September 1997. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. The mission design of Lunar Prospector is characterized by a direct minimum energy transfer trajectory to the moon with an injection into a circular 100 km altitude polar mapping orbit. The mission design will incorporate the optimization of the reference trajectory for a new launch vehicle. An extended mission includes a periselene altitude approaching 10 km. As part of the navigation, a new lunar potential model will be used that incorporates data from the recent Clementine mission. This paper provides understanding of the design of the Lunar Prospector mission and the optimization process of the nominal trajectory, orbit determination, launch windows, and lunar orbit targets, and discusses the feasibility of meeting the mission goals.

Folta, David↗

STS-102 Crew Activity Report/Flight Day 13 Highlights

On this 13th day of the STS-102 mission, the Expedition 1 crew, William Shepherd, Yuri Gidzenko, and Sergei Krikalev, answers questions about their extended mission and the International Space Station (ISS).

Source record↗

A study of lens opacification for a Mars mission

A method based on risk-related cross sections is used to estimate risks of 'stationary' cataracts caused by radiation exposures during extended missions in deep space. Estimates of the even more important risk of late degenerative cataractogenesis are made on the basis of the limited data available. Data on lenticular opacification in the New Zealand white rabbit, an animal model from which such results can be extrapolated to humans, are analyzed by the Langley cosmic ray shielding code (HZETRN) to generate estimates of stationary cataract formation resulting from a Mars mission. The effects of the composition of shielding material and the relationship between risk and LET are given, and the effects of target fragmentation on the risk coefficients are evaluated explicitly.

Shinn, J. L.↗

An Update on the Performance of Li-Ion Rechargeable Batteries on Mars Rovers

NASA's Mars Rovers, Spirit and Opportunity have been exploring the surface of Mars for the last thirty months, far exceeding the primary mission life of three months, performing astounding geological studies to examine the habitability of Mars. Such an extended mission life may be attributed to impressive performances of several subsystems, including power subsystem components, i.e., solar array and batteries. The novelty and challenge for this mission in terms of energy storage is the use of lithium-ion batteries, for the first time in a major NASA mission, for keeping the rover electronics warm, and supporting nighttime experimentation and communications. The use of Li-ion batteries has considerably enhanced or even enabled these rovers, by providing greater mass and volume allocations for the payload and wider range of operating temperatures for the power subsystem and thus reduced thermal management. After about 800 days of exploration, there is only marginal change in the end-of discharge (EOD) voltages of the batteries or in their capacities, as estimated from in-flight voltage data and corroborated by ground testing of prototype batteries. Enabled by such impressive durability from the Li-ion batteries, both from a cycling and calendar life stand point, these rovers are poised to extend their exploration well beyond 1000 sols, though other components have started showing signs of decay. In this paper, we will update the performance characteristics of these batteries on both Spirit and Opportunity.

low temperatures↗

Voyager mission support

Tracking and data acquisition for Project Voyager are discussed for the period of April through June 1981. Voyager 1 was in the extended mission phase of operations. Voyager 2 completed the cruise phase of its operations and on 5 June entered the observatory phase of the Saturn encounter operations.

Fanelli, N.↗