Search NASA⌕ Search

SEARCH · Search NASA

Results for “interoperability and control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Consequence Management Cobalt Magnet 2022 Laboratory Analysis: After Action Report

On May 16-20, 2022, federal mission partners (e.g., DOE Consequence Management, CDC, FDA, FBI, DHS) as well as integrated state, local, tribal, and territorial governments took part in Cobalt Magnet 22 (CM22), a large-scale, week-long radiological incident exercise in Austin, Texas, that linked several important national assets (National Search Program, Radiological Assistance Program, and Consequence Management [CM] personnel) into a single response effort. The exercise had nine (9) overarching Objectives and an additional 162 associated Critical Tasks for all the participating organizations. In total, 13 National Core Capabilities spanning 5 Mission Areas were represented in the final exercise. This exercise enabled a full range of capabilities to be fielded together and examine the operational connection between major assets, discover any resource shortages associated with conducting multiple mission areas simultaneously or in close succession, and identify any challenges related to leadership. This report summarizes nearly 100 successes and observations provided from players and controllers supporting the LA Division, Fly Away Laboratory (FAL) and Gamma Spectroscopist operations. The observations were categorized to align with the FRMAC programmatic functional areas to consider for future improvements: Logistics, CBRN Responder, Laboratory Analysis, Sampling and Monitoring, Health and Safety, Gamma Spectroscopist Operations, Fly Away Laboratory, and the FRMAC Interdivision Interoperability Group (FIIG).

54 ENVIRONMENTAL SCIENCES↗

UAS-NAS Flight Test Series 3: Test Environment Report

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration in the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability (SSI), Human Systems Integration (HSI), and Communications (Comm), and Certification to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Detect and Avoid (DAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project is conducting a series of human-in-the-loop (HITL) and flight test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity, and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS. The integrated events started with two initial flight test used to develop and test early integrations and components of the test environment. Test subjects and a relevant test environment were brought in for the integrated HITL (or IHITL) conducted in 2014. The IHITL collected data to evaluate the effectiveness of DAA Well Clear (DWC) algorithms and the acceptability of UAS concepts integrated into the NAS. The first integrated flight test (and the subject of this report) followed the IHITL by replacing the simulation components with live aircraft. The project finishes the integrated events with a final flight test to be conducted in 2016 that provides the researchers with an opportunity to collect DWC and Collision Avoidance (CA) interoperability data during flight encounters.

flight test↗

FAIR Data and Interpretable AI Framework for Architectured Metamaterials

Our interdisciplinary effort successfully generated FAIR (Findable, Accessible, Interoperable, and Reusable) benchmark datasets for mechanical metamaterials while introducing a novel Artificial Intelligence (AI) framework known as Learning Refined Compositional Rules (LRCR). This framework was specifically designed to bridge the gap across varying computational length scales and extract the underlying physical mechanisms that connect a material's structural geometry to its bulk acoustic properties. Historically, the discovery of such structured materials relied heavily on human intuition or opaque, black-box optimization algorithms that were difficult to generalize. By combining interpretable machine learning techniques with rigorous experimental validation, this project established clear, generalizable design guidelines for tuning wave dispersion and controlling vibrations. Ultimately, the public availability of these structured datasets and algorithms will significantly reduce computational costs and accelerate the design of advanced multi-functional acoustic devices, offering broad societal impacts across fields like aerospace engineering, telecommunications, and biomedical implant design.

