Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket Lays Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce R. Askins↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket: Laying Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce Askins↗

Validation and Simulation of Ares I Scale Model Acoustic Test - 3 - Modeling and Evaluating the Effect of Rainbird Water Deluge Inclusion

The Ares I Scale Model Acoustics Test (ASMAT) is a series of live-fire tests of scaled rocket motors meant to simulate the conditions of the Ares I launch configuration. These tests have provided a well documented set of high fidelity measurements useful for validation including data taken over a range of test conditions and containing phenomena like Ignition Over-Pressure and water suppression of acoustics. Building on dry simulations of the ASMAT tests with the vehicle at 5 ft. elevation (100 ft. real vehicle elevation), wet simulations of the ASMAT test setup have been performed using the Loci/CHEM computational fluid dynamics software to explore the effect of rainbird water suppression inclusion on the launch platform deck. Two-phase water simulation has been performed using an energy and mass coupled lagrangian particle system module where liquid phase emissions are segregated into clouds of virtual particles and gas phase mass transfer is accomplished through simple Weber number controlled breakup and boiling models. Comparisons have been performed to the dry 5 ft. elevation cases, using configurations with and without launch mounts. These cases have been used to explore the interaction between rainbird spray patterns and launch mount geometry and evaluate the acoustic sound pressure level knockdown achieved through above-deck rainbird deluge inclusion. This comparison has been anchored with validation from live-fire test data which showed a reduction in rainbird effectiveness with the presence of a launch mount.

Strutzenberg, Louise L.↗

Development of Constraint Force Equation Methodology for Application to Multi-Body Dynamics Including Launch Vehicle Stage Seperation

The objective of this report is to develop and implement a physics based method for analysis and simulation of multi-body dynamics including launch vehicle stage separation. The constraint force equation (CFE) methodology discussed in this report provides such a framework for modeling constraint forces and moments acting at joints when the vehicles are still connected. Several stand-alone test cases involving various types of joints were developed to validate the CFE methodology. The results were compared with ADAMS(Registered Trademark) and Autolev, two different industry standard benchmark codes for multi-body dynamic analysis and simulations. However, these two codes are not designed for aerospace flight trajectory simulations. After this validation exercise, the CFE algorithm was implemented in Program to Optimize Simulated Trajectories II (POST2) to provide a capability to simulate end-to-end trajectories of launch vehicles including stage separation. The POST2/CFE methodology was applied to the STS-1 Space Shuttle solid rocket booster (SRB) separation and Hyper-X Research Vehicle (HXRV) separation from the Pegasus booster as a further test and validation for its application to launch vehicle stage separation problems. Finally, to demonstrate end-to-end simulation capability, POST2/CFE was applied to the ascent, orbit insertion, and booster return of a reusable two-stage-to-orbit (TSTO) vehicle concept. With these validation exercises, POST2/CFE software can be used for performing conceptual level end-to-end simulations, including launch vehicle stage separation, for problems similar to those discussed in this report.

Pamadi, Bandu N.↗

Software Architecture of the NASA Shuttle Ground Operations Simulator - SGOS

The SGOS executive and its subsystems have been an integral component of the Shuttle Launch Safety Program for almost thirty years. It is usable (via the LAN) by over 2000 NASA employees at the Kennedy Space Center and 11,000 contractors. SGOS supports over 800 models comprised of several hundred thousand lines of code and over 1,000 MCP procedures. Yet neither language has a for loop!! The simulation software described in this paper is used to train ground controllers and to certify launch countdown readiness.

Cook, Robert P.↗

Software Architecture of the NASA Shuttle Ground Operations Simulator--SGOS

The SGOS executive and its subsystems have been an integral component of the Shuttle Launch Safety Program for almost thirty years. it is usable (via the LAN) by over 2000 NASA employees at the Kennedy Space Center and 11,000 contractors. SGOS supports over 800 models comprised of several hundred thousand lines of code and over 1,00 MCP procedures. Yet neither language has a for loop!! The simulation software described in this paper is used to train ground controllers and to certify launch countdown readiness.

