Search NASA⌕ Search

SEARCH · Search NASA

Results for “interconnected systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Evaluating the Potential of Cray Gemini Interconnect for PGAS Communication Runtime Systems

The Cray Gemini Interconnect has been recently introduced as the next generation network for building scalable multi-petascale supercomputers. The Cray XE6 systems, which use the Gemini Interconnect are becoming available with Message Passing Interface (MPI) and Partitioned Global Address Space (PGAS) Models such as as Global Arrays, Unified Parallel C, Co-Array Fortran and Cascade High Performance Language. These PGAS models use one-sided communication runtime systems such as MPI-Remote Memory Access, Aggregate Remote Memory Copy Interface and proprietary communication runtime systems. The primary objective of our work is to study the potential of Cray Gemini Interconnect by designing application specific micro-benchmarks using the DMAPP userspace library provided by the Gemini Interconnect. To meet this objective, we design micro-benchmarks to study the performance of simple communication primitives and application specific micro-benchmarks to understand the behavior of Gemini Interconnect at scale. In our experiments, the Gemini Interconnect can achieve a peak bandwidth of 6911 MB/s and a latency of 1us for get communication primitive. Scalability tests for atomic memory operations and shift communication operation up to 65536 processes shows the efficacy of the Gemini Interconnect.

Vishnu, Abhinav↗

Climate-Water Impacts on Interconnection-Scale Electricity System Planning

A growing literature emphasizes the importance of integrating climate change impacts into electricity system planning. Rising average temperatures can increase and shift electricity demand while reducing generator and transmission efficiency. Changes to water availability and quality can reduce the output of thermally cooled generators and hydropower. Electric power grids across the US and globally are undergoing transformational changes that present new opportunities and challenges to reliability assurance. However, electric utilities and system operators have limited internal capabilities to incorporate these effects into planning practices. This work addresses gaps in utility and system planner practices by integrating climate-water-electricity expertise from universities and U.S. Department of Energy National Laboratories with electricity system planners and stakeholders in the Western Electricity Coordinating Council (WECC). Using a highly collaborative approach, global climate model data, high-resolution hydrology models, and long-term electric sector capacity expansion tools are employed to analyze a range of climate outcomes for future electricity scenarios aligned with recent WECC planning studies. Doing so allows WECC to expand its climate-agnostic planning assessments to consider how future temperature and precipitation patterns could influence generation and transmission planning. We explore how changes to climate-water conditions can affect power plant investment and operation, system economics, and environmental impacts, providing an expanded perspective on interconnection-wide decision making under climate uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transmission Reinforcements in the Central American Regional Power System

The Central American regional interconnected power system (SER) connects the countries members of the Central American regional electricity market (MER): Guatemala, El Salvador, Honduras, Nicaragua, Costa Rica, and Panama. The SER was a result of a long term regional effort, and was initially conceived to transfer 300 MW between countries. However, the current transfer limits between countries range from 70 MW to 300 MW. Regional entities, like CRIE (Regional Commission of Electrical Interconnection), EOR (Central American Regional System Operator), and CDMER (Board of Directors of the Central American Market) are working on coordinating the national transmission expansion plans with regional transmission planning efforts. This paper presents experience in Central America region to recommend transmission reinforcements to achieve 300 MW transfer capacity between any pair of member countries of the Central American regional electricity market (MER). This paper also provides a methodology for technical analysis and for coordination among the regional and national entities. This methodology is unique for transmission systems of these characteristics.

power system interconnection↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Machine Learning-Based PV Reserve Determination Strategy for Frequency Control on the WECC System

Frequency control from photovoltaic (PV) power plants has great potential to address the frequency response challenge of the power system with high penetrations of renewable generation. Using model-based approaches to determine the optimal PV headroom reserve, however, requires significant online computation and is intractable for an interconnection level system. This paper proposes a machine learning based strategy, that is suitable for real-time operation, to determine the optimal PV reserve for frequency control. The proposed machine learning algorithm is trained and tested on 1,987 offline simulations of a 60% renewable penetration Western Electricity Coordinating Council (WECC) system. Furthermore, the proposed reserve determination strategy is applied on a realistic 1-day operation profile of the WECC system and demonstrates a savings of more than 40% PV headroom compared to a conservative approach. It is evident that the proposed strategy can efficiently and effectively determine the optimal PV frequency control reserve for realistic interconnection systems.

