Search NASA⌕ Search

SEARCH · Search NASA

Results for “instance selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

275 records · Page 16

Public Reference Data for Megawatt-Scale Hydrogen Electrolysis - NLR Historical Solar PV

The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis from variable sources, hydrogen compression and storage, and hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Research on Integrated Energy Systems (ARIES) research platform. This dataset represents part of that effort and is intended for academic, national laboratory, industrial, and other stakeholders to plan, design, and validate models of megawatt-scale hydrogen technologies and diverse energy infrastructure nationwide. These data provide a baseline for how existing hydrogen electrolysis technologies perform when coupled with various energy technologies. Future datasets will demonstrate how existing hydrogen fuel cell technologies can provide controllable, dispatchable, and variable power output for artificial intelligence data centers and other variable loads. This dataset entry describes the behavior of a 1.25-MW proton exchange membrane MC250 electrolyzer system, manufactured by Nel Hydrogen , [1] when fed historical data generated by the 430-kW, fixed-axis solar photovoltaic (PV) array located at NLR’s Flatirons Campus. (While the electrolyzer balance of plant supports up to 2.5 MW of electrolysis, NLR only has a single 1.25-MW electrolysis stack.) Solar PV power output data for the 2020 calendar year were categorized on a daily basis by total energy generation and standard deviation. Each day was then ranked by these metrics, and the 25th, 50th, and 100th percentiles were selected. The 75th percentile day did not exhibit sufficient variability to make for a valuable experiment. A similar process was used for the related historical wind dataset . [2] The historical days in 2020 that represented these percentiles are Dec. 19, March 29, and May 4, respectively. The entire solar day’s power profile was then fed through the MC250 electrolyzer. Due to its length, the 100th percentile day experiment was split into two parts, and the final 3 hours of the solar day were not captured. These final 3 hours contained no spikes or dips of interest and simply represented a slow decay of input solar power. Also, a single timestamp (13:13:47 on Jan. 14, 2026) was lost in the hydrogen system supervisory control and data acquisition. Finally, during the 25th percentile experiment (solar day Dec. 19, 2020) data recording was lost from 11:00:13 to 11:14:45. The roughly 15 minutes of the solar profile were rerun at the end of the experiment and spliced into this time slot during post-processing. The electrolysis system controls hydrogen production by varying direct current applied to the stack, from a maximum of 3,000 A to a minimum safe operation of 300 A, or 10%. Because the current–voltage characteristic changes as the stack ages and efficiency degrades, the actual minimum safe operating power changes over time. The historical solar profiles were translated from power (kilowatts) to current (amperes) using a curve fit with calibration data and sent to the electrolyzer power supply at 1-Hz frequency. For more details on the statistical analysis process, see the slide deck “Public Reference Data for Megawatt-Scale Hydrogen Electrolysis: NLR Historical Solar PV Analysis and Profile Generation” accessible with this data entry. These datasets report relevant hydrogen balance-of-plant and system data, all captured at 1 Hz, including hydrogen mass production measured with an Emerson Coriolis flow meter. Each .zip file represents a single solar PV electrolysis experiment and is formatted as: {technology}_{percentile}_{scaling factor} For instance, “solarPV-430kW_25_2x.zip” reports the experiment using the 25th percentile solar data from the historical 2020 solar PV dataset, scaled to 200%. Scaling factors were applied to the generated solar PV power output files to more closely match the 1.25-MW capacity of the electrolyzer. Each .zip folder contains the following files: A .csv file containing raw data. An .xlsx file explaining all the fields in the raw data. A .png plot showing the time series of hydrogen production, electrolysis power consumption, and solar power input. A PDF file detailing the historical solar data statistical analysis used to generate the solar profile. An experiment labeled “characterization_200.zip” demonstrates the MC250 electrolyzer steady-state response with 30-minute load steps for a total duration of 5 hours. Finally, a .csv file is provided with all experiments combined into one dataset labeled "combined_solarPV_experiments.csv". [1] nelhydrogen.com/product/mc-series-electrolyser . [2] data.nlr.gov/submissions/316 .

08 HYDROGEN↗

Coupling and Testing the Fate and Transport of Heavy Metals and Other Ionic Species in a Groundwater Setting at Oak Ridge, TN - 13498

