Search NASA⌕ Search

SEARCH · Search NASA

Results for “final”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

TRMM Microwave Imager (TMI) Updates for Final Data Version Release

The Tropical Rainfall Measuring Mission (TRMM) Microwave Imager (TMI) dataset released by the Precipitation Processing System (PPS) will be updated to a final version within the next year. These updates are based on increased knowledge in recent years of radiometer calibration and sensor performance issues. In particular, the Global Precipitation Measurement (GPM) Microwave Imager (GMI) is used as a model for many of the TMI version updates. This paper discusses four aspects of the TMI data product that will be improved: spacecraft attitude, calibration and quality control, along-scan bias corrections, and sensor pointing accuracy. These updates will be incorporated into the final TMI data version, improving the quality of the data product and ensuring accurate geophysical parameters can be derived from TMI.

Tropical Rainfall Measuring Mission↗

Aquarius Final Release Product and Full Range Calibration of L-band Radiometers

Aquarius final product V5.0 has been released. The dataset includes close to four years of global radiometric measurements at L-band. The mission's objective was to monitor sea surface salinity, but other applications of its data over land and the cryosphere have been developed. For this reason, it is important to have accurate calibration over the full range of antenna temperatures from natural targets. It is also needed in order to combine Aquarius measurements with other L-band sensors. Aquarius calibration is strongly focused on the ocean. We present a research product which is part of the final release and aims at producing an accurate calibration from the low end (celestial sky) to the high end (land and ice) of the brightness temperature scale. We calibrate the Aquarius radiometers using measurements over the Sky and oceans and assess the new calibration using measurements over land.

Radiometry↗

Preparation for Cassini Grand Finale - Validation of Saturn Ring Heating in TSS

Thermal analysis of spacecraft at Saturn have previously been restricted to three environmental heat fluxes: solar, Saturn planet IR, and Saturn planet albedo. Heat flux from Saturn’s rings were not available in any commercially available thermal analysis tools. While preparing for the Cassini Grand Finale, during which Cassini will travel extremely close to the rings of Saturn, it was determined the existing thermal model required updating to accurately predict heat fluxes from the rings. This is particularly important for Cassini’s Visual and Infrared Mapping Spectrometer infrared spectrometer (VIMS-IR), as it is cooled by a passive radiator which operates below the temperature of Saturn’s rings. This paper discusses the validation of the heat flux from solar, Saturn, and Saturn’s rings in Spacedesign’s Thermal Synthesizer System (TSS). The incorporation of heating from Saturn’s rings also led to the use of SPICE geometry to ensure accurate spacecraft positioning and pointing. Thermal model results are compared against historical heating events as well as predictive Grand Finale sequences.

Swanson, Kirsten S.↗

A Linear Analysis for the Flight Path Control of the Cassini Grand Finale Orbits

Cassini’s Grand Finale Mission begins after the last targeted Titan flyby on April 22, 2017 and ends with a series of 22 ballistic orbits each passing within a few thousand kilometers of the cloud tops of Saturn, ultimately impacting the planet on September 15, 2017. Despite the ballistic nature of the trajectory, the absence of targeted maneuvers throughout the final orbits causes position uncertainties to grow exponentially with time, posing a significant difficulty for the science sequence planning team. Thus, a strategy that incorporates trajectory correction maneuvers was developed to significantly reduce dispersions from the reference path and maintain dispersions below 250 km (1- ). In this paper, the linear method used to determine the optimal number and location of the maneuvers to control the trajectory, along with the corresponding targets, is detailed. A nonlinear Monte Carlo trajectory dispersion tool served as a testbed to validate the linear analysis results. Based on orbit determination covariance sampling with Monte Carlo simulations, the linear approach allowed the Cassini maneuver analysts to run thousands of maneuver combinations in little time, eventually finding an optimal strategy with three statistical maneuvers ( V99 < 1.5 m/s) to adequately control most of the trajectory.

