Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch services”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Orion Launch Abort System Performance on Exploration Flight Test 1

This paper will present an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. NASA is currently designing and testing the Orion Multi-Purpose Crew Vehicle (MPCV). Orion will serve as NASA's new exploration vehicle to carry astronauts to deep space destinations and safely return them to earth. The Orion spacecraft is composed of four main elements: the Launch Abort System, the Crew Module, the Service Module, and the Spacecraft Adapter (Fig. 1). The Launch Abort System (LAS) provides two functions; during nominal launches, the LAS provides protection for the Crew Module from atmospheric loads and heating during first stage flight and during emergencies provides a reliable abort capability for aborts that occur within the atmosphere. The Orion Launch Abort System (LAS) consists of an Abort Motor to provide the abort separation from the Launch Vehicle, an Attitude Control Motor to provide attitude and rate control, and a Jettison Motor for crew module to LAS separation (Fig. 2). The jettison motor is used during a nominal launch to separate the LAS from the Launch Vehicle (LV) early in the flight of the second stage when it is no longer needed for aborts and at the end of an LAS abort sequence to enable deployment of the crew module's Landing Recovery System. The LAS also provides a Boost Protective Cover fairing that shields the crew module from debris and the aero-thermal environment during ascent. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. A number of flight tests have been conducted and are planned to demonstrate the performance and enable certification of the Orion Spacecraft. Exploration Flight Test 1, the first flight test of the Orion spacecraft, was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. Orion's first flight was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety, such as heat shield performance, separation events, avionics and software performance, attitude control and guidance, parachute deployment and recovery operations. One of the key separation events tested during this flight was the nominal jettison of the LAS. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. The LAS nominal jettison event on Exploration Flight Test 1 occurred at six minutes and twenty seconds after liftoff (See Fig. 3). The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. A suite of developmental flight instrumentation was included on the flight test to provide data on spacecraft subsystems and separation events. This paper will focus on the flight test objectives and performance of the LAS during ascent and nominal jettison. Selected LAS subsystem flight test data will be presented and discussed in the paper. Exploration Flight Test -1 will provide critical data that will enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

McCauley, R.↗

SU-E-T-259: Development of a Primary Standard for LDR Brachytherapy

Purpose: The National Research Council initiated a program in 2012 to develop a primary standard to calibrate I-125 and Pd-103 sources used for LDR brachytherapy and disseminate this through calibration services to Canadian users. This will simplify procedures as Canadian cancer centres currently have to ship instruments to the US. Methods: The standard is based on a commercial version of the wide-angle free air chamber (WAFAC) pioneered by NIST. Significant enhancements were implemented to improve signal-to-noise and measurement reproducibility and eliminate electric field effects. Validation of this ionization chamber was then carried out in a low-energy X -ray beam (∼ 31 keV) where the dose rate had been previously established using the existing NRC primary standard free-air chamber. As a final component of this initial testing, measurements were made with a set of I-125 seeds (with air kerma strength traceable to NIST). Results: Excellent agreement of the two NRC free-air chambers was obtained within the combined standard uncertainty of 0.5 %. However, it was found that the WAFAC response is very sensitive to the beam geometry (distance from the source, diameter of the beam-defining aperture, etc) and Monte Carlo calculations, carried out to evaluate these geometry corrections, have confirmed the experimental results. The results for the seed measurements indicated a precision of better than 1 % is achievable for a reasonable acquisition time and the air kerma strength agreed with the manufacturer (NIST-traceable) value within 2 %. Conclusion: The prototype primary standard for LDR brachytherapy has met accuracy target of 3 % for the determination of air kerma strength. Work is ongoing to refine operation of the device and develop the calibration protocol for clinical users, with an anticipated launch of a calibration service in late 2015.