frequency control↗

The interconnected data directory system and Catalog Interoperability

The Catalog Interoperability (CI) project, designed to enable rapid and efficient identification, location, and access to data of interest to the science community, is considered. The CI goal is to create a worldwide data information network composed of interconnected directory, guide (catalog), and inventory systems. Directories were created to aid in finding data. The directories contain brief information about the data sets, sufficient for determining whether further investigation is warranted. They also provide automated links to other information systems which give more detail on data of interest. A common format for describing data sets has been developed, called the Directory Interchange Format (DIF), which is used as the basis of information to be shared among the directories. These DIF files can be passed among the directories to keep their information up to date.

Thieman, James R.↗

Event Screening Methods for the Eastern Interconnection Situational Awareness and Monitoring System (ESAMS)

The Eastern Interconnection Situational Awareness and Monitoring System (ESAMS) is a tool developed to explore the applications and advantages of sharing phasor measurement unit (PMU) data among operating entities. An initial conclusion from testing was that detected events required further screening before being reported to ensure that events would be of interest to system operators. The methods described in this report were integrated into ESAMS to meet this need. First, an event is screened for whether the change in voltage angle measurements indicates that the detected disturbance is sufficiently large. Next, an event is classified to determine if it was related to a loss of generation. Finally, a neural network is used to determine if the system’s response to the disturbance is normal or abnormal. These methods were tested with one month of field-measured PMU data. Results indicate that the additional information provided by these additional screening tools will improve selection of events for inclusion in the daily event reports automatically generated by ESAMS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Using Co-Simulation to Model Interconnect-Scale Power Systems from Loads to Generators

Co-simulation is a modeling technique that allows analysts to combine simulation tools and their corresponding models to exchange data during run-time, allowing the creation of larger and more complex models across heterogeneous domains. HELICS is a co-simulation platform developed over the past six years that has been shown to be effective for these multi-domain analysis. Recently, a HELICS-based analysis was completed where the ERCOT electrical interconnect in the United States was modeled in high detail from bulk power system generation to individual customer loads. This model was used to evaluate a flat-rate and transactive energy tariff with integrated wholesale and retail real-time and day-ahead energy markets. This modeling allows detailed analysis showing how the operations of the power system under these tariffs impact all actors in the power system, from individual customers to bulk power system operators.

co-simulation, HELICS, transactive energy system, ↗

Sustainable Energy Solutions Task 1.0: Networked Monitoring and Control of Small Interconnected Wind Energy Systems

This report presents accomplishments, results, and future work for one task of five in the Wichita State University Sustainable Energy Solutions Project: To develop a scale model laboratory distribution system for research into questions that arise from networked control and monitoring of low-wind energy systems connected to the AC distribution system. The lab models developed under this task are located in the Electric Power Quality Lab in the Engineering Research Building on the Wichita State University campus. The lab system consists of four parts: 1. A doubly-fed induction generator 2. A wind turbine emulator 3. A solar photovoltaic emulator, with battery energy storage 4. Distribution transformers, lines, and other components, and wireless and wired communications and control These lab elements will be interconnected and will function together to form a complete testbed for distributed resource monitoring and control strategies and smart grid applications testing. Development of the lab system will continue beyond this project.

17 WIND ENERGY↗

Communication engine for hybrid interconnect technologies

Systems, apparatuses, and methods for dynamically selecting between wired and wireless interconnects for sending packets are disclosed. A system includes at least a hybrid communication engine and a plurality of interconnects for connecting to various end-points. The communication engine dynamically discovers and utilizes the best interconnect technology available in between given end-points. The communication engine dynamically chooses the physical interconnect that is best suited at any given time to send data from one source to one or multiple destinations. This communication can be either on-chip or across nodes. The communication engine makes a decision based on a set of predetermined parameters that can be re-adjusted by the application layer, such as latency of the transmission, message data size, physical distance from source to destination, the energy cost, and the current congestion on the alternative interconnects.