Cook Robert P.↗

NASA Software Cost Estimation Model: An Analogy Based Estimation Model

The cost estimation of software development activities is increasingly critical for large scale integrated projects such as those at DOD and NASA especially as the software systems become larger and more complex. As an example MSL (Mars Scientific Laboratory) developed at the Jet Propulsion Laboratory launched with over 2 million lines of code making it the largest robotic spacecraft ever flown (Based on the size of the software). Software development activities are also notorious for their cost growth, with NASA flight software averaging over 50% cost growth. All across the agency, estimators and analysts are increasingly being tasked to develop reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods there is very little focus on the use of models based on analogy and clustering algorithms. In this paper we summarize our findings on effort/cost model estimation and model development based on ten years of software effort estimation research using data mining and machine learning methods to develop estimation models based on analogy and clustering. The NASA Software Cost Model performance is evaluated by comparing it to COCOMO II, linear regression, and K-­ nearest neighbor prediction model performance on the same data set.

Hihn, Jairus↗

Unexplained Discontinuity in the US Radiosonde Temperature Data: Stratosphere - Part 2

In part I of this paper, the United States (US) radiosonde temperature data are shown to have significant and unexplained inhomogeneities in the mid-troposphere. This part discusses the differences between observations taken at 0 and 12 UTC especially in the stratosphere by the Vaisala RS80 radiosondes that are integrated within the National Weather Service's (NWS) Micro-ART system. The results show that there is a large maxima in the horizontal distribution of the monthly means of the 0/12 UTC differences over the central US that is absent over Canada and this maxima is as large as 5 C at 10 hPa. The vertical profiles of the root-mean-square of the monthly means are much larger in the US than those else where. The data clearly shows that the 0/12 UTC differences are largely artificial especially over the central US and originate in the post processing software at observing stations, thus confirming the findings in part I. Special flight data from the NWS's test facility at Sterling, Va. have been obtained. This data can be used to deduce the bias correction applied by Vaisala's post processing system. By analyzing the correction data, it can be shown that the inconsistencies with non-US Vaisala RS80 data as well as most of the large 0/12 UTC differences over the US can be accounted for by multiplying the reported elapsed time (i.e. time since launch) by the factor which is incorrectly applied by the post processing software. After being presented with the findings in this paper, Vaisala further isolated the source of the inconsistencies to a software coding error in the radiation bias correction scheme. The error effects only the software installed at US stations.

Redder, Christopher R.↗

SEDSAT 1 Technologies

The original goals of this project were to support the development of SEDSAT 1 for a tethered launch in July of 1997. This specifically required: (1) Monitoring development progress against a comprehensive delivery plan; (2) Incremental development and release of CDS and SEASIS software; (3) Supporting the integration of version 1.0 SEASIS software that will allow minimal autonomous operation without a software reload. These algorithms would include image quality evaluation, attitude determination, and autonomous earth imaging; and (4) Developing software requirements and design for ground segment software, concentrating on command and data download capability; and interface to external development efforts for a more comprehensive software suite to be used after the initial mission. Because of an unfavorable space shuttle safety review of the SEDS-3 tether deployer, and cost and schedule problems in upgrading the deployer, the mission was changed to an independent launch of SEDSAT. The original plan was to do a tether-less deployment from the space shuttle. Since this would have resulted in an unacceptable orbital lifetime, the mission was changed again to a tethered launch from a Delta II in June 1998. As a result of Marshall Space Flight Center's redirection of the SEDS-3 mission away from a tether launch, the whole question of a tether endmass had to be reconsidered. The net result of these multiple changes was twofold. First, we completed work needed to define some aspects of ground software on SEDSAT 1 that would remain constant no matter the launch mode. Second, we developed a set of concepts for using SEDSAT 1 technology to support alternative endmass missions on SEDS-3. Both of these are included.

