Search NASA⌕ Search

SEARCH · Search NASA

Results for “network scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Building Columbia from the System Administrator View

This document is about NASA advanced supercomputing by building Columbia through the configuration of its software, hardware, and network. The content also includes future plans which include tight scheduling, maintaining production while building Columbia and continued production work while reworking the facilities to acommodate Columbia.

Chan, Davin↗

System Engineering on the Use for Ares I,V - the Simpler, the Better

The Ares I and Ares V Vehicles will utilize the J-2X rocket engine developed for NASA by the Pratt & Whitney Rocketdyne Company. The J-2X is an improved higher power version of the original J-2 engine used during the Apollo program. With higher power and updated requirements for safety and performance, the J-2X becomes a new engine using state-of-the-art design methodology, materials and manufacturing processes. The implementation of Systems Engineering (SE) principles enables the rapid J-2X development program to remain aligned with the ARES I and V vehicle programs, Meeting the aggressive development schedule is a challenge. Coordinating the best expertise thai NASA and PWR have to offer requires effectively utilizing resources at multiple sites. This presents formidable communication challenges. SE allows honest and open discussions of issues and problems. This simple idea is often overlooked in large and complex SE programs. Regular and effective meetings linking SE objectives to component designs are used to voice differences of opinions with customer and contractor in attendance so that the best mutual decisions can be made on the shortest possible schedule. Regular technical interchange meetings on secure program wide computer networks and CM processes are effective,in the "Controlled Change" process that exemplifies good SE. Good communication is a key effective SE implementation. The System of Systems approach is the vision of the Orion program which facilitates the establishment of dynamic SE processes at all levels including the engine. SE enables requirements evolution by facilitating organizational and process agility. Flow down and distribution of requirements is controlled by Allocation Reports which breakdown numerical design objectives (weight, reliability, etc.) into quanta goals for each component area. Linked databases of design and verification requirements helps eliminate redundancy and potential mistakes inherent m separated systems. Another tool, the Architecture Design Description, is being used to control J-2X system architecture and effectively communicate configuration changes to those involved in the design process. But the proof is in successful program accomplishment. The SE is the methodology being used to meet the challenge of completing J-2X engine certification 2 years ahead of any engine program ever developed at PWR. The Ares I SE system of systems has delivered according to expectations thus far. All major design reviews (SRR. PDR, CDR) have been successfully conducted to satisfy overall program objectives using SE as the basis for accomplishment. The paper describes SE tools and techniques utilized to achieve this success.

Kelly, William↗

Proposed planning and scheduling services for the SNC in the CDOS era

Studies indicate that the current NCC mode of operation needs to be enhanced to meet the needs of the mid to late 19990's. There is a need to simplify the request interface for Space Network services. This is because there are more complex missions, more flexible spacecraft operations, more scheduling data volume, and more events per spacecraft and scheduling period.

Welden, Todd↗

The EDSN Intersatellite Communications Architecture

The Edison Demonstration of Smallsat Networks (EDSN) is a swarm of eight 1.5U Cubesats developed by the NASA Ames Research Center under the Small Spacecraft Technology Program (SSTP) within NASA Space Technology Mission Directorate (STMD). EDSN, scheduled for launch in late 2014, is designed to explore the use of small spacecraft networks to make synchronized, multipoint scientific measurements, and to organize and pass those data to the ground through their network. Networked swarms of these small spacecraft will open new horizons in astronomy, Earth observations and solar physics. Their range of applications include the formation of synthetic aperture radars for Earth sensing systems, large aperture observatories for next generation telescopes and the collection of spatially distributed measurements of time varying systems, probing the Earth's magnetosphere, Earth-Sun interactions and the Earth's geopotential. The EDSN communications network is maintained and operated by a simple set of predefined rules operating independently on all eight spacecraft without direction from ground based systems. One spacecraft serves as a central node, requesting and collecting data from the other seven spacecraft, organizing the data and passing it to a ground station at regular intervals. The central node is rotated among the spacecraft on a regular basis, providing robustness against the failure of a single spacecraft. This paper describes the communication architecture of the EDSN network and its operation with small spacecraft of limited electrical power, computing power and communication range. Furthermore, the problems of collecting and prioritizing data through a system that has data throughput bottlenecks are addressed. Finally, future network enhancements that can be built on top of the current EDSN hardware are discussed.

