Search NASA⌕ Search

SEARCH · Search NASA

Results for “intelligent infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

272 records · Page 16

Toward Drilling the Perfect Geothermal Well: An International Research Coordination Network for Geothermal Drilling Optimization Supported by Deep Machine Learning and Cloud Based Data Aggregation

The EDGE project, supported by the U.S. Department of Energy Geothermal Technologies Office under award DE-EE0008793, established a data-driven framework for improving the efficiency, cost-effectiveness, and reliability of geothermal well drilling. The project focused on developing scalable data infrastructure, advanced machine learning and probabilistic models, and integrated analytics tools to support continuous drilling optimization. A central objective was to reduce geothermal drilling costs by up to seventy percent while minimizing the risk of well failure through predictive diagnostics and adaptive planning. Over the project period, a comprehensive data repository was designed and deployed, incorporating records from over one hundred geothermal wells across varied geological settings. This repository supported both structured and unstructured data and adhered to FAIR data principles, enabling provenance tracking, quality control, and standardized metadata. The project introduced automated ingestion pipelines and a cloud-hosted platform that facilitated access to raw, processed, and derived datasets. This infrastructure served as the foundation for model development and analysis. Machine learning workflows were developed to predict key drilling metrics including rate of penetration, non-productive time, and total drilling costs. Self-organizing maps and dimensionality reduction methods were used to uncover operational patterns and outliers, while supervised learning algorithms such as random forests and deep neural networks were applied to forecast performance outcomes. The models were validated on heterogeneous datasets from both U.S. and Icelandic fields, demonstrating variable but significant predictive accuracy. The results indicated that finer temporal resolution, inclusion of lithological data, and consistency in operational annotations could substantially improve model performance. The project also implemented process mining techniques to reconstruct state-transition models from drilling event logs. These models enabled the identification of deviations from optimal workflows and provided insights into recurring failure modes. Analysis of non-productive time highlighted the impact of equipment failures, geological challenges, and human factors, offering opportunities for targeted mitigation strategies. The EDGE Dashboard was developed as a web-based expert system integrating data visualization, model outputs, and user-driven queries. It provided an accessible interface for operators to explore historical data, evaluate predicted outcomes, and compare drilling scenarios. Initial feedback from project partners suggested that the dashboard could serve as a foundation for more advanced advisory and optimization tools. Overall, the EDGE project demonstrated the feasibility and value of applying modern data science techniques to geothermal drilling. It delivered a set of interoperable tools and models that can support more efficient, lower-risk well development. The findings point toward a viable path for transitioning from advisory analytics to semi-autonomous drilling systems, contingent on continued collaboration, expanded datasets, and field validation. The project results have immediate relevance for drilling operations, data management practices, and future geothermal R&D efforts aimed at achieving reliable, cost-competitive geothermal energy at scale.

15 GEOTHERMAL ENERGY↗

Joint Optimization of Well Completions and Controls for CO 2 Enhanced Oil Recovery and Storage

CO 2 storage through CO 2 enhanced oil recovery (EOR) is considered as one of the technologies to help promote larger scale deployment of CO 2 storage because of associated economic benefits through oil recovery, 45Q tax credits and the utilization of existing infrastructure. The objective of this study is to demonstrate how optimal reservoir management and operation strategies (including well completions and controls) can be used to optimize both CO 2 storage and oil recovery. The optimization problem was focused on jointly estimating the well completions (i.e., fraction of injection/production well perforations in each reservoir layer) and CO 2 injection/oil production controls that maximize the net present value (NPV) in a CO 2 EOR and storage operation. We utilized the newly developed StoSAG algorithm, one of the most efficient optimization algorithms in the reservoir management community, to solve the optimization problem. The performance of joint optimization approach was compared with the performance of well control only optimization approach. In addition, the performance of co-optimization of CO 2 storage and oil recovery approach was compared with the performances of maximization of only CO 2 storage and maximization of only oil recovery approaches. The optimization results showed that a joint optimization of well completions and well controls can achieve an 8.84% higher final NPV than the one obtained from the optimization of only well controls. It was observed that the NPV incremental for joint optimization is mainly due to the fact that the optimal well completions and controls approach results in efficient CO 2 storage and oil production from different reservoir layers depending on the differences in individual layer properties. Comparison of co-optimization (i.e., maximization of NPV) and maximization of only CO 2 storage or only oil recovery showed that the co-optimization and maximization of only oil recovery result in significantly higher final NPV than that obtained through maximization of only CO 2 storage approach while maximization of only CO 2 storage can achieve significantly higher CO 2 storage in the reservoir compared to the other two scenarios. The similar results for co-optimization and maximization of oil production are obtained because of the difference in oil revenue compared to CO 2 storage tax credit. To the best of our knowledge, this is the first study in oil/gas industry and CO 2 storage community to perform joint optimization of well completions and well controls in the fields. We expect that the proposed optimization framework will be a useful and efficient tool for field engineers to optimally manage CO 2 EOR projects to maximize revenue through oil recovery as well as CO 2 storage by taking advantage of the new 45Q tax law.

Artificial intelligence↗