Search NASA⌕ Search

SEARCH · Search NASA

Results for “procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Robot deployable air sampling development suite

Many areas exist within the DOE EM complex where it is desired to obtain a better understanding of the environment through the use of sensors. Many of these areas are hazardous and/or inaccessible to humans requiring the development of capabilities and technologies to remotely access these areas for monitoring. Often it is desired to understand the air quality and basic environmental parameters of these inaccessible areas. The focus this LDRD was to identify and procure air and environmental sampling sensors of common interest to DOE facilities such as pH, Nitric Acid Concentration (NOx), humidity, temperature, and air velocity. Additionally, it was desired to procure a robotic platform as a basis developing a remotely deployable air sampling suite.

54 ENVIRONMENTAL SCIENCES↗

An On-Axis Tomography Holder for Correlative Electron and Atom Probe Microscopy

This document briefly outlines the procurement and commissioning of a Fishione Model 2050 on-axis rotational tomography specimen holder for the FEI F200X Talos Scanning Transmission Electron Microscope in Oak Ridge National Laboratory’s Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Model 2050 specimen rod was successfully procured and commissioned and is now available to users.

47 OTHER INSTRUMENTATION↗

Weekly Update -- Scintillators and Mobile Imaging System

The Neutron Imaging (NI) project is developing innovative tools that will allow multimodal imaging and high-quality CT imaging of dense objects. To realize these goals a Flat Panel Detector (FPD) has been procured and novel scintillating materials are being investigated. A compact, mobile neutron imaging system is being designed and components procured

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Design Installation and Operation of the Vortex ART Platform

ATS platforms are some of the largest, most complex, and most expensive computer systems installed in the United States at just a few major national laboratories. This milestone describes our recent efforts to procure, install, and test a machine called Vortex at Sandia National Laboratories that is compatible with the larger ATS platform Sierra at LLNL. In this milestone, we have 1) configured and procured a machine with similar hardware characteristics as Sierra ATS, 2) installed the machine, verified its physical hardware, and measured its baseline performance, and 3) demonstrated the machine's compatibility with Sierra ATS, and capacity for useful development and testing of Sandia computer codes (such as SPARC), including uses such as nightly regression testing workloads.

97 MATHEMATICS AND COMPUTING↗

Site Preparation Integration and Operation of Mini-Sierra ART System

ATS platforms are some of the largest, most complex, and most expensive computer systems installed in the United States at just a few major national laboratories. This milestone describes our recent efforts to procure, install, and test a machine called Vortex at Sandia National Laboratories that is compatible with the larger ATS platform Sierra at LLNL. In this milestone, we have 1) configured and procured a machine with similar hardware characteristics as Sierra ATS, 2) installed the machine, verified its physical hardware, and measured its baseline performance, and 3) demonstrated the machine’s compatibility with Sierra ATS, and capacity for useful development and testing of Sandia computer codes (such as SPARC), including uses such as nightly regression testing workloads.