Communications↗

SMC: SCENIC Model Control

NASAs Space Communications and Navigation (SCaN) program manages three active networks: the Near Earth Network, the Space Network, and the Deep Space Network. These networks simultaneously support NASA missions and provide communications services to customers worldwide. To efficiently manage these resources and their capabilities, a team of student interns at the NASA Glenn Research Center is developing a distributed system to model the SCaN networks. Once complete, the system shall provide a platform that enables users to perform capacity modeling of current and prospective missions with finer-grained control of information between several simulation and modeling tools. This will enable the SCaN program to access a holistic view of its networks and simulate the effects of modifications in order to provide NASA with decisional information. The development of this capacity modeling system is managed by NASAs Strategic Center for Education, Networking, Integration, and Communication (SCENIC). Three primary third-party software tools offer their unique abilities in different stages of the simulation process. MagicDraw provides UMLSysML modeling, AGIs Systems Tool Kit simulates the physical transmission parameters and de-conflicts scheduled communication, and Riverbed Modeler (formerly OPNET) simulates communication protocols and packet-based networking. SCENIC developers are building custom software extensions to integrate these components in an end-to-end space communications modeling platform. A central control module acts as the hub for report-based messaging between client wrappers. Backend databases provide information related to mission parameters and ground station configurations, while the end user defines scenario-specific attributes for the model. The eight SCENIC interns are working under the direction of their mentors to complete an initial version of this capacity modeling system during the summer of 2015. The intern team is composed of four students in Computer Science, two in Computer Engineering, one in Electrical Engineering, and one studying Space Systems Engineering.

Simulation↗

ACTS Multibeam Communications Package - Technology for the 1990S

To maintain its competitive position in the 1990s, satellite communications must evolve to provide new services and to reduce the costs of supplying existing services. NASA's Advanced Communications Technology Satellite (ACTS) program is directed toward developing the technology base that will support this evolution. The ACTS communications payload is optimized for digital communications using a time-division multiple access format. Scanning spot-beam antennas provide high-performance on-demand service to the earth communication stations. On-board processing and switching allow full connectivity in a single-hop network architecture. ACTS employs Ka-band (30/20 GHz) links for communications traffic and includes techniques for mitigating rain fades. Scheduled to be launched by a Space Shuttle in 1992, ACTS will provide in-orbit technology verification and support experimental communications networks for up to four years.

Graebner, John C.↗

Research In Nonlinear Flight Control for Tiltrotor Aircraft Operating in the Terminal Area

The research during the first year of the effort focused on the implementation of the recently developed combination of neural net work adaptive control and feedback linearization. At the core of this research is the comprehensive simulation code Generic Tiltrotor Simulator (GTRS) of the XV-15 tilt rotor aircraft. For this research the GTRS code has been ported to a Fortran environment for use on PC. The emphasis of the research is on terminal area approach procedures, including conversion from aircraft to helicopter configuration. This report focuses on the longitudinal control which is the more challenging case for augmentation. Therefore, an attitude command attitude hold (ACAH) control augmentation is considered which is typically used for the pitch channel during approach procedures. To evaluate the performance of the neural network adaptive control architecture it was necessary to develop a set of low order pilot models capable of performing such tasks as, follow desired altitude profiles, follow desired speed profiles, operate on both sides of powercurve, convert, including flaps as well as mastangle changes, operate with different stability and control augmentation system (SCAS) modes. The pilot models are divided in two sets, one for the backside of the powercurve and one for the frontside. These two sets are linearly blended with speed. The mastangle is also scheduled with speed. Different aspects of the proposed architecture for the neural network (NNW) augmented model inversion were also demonstrated. The demonstration involved implementation of a NNW architecture using linearized models from GTRS, including rotor states, to represent the XV-15 at various operating points. The dynamics used for the model inversion were based on the XV-15 operating at 30 Kts, with residualized rotor dynamics, and not including cross coupling between translational and rotational states. The neural network demonstrated ACAH control under various circumstances. Future efforts will include the implementation into the Fortran environment of GTRS, including pilot modeling and NNW augmentation for the lateral channels. These efforts should lead to the development of architectures that will provide for fully automated approach, using similar strategies.