Vaquero, Mar↗

Kibo Robot Programming Challenge Final Activity Report

On October 8th, 2020 the Kibo Robot Programming Challenge (RPC) Finals Event took place. Student teams from Australia, Indonesia, Japan, Singapore, Taiwan, Thailand, and UAE were the finalists of the competition and became the first students to ever upload APKs to an Astrobee robot (Bumble) on the ISS. This was the culmination of a joint effort between JAXA’s Int-Ball developing team in Tsukuba, Japan and NASA’s Astrobee Facility team at NASA Ames Research Center\ in California, USA. The collaboration between JAXA and NASA started in late 2017. Throughout this time mutual visits by the engineering and management teams were organized. In July 2019 the Kibo RPC concept was formally defined and the competition started. Hundreds of students across the Asia Pacific region participated and during the final event they did so in real time with the participation of NASA’s astronaut, Chris Cassidy. Chris interacted with the students, JAXA personnel and with the robot during the activity. This report aims to summarize the lessons learned from the several crew and non-crew tended activities, the evaluations performed on ground, the coordination of resources both in the ground and at the International Space Station (ISS) as well as operations. It identifies the issues the teams faced and the solutions put in place to mitigate them.

Astrobee↗

Cassini Power During the 20 Year Mission and Until the Final Plunge into Saturn

The NASA-ESA Cassini mission ended on September 15, 2017, after almost 20 years of operations. Electrical power telemetry data is presented for the entire mission from launch and End Of Mission (EOM). The Cassini spacecraft was powered by three Radioisotope Thermoelectric Generators (RTGs) connected in parallel. These three RTGs generated 882.1 W at the beginning of the mission. At EOM, the power level was 600.3 W. The electrical output of Cassini’s power subsystem decayed consistently, as predicted, during the entire mission between October 1997 and September 2017. Further, no heating of the RTGs was reported in telemetry during the last minutes of the mission, nor was there any variance apparent in the final output of the three RTGs that is attributable to the final plunge into Saturn.

Burk, Thomas A.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Completion of the Final Orbit Around Dwarf Planet Ceres

The Dawn mission, part of NASA’s Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional DV of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in August 2012 and completed in late December 2014. From December 2014 through June 2016 the IPS was used for transiting the spacecraft to all science orbits at Ceres including the final orbit for Dawn’s primary mission, called the low altitude mapping orbit (LAMO), a circular orbit at a mean altitude above Ceres of approximately 385 km. Dawn met or exceeded all pre-launch science requirements and Dawn's prime mission concluded on June 30, 2016. Dawn subsequently received NASA approval for two extended missions at Ceres, called XM1 and XM2. During XM1 IPS was used for orbit maintenance and to transit the spacecraft to several new, higher-altitude science orbits, ending in an elliptical orbit at a maximum altitude of approximately 38,000 km. In XM2, IPS operations included transiting the Dawn spacecraft to its final, highly elliptical orbit at Ceres ranging from 35 km perigee to 4,800 km apogee. Science data acquisition will continue in XM2 until the hydrazine is exhausted, which is expected to occur between August and October 2018. Dawn has successfully completed all science goals for both the primary and XM1 extended missions. To date the IPS has been operated for approximately 51,250 hours, consumed approximately 416 kg of xenon, and provided a delta-V of almost 11.5 km/s, a record for an on-board propulsion system. The IPS performance characteristics are close to the expected performance based on analysis and testing performed pre-launch. Dawn’s IPS continues to be fully operational as of June 2018. This paper provides an overview of Dawn’s mission objectives and the results of Dawn IPS mission operations for XM1, and XM2 through June 2018.

Rayman, Marc D.↗

Stability and targeting in Dawn's final orbit

The Dawn spacecraft conducted two extended missions at Ceres following the completion of the primary mission in June 2016. The final orbit of the second extended mission was designed to have a 35-km periapsis altitude for 10x higher resolution science. The mission ended in this orbit when the spacecraft ran out of attitude control propellant. In this paper, we describe the final orbit and discuss the challenges of flying this low at Ceres. We also include our stability analysis showing the spacecraft will remain in orbit for more than 20 years, as stipulated by the planetary protection requirements.

