Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch availability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Climatological Study of the Short-Term Variation of the 0 C, -10 C, and -20 C Altitude Levels over the Florida Spaceport

For evaluation of the potential of cloud electrification, it is necessary to know the altitude of the 0, -10 and -20 degree Celsius levels. Cape Canaveral Air Force Station has recorded balloon launch data back to 1989. In support of rocket launches, often multiple balloons are launched within minutes of each other in the 4-6 hours leading up to launch. In the past, temperature data from sondes was typically available every hour or so through the launch countdown, allowing for frequent updates of these critical temperature thresholds. Recently, launch customers are relying on Jimsphere and wind profiler data that do not have a thermodynamic component in the latter 4-6 hours of a countdown. This study compares the altitude differences of the 0, -10 and -20 degree Celsius levels from consecutive balloon pairs not to exceed 6 hours apart. The analysis uses 9685 soundings from 1989 to 2013. Approximately 5 of the time the altitude of the temperature level in question (0, -10, -20 degrees C), varies by more than 500 feet (operationally significant threshold) within 6 hours. This study analyzes the altitude variability as a function of several meteorological parameters, such as change in sonde type, dew point depression, and solar zenith angle. Additionally, the study concludes with impacts to launch operations.

Huddleston, Lisa L.↗

Low Cost Space Demonstration for a Single-Person Spacecraft

This paper introduces a concept for a single-person spacecraft and presents plans for flying a low-cost, robotic demonstration mission. Called FlexCraft, the vehicle integrates propulsion and robotics into a small spacecraft that enables rapid, shirt-sleeve access to space. It can be flown by astronauts or tele-operated and is equipped with interchangeable manipulators used for maintaining the International Space Station (ISS), exploring asteroids, and servicing telescopes or satellites. Most FlexCraft systems are verified using ground facilities; however, a test in the weightless environment is needed to assess propulsion and manipulator performance. For this, a simplified, unmanned, version of FlexCraft is flown on a low-cost launch vehicle to a 350 km circular orbit. After separation from the upper stage, the vehicle returns to a target box mounted on the stage testing the propulsion and control capability. The box is equipped with manipulator test items that are representative of tasks performed on ISS, asteroid missions, or for satellites servicing. Nominal and off-nominal operations are conducted over 3 days then the vehicle re-enters the atmosphere without becoming a debris hazard. From concept to management to operations, the FlexCraft demonstration is designed to be low cost project that is launched within three years. This is possible using a simplified test configuration that eliminates nine systems unique to the operational version and by designing-to-availability. For example, the propulsion system is the same as the Manned Maneuvering Unit because it capable, simple, human-rated and all components or equivalent parts are available. A description of the launch vehicle options, mission operations, configuration, and demonstrator subsystems is presented.

Griffin, Brand N.↗

Final Environmental Impact Statement for the Galileo Mission (Tier 2)

This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

Source record↗