Calise, A. J.↗

TechEdSat-11: Prototyping Autonomous Communications in Orbit

Cognitive Engine 1 (CE-1) is a state-of-the-art automated system designed to manage routine operations and respond to adverse events without requiring human operator input. CE-1 will optimize scheduling capabilities, detect and react to link failures, and ensure data delivery deadlines are met efficiently. Seamless roaming between government and commercial providers will allow for a robust and cost-effective network. TechEdSat-11 will demonstrate two key components of CE-1: User Initiated Services (UIS) and Delay Tolerant Networking (DTN). The first phase of the experiment will use UIS to automate on-demand scheduling of a commercial S-band ground station. Later phases of the experiment will demonstrate DTN store-and-forward and space internetworking capabilities through the TechEdSat-11 S-band radio. This paper will discuss the CE-1 main components relevant to the experiment, the flight and ground software architecture, experiment concept of operations and preliminary results.

Rachel Dudukovich↗

An Integrated Gate Turnaround Management Concept Leveraging Big Data Analytics for NAS Performance Improvements

"Gate Turnaround" plays a key role in the National Air Space (NAS) gate-to-gate performance by receiving aircraft when they reach their destination airport, and delivering aircraft into the NAS upon departing from the gate and subsequent takeoff. The time spent at the gate in meeting the planned departure time is influenced by many factors and often with considerable uncertainties. Uncertainties such as weather, early or late arrivals, disembarking and boarding passengers, unloading/reloading cargo, aircraft logistics/maintenance services and ground handling, traffic in ramp and movement areas for taxi-in and taxi-out, and departure queue management for takeoff are likely encountered on the daily basis. The Integrated Gate Turnaround Management (IGTM) concept is leveraging relevant historical data to support optimization of the gate operations, which include arrival, at the gate, departure based on constraints (e.g., available gates at the arrival, ground crew and equipment for the gate turnaround, and over capacity demand upon departure), and collaborative decision-making. The IGTM concept provides effective information services and decision tools to the stakeholders, such as airline dispatchers, gate agents, airport operators, ramp controllers, and air traffic control (ATC) traffic managers and ground controllers to mitigate uncertainties arising from both nominal and off-nominal airport gate operations. IGTM will provide NAS stakeholders customized decision making tools through a User Interface (UI) by leveraging historical data (Big Data), net-enabled Air Traffic Management (ATM) live data, and analytics according to dependencies among NAS parameters for the stakeholders to manage and optimize the NAS performance in the gate turnaround domain. The application will give stakeholders predictable results based on the past and current NAS performance according to selected decision trees through the UI. The predictable results are generated based on analysis of the unique airport attributes (e.g., runway, taxiway, terminal, and gate configurations and tenants), and combined statistics from past data and live data based on a specific set of ATM concept-of-operations (ConOps) and operational parameters via systems analysis using an analytic network learning model. The IGTM tool will then bound the uncertainties that arise from nominal and off-nominal operational conditions with direct assessment of the gate turnaround status and the impact of a certain operational decision on the NAS performance, and provide a set of recommended actions to optimize the NAS performance by allowing stakeholders to take mitigation actions to reduce uncertainty and time deviation of planned operational events. An IGTM prototype was developed at NASA Ames Simulation Laboratories (SimLabs) to demonstrate the benefits and applicability of the concept. A data network, using the System Wide Information Management (SWIM)-like messaging application using the ActiveMQ message service, was connected to the simulated data warehouse, scheduled flight plans, a fast-time airport simulator, and a graphic UI. A fast-time simulation was integrated with the data warehouse or Big Data/Analytics (BAI), scheduled flight plans from Aeronautical Operational Control AOC, IGTM Controller, and a UI via a SWIM-like data messaging network using the ActiveMQ message service, illustrated in Figure 1, to demonstrate selected use-cases showing the benefits of the IGTM concept on the NAS performance.

Efficent ATM systems↗

A distributed computing approach to mission operations support

Computing mission operation support includes orbit determination, attitude processing, maneuver computation, resource scheduling, etc. The large-scale third-generation distributed computer network discussed is capable of fulfilling these dynamic requirements. It is shown that distribution of resources and control leads to increased reliability, and exhibits potential for incremental growth. Through functional specialization, a distributed system may be tuned to very specific operational requirements. Fundamental to the approach is the notion of process-to-process communication, which is effected through a high-bandwidth communications network. Both resource-sharing and load-sharing may be realized in the system.