36 MATERIALS SCIENCE↗

ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with the ACTS satellite. The ACTS experiment's program proposed to validate Ka-band satellite and ground station technology. demonstrate future telecommunication services. demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals (Part 1) and the lessons learned throughout their six year operation including the inclined orbit phase of operations (Full Report). An overview of the Ka-band technology and components developed for the ACTS ground stations is presented. Next. the performance of the ground station technology and its evolution during the ACTS campaign are discussed to illustrate the technical tradeoffs made during the program and highlight technical advances by industry to support the ACTS experiments program and terminal operations. Finally. lessons learned during development and operation of the user terminals are discussed for consideration of commercial adoption into future Ka-band systems. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector based offset-fed antenna systems ranging in size from 0.35m to 3.4m antenna diameter. Gateway earth stations included two systems, referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET). The NGS provides tracking, telemetry, and control (TT&C) and Time Division Multiple Access (TDMA) network control functions. The LET supports technology verification and high data rate experiments. The ground stations successfully demonstrated many services and applications at Ka-band in three different modes of operation: circuit switched TDMA using the satellite on-board processor, satellite switched SS-TDMA applications using the on-board Microwave Switch Matrix (MSM), and conventional transponder (bent-pipe) operation. Data rates ranged from 4.8 kbps up to 622 Mbps. Experiments included: 1) low rate (4.8- 1 00's kbps) remote data acquisition and control using small earth stations, 2) moderate rate (1-45 Mbps) experiments included full duplex voice and video conferencing and both full duplex and asymmetric data rate protocol and network evaluation using mid-size ground stations, and 3) link characterization experiments and high data rate (155-622 Mbps) terrestrial and satellite interoperability application experiments conducted by a consortium of experimenters using the large transportable ground stations.

Reinhart, Richard C.↗

Emulation and Adversarial Analysis of EV Charging Networks

In the effort of decarbonization and evolution of the modern electrical grid, electric vehicles (EVs) play a key part to transform the grid. However, due to the rapid adoption of EVs and the demand of the charging infrastructure required to power said EVs, risk of a cyber-attack may impose serious consequences. There is a need to analyze and protect the charging ecosystem infrastructure from cyber threats before it reaches wide-scale deployment. In an effort to secure vehicle to grid (V2G) communications, standardization is necessary for continued reliable system operation. The protocol ISO 15118 outlines controls and practices that should be implemented for secure vehicle to grid (V2G) communications. The standard is gaining momentum for American markets as the demand for EV infrastructure grows. The adoption of ISO 15118 in American markets poses several challenges: the deployment of a public key infrastructure (PKI) as outlined within the standard, interoperability of charging different EVs with chargers from different manufactures using the PKI, and scaling the ecosystem to meet the demand while managing risks. This project was created to understand potential cyber and scaling challenges of PKI for EV infrastructure through utilizing a series of emulated components mapping to what exists in the EV ecosystem today, and the components of the PKI that are under development. The key nodes within the emulation that are under development are: electric vehicle (EV), electric vehicle supply equipment (EVSE), charge network operator (CNO), certificate authority (CA), and online certificate status protocol (OCSP) that must all interact using secure and trusted communications. With these emulated components and utilizing orchestration methods to rapidly deploy and scale the components, the ability to analyze risks of the ecosystem and address gaps before the PKI ecosystem is fully deployed to production should yield a more robust and mature production charging infrastructure. Our approach will use a modular architecture of virtual machines within an orchestration platform and will target scales of 100s, 1000s, and 10,000s of entities interacting. The core research questions trying to be answered with this scope of work are: what are the impacts of a rogue CA, what are the risks of certificate revocation list (CRL) management, what is the value of OCSP stapling, what components are vulnerable to DOS attacks, and what test effective payloads may impact the components.

charging ecosystem↗

Re-engineering Nascom's network management architecture

The development of Nascom systems for ground communications began in 1958 with Project Vanguard. The low-speed systems (rates less than 9.6 Kbs) were developed following existing standards; but, there were no comparable standards for high-speed systems. As a result, these systems were developed using custom protocols and custom hardware. Technology has made enormous strides since the ground support systems were implemented. Standards for computer equipment, software, and high-speed communications exist and the performance of current workstations exceeds that of the mainframes used in the development of the ground systems. Nascom is in the process of upgrading its ground support systems and providing additional services. The Message Switching System (MSS), Communications Address Processor (CAP), and Multiplexer/Demultiplexer (MDM) Automated Control System (MACS) are all examples of Nascom systems developed using standards such as, X-windows, Motif, and Simple Network Management Protocol (SNMP). Also, the Earth Observing System (EOS) Communications (Ecom) project is stressing standards as an integral part of its network. The move towards standards has produced a reduction in development, maintenance, and interoperability costs, while providing operational quality improvement. The Facility and Resource Manager (FARM) project has been established to integrate the Nascom networks and systems into a common network management architecture. The maximization of standards and implementation of computer automation in the architecture will lead to continued cost reductions and increased operational efficiency. The first step has been to derive overall Nascom requirements and identify the functionality common to all the current management systems. The identification of these common functions will enable the reuse of processes in the management architecture and promote increased use of automation throughout the Nascom network. The MSS, CAP, MACS, and Ecom projects have indicated the potential value of commercial-off-the-shelf (COTS) and standards through reduced cost and high quality. The FARM will allow the application of the lessons learned from these projects to all future Nascom systems.