97 MATHEMATICS AND COMPUTING↗

Thermally Conductive Backsheets (TCB) for Reduced Operating Temperatures

The performance of photovoltaic (PV) modules is primarily influenced by the plane of array (POA) irradiance and their operating temperature. The lower the module operating temperature, the higher is its performance. Increasing a module’s operating temperature reduces its power output due to an increase in the semiconductor’s intrinsic carrier density, leading to a reduction in the open-circuit voltage and, subsequently, reducing the maximum power point voltage. Reducing the operating temperature lowers the levelized cost of energy (LCOE) via increased energy production (i.e., more kilowatt hour over the life of the asset) and increased service lifetime (years in the field). The module operating temperature is dictated by the weather parameters and the thermal properties of module construction materials. The primary weather parameters influencing the PV module temperature are: the ambient temperature (directly related), irradiance (directly related), and wind speed (inversely related). The primary thermal properties of module construction materials influencing the PV module temperature are: the optical transmissivity and thermal conductivity of superstrate, the thermal conductivity of substrate, the thermal conductivity of encapsulant and the efficiency of the encapsulated solar cells. The primary goal of this study is to reduce the operating temperature of PV modules using thermally conductive backsheet (TCB) substrates developed by the industry. The temperature of PV modules installed in a large multi-MW plant can also be influenced by their physical locations in the plants due to the influence of wind direction. A thermal mapping of PV plants has also been investigated and presented in this study. The most commonly used PV backsheet material has been polyvinyl fluoride (DuPont trade name “Tedlar”)-based backsheet, which typically has three layers: Tedlar–polyethylene terephthalate (PET)–Tedlar (TPT). The primary goal of this project is to reduce the module operating temperature below the benchmark TPT backsheet temperature using newly developed TCBs by the industry. The overall approach of this project involves six focus areas: i) select and procure one TPT and thirteen promising TCBs available in the industry; ii) construct a large number of 1-cell and 9-cell modules using benchmark TPT and selected TCBs [all other construction materials are fixed and they are: glass superstrate, EVA encapsulant, mono-Si cell and junction box]; iii) to identify best performing TCBs, monitor the long-term field operating temperatures of the constructed modules which are installed in three climatic conditions (hot-low wind [Mesa, AZ], hot-high wind [Maricopa County, AZ] and temperate [Cumberland County, NC]; iv) to identify the most durable TCB, perform extended accelerated reliability testing of modules constructed with best three TCBs and benchmark TPT; v) to predict module temperature, develop physical and empirical thermal models with and without thermal properties of all construction materials in the modules, respectively; and vi) to determine the influence of wind speed and direction on the module operating temperature in a plant, and perform thermal mapping of PV modules in two large PV plants [Maricopa County, AZ and Cumberland County, NC]. The key achievements of this project are listed below: Backsheet selection: 14 backsheets were procured after an extensive literature and industry search. Finally, based on the thermal and other selection criteria, 1 TPT and 4 thermally conductive backsheets were selected for this project. Fabrication of mini modules: 50 one-cell modules were fabricated in year 1 for thermal performance evaluation. The module design was changed to nine-cell module at start of year 2 to mimic commercial design. 20 nine-cell modules were fabricated in year 2 for thermal performance evaluation. 28 four-cell modules were fabricated in year 3 for accelerated stress-testing. Thermal conductivity of backsheets: Year 1 TCBs showed at least 8% higher thermal conductivities than TPT. Year 2 and 3 TCBs showed at least 20% higher thermal conductivities than TPT. Installation of mini PV modules at three sites: 6 one-cell modules and 8 nine-cell modules were installed at AZ-1 site [Mesa, AZ]. 12 one-cell modules and 6 nine-cell modules were installed at each of two powerplants (AZ-2 [Maricopa County, AZ] and NC sites). Nominal operating cell temperatures (NOCT) of mini PV modules: NOCT of TCBs were observed to be lower than TPT with differences as high as 2°C. Comparison of thermal performance: The median operating temperature of one-cell modules was found to be reduced by 2°C by using TCB_A modules compared to TPT modules on several days in a month for few months in a year. The median temperature improvement of 4oC was achieved at several instances on a few days, but not all days, in a year using multiple TCBs compared to TPT. The final project milestone of achieving median temperature improvement of 5oC was achieved at several instances on a few days, but not all days, in a year using TCB_A compared to TPT. Empirical thermal model (without the need of construction material properties): Empirical thermal model for one-cell module was developed based on the input data of irradiance, wind speed and ambient temperatures. The primary input data differentiator for temperature differences between TPT and TCBs appears to be the irradiance level (solar gain). Accelerated durability testing: 20 four-cell modules using 4 backsheets (1 TPT and 3 TCBs) were exposed to Damp Heat 1000 hours (8 modules), UV/Thermal cycling (50 cycles)/Humidity freeze (10 cycles) test sequence (8 modules) and UV Weathering for qualification (8 modules). All the modules with four selected backsheets passed the stress tests per the retest guidelines of IEC 61215 standard for the backsheet change. Simplified comparative LCOE analysis: Using backsheet-specific power degradation levels in the accelerated tests (for TCB_A and TPT only), efficiency, service lifetime and assuming same cost for all backsheets, the LCOE of modules using TCB_A is determined to be lower than TPT. Due to lower operating temperature of TCB_A-based modules compared to TPT-based modules, the operating efficiency and service life of TCB_A-based modules are calculated to be higher than TPT-based modules. Temperature mapping of PV power plants: A distinct temperature difference (as high as 4°C) has been observed between the modules located in various parts of a single PV plant.