Maier, Mark W.↗

Managing Complexity - Developing the Node Control Software For The International Space Station

On December 4th, 1998 at 3:36 AM STS-88 (the space shuttle Endeavor) was launched with the "Node 1 Unity Module" in its payload bay. After working on the Space Station program for a very long time, that launch was one of the most beautiful sights I had ever seen! As the Shuttle proceeded to rendezvous with the Russian American module know as Zarya, I returned to Houston quickly to start monitoring the activation of the software I had spent the last 3 years working on. The FGB module (also known as "Zarya"), was grappled by the shuttle robotic arm, and connected to the Unity module. Crewmembers then hooked up the power and data connections between Zarya and Unity. On December 7th, 1998 at 9:49 PM CST the Node Control Software was activated. On December 15th, 1998, the Node-l/Zarya "cornerstone" of the International Space Station was left on-orbit. The Node Control Software (NCS) is the first software flown by NASA for the International Space Station (ISS). The ISS Program is considered the most complex international engineering effort ever undertaken. At last count some 18 countries are active partners in this global venture. NCS has performed all of its intended functions on orbit, over 200 miles above us. I'll be describing how we built the NCS software.

Wood, Donald B.↗

The Space Communications and Navigation Testbed aboard International Space Station: Seven Years of Space-based Reconfigurable Software Defined Communications, Navigation, and Networking

The adoption of software defined radios offers space missions a new way to develop and operate space transceivers for communications and navigation.The SCaN Testbed on-board the ISS led groundbreaking efforts to champion use of software defined radios for space communications. The SCaN Testbed has allowed NASA, industry, academia, and international partners to pursue their respective interests in joint collaboration with NASA, and move this technology and it's applications to the space domain. Launched in 2012, The SCaN Testbed has logged over 4000 hours of operation exploring the development, reconfiguration, and operation of software defined radios and their software applications. Over the past seven years, experimenters and organizations from across the United States and around the world, have advanced the applications of software defined radios and networks using the SCaN Tested. Some of SCaN Testbed's successful experiments include the demonstration of the first Ka-band full duplex space transceiver, which became an R&D 100 award winning technology, and was inducted into the Space Technology Hall of Fame, following the launch and space deployment of a successful commercial product line based on the Testbed radios.Experiments have focused on new software development and operations concepts for understanding how to manage and apply this relatively new technology to space to improve communications and navigation for space science and exploration missions. The advanced capabilities of the software radios allow for multiple applications or functions (e.g., communication and navigation) to operate from the same radio platform. Multiple software waveform applications enable software component reuse and improve efficiency for multiple applications operating over different mission phases. The new capabilities of software defined radios such as on-orbit reconfiguration, also present new challenges such as increased operational complexity. Experiments of the SCaN testbed include more intelligent or cognitive applications to improve communications efficiency and manage the complexity of the radios, the communication channels, and the network itself. The software defined radios on the SCaN Testbed are each compliant to NASA's Space Telecommunications Radio System (STRS) Architecture. The STRS Architecture provides commonality among radio developments from different providers and different mission applications, and is designed to reduce the cost, risk, and complexity of unique and custom radio developments. This radio architecture standard defines common waveform software interfaces, methods of instantiation, operation, and documentation. As the SCaN Testbed concludes its operations on ISS, this presentation explores the advancements and accomplishments made to advance software defined radio technology and its applications for exploration. The accomplishments cover a number of experiment areas in Ka-band and S-band communications with TDRS, high rate communications, adaptive waveform operation, navigation using both GPA and Galileo constellations, complex networking and disruptive tolerant link protocols, user initiative service, and initial experiments with intelligent and cognitive applications which demonstrate the significant potential of software defined and cognitive radios.

Mortensen, Dale↗

Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements

KSC-DE-512-SM establishes overall requirements and best design practices to be used at the John F. Kennedy Space Center (KSC) for the development of ground systems (GS) in support of operations at launch, landing, and retrieval sites. These requirements apply to the design and development of hardware and software for ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F-GSS) used to support the KSC mission for transportation, receiving, handling, assembly, test, checkout, servicing, and launch of space vehicles and payloads and selected flight hardware items for retrieval. This standards manual supplements NASA-STD-5005 by including KSC-site-specific and local environment requirements. These requirements and practices are optional for equipment used at manufacturing, development, and test sites.

