Search NASA⌕ Search

SEARCH · Search NASA

Results for “program managers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Competing Interests and Creating Value - Balancing Durable and Enforceable Institutional Controls with Beneficial Reuse - 20320

US DOE LM has various real property interests at the 100 sites within its current portfolio, with an anticipated total of 127 sites within the next 5 years. Each site has its own narrative with respect to the real property assets. Since the regulatory time frame for long-term surveillance and maintenance activities at some sites can be in perpetuity, durable and effective instruments and documentation are necessary to support LM's unique mission as a federal land manager and steward. More than half of the sites currently in LM's inventory do not allow unrestricted use, and institutional controls (ICs) are required to limit human and environmental exposures to residual contamination. LM's Asset Management program balances protection of human health and the environment with a goal of optimizing its land portfolio through mitigation of risk, limiting liability, and creating value, whether tangible or intangible, in these types of assets. The IC layering strategy utilizes multiple types, restrictions, and legal authorities to protect human health and the environment. This layering strategy influences the transition of these properties into LM's portfolio to assess potential beneficial reuses. The LM's beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. LM strives to create value in a perceived valueless asset and reevaluates and revisits the potential opportunities for these sites as long-term surveillance and maintenance activities are performed and objectives are achieved. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment as well as ensuring activities are environmentally sound by retaining good stewardship of natural resources. LM has recently revised both the Institutional Control Program Guidance and its Beneficial Reuse Management Plan to integrate the issues of land use with ICs, creating value in these impaired assets. This paper presents the following topics: (1) a general overview of LM's IC and beneficial reuse programs; (2) the unique aspects of each of these programs as a result of the multiple regulatory requirements and programs that affect LM sites; (3) case studies of LM sites to show examples of how LM created value while complying with the ICs and layering strategies; and (4) the most common challenges to beneficial reuses at LM sites and potential options for value creation in impaired assets. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aggregate Risk Tool for Human Space Flight

This project utilized Data fusion capabilities developed from the 2020-2022 Information Fusion (IFDA) IRAD to enhance functionality of a Human Spaceflight (HSF) Aggregate Risk Product developed by the JSC Flight Safety Office. The tool compiles and presents risk data from multiple Program and Commercial Provider vehicles to provide a holistic assessment of residual risk to Program Managers and Technical Authorities prior to HSF Launches. The aggregation or coupling of risks from multiple sources (Examples: PRA, variances, anomaly data bases, Program Risk Management data bases, technical review board minutes, Hazard Analysis, etc.) when analyzed, identify potential areas of elevated risk in components, systems or mission phases that would otherwise be undetected by nonintegrated program risk management tools and possesses.

Patrick Huckaby↗

Strategic Options for International Participation in Space Exploration: Lessons from U.S.-Japan Defense Cooperation

The President's Commission on Implementation of United States Space Exploration Policy suggests that after NASA establishes the Space Exploration vision architecture, it should pursue international partnerships. Two possible approaches were suggested: multiple independently operated missions and an integrated mission with carefully selected international components. The U.S.-Japan defense sectors have learned key lessons from experience with both of these approaches. U.S.-Japan defense cooperation has evolved over forty years from simple military assistance programs to more complex joint development efforts. With the evolution of the political-military alliance and the complexity of defense programs, these cooperative efforts have engaged increasingly industrial resources and capabilities as well as more sophisticated forms of planning, technology transfers and program management. Some periods of this evolution have been marked by significant frictions. The U.S.Japan FS-X program, for example, provides a poor example for management of international cooperation. In November 1988, the United States and Japan signed a Memorandum of Understanding (MOU) to co-develop an aircraft, named FS-X and later renamed F -2, as a replacement to the aging Japan support fighter F-l. The program was marked by numerous political disputes. After over a decade of joint development and testing, F -2 production deliveries finally began in 1999. The production run was curtailed due to much higher than anticipated costs and less than desired aircraft performance. One universally agreed "lesson" from the FSX/F-2 case was that it did not represent the ideal approach to bilateral cooperation. More recent cooperative programs have involved targeted joint research and development, including component development for ballistic missile defense systems. These programs could lay the basis for more ambitious cooperative efforts. This study examines both less-than-stellar international cooperation efforts as well as more successful initiatives to identify lessons from military programs that can help NASA encourage global investment in its Space Exploration Vision. The paper establishes a basis for examining related policy and industrial concerns such as effective utilization of dual-use technologies and trans-Pacific program management of large, complex cooperative programs.