60 APPLIED LIFE SCIENCES↗

Shuttle and ISS Food Systems Management

Russia and the U.S. provide the current International Space Station (ISS) food system. Each country contributes half of the food supply in their respective flight food packaging. All of the packaged flight food is stowed in Russian provided containers, which interface with the Service Module galley. Each country accepts the other's flight worthiness inspections and qualifications. Some of the food for the first ISS crew was launched to ISS inside the Service Module in July of 2000, and STS-106 in September 2000 delivered more food to the ISS. All subsequent food deliveries will be made by Progress, the Russian re-supply vehicle. The U.S. will ship their portion of food to Moscow for loading onto the Progress. Delivery schedules vary, but the goal is to maintain at least a 45-day supply onboard ISS at all times. The shelf life for ISS food must be at least one year, in order to accommodate the long delivery cycle and onboard storage. Preservation techniques utilized in the US food system include dehydration, thermo stabilization, intermediate moisture, and irradiation. Additional fresh fruits and vegetables will be sent with each Progress and Shuttle flights as permitted by volume allotments. There is limited refrigeration available on the Service Module to store fresh fruits and vegetables. Astronauts and cosmonauts eat half U.S. and half Russian food. Menu planning begins 1 year before a planned launch. The flight crews taste food in the U.S. and in Russia and rate the acceptability. A preliminary menu is planned, based on these ratings and the nutritional requirements. The preliminary menu is then evaluated by the crews while training in Russia. Inputs from this evaluation are used to finalize the menu and flight packaging is initiated. Flight food is delivered 6 weeks before launch. The current challenge for the food system is meeting the nutritional requirements, especially no more than 10 mg iron, and 3500 mg sodium. Experience from Shuttle[Mir also indicated insufficient caloric intake for many crewmembers. Additional thermostabilized and irradiated foods have been developed for ISS to improve the ease of preparation and overall acceptability. Dehydrated foods offer limited advantage, since water must be delivered to ISS. An effort is underway to introduce other International Partner's food into the ISS food system. At first this will be one or two selected foods with the potential for more as the program matures. An increase in the variety of available foods would improve the overall acceptability. Additional galley capability will be required when the crew size increases on ISS. Anticipated improvements include freezers, refrigerators and microwave ovens. All of the ISS food development efforts are devoted to improving the food acceptability and subsequent consumption and mission success

Kloeris, Vickie↗

Roles of the ground and flight crew in Apollo operations.

The functions performed by ground personnel and flight crews of Apollo missions are reviewed, covering vehicle systems operation and management, Saturn launch vehicle, command-service and lunar modules, lunar rover, communication relay unit and ground-commanded TV assembly. Details of the flight path, scientific experiments, photographic equipment and crew health monitoring are also discussed in terms of these functions. The coordinated combination of large numbers of experts and data processing equipment on the ground with the crew's capabilities to operate the spacecraft and exercise on-the-spot judgements is viewed as the backbone of the successful fulfillment of Apollo missions.

Wolfer, B. M.↗

A 10,000-gpm liquid hydrogen transfer system for the Saturn/Apollo program.

Brief description of the design and operation of the liquid hydrogen transfer system used to service the Saturn V launch vehicle. The cryogenic loading of the huge booster begins eight hours before the scheduled liftoff. The first three hours of fueling are spent in cold hydrogen gas conditioning of the fuel tank. The cold hydrogen gas is provided by vaporizing liquid hydrogen from the storage tank and routing the resultant gas through the fill system. Boil-off losses after loading are continuously replaced through control valves which are driven by a computer system. The liquid hydrogen transfer system is made up of a number of subsystems including the 850,000 gal storage tank whose boil-off losses amount to only 200 gal/day, the pressurization system, the burn pond for controlled disposal of hydrogen waste gas, the storage tank fill manifold, and the hazardous gas monitoring system. Some of the subsystems and components are redundant to provide a high degree of reliability.

Wybranowski, E., Jr.↗

Expendable second stage reusable space shuttle booster. Volume 2: Technical summary. Book 3: Booster vehicle modifications and ground systems definition

A definition of the expendable second stage and space shuttle booster separation system is presented. Modifications required on the reusable booster for expendable second stage/payload flight and the ground systems needed to operate the expendable second stage in conjuction with the space shuttle booster are described. The safety, reliability, and quality assurance program is explained. Launch complex operations and services are analyzed.

Source record↗

Skylab 2 space vehicle data evaluation guide

Vehicle telemetry measurements for all stages of Skylab 2 are presented. The data sources for the launch vehicle and command service module are identified. The data evaluation guide format is described. The system for designating the components of the spacecraft is defined. A list of abbreviations for technical terms used in the reporting documents is included.