Larsen, R. L.↗

Intelligent systems technology infrastructure for integrated systems

Significant advances have occurred during the last decade in intelligent systems technologies (a.k.a. knowledge-based systems, KBS) including research, feasibility demonstrations, and technology implementations in operational environments. Evaluation and simulation data obtained to date in real-time operational environments suggest that cost-effective utilization of intelligent systems technologies can be realized for Automated Rendezvous and Capture applications. The successful implementation of these technologies involve a complex system infrastructure integrating the requirements of transportation, vehicle checkout and health management, and communication systems without compromise to systems reliability and performance. The resources that must be invoked to accomplish these tasks include remote ground operations and control, built-in system fault management and control, and intelligent robotics. To ensure long-term evolution and integration of new validated technologies over the lifetime of the vehicle, system interfaces must also be addressed and integrated into the overall system interface requirements. An approach for defining and evaluating the system infrastructures including the testbed currently being used to support the on-going evaluations for the evolutionary Space Station Freedom Data Management System is presented and discussed. Intelligent system technologies discussed include artificial intelligence (real-time replanning and scheduling), high performance computational elements (parallel processors, photonic processors, and neural networks), real-time fault management and control, and system software development tools for rapid prototyping capabilities.

Lum, Henry, Jr.↗

Satellite laser station Helwan status 1992

The Satellite Laser Station Helwan has been operated jointly by the National Research Institute of Astronomy and Geophysics in Helwan, Egypt and the Czech Technical University in Prague, Czechslovakia. The station components have been carefully tuned to increase the systems overall stability and reliability critical for the remote location. The mount correction model based on the Gaussian smoothing has been implemented to simplify the blind satellite acquisition and tracking. The on-site normal points generation algorithm has been implemented, the station has been connected to the international information network. The ERS-1 satellite has been included into the tracking schedule. The station range capability has been verified by experimental Etalon 1 ranging by April 1992. The ranging precision of 2-3 centimeters is obtained when ranging to ERS-1, Starlette, and Lageos satellites.

Cech, M.↗

Deep Space Network (DSN), Network Operations Control Center (NOCC) computer-human interfaces

The Network Operations Control Center (NOCC) of the DSN is responsible for scheduling the resources of DSN, and monitoring all multi-mission spacecraft tracking activities in real-time. Operations performs this job with computer systems at JPL connected to over 100 computers at Goldstone, Australia and Spain. The old computer system became obsolete, and the first version of the new system was installed in 1991. Significant improvements for the computer-human interfaces became the dominant theme for the replacement project. Major issues required innovating problem solving. Among these issues were: How to present several thousand data elements on displays without overloading the operator? What is the best graphical representation of DSN end-to-end data flow? How to operate the system without memorizing mnemonics of hundreds of operator directives? Which computing environment will meet the competing performance requirements? This paper presents the technical challenges, engineering solutions, and results of the NOCC computer-human interface design.