14 SOLAR ENERGY↗

Hot Topic Brief: Emerging Policies for Mobilizing Private Sector Investment into Clean Energy in the Philippines

The Philippines has one of the highest electricity prices for commercial and residential consumers in the Association of Southeast Asian Nations (ASEAN) region with prices between $0.12 (commercial) and $0.20 (residential) per kilowatt-hour (kWh) (ERIA 2018). Significant reliance on imported coal and diesel is the primary cause of this cost to ratepayers. This 'hot topic brief' details new policies in the Philippines designed to diversify the country's fuel-mix and the opportunities for investments in renewable energy to reduce prices for consumers and industry. This brief focuses on two recent policies: 1. Renewable Portfolio Standard (RPS): The RPS establishes mandatory targets for each electric distribution utility--both publicly and privately owned--to procure renewable energy through 2030. 2. Green Energy Option Program (GEOP): The GEOP enables companies to independently procure renewable energy from third-party power producers, which can be used to help meet private sector renewable energy goals, unlock lower electricity costs, and increase energy security.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ORBIT: Offshore Renewables Balance-of-System and Installation Tool

This report describes the Offshore Renewables Balance-of-system Installation Tool ("ORBIT"), a new model developed by the National Renewable Energy Laboratory (NREL) to evaluate the balance-of-system (BOS) costs associated with offshore wind projects. In the context of wind energy projects BOS costs encompass all expenses required to construct a project other than the capital expenditures (CapEx) of the turbines and towers, including the procurement costs for all other components (such as substructures, cables, and electrical infrastructure), offshore and land-based construction costs, port costs, site surveying fees, permitting fees, and leasing fees are all categorized as BOS costs. BOS costs significantly contribute to the levelized cost of energy (LCOE) for offshore wind, typically comprising over 50\% of the CapEx for a fixed-bottom offshore wind project and 60\% for a floating project. In addition, technology solutions and installation methods vary drastically between projects as they are impacted by factors such as vessel availability, geographic considerations and site geotechnical conditions. These effects require a model with appropriate fidelity to understand how these costs scale as turbine rating increases and the offshore wind supply chain, particularly offshore construction vessels, is expanded. For offshore wind, cost savings attributed to increased turbine rating are primarily realized through BOS procurement and project installation as fewer substructures and less cable are required. BOS costs represent both a modeling challenge, as well as an opportunity, for project developers to optimize solutions to reduce costs. It is critical to understand how these costs are affected by novel technologies, innovative installation processes, and operational constraints in order identify meaningful cost reductions for offshore wind energy.

17 WIND ENERGY↗

Materials response under hypersonic flow conditions probed by multi-modal diagnostics in a benchtop wind tunnel