Blagodurov, Sergey↗

Dynamic-Feature Extraction, Attribution and Reconstruction (DEAR) Method for Power System Model Reduction

In interconnected power systems, dynamic model reduction can be applied on generators outside the area of interest to mitigate the computational cost with transient stability studies. This paper presents an approach of deriving the reduced dynamic model of the external area based on dynamic response measurements, which comprises of three steps, dynamic-feature extraction, attribution and reconstruction (DEAR). In the DEAR approach, a feature extraction technique, such as singular value decomposition (SVD), is applied to the measured generator dynamics after a disturbance. Characteristic generators are then identified in the feature attribution step for matching the extracted dynamic features with the highest similarity, forming a suboptimal ‘basis’ of system dynamics. In the reconstruction step, generator state variables such as rotor angles and voltage magnitudes are approximated with a linear combination of the characteristic generators, resulting in a quasi-nonlinear reduced model of the original external system. Network model is un-changed in the DEAR method. Tests on several IEEE standard systems show that the proposed method gets better reduction ratio and response errors than the traditional coherency aggregation methods.

Dynamic response, model reduction, orthogonal deco↗

Measurement-based Power System Dynamic Model Reductions

Interconnected power systems have experienced a significant increase in its size and complexity, due to continuous topology and operating condition changes. It is computationally burdensome to represent entire system models in detail to conduct power system analysis. In the large-scale power system dynamic simulations, the models in the study area need to be retained in detail while the external area can be reduced without compromising accuracy, which can preserve the full system dynamic properties. This paper develops measurement-based continuous-time dynamic equivalents for power systems in order to both improve the model accuracy of the reduced system and increase the speed of dynamic simulation. Our method is based on a set of measurements at the boundary nodes between the study area and external area. Case studies demonstrate that the measurement-based model can capture the full system behavior sufficiently, and improve computational efficiency.Interconnected power systems experienced a significant increase in size and complexity. It is computationally burdensome to represent the entire system in detail to conduct power system analysis. Therefore, the model of the study system must be retained in detail while the external system can be reduced using system reduction techniques. This paper proposes a measurement-based dynamic equivalent in order to increase both model accuracy and simulation speed. The proposed method uses a set of measurements at the boundary nodes between the study area and external area for model parameter identification. Case studies demonstrate that the measurement-based technique can capture the main system behaviors accurately and improve computational efficiency.

Xue, Yaosuo↗

Understanding the Capabilities and Limitations of the Controls and Operations of High Voltage Direct Current (HVdc) Converters in Interconnected Electric Power Systems

This project will seek to build a fundamental understanding, and capability, to model and simulate the controls and operations of high voltage direct current (HVdc) converter stations in an electromagnetic simulation environment. While HVdc stations have been operated in the United States for over 50 years, these are typically simple two terminal point-to-point systems. Recently multi-terminal systems have begun to be deployed. The challenge with these new multi-terminal systems is that they often use different control schemes on the different terminals. The interactions of existing and new controls, and the fact that HVdc systems are rates in the 1,000’s of MWs means that small control instabilities can have dramatic impacts to bulk power systems. Despite these challenges, the operational capabilities of HVdc make them an attractive option for the transfer of the large amounts of renewable electricity that will be necessary for decarbonization of the nation’s electrical infrastructure and other sectors.

42 ENGINEERING↗

Valuing Resilience Benefits of Microgrids for an Interconnected Island Distribution System

Extreme climate-driven events such as hurricanes, floods, and wildfires are becoming more intense in areas exposed to these threats, requiring approaches to improve the resilience of the electrical infrastructure serving these communities. Long-duration outages caused by such high impact events propagate to economic, health, and social consequences for communities. As essential service providers, electric utilities are mandated to provide safe, economical and reliable electricity to their customers. The public is becoming less tolerant to these more frequent disruptions, especially in view of technological advances that are intended to improve power quality, reliability and resilience. One promising solution is state-of-the-art microgrids and the advanced controls employed therein. This paper presents and demonstrates an approach to technoeconomic analysis that can be used to value the avoided economic consequences of grid resilience investments, as applied to the islands of Vieques and Culebra in Puerto Rico. This valuation methodology can support policies to incorporate resilience value into any investment decision-making process, especially those which serve the public interest.

24 POWER TRANSMISSION AND DISTRIBUTION↗