Source record↗

Space tug/shuttle interface compatibility study. Volume 1: Executive summary

Shuttle interfaces required for space tug accommodation are primarily involved with supporting and servicing the tug during launch countdown, flight, and postlanding; deploying and retrieving the tug on orbit; and maintaining control over the tug when it is in or near the orbiter. Each of these interface areas was investigated to determine the best physical and operational method of accomplishing the required functions, with an overriding goal of establishing simple and flexible orbiter interface requirements suitable for tug, tug payloads, IUS and other cargo. It is concluded the orbiter payload accommodations and the MSFC baseline tug are generally interface compatible. Specific minor changes to tug and orbiter interfaces were identified to provide full compatibility. A system concept for supporting and deploying tug from orbiter is described.

Source record↗

Space Shuttle External Tank Gaseous Oxygen Vent System

Two problems had to be solved to assure successful elimination of ice on the External Tank (ET). First, an access/support structure was provided from the Launch Complex 39A Fixed Service Structure to the vicinity of the nose cone on the ET approximately 82.3 meters (270 feet) above the surface of the pad and 22.9 meters (75 feet) from the face of the FSS. Second, an umbilical was designed and tested that would seal around the ET gaseous oxygen (GOX) vent louvers and not allow ice to form on the tank or the umbilical. A modified Apollo service arm was chosen. An inflatable vent seal subsystem was chosen, providing a cloth seal around each vent louver with an internal annulus to provide a path for the gaseous oxygen from the ET to a hard duct on the swing arm.

Franklin, W. G.↗

STS pricing policy

In 1977 NASA published Shuttle Reimbursement Policies for Civil U.S. Government, DOD and Commercial and Foreign Users. These policies were based on the principle of total cost recovery over a period of time with a fixed flat price for initial period to time to enhance transition. This fixed period was to be followed with annual adjustments thereafter, NASA is establishing a new price for 1986 and beyond. In order to recover costs, that price must be higher than the initial fixed price through FY 1985. NASA intends to remain competitive. Competitive posture includes not only price, but other factors such as assured launch, reliability, and unique services. NASA's pricing policy considers all these factors.

Lee, C. M.↗

Lunar surface vehicle model competition

During Fall and Winter quarters, Georgia Tech's School of Mechanical Engineering students designed machines and devices related to Lunar Base construction tasks. These include joint projects with Textile Engineering students. Topics studied included lunar environment simulator via drop tower technology, lunar rated fasteners, lunar habitat shelter, design of a lunar surface trenching machine, lunar support system, lunar worksite illumination (daytime), lunar regolith bagging system, sunlight diffusing tent for lunar worksite, service apparatus for lunar launch vehicles, lunar communication/power cables and teleoperated deployment machine, lunar regolith bag collection and emplacement device, soil stabilization mat for lunar launch/landing site, lunar rated fastening systems for robotic implementation, lunar surface cable/conduit and automated deployment system, lunar regolith bagging system, and lunar rated fasteners and fastening systems. A special topics team of five Spring quarter students designed and constructed a remotely controlled crane implement for the SKITTER model.

Source record↗

Development of the MAMA Detectors for the Hubble Space Telescope Imaging Spectrograph

The development of the Multi-Anode Microchannel Array (MAMA) detector systems started in the early 1970's in order to produce multi-element detector arrays for use in spectrographs for solar studies from the Skylab-B mission. Development of the MAMA detectors for spectrographs on the Hubble Space Telescope (HST) began in the late 1970's, and reached its culmination with the successful installation of the Space Telescope Imaging Spectrograph (STIS) on the second HST servicing mission (STS-82 launched 11 February 1997). Under NASA Contract NAS5-29389 from December 1986 through June 1994 we supported the development of the MAMA detectors for STIS, including complementary sounding rocket and ground-based research programs. This final report describes the results of the MAMA detector development program for STIS.

Timothy, J. Gethyn↗

Aerospace Safety Advisory Panel

This annual report is based on the activities of the Aerospace Safety Advisory Panel in calendar year 2000. During this year, the construction of the International Space Station (ISS) moved into high gear. The launch of the Russian Service Module was followed by three Space Shuttle construction and logistics flights and the deployment of the Expedition One crew. Continuous habitation of the ISS has begun. To date, both the ISS and Space Shuttle programs have met or exceeded most of their flight objectives. In spite of the intensity of these efforts, it is clear that safety was always placed ahead of cost and schedule. This safety consciousness permitted the Panel to devote more of its efforts to examining the long-term picture. With ISS construction accelerating, demands on the Space Shuttle will increase. While Russian Soyuz and Progress spacecraft will make some flights, the Space Shuttle remains the primary vehicle to sustain the ISS and all other U.S. activities that require humans in space. Development of a next generation, human-rated vehicle has slowed due to a variety of technological problems and the absence of an approach that can accomplish the task significantly better than the Space Shuttle. Moreover, even if a viable design were currently available, the realities of funding and development cycles suggest that it would take many years to bring it to fruition. Thus, it is inescapable that for the foreseeable future the Space Shuttle will be the only human-rated vehicle available to the U.S. space program for support of the ISS and other missions requiring humans. Use of the Space Shuttle will extend well beyond current planning, and is likely to continue for the life of the ISS.