In this LDRD “Materials response under hypersonic flow conditions probed by multi-modal diagnostics in a benchtop wind tunnel” a peer-reviewed lab-scale hypersonic wind tunnel (WT) was planned to be assembled in-house, along with time and space resolved and related flow and materials diagnostics to derive high quality measurements and the science that is able to inform the development of our modeling and simulation codes for the hypersonic regime. The baseline capability to achieve Mach 3 flow was scheduled to be completed in Q4 2020, in the first year of the LDRD. However due to the COVID-19 delays and travel restrictions starting in March, 2020 this task could not be completed to carry out the materials response studies in-house, or those planned with external partners that were engaged during this LDRD (NASA Langley, NASA Ames, Texas A&M university, and Virginia Tech). Still, using our hypersonic computational fluid simulation codes, many of the hypersonic components have been designed (for Mach 3, 5, and 7) and procured (or in procurement phase), and a new dedicated hypersonic laboratory was facilitized, 2 WT test sections have been manufactured, and a Mach 3 nozzle was 3D printed for prototyping. In parallel, unique materials diagnostics have been tested under static conditions and fully specified and awaiting validation in our partner facilities. Due to the new hypersonic initiative announced in January, 2020 we proposed a related scope increase in hypersonics research requiring energy interactions and new diagnostics well beyond what could be supported by an LDRD ER. A decision was made to end the current LDRD ER and formally propose a new LDRD SI that leverages the current effort, which will be starting in FY21. As a result of the uniqueness of this LDRD work, our early efforts have been encouraged and well received in the hypersonic research community, and is now part of multiple unsolicited internal and external project proposals expected to be funded in the coming years, which is encouraging to make LLNL a leader in experimentally probing extreme physics of local energetics critical to hypersonics.

36 MATERIALS SCIENCE↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Plant Water Profiler: A Water Balance and True Cost of Water Calculator for Manufacturing Plants

As the uncertainty of a sustained water supply, regulatory constraints, competition among end users, and public scrutiny increases, a growing number of manufacturing sectors are adapting to current and emerging water-related risks by optimizing productivity and reducing waste. As a step toward increasing water use efficiency and making informed business decisions, corporations must make an effort to understand and track their water demands, losses, and costs associated with each subsystem within their facilities. Manufacturers are often unaware of the “true cost of water” (i.e., the total costs associated with procurement, treatment, and consumption of water, and wastewater disposal), which reduces the visibility of the actual impact of water-saving measures. To help manufacturers account for water procurement and use in manufacturing operations, quantify the true cost of water, and identify potential areas for water and associated energy cost savings, an open access tool—Plant Water Profiler (PWP)—was developed. The tool is based on water mass balance analysis and has been adopted as the core analysis tool for plant water use assessments, Water In-Plant Training (Water INPLT), as part of the US Department of Energy’s Better Plants program. During three pilot INPLTs conducted in 2019 at three manufacturing facilities, the PWP tool allowed users to understand water flows within the facilities and provided additional capabilities to analyze their water use. This paper describes the methodology behind the PWP tool and its implementation through pilot Water INPLT trainings delivered in three manufacturing facilities in the United States. The three case studies demonstrate opportunities to improve water efficiency and reduce associated costs and the challenges encountered in three different manufacturing sectors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Preparing Distribution Utilities for the Future - Evolving Customer Consumption in Renewable Rich Grids: A Novel Analytical Framework

The research collaboration between NREL and BYPL focuses on the challenges caused by renewable integration into the power grid at large. Since the challenges and opportunities vary depending on the point of interconnection (distribution or transmission) the research team identified two tracks for research as listed below: 1. Power procurement - This research track focuses on the challenges and opportunities caused by GW scale renewable integration at the transmission level. Specifically, this track focuses on the contribution that utility-scale renewable energy procurement provides to distribution utilities, both from energy and capacity perspectives. In this track of research, utility customers are only considered as traditional (one-directional) consumers of energy. 2. Distributed energy resources - This research track focuses on the challenges and opportunities caused by many small-scale distributed renewable resource integrations at the distribution systems. At the power distribution level, distribution utilities may face not only new solar energy technologies, but also battery energy storage and electric vehicles as well. These three technologies (solar PV, battery energy storage, and electric vehicles) combined, pose unique challenges to distribution utilities. This track focuses on assessing the net-load evolution that distribution utilities observe as these emerging technologies make their way to the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience Service Framework Using Transactive Systems Valuation Methodology