Drake, Brian C.↗

Datascope to Enable Earth Independent Medical Operations (EIMO)

BACKGROUND: NASA has amassed sixty years of knowledge and experience relevant to maintenance of crew health and performance in low earth orbit. The Apollo Program introduced the importance of ensuring progressively autonomous operational capability. Earth Independent Medical Operations (EIMO) will require a gradual shift in the balance of medical responsibility, management, and authority from terrestrial to space-based assets. Terrestrial assets will continue to be essential for pre-mission screening and planning in addition to maintenance of crew health and performance. However, new capabilities are needed to enable EIMO and the amount of data required to support these systems, and mitigate the impacts of data transmission delays and reduced bandwidth coupled with lack of cloud-like resources and on-board computing capacity that is currently unclear or operationally insufficient. OVERVIEW: The overall goal of EIMO is to develop artificial intelligence (AI)-based solutions to analyze crew health and performance data utilizing a clinical decision support system (CDSS) to provide crew medical officers (CMO) with the equivalent of real-time, on-board medical consults. The EIMO ecosystem is envisioned as a “system of systems” where embedded reference databases and real-time data streams from multiple input vectors continuously and seamlessly assess crew health and performance. EIMO will be designed to make recommendations to the CMO using multi-modal AI-based natural language processing and machine learning methods with interoperability to push/pull data within and between multiple vehicle and habitat architectures. DISCUSSION: Data flows and storage/retrieval capacity are severely constrained during space missions and the challenges will become even greater during exploration missions. Just as each past program from Mercury to the International Space Station (ISS) required rethinking the interaction between ground-based controllers and space-based crew, so too will future missions to the Moon and Mars. While the NASA High-Performance Spaceflight Computing Processor project aims to increase computational capacity by 100 times over current spaceflight computers, the projected deliverable still lags considerably behind what will be needed to enable an AI-driven CDSS. Restrictions in processing speed and data storage capacity, coupled with transmission bottlenecks and delays, necessitate definition and optimization of an integrated data architecture to enable a progressively autonomous medical capability.

Medical operations↗

Transforming Our SMEX Organization by Way of Innovation, Standardization, and Automation

NASA's Small Explorer (SMEX) Flight Operations Team (FOT) is currently tackling the challenge of supporting ground operations for several satellites that have surpassed their designed lifetime and have a dwindling budget. At Goddard Space Flight Center (GSFC), these missions are presently being reengineered into a fleet-oriented ground system. When complete, this ground system will provide command and control of four SMEX missions, and will demonstrate fleet automation and control concepts as a pathfinder for additional mission integrations. A goal of this reengineering effort is to demonstrate new ground-system technologies that show promise of supporting longer mission lifecycles and simplifying component integration. In pursuit of this goal, the SMEX organization has had to examine standardization, innovation, and automation. A core technology being demonstrated in this effort is the GSFC Mission Services Evolution Center (GMSEC) architecture. The GMSEC architecture focuses on providing standard interfaces for ground system applications to promote application interoperability. Building around commercial Message Oriented Middleware and providing a common messaging standard allows GMSEC to provide the capabilities necessary to support integration of new software components into existing missions and increase the level of interaction within the system. For SMS, GMSEC has become the technology platform to transform flight operations with the innovation and automation necessary to reduce operational costs. The automation technologies supported in SMEX are built upon capabilities provided by the GMSEC architecture that allows the FOT to further reduce the involvement of the console, operator. Initially, SMEX is automating only routine operations, such as safety and health monitoring, basic commanding, and system recovery. The operational concepts being developed here will reduce the need for staffed passes and are a necessity for future fleet management. As this project continues to evolve, additional innovations beyond GMSEC and automation have, and will continue to be developed. The team developed techniques for migrating ground systems of existing on-orbit assets. The tools necessary to monitor and control software failures were integrated and tailored for operational environments. All this was done with a focus of extending fleet operations to mission beyond SMU. The result of this work is the foundation for a broader fleet-capable ground system that will include several missions supported by the Space Science Mission Operations Project.