Ellman, Alvin↗

Nozomi Cis-Lunar Phase Orbit Determination

Japan's Institute of Space and Astronautical Science (ISAS) launched Nozomi, its first mission to the planet Mars using the newly developed M-V launch vehicle on July 3, 1998. Scientific objectives of the mission are to study the structure and dynamics of the Martian upper atmosphere and its interaction with the solar wind. Nozomi is a cooperative mission between ISAS and the National Aeronautics and Space Administration (NASA). The NASA contribution includes navigation and tracking services provided by the Jet Propulsion Laboratory (JPL). The spacecraft also serves as an engineering demonstration of basic technology for planetary exploration. One of the new technologies was a unique trajectory, developed by ISAS, which used solar gravitational perturbations at the weak stability boundary as an aid to achieve an Earth-Mars transfer orbit. This trajectory saves approximately 120 m/s of Delta V compared to direct hyperbolic insertion and is considered an enabling technology for the mission. Nozomi was the first spacecraft to employ this trajectory and provided on-orbit validation of the technique. The trajectory was achieved by initially placing the spacecraft in a highly elliptical cis-lunar phasing orbit. Six maneuvers were performed during this period to correct injection errors and target an outbound lunar swingby in September 1998. The gravity assist from the lunar swingby raised apogee to the vicinity of the weak stability boundary. After three more targeting maneuvers, Nozomi performed an inbound lunar swingby followed immediately by a powered Earth swingby in late December 1998. A 420 m/s Trans Mars Insertion (TMI) burn at the final Earth periapsis was intended to place the spacecraft on a heliocentric trajectory leading to Mars orbit insertion in October 1999. Orbit determination for Nozomi is performed in parallel by both ISAS and the Multi-Mission Navigation (MMNAV) group at JPL. This was an advantage for the mission because each group would generate solutions based on data collected from their respective tracking networks. Spacecraft events, such as sequence uplinks and maneuvers, were generally scheduled during passes at the Usuda tracking station in Japan. As a result, maneuver design and reconstruction was derived from MMNAV solutions based on JPL tracking data obtained immediately prior to or following maneuvers. Data was also exchanged between ISAS and MMNAV so orbit determination could be performed on joint data sets in support of critical targeting late in the cis-lunar phase. In this paper, information regarding the MMNAV orbit determination effort for the first six months of the mission is presented. The spacecraft trajectory is characterized first, followed by a discussion of the orbit determination estimation procedure and models. Results from selected orbit solutions are presented and compared against reconstructed trajectories. One area of emphasis in this paper is orbit determination in the vicinity of the weak stability boundary. Precise navigation was necessary to target the second lunar swingby and the powered Earth swingby. Delivery accuracy of 150 m was required for these critical encounters, but a number of factors contributed to the general degradation of orbit determination accuracy. This included the fact that the spacecraft was at apogee, at a range of 1.7 million km and moving at less than I km/sec perpendicular to the line of sight. Nozomi was also close to zero degrees declination where there are known limitations on orbit determination performance. Finally, S-band tracking data was acquired through the Nozomi backup low gain antenna. This antenna is offset from the axis of this spin stabilized spacecraft and superimposed large signatures in the Doppler and range data. These difficulties were overcome by combining long data arcs, spanning several maneuvers, with a high fidelity solar pressure model. The model included a physically accurate representation of the spacecraft structure and a high time resolution orientation model. Observation modeling included the removal of the spin induced Doppler bias, spin signature and per pass correction of range calibration errors applied for data leading up to critical events. As a result, all orbit determination goals were met. A second area of emphasis in this paper is the JPL tracking and orbit determination effort in support of the TMI maneuver. TMI occurred out of contact with ground stations and the JPL Goldstone tracking complex had the first pass following the bum. As a result, MMNAV had the responsibility to make a rapid assessment of the maneuver performance. MMNAV made the determination that a 100 m/s under bum had occurred and promptly informed ISAS via voice lines. ISAS immediately began preparations for a correction maneuver (TMIc), which had to be performed during the next Usuda pass. The near real time assessment by MMNAV provided accurate antenna frequency and pointing updates for the spacecraft acquisition at Usuda and the close coordination between the two agencies enabled the design and successful execution of the TMc maneuver. Propellant consumption during the correction burn dictated that the mission be redesigned. ISAS developed a new plan which adds 3 full solar orbits, two Earth swingbys and one lunar swingby with arrival at Mars in January 2004. The final Mars orbit will still enable the mission to achieve all of its science objectives.

Ryne, Mark↗

Coordinating, Scheduling, Processing and Analyzing IYA09

The IVS scheduled a special astrometric VLBI session for the International Year of Astronomy 2009 (IYA09) commemorating 400 years of optical astronomy and 40 years of VLBI. The IYA09 session is the most ambitious geodetic session to date in terms of network size, number of sources, and number of observations. We describe the process of designing, coordinating, scheduling, pre-session station checkout, correlating, and analyzing this session.

Gipson, John↗

Integrated RF/Optical Interplanetary Networking Preliminary Explorations and Empirical Results

Over the last decade interplanetary telecommunication capabilities have been significantly expanded--specifically in support of the Mars exploration rover and lander missions. NASA is continuing to drive advances in new, high payoff optical communications technologies to enhance the network to Gbps performance from Mars, and the transition from technology demonstration to operational system is examined through a hybrid RF/optical approach. Such a system combines the best features of RF and optical communications considering availability and performance to realize a dual band trunk line operating within characteristic constraints. Disconnection due to planetary obscuration and solar conjunction, link delays, timing, ground terminal mission congestion and scheduling policy along with space and atmospheric weather disruptions all imply the need for network protocol solutions to ultimately manage the physical layer in a transparent manner to the end user. Delay Tolerant Networking (DTN) is an approach under evaluation which addresses these challenges. A multi-hop multi-path hybrid RF and optical test bed has been constructed to emulate the integrated deep space network and to support protocol and hardware refinement. Initial experimental results characterize several of these challenges and evaluate the effectiveness of DTN as a solution to mitigate them.

Raible, Daniel E.↗