Recent outage events have spurred national and international interest in improving grid resilience. Actions to make the grid more resilient must be valued against their costs and benefits. This is the goal of this report. We explore a resilience valuation framework, where the services procured by the utility are arranged such that the values associated with them are pinpointed. This is demonstrated by utilizing various diagrams developed in Pacific Northwest National Laboratory’s Transactive System Program, called the Transactive Systems Valuation Methodology (TSVM). We show that TSVM can be utilized to guide traditional valuation methodologies such as integrated resource planning so that resilience considerations can be embedded. This report demonstrates this using a three-step procedure: (1) a use case is developed to define functional requirements, (2) value identification of the utility and the actors with which it interacts (both inside and outside its internal functions), and (3) value tracking of activity performed by actors interacting with the utility while services are procured to enable a resilient grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Hydraulic Experimental Test Article - Status Report FY20 Q2

The Thermal Hydraulic Experimental Test Article (THETA) is a facility that will be used to develop sodium components and instrumentation as well as acquire experimental data for validation of reactor thermal hydraulic and safety analysis codes. The facility will simulate nominal conditions as well as protected/unprotected loss of flow accidents in a sodium-cooled fast reactor (SFR). High fidelity distributed temperature profiles of the developed flow field will be acquired with Rayleigh backscatter based optical fiber temperature sensors. The facility is being designed in partnership with systems code experts to tailor the experiment to ensure the most relevant and highest quality data for code validation. THETA is comprised of a traditional primary and secondary system. The primary system is submerged in the pool of sodium and consists of a pump, electrically heated core, intermediate heat exchanger, and connected piping and thermal barriers (like a redan). The secondary system, located outside of the sodium pool, consists of a pump, sodium to air heat exchanger, and connected piping and valves. Figure 1 illustrates the main components of the primary system. THETA will be installed in the Mechanisms Engineering Test Loop (METL) with the primary system in the 28 inch Test Vessel #4, Figure 2. The design work for the facility has been completed, most primary component have been fabricated, primary components are being assembled in preparation for initial testing, and procurement is continuing with the secondary system components. Since the FY19 THETA status report, The THETA primary system components are at Argonne National Laboratory (ANL) and have been dry assembled. The secondary sodium system for heat rejection from intermediate heat exchanger has all been analyzed according to ASME code. All secondary side piping, fittings and a U-stamped air-to-sodium heat exchanger has been procured.

42 ENGINEERING↗

Opportunities for Simultaneous Efficiency Improvement and Refrigerant Transition in Air Conditioning

In October of 2016, nearly 200 Parties agreed to amend the Montreal Protocol in Kigali, Rwanda, to phase-down consumption and production of hydrofluorocarbons (HFCs) by 2050. Growth in the use of HFCs, including those currently used as refrigerants in air-conditioning systems, is being driven by demand from emerging economies, hot climates, and rising incomes that are also undergoing rapid urbanization and electrification. Air conditioners (ACs), as an energy-intensive end-use technology, are also covered by a growing number of energy efficiency standards, labeling, procurement, incentive, and other supporting efficiency programs. Therefore, improving room AC energy efficiency and transitioning to low-global warming potential (GWP) refrigerants simultaneously presents significant opportunities to deploy energy efficient technology and reduce the energy and emissions impacts of room ACs, while keeping costs low for consumers. This report aims to provide an initial sense of the opportunities to improve efficiency and transition to low-GWP refrigerants by reviewing the HCFC and HFC regulatory framework and energy efficiency standards and labeling programs in 19 economies that account for roughly 65 percent of global room AC demand. Based on this analysis, we identified key opportunities for coordinated action on efficiency improvement and refrigerant transition for the domestic room AC sector (i.e., ductless mini-split ACs), such as: - implementing or revising standards and labeling programs to improve efficiency levels with the possibility of adding a low-GWP criterion. - combining fixed speed and inverter AC product categories to account for seasonal variations in climate and part-load operating conditions, and using seasonal energy efficiency ratio (SEER) instead of energy efficiency ratio (EER) to better reflect performance of inverter ACs. - implementing market transformation programs, such as bulk procurement programs, to drive down the costs of efficient technology through economies of scale. - aligning timelines for implementing efficiency standards with timelines for refrigerant management plans to coordinate policy actions. - maximizing the energy efficiency improvements of Montreal Protocol investments by coordinating efforts to help keep costs low for consumers and manufacturers during equipment redesign and manufacturing line retooling for refrigerant transition. In order to realize the significant peak load, energy saving and climate benefits of these opportunities associated with improving energy efficiency in tandem with the refrigerant transition, some risks may need to be mitigated, principally safety concerns over risks of accidental ignition with refrigerants rated flammable. This can be mitigated by continuing and accelerating the development of safety standards currently being updated, for example, by the International Electrotechnical Commission (IEC) and improving training for production, installation and maintenance during the use of flammable refrigerants. While some low-GWP refrigerants may cost more than the current baseline refrigerants, the cost of refrigerants is only ~1% of lifecycle costs for an AC. Costs can also be reduced through manufacturing advances and efficiency improvements, particularly if they are supported by policies that encourage technological development through deployment of superefficient ACs at scale. Finally, during the transition, there is a risk of obsolete technology being deployed in markets that either have not updated their standards or have later compliance dates. This risk can be mitigated by updating standards and reviewing them periodically to ensure their effectiveness.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