Ground Support Systems↗

Applied Research Study

The purpose of this project was to study the feasibility of reusing major components of a software system that had been used to control the operations of a spacecraft launched in the 1980s. The study was done in the context of a ground data processing system that was to be rehosted from a large mainframe to an inexpensive workstation. The study concluded that a systematic approach using inexpensive tools could aid in the reengineering process by identifying a set of certified reusable components. The study also developed procedures for determining duplicate versions of software, which were created because of inadequate naming conventions. Such procedures reduced reengineering costs by approximately 19.4 percent.

Leach, Ronald J.↗

Modeling and Simulation of Shuttle Launch and Range Operations

The simulation and modeling test bed is based on a mockup of a space flight operations control suitable to experiment physical, procedural, software, hardware and psychological aspects of space flight operations. The test bed consists of a weather expert system to advise on the effect of weather to the launch operations. It also simulates toxic gas dispersion model, impact of human health risk, debris dispersion model in 3D visualization. Since all modeling and simulation is based on the internet, it could reduce the cost of operations of launch and range safety by conducting extensive research before a particular launch. Each model has an independent decision making module to derive the best decision for launch.

Bardina, Jorge↗

Extreme Ultraviolet Imaging Telescope (EIT)

Efforts concentrated on development and implementation of the SolarSoft (SSW) data analysis system. From an EIT analysis perspective, this system was designed to facilitate efficient reuse and conversion of software developed for Yohkoh/SXT and to take advantage of a large existing body of software developed by the SDAC, Yohkoh, and SOHO instrument teams. Another strong motivation for this system was to provide an EIT analysis environment which permits coordinated analysis of EIT data in conjunction with data from important supporting instruments, including Yohkoh/SXT and the other SOHO coronal instruments; CDS, SUMER, and LASCO. In addition, the SSW system will support coordinated EIT/TRACE analysis (by design) when TRACE data is available; TRACE launch is currently planned for March 1998. Working with Jeff Newmark, the Chianti software package (K.P. Dere et al) and UV /EUV data base was fully integrated into the SSW system to facilitate EIT temperature and emission analysis.

Lemen, J. R.↗

Radio astronomy Explorer-B postlaunch attitude operations analysis

The attitude support activities of the Radio Astronomy Explorer-B are reported. The performance of the spacecraft hardware and software are discussed along with details of the mission events, from launch through main boom deployment. Reproductions of displays are presented which were used during support activities. The interactive graphics proved the support function by providing the quality control necessary to ensure mission success in an environment where flight simulated ground testing of spacecraft hardware cannot be performed.

Werking, R. D.↗

Real-time dynamic spacecraft simulation

This paper presents experience in designing and implementing a fully interactive real-time dynamic spacecraft simulation software system for the International Ultraviolet Explorer (IUE) satellite to be launched by NASA. The primary objective for this simulator, called SIMIUE, is to help train the IUE Operations Control Center personnel in the dynamic commanding and operations of the IUE spacecraft. It is felt that the approach taken in developing SIMIUE will prove to be largely valid for spacecraft training simulators to be developed for future satellites. For this reason discussion of those aspects of SIMIUE which relate specifically to the IUE satellite has been kept to a minimum.

Macker, A. J.↗

KSC facilities status and planned management operations

A status report is presented on facilities and planned operations at the Kennedy Space Center with reference to Space Shuttle launch activities. The facilities are essentially complete, with all new construction and modifications to existing buildings almost finished. Some activity is still in progress at Pad A and on the Mobile Launcher due to changes in requirements but is not expected to affect the launch schedule. The installation and testing of the ground checkout equipment that will be used to test the flight hardware is now in operation. The Launch Processing System is currently supporting the development of the applications software that will perform the testing of this flight hardware.

Gray, R. H.↗