Madden, Maureen↗

A First Look at the Upcoming SISO Space Reference FOM

Simulation is increasingly used in the space domain for several purposes. One example is analysis and engineering, from the mission level down to individual systems and subsystems. Another example is training of space crew and flight controllers. Several distributed simulations have been developed for example for docking vehicles with the ISS and for mission training, in many cases with participants from several nations. Space based scenarios are also used in the "Simulation Exploration Experience", SISO's university outreach program. We have thus realized that there is a need for a distributed simulation interoperability standard for data exchange within the space domain. Based on these experiences, SISO is developing a Space Reference FOM. Members of the product development group come from several countries and contribute experiences from projects within NASA, ESA and other organizations. Participants represent government, academia and industry. The first version will focus on handling of time and space. The Space Reference FOM will provide the following: (i) a flexible positioning system using reference frames for arbitrary bodies in space, (ii) a naming conventions for well known reference frames, (iii) definitions of common time scales, (iv) federation agreements for common types of time management with focus on time stepped simulation, and (v) support for physical entities, such as space vehicles and astronauts. The Space Reference FOM is expected to make collaboration politically, contractually and technically easier. It is also expected to make collaboration easier to manage and extend.

Crues, Edwin↗

Secure Information Exchange Gateway for Electric Grid Operations

The major objectives of the SIEGate project were to improve the security posture and minimize the cyber-attack surface of electric utility control centers and to reduce the cost of maintaining control-room-to-control-room information exchange. Major project goals included the design, development, testing, and commercialization of a single security-hardened appliance that could meet industry needs for resisting cyber-attacks while protecting the confidentiality and integrity of a growing volume of real-time information needed to ensure the reliability of the bulk electric system and interoperating with existing data formats and networking technologies. The SIEGate project has achieved its goals and objectives. The SIEGate Design Document, issued in March 2012, presented SIEGate use cases, provided SIEGate requirements, established SIEGate design principles, and prescribed design functionality of SIEGate as well as the components that make up SIEGate. SIEGate Release Version 1.0 was posted in January 2014. Release Version 1.0.83, which was posted on March 28, 2014, fixed many issues discovered by early adopters and added several new features. Release Candidate 1.1, which added additional improvements and bug fixes, was posted in June 2014. SIEGate executables have been downloaded more than 300 times. SIEGate has been tested at PJM, Entergy, TVA, and Southern. Security testing and analysis of SIEGate has been conducted at PNNL and PJM. Alstom has provided a summary of recommended steps for commercialization of the SIEGate Appliance and identified two deployment models with immediate commercial application.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NASA InterCenter Collaboration Increases ROI

Funding for National Aeronautics and Space Administration (NASA) space mission operations is tighter than ever in the current environment of federal government deficit reductions. Conventional wisdom would expect this environment to drive increasing competition between NASA centers for the limited available funds. However, recent inter-center activities at the Huntsville Operations Support Center (HOSC) at NASA's Marshall Space Flight Center emphasize collaboration rather than competition and demonstrate the value of partnerships to increase the return on shrinking investments. These efforts cover a variety of activities and potential returns. To facilitate sharing data from test and verification through operations without levying requirements on data format or software tools, the HOSC is working with multiple centers on an evolutionary path toward a distributed data architecture and archive. The approach reduces the required investment by allowing the partners to reuse their existing formats and tools, while facilitating gone ]stop h user visibility into and controlled access to the full complement of data regardless of user or data location. The HOSC is also working on two activities to promote sharing operations implementations and leveraging the experts and expertise across multiple NASA sites. In one, the use of Consultative Committee for Space Data Systems (CCSDS) standards for the message abstraction layer provides an interoperability layer on top of existing ground data system communication architectures. This allows missions to select the most appropriate solutions for their requirements with a minimal investment in rehosting the components in a coherent operational environment. The other emphasizes shared tools and increased remote access to minimize travel for tests and critical activities and reduce the floor space required for a dedicated operations center. This paper summarizes these and other inter-center collaboration activities at the HOSC and the benefits that each can bring, not just to the participants, but to the broader operations community.