LANL’s Digital Supply Chain Transformation with Ariba Part 2 [Slides]

LANL’s budget continues to increase. Our annual procurement spend has increased from approximately 750 million two years ago to 1.4 Billion in FY21. Procurement for LANL is a mix of indirect and direct but had limited managed spend – more standalone orders vs master contracts. The level of transformation we were looking to achieve required a comprehensive approach, encompassing people, processes and software solutions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Medium and Heavy Duty Vehicle Powertrain Electrification and Fleet Demonstration

The Contract Award Grant # EE0007513 dated 2 June, 2016 is for the design, development and demonstration of medium duty package delivery vehicles that will result in a 100% increase in fuel economy as measured in miles per gallon. The project was proposed in 3 phases over two budget periods. The Phases were: 1. Modeling and Simulation – This phase was completed and formed the basis of the specifications for the design and build of the physical systems. The modeling and simulation was conducted by AVL and used real world package delivery routes that AVL mapped. The motors, battery pack, range extender and balance of plant support systems were modeled and iterated until a system with the desired fuel economy improvement was realized. Early design of the major subsystems using the actual vehicle space constraints was also completed. This phase was successfully completed in May of 2017. 2. 1st Build and FE Confirmation - This phase was completed and resulted in the final design, release, procurement and build of all major vehicle systems for commissioning into the first vehicle. The work was a partnered effort between McLaren and AVL. McLaren built the eAxle system while AVL built the range extender and integrated the range extender, battery and balance of plant sub-systems into the first vehicle with a control system to make it operate. Prior to the end of this phase a real world HIL system test gave evidence that the fuel economy improvement would be achieved in the real world. This phase was exited with a 7 month delay due mostly to procurement and supply base issues and ended in May, 2018. 3. Final Build and Demonstration - This phase included the final build and commissioning of the four program vehicles and the operation of a demonstration on a set of routes near San Diego California. During this phase, a multitude of issues arose in different systems in the vehicle. These issue resolution exercises were quite complex and caused repeated delays but were all successfully completed. It should also be noted that an early commercialization analysis resulted in the conclusion that the complexity of the system would not make it cost effective, leading to the start of a follow-on design that used newly available component technologies to specify a more cost effective system. This design will be repurposed and put into demonstration on a separately (non-DOE) funded program. It was decided and agreed with DOE that this phase should be considered completed. The knowledge and know-how gained on this program has been incorporated into and transferred to the new program. This phase and the entire program was considered closed on June 1, 2021.

33 ADVANCED PROPULSION SYSTEMS↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