Historical data show that heavy metals (including mercury) were released from Y -12 National Security Complex (NSC) at Oak Ridge, Tennessee, to the surrounding environments during its operation in 1950's. Studies have also shown that metals accumulated in the soil, rock, and groundwater, and are, at the present time, sources of contamination to nearby rivers and creeks (e.g., East Fork Poplar Creek, Bear Creek). For instance, mercury (Hg), zinc (Zn), cadmium (Cd) and lead (Pb) have been found and reported on the site groundwater. The groundwater type at the site is Ca-Mg-HCO{sub 3}. This paper presents a modeling application of PHREEQC, a model that simulates geochemical processes and couples them to flow and transport settings. The objective was to assess the capability of PHREEQC to simulate the transport of ionic species in groundwater at Oak Ridge, Tennessee; data were available from core holes and monitoring wells over a 736-m distance, within 60-300 m depths. First, predictions of the transport of major ionic species (i.e., Ca{sup 2+} and Mg{sup 2+}) in the water were made between monitoring wells and for GW-131. Second, the model was used to assess hypotheses under two scenarios of transport for Zn, Cd, Pb and Hg, in Ca-Mg-HCO{sub 3} water, as influenced by the following solid-liquid interactions: a) the role of ion exchange and b) the role of both ion exchange and sorption, the latter via surface complexation with Fe(OH){sub 3}. The transport scenario with ion exchange suggests that significant ion exchange is expected to occur for Zn, Cd and Pb concentrations, with no significant impact on Hg, within the first 100 m. Predictions match the expected values of the exchange coefficients relative to Ca{sup 2+} and Mg{sup 2+} (e.g., K{sub Ca/Zn} = K{sub Ca/Cd} > K{sub Ca/Pb} > K{sub Ca/Hg}). The scenario with both ion exchange and sorption does affect the concentrations of Zn and Cd to a small extent within the first 100 m, but does more meaningfully reduce the concentration of Pb, within the same distance, and also decreases the concentration of Hg in between core holes. Analysis of the above results, in the light of available literature on the ions of this study, does fundamentally support the capability of PHREEQC to predict the transport of major ions in a groundwater setting; it also generally supports the hypothesized role of ion exchange and sorption. The results indicate the potential of the model as a tool in the screening, selection and monitoring of remediation technologies for contaminated groundwater sites. (authors)

54 ENVIRONMENTAL SCIENCES↗

Subsurface Characterization and Machine Learning Predictions at Brady Hot Springs Results

Geothermal power plants typically show decreasing heat and power production rates over time. Mitigation strategies include optimizing the management of existing wells - increasing or decreasing the fluid flow rates across the wells - and drilling new wells at appropriate locations. The latter is expensive, time-consuming, and subject to many engineering constraints, but the former is a viable mechanism for periodic adjustment of the available fluid allocations. Data and supporting literature from a study describing a new approach combining reservoir modeling and machine learning to produce models that enable strategies for the mitigation of decreased heat and power production rates over time for geothermal power plants. The computational approach used enables translation of sets of potential flow rates for the active wells into reservoir-wide estimates of produced energy and discovery of optimal flow allocations among the studied sets. In our computational experiments, we utilize collections of simulations for a specific reservoir (which capture subsurface characterization and realize history matching) along with machine learning models that predict temperature and pressure timeseries for production wells. We evaluate this approach using an "open-source" reservoir we have constructed that captures many of the characteristics of Brady Hot Springs, a commercially operational geothermal field in Nevada, USA. Selected results from a reservoir model of Brady Hot Springs itself are presented to show successful application to an existing system. In both cases, energy predictions prove to be highly accurate: all observed prediction errors do not exceed 3.68% for temperatures and 4.75% for pressures. In a cumulative energy estimation, we observe prediction errors that are less than 4.04%. A typical reservoir simulation for Brady Hot Springs completes in approximately 4 hours, whereas our machine learning models yield accurate 20-year predictions for temperatures, pressures, and produced energy in 0.9 seconds. This paper aims to demonstrate how the models and techniques from our study can be applied to achieve rapid exploration of controlled parameters and optimization of other geothermal reservoirs. Includes a synthetic, yet realistic, model of a geothermal reservoir, referred to as open-source reservoir (OSR). OSR is a 10-well (4 injection wells and 6 production wells) system that resembles Brady Hot Springs (a commercially operational geothermal field in Nevada, USA) at a high level but has a number of sufficiently modified characteristics (which renders any possible similarity between specific characteristics like temperatures and pressures as purely random). We study OSR through CMG simulations with a wide range of flow allocation scenarios. Includes a dataset with 101 simulated scenarios that cover the period of time between 2020 and 2040 and a link to the published paper about this project, where we focus on the Machine Learning work for predicting OSR's energy production based on the simulation data, as well as a link to the GitHub repository where we have published the code we have developed (please refer to the repository's readme file to see instructions on how to run the code). Additional links are included to associated work led by the USGS to identify geologic factors associated with well productivity in geothermal fields. Below are the high-level steps for applying the same modeling + ML process to other geothermal reservoirs: 1. Develop a geologic model of the geothermal field. The location of faults, upflow zones, aquifers, etc. need to be accounted for as accurately as possible 2. The geologic model needs to be converted to a reservoir model that can be used in a reservoir simulator, such as, for instance, CMG STARS, TETRAD, or FALCON 3. Using native state modeling, the initial temperature and pressure distributions are evaluated, and they become the initial conditions for dynamic reservoir simulations 4....