Lankford, Kimberly↗

Ontology Development Kit: a toolkit for building, maintaining and standardizing biomedical ontologies

Similar to managing software packages, managing the ontology life cycle involves multiple complex workflows such as preparing releases, continuous quality control checking and dependency management. To manage these processes, a diverse set of tools is required, from command-line utilities to powerful ontology-engineering environmentsr. Particularly in the biomedical domain, which has developed a set of highly diverse yet inter-dependent ontologies, standardizing release practices and metadata and establishing shared quality standards are crucial to enable interoperability. The Ontology Development Kit (ODK) provides a set of standardized, customizable and automatically executable workflows, and packages all required tooling in a single Docker image. In this paper, we provide an overview of how the ODK works, show how it is used in practice and describe how we envision it driving standardization efforts in our community.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗

NASA GRC UAS Project: Communications Modeling and Simulation Status

The integration of Unmanned Aircraft Systems (UAS) in the National Airspace represents new operational concepts required in civil aviation. These new concepts are evolving as the nation moves toward the Next Generation Air Transportation System (NextGen) under the leadership of the Joint Planning and Development Office (JPDO), and through ongoing work by the Federal Aviation Administration (FAA). The desire and ability to fly UAS in the National Air Space (NAS) in the near term has increased dramatically, and this multi-agency effort to develop and implement a national plan to successfully address the challenges of UAS access to the NAS in a safe and timely manner is well underway. As part of the effort to integrate UAS in the National Airspace, NASA Glenn Research Center is currently involved with providing research into Communications systems and Communication system operations in order to assist with developing requirements for this implementation. In order to provide data and information regarding communication systems performance that will be necessary, NASA GRC is tasked with developing and executing plans for simulations of candidate future UAS command and control communications, in line with architectures and communications technologies being developed and/or proposed by NASA and relevant aviation organizations (in particular, RTCA SC-203). The simulations and related analyses will provide insight into the ability of proposed communications technologies and system architectures to enable safe operation of UAS, meeting UAS in the NAS project goals (including performance requirements, scalability, and interoperability), and ultimately leading to a determination of the ability of NextGen communication systems to accommodate UAS. This presentation, compiled by the NASA GRC team, will provide a view of the overall planned simulation effort and objectives, a description of the simulation concept and status of the design and development that has occurred to date.

Kubat, Greg↗

Integrated Test and Evaluation Flight Test 3 Flight Test Plan

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

Unmanned↗

Black Start of Unbalanced Microgrids Harmonizing Single- and Three-Phase Grid-Forming Inverters: Preprint

As power systems are transforming with increasing penetrations of inverter-based resources (IBRs), system restoration using IBRs has drawn attention. Using distributed grid-forming (GFM) assets located near critical loads, either three-phase or single-phase, to establish microgrid voltages in the absence of a bulk grid, a distribution system could obtain high system survivability. For swift and secure recovery of a critical load in a single-phase lateral, local single-phase GFM inverters can form a microgrid, and then it can be combined with a neighbouring grid with the inverters remaining in GFM mode for voltage and frequency regulation until the bulk grid comes online. It leads to dynamic interoperation of single-phase GFM inverters with three-phase ones in the black start process. This paper studies the novel approach with electromagnetic transient (EMT) simulations. To evaluate the potential and the technical challenges of the heterogeneous IBR-driven black start, three-phase and single-phase GFM inverter models are developed, including negative-sequence control for voltage balance and a phase-by-phase current limiter (three-phase) and current magnitude limiter (single-phase). To examine dynamic aspects of the black-start process, the EMT simulation also models transformer and motor dynamics emulating their inrush and startup behavior as well as network dynamics. Involvement of grid-following assets to facilitate the black-start process is also modeled. By allowing multiple GFM inverters to collectively black start without leader-follower coordination, regardless of phases, a system can achieve extreme resilience. An inverter-driven black start of a heavily unbalanced 2-MVA distribution feeder using 1 three-phase and 3 single-phase GFM inverters is demonstrated. The simulation shows the heterogeneous system can maintain stability with the single-phase GFM dynamics coupled with the three-phase one.

grid-forming inverter↗