Kennedy, Brian↗

GA-ASI Final Report and Program Wrap-up for NASA System Integration and Operationalization (SIO)

The NASA SIO demonstration flight of April 3, 2020 represents a successful culmination of 18 months of coordinated effort between GA-ASI, NASA, the FAA, Collins Aerospace, and Honeywell Aerospace to operate a Medium Altitude, Long Endurance (MALE) Unmanned Aircraft System (UAS) safely in the National Airspace System (NAS) using industry leading prototype technologies. The GA-ASI team consisted of technical experts, program managers, engineers, mechanics, flight technicians, flight crews, and numerous other subject matter experts. This final report describes the most significant and potentially impactful aspects of the planning, integration, test, and flight aspects of this effort. GA-ASI successfully integrated the key technologies needed for UAS to fly in the NAS onto our prototype SkyGuardian UAS, which was designed to meet the most stringent airworthiness standards applicable to an aircraft of its size category. A proven Detect and Avoid (DAA) system, developed by GA-ASI and utilizing Honeywell Aerospace technology was integrated onto SkyGuardian for the first time, along with datalink radios from Collins Aerospace that meet the new civil standard for Control and Non-Payload Communication (CNPC) links. GA-ASI also obtained approvals from the FAA and FCC to operate the reconfigured UAS. The SIO demonstration flight represented a commercial aerial surveying operation conducted at medium altitude (>10,000ft above mean sea level). The aircraft’s onboard sensors were used to capture photographic, infrared and radar imagery of public and commercial infrastructure and land, and to subsequently produce the types of data products that would provide business value to potential customers. These survey services would supplement or replace services currently provided by manned airplanes and helicopters, small drones or satellites. A “virtual” mission was also planned, to show what additional survey data could have been captured during the flight if additional sensors had been installed on the aircraft’s external hardpoints. This revision of the final report focuses on information of value to the wider UAS community, and avoids propriety data to facilitate broad dissemination. It also includes a description of GA-ASI’s engagement with the FAA following the SIO flight, which led to the award of an updated Special Airworthiness Certificate in the Experimental Category (SAC-EC) and a Certificate of Waiver or Authorization (COA) allowing operation of the SkyGuardian UAS using its DAA system to satisfy right-of-way rules, instead of a chase plane. The associated operational limitations are described to illustrate the further steps that would be needed to remove those limitations for unhindered commercial operations.

Flight demonstration↗

Derivation of the final OSIRIS-REx OVIRS in-flight radiometric calibration

The OSIRIS-REx Visible and InfraRed Spectrometer (OVIRS) operates over the ∼0.4- to 4.3-μm wavelength range. Radiometric calibration over this broad range requires the use of multiple calibration sources. Initial OVIRS in-flight calibration coefficients were previously computed using ground calibration from visible integrating sphere and IR blackbody sources, cross-calibrated with Earth-observing satellites for visible wavelengths, and adjusted using the spectrum of the OSIRIS-REx mission’s target body, asteroid (101955) Bennu. As part of the final in-flight calibration, we determined that the best calibration method removes out-of-band IR signal leakage prior to radiometric calibration and updated the calibration coefficients accordingly. These final calibration coefficients work well for data where the field of view is filled, and we document the possible artifacts in underfilled spots.

Amy A. Simon↗

Blue Origin De-orbit Descent and Landing Tipping Point: Program Final Report

The purpose of this document is to provide a final report on the Deorbit, Descent, and Landing (DDL) Tipping Point program, a public-private partnership between Blue Origin and NASA that is partially funded by NASA contract 80LARC19C0005. In this report we summarize the results of the entire contract, including recommendations and conclusions based on the experience and results obtained. Only the portions funded by the government with associated unlimited rights are documented in detail in this report. For the work funded by Blue Origin, summaries with unlimited rights are provided for context and completeness. The Blue Origin funded work exceeded 25% of the originally proposed total program cost and included a mixture of hardware procurement and critical technology maturation. The scope of this document is a discussion of all the major tasks performed under the contract including the sensor flight demonstrations on New Shepard, the hardware in the loop lunar landing navigator demonstration, and the ground testing of the Flash LiDAR hazard sensor. The contributions from the multiple NASA teams – Johnson Space Center, Langley Research Center, Goddard Space Flight Center, and Jet Propulsion Laboratory – are described along with the contributions from Blue Origin. This document is the Final Report for statement of work item 4.1.2.10 as Deliverable 5.8.