15 GEOTHERMAL ENERGY↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Project 57 Air Monitoring Report: January 1 through December 31, 2017

On April 24, 1957, the Atomic Energy Commission (AEC) (now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley northeast of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DOD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a non-nuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DOD. Various radiological surveys were performed in the area and in 2007, the DOE expanded the demarked Contamination Area (CA) by posting signs 200 to 400 ft (60 to 120 m) outside of the original fence. Plutonium in soil attaches preferentially to smaller particles (Tamura, 1985; Friesen, 1992; Murarik et al., 1992; and Misra et al., 1993). Therefore, redistribution of soil particles by wind (dust) and water are the mechanisms most likely to transport plutonium beyond the boundary of the Project 57 CA. Monitoring was implemented in 2011 by Desert Research Institute (DRI) to determine if radionuclide contamination was detectable in samples of airborne dust and to characterize meteorological and environmental parameters that influence dust transport. Initially, two monitoring stations consisting of radiological, meteorological, and dust sampling equipment were installed near the southeast and northeast corners of the CA. In January 2015, the original monitoring stations were dismantled and moved farther to the west along the CA boundary. This move was made to place the monitoring stations downwind of ground zero and the High Contamination Area (HCA) during the dominant northerly and southerly winds. Samples of particles suspended in the air are collected every two weeks and submitted for laboratory assessments of gross alpha and gross beta radioactivity, and for determinations of gamma-emitting radionuclides. In calendar year (CY) 2017, the mean gross alpha concentration at monitoring station P57-4 was approximately 4.25 times the value at monitoring station P57-3. In CY2015 and CY2016, the difference in mean gross alpha concentration at the two stations was approximately 1.5. The mean gross alpha concentrations at P57-3 and P57-4 were approximately 1.9 and 7.9 times, respectively, the mean gross alpha concentrations at the surrounding Community Environmental Monitoring Program (CEMP) stations. The minimum gross alpha concentrations reported for the Project 57 stations are in the range of the minimum values observed at the CEMP stations. However, maximum gross alpha concentrations are greater than the maximum concentrations observed at the surrounding CEMP stations. Gamma spectroscopy analyses resulted in the detection of seven radionuclides. Except for americium-241 (Am-241), all reported radionuclides occur naturally in the environment. The Am-241 detection by gamma spectroscopy was confirmed by alpha spectroscopy. During each quarter of CY2017, four suspended particulate matter samples were selected for alpha spectroscopy analysis. Two were selected each quarter from the regular biweekly samples collected at each of the two monitoring stations. Of the eight samples from P57-3, one was reported to have plutonium-238 (Pu-238) above the minimum detectable activity (MDA) and five were reported to have plutonium 239/240 (Pu-239/240) above the MDA. Of the eight samples from P57-4, three were reported to have Pu-238 above the MDA and six were reported to have Pu-239/240 above the MDA. Soil material is also transported by saltation, which is a wind driven phenomena that bounces sand-sized soil particles across the land surface because they are too heavy to be suspended in the air. Samples of particles transported by saltation were collected downwind and upwind of the CA at both monitoring stations in May 2017 after a 190-day deployment and again in September 2017 after a 114-day deployment. Mass of the saltation samples was determined after oven drying. The September sample had greater mass than the May sample. The same relationship was observed for the suspended particulate matter samples during periods of saltation sample collection. The difference in the collected mass appears to be because of the amount of soil moisture. Higher soil moisture exerts additional isotopic bonds between soil particles and water molecules, and between water molecules that envelop soil particles, making it more difficult for wind to raise the particles as dust. In general, samples collected from saltation traps facing south contained more material than samples collected from traps facing north. This suggests that although saltation material may have been moving back and forth in conjunction with the two dominant wind directions, there was a net trend for saltation material to be transported toward the north. Radiological analyses of the saltation samples show that the smaller particle size faction (<63 μm) generally produced the highest activity levels of Am-241, Pu-238, and Pu-239/240. In general, the isotope activity levels decreased as the particle size increased. These results are consistent with the expectation that the greatest potential for transport of radiological contamination is with the smaller particles. Thermoluminescent dosimeters (TLDs) indicated that the average annual external radioactivity dose at the monitoring stations is slightly higher than the dose determined at the surrounding CEMP stations, but approximately half of the estimated national average dose received by the general public from exposure to natural sources. The TLDs at the Project 57 monitoring stations are exposed to both natural sources (terrestrial and cosmic) and radioactive releases from the Project 57 CA. Winds in excess of approximately 15 mph (24 km/hr) begin to generate dust movement by saltation or suspension, as determined by the monitoring instruments. Saltated particles, PM10 (i.e., inhalable dust), and PM2.5 (i.e., fine particulate dust) exhibit an approximately exponential increase with increasing wind speed. The greatest concentrations of dust occurred for winds exceeding 20 mph (32 km/hr). When the wind/dust analysis was performed for winds separated into the dominant northerly and southerly wind directions, it was evident that the northerly winds generated the higher PM10 concentrations and had the dominate influence on the PM10 concentration determined for all wind speeds when all wind directions were evaluated together. During the year, winds in excess of 20 mph (32 km/hr) occurred approximately one percent of the time. Although winds sufficient to generate dust occur at the Project 57 site, they are infrequent and of short duration. A preliminary assessment of individual wind events suggests that dust generation in response to specific wind conditions is highly variable. Wind speeds that would be expected to generate noticeable dust may not do so in every instance. Additionally, saltation transport in response to wind conditions was less common than expected. These variations were likely because of the influence of meteorological and environmental parameters other than wind.

54 ENVIRONMENTAL SCIENCES↗