Source record↗

Lightning Detection in a Flash

In a joint project with NASA's Kennedy Space Center, Global Atmospherics, Inc. (GAI), participated in the upgrade and commercialization of the Lightning Detection and Ranging (LDAR) System. Under a Space Act Agreement, GAI and Kennedy agreed to the joint development of a new LDAR system that meets the needs of both NASA and private industry. The resulting development was a volumetric lightning mapping system. NASA operates a three- dimensional LDAR system capable of determining the exact location and altitude of in-cloud and cloud-to-cloud lightning. Under the Space Act Agreement, GAI contributed its wealth of experience and resources to update and improve the current lightning mapping system used by NASA. Previously, commercial systems were only capable of locating cloud-to-ground lightning. The resulting innovations allowed GAI to position the LDAR system for commercial applications. The upgraded product has the ability to measure in-cloud and cloud-to-cloud lightning. Notable improvements have also been made in the system's location accuracy and signal detection. The new product, known as LDAR II, is targeted for use by utility providers, aviation companies, airports, and commercial space vehicle launch facilities. Presently, forecasting services, research facilities, and a utility company are using the system.

Source record↗

Corrosion Study Using Electrochemical Impedance Spectroscopy

Corrosion is a common phenomenon. It is the destructive result of chemical reaction between a metal or metal alloy and its environment. Stainless steel tubing is used at Kennedy Space Center for various supply lines which service the orbiter. The launch pads are also made of stainless steel. The environment at the launch site has very high chloride content due to the proximity to the Atlantic Ocean. Also, during a launch, the exhaust products in the solid rocket boosters include concentrated hydrogen chloride. The purpose of this project was to study various alloys by Electrochemical Impedance Spectroscopy in corrosive environments similar to the launch sites. This report includes data and analysis of the measurements for 304L, 254SMO and AL-6XN in primarily neutral 3.55% NaCl. One set of data for 304L in neutral 3.55%NaCl + 0.1N HCl is also included.

Farooq, Muhammad Umar↗

Introduction and ISS assembly description

This introductory address provides a brief overview and a timeline for construction of the International Space Station, beginning with the July 2000 launch of the Russian Service Module, Zvezda, and ending with the Mission STS-112.

Facility Design and Construction↗

STS-114 Flight Day 1 Highlights

Video coverage of NASA's Return to Flight begins with the pre-flight meal and suit-up of the STS-114 crew (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda), and its departure for the launch pad on the Astrovan. The astronauts board Space Shuttle Discovery and are seated. Arms on the launch pad's Fixed Service Structure pull away, and Discovery is shown from liftoff through booster separation. Video of the ascent from a new camera onboard the External Tank (ET) is included, which features views of the ET's bipod and the tank's separation from the orbiter, with Earth in the background. During a change of shift at Mission Control Center, staff members congratulate the Shuttle crew, and Commander Collins thanks them.

Source record↗

Ares First Stage "Systemology" - Combining Advanced Systems Engineering and Planning Tools to Assure Mission Success

Ares is an integral part of NASA s Constellation architecture that will provide crew and cargo access to the International Space Station as well as low earth orbit support for lunar missions. Ares replaces the Space Shuttle in the post 2010 time frame. Ares I is an in-line, two-stage rocket topped by the Orion Crew Exploration Vehicle, its service module, and a launch abort system. The Ares I first stage is a single, five-segment reusable solid rocket booster derived from the Space Shuttle Program's reusable solid rocket motor. The Ares second or upper stage is propelled by a J-2X main engine fueled with liquid oxygen and liquid hydrogen. This paper describes the advanced systems engineering and planning tools being utilized for the design, test, and qualification of the Ares I first stage element. Included are descriptions of the current first stage design, the milestone schedule requirements, and the marriage of systems engineering, detailed planning efforts, and roadmapping employed to achieve these goals.

Seiler, James↗