Stefan Bieniawski↗

Atacama Rover Astrobiology Drilling Studies Project: Final Year

The Atacama Rover Astrobiology Drilling Studies (ARADS) project, a simulated Mars rover biomarker detection mission, was iteratively developed over four years from 2015 -2019, including three NASA centers, the Centro de Astrobiologia, Johns Hopkins University, Honeybee Robotics, Maxar and the University of Antofagasta. The final (4th) ARADS field season, in 2019, tested an integrated mobile life-prospecting platform loosely inspired by the 2000’s Astrobiology Field Laboratory concept, with a 1m rotary-percussive drill and sample transfer robot arm that fed three astrobiology instruments operating in-situ on the KREX2 medium rover prototype. A fourth instrument was field tested earlier in 2019 due to flight mission requirements. In the final ARADS field deployment in September 2019, the project conducted a remote mission operation simulation (Stoker 2022)demonstrating sample drilling, acquisition and transfer into the rover instruments (while minimizing cross-contamination), performing in-situ analysis of the samples, and returning the results to a remote science operations team(which commanded the daily science goals and uploaded operations sequences).

astrobiology↗

H2O Electrolysis with Impure Water Source - Final Report

This Phase III final report summarizes the Phase I research and development work performed during the IRAD FY 2018-Cycle 1, Stage C-Phase I project March 15, 2018 through August 17, 2018 and during the Phase II continuation request which funded the research and development November 26, 2018 through September 30, 2019. A Phase III proposal was accepted to continue the technology development, but due to the unavailability of the Principal Investigators to complete the proposed PhasE III work, the Phase III project was re-scoped to complete a final report on the research and development work that was previously completed as a wrap-up of this IRAD project

Electrolysis↗

RST CGI: Final Verification and Calibration of Prism and Polarizer Flight Units

As part of its technology demonstration, the Nancy Grace Roman Space Telescope Coronagraph Instrument (CGI) will demonstrate point source spectroscopy and polarization measurements of disks. The spectroscopy mode is a zero-deviation Amici prism and slit which is deployed to the planet position after an imaging detection. The Wollaston prism polarization optics allow for imaging two orthogonal polarization states simultaneously. The CGI spectral characterization modes, designed and built at Goddard Space Flight Center (GSFC), have a spectral resolution of R50 in two 15% bandpass centered at 660nm and 730nm. There are duplicate Wollaston prism channels, clocked 45 degrees with respect to one another to completely characterize the instrument polarization effects and recover the Stokes parameters of the targeted disk. The Wollaston design and optical elements are a contribution by the Japanese Aerospace Exploration Agency, with final alignment and testing being done at GSFC. The spectroscopy mode is optimized to target Methane absorption features around 730nm, keeping the spectral resolution as low as possible to improve the signal-to-noise ratio and hence reduce detection time. We highlight the requirements for these modes, the ground-to-orbit calibration process, and the operations required to use a deployable slit on a CGI point source in the presence of pointing error. We also provide further detail on the optomechanical design, testing results from the final as-built flight units, verification process, and performance of the as-built flight assemblies.

high contrast imaging↗

CALIPSO Final Data Product Status

The CALIPSO project is preparing for the end of the mission in October 2025. In this poster we provide detailed summaries of each final data products that will be released, a concise description of the changes between each of these final products and their previous versions, and a target release schedule. A summary of all of the steps that will be carried outby the CALIPSO project during the remainder of the mission for long term data discoverability and accessibility will also be provided.

Brian Getzewich↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Panel Session 46: Final Closure of Unlined LLW Disposal Facilities Worldwide (R3.5)

This panel discussed the on-going and emerging issues with the design and construction of final cover system of unlined disposal facilities (e.g., material disposal areas (MDAs), subsurface disposal areas (SDAs), burial grounds, and similar historical waste trenches, pits and vaults). The discussion focused on key technical and regulatory issues as well as lessons learned from years of engineering and construction in US and non-US locations. Panelists with presentations: Closure of Unlined LLW Disposal Sites (Craig Benson); Closure of LLW Facilities (Paul Pointon); Final Closure of Unlined LLW Disposal Facilities - Lessons Learned (Kevin Foye)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