Hudiburg, John J.↗

Best Practices to Support EMIS Operation at Federal Facilities

The Federal Energy Management Program (FEMP) promotes best practices for impactful utilization of Energy Management Information Systems (EMIS) at federal facilities, as detailed in the EMIS Technical Resources Report. A series of best practices documents was created by FEMP to help accelerate the market adoption and use of EMIS in the federal sector. This document highlights best practices for supporting EMIS use at federal facilities.

EMIS↗

Accelerating Nuclear Facility Mission Completion Through an Improved Chemical Hazard Control Strategy - 20460

Code of Federal Regulation (CFR) 10 CFR 830, Nuclear Safety Management [1], explicitly identifies hazardous materials in addition to radioactive materials when establishing the scope of materials that must be evaluated in Hazard Category (HC) 1, 2, and 3 nuclear facilities. This inclusion has led to a near decade-long progression of more and more rigorous application of chemical hazard controls in these facilities. The progressive addition of more rigorous chemical hazard controls has occurred across the Department of Energy (DOE) Complex, having been driven by contractors and regulators alike. However, chemical hazards in other DOE facilities have been, and continue to be, controlled using traditional industrial safety centered strategies. Thus, identical chemical hazards are controlled using dramatically different approaches based solely on the facility type. Not only are the controls different, the analysis and derivation rigor and requirements are also significantly different. In particular, chemical control derivation and application in non-nuclear facilities are much less onerous than the comprehensive hazard analysis process used in nuclear facilities, even in circumstances in which chemicals are not initiators to, or do not exacerbate a nuclear event. While the derivation and control approaches used in these two types of facilities are disparate, the safety results are similarly effective based on a review of reported chemical events from 2014 through 2018. While both approaches achieve comparable safety outcomes, the approach used in nuclear facilities results in significantly greater preparation costs and implementation costs. Furthermore, the problem with the differing approach is not relegated to the control preparation and implementation burden. The operational impact of potentially unnecessary controls slows mission completion without a corresponding increase in safety, not to mention the dilution of the importance of Technical Safety Requirements. The proposed solution must first include a critical and thorough examination of DOE Complex and top-tier chemical industry chemical hazard control practices, coupled with a similar examination of the driving facility regulatory requirements. Results from the examination can then be used to fuel a bold departure from current chemical control practices in Hazard Category 1, 2, and 3 nuclear facilities. Development of an improved and consistent chemical hazard control process would follow, one that continues to ensure safety while accelerating mission completion and significantly reducing the burden associated with chemical hazard control development and implementation. The improved process must establish a hierarchy where radiological hazards are addressed using safety class and safety significant controls and chemical hazards are addressed using overarching safety management programs (with limited unique exceptions). The improved Hazard Category 1,2, and 3 nuclear facility chemical hazard control strategy, while compliant with 10 CFR 830 [1], would be founded on the requirements in 10 CFR 851, Worker Safety and Health Program [2], and the complementary DOE O 151.1D, Comprehensive Emergency Management System [3]. In this way, the Hazard Category 1, 2, and 3 nuclear facility chemical hazard control strategy would, wherever appropriate, be the same process used at other DOE Complex facilities. Ultimately, the improved process will maintain safety and significantly reduce costs and life cycle risk through faster mission completion. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The NASA Software Management and Assurance Program

A committee of experienced managers representing each major NASA organization guides a major development effort which seeks to ensure the acquisition of economical and reliable software for more complex future programs. The primary, near-term development objectives of the NASA Software Management and Assurance Program are: (1) to provide the best management and technical guidance available; (2) to facilitate the use of proven tools, techniques, and information; and (3) to maintain a pool of highly qualified software personnel. The software development tasks addressed involve such problems as satellite end-to-end architecture and advanced aircraft guidance and control systems.

Hall, D. L.↗

Evaluation of human engineering design standard (MSFC-STD-267A) in the design of manned space vehicles

The major conclusion of the detailed examination of the human factors engineering design standard is that it is unsuitable for future spacecraft design. The standard, published in 1966, was not intended to be a zero or reduced gravity standard and was directed primarily toward ground support equipment and technology. Futhermore, ambiguities, conflicts, and unenforceable requirements contribute to the difficulty. The role of man in future space missions and its impact on human engineering standards are also discussed, and it is concluded that greater standardization is vital to the success of future missions. A survey of NASA/MSFC contractors was made, and it was found that MSFC-STD-267A is largely ignored and the most significant problems are inaccessibility and nonspecificity of the data. The resistance of contract management and designer and of program managers is a primary reason for poor human engineering design. Specific recommendations for improvement of format and organization, including an interim solution, are given.

Rogers, J. G.↗

The personal computer and GP-B management

The Gravity Probe-B (GP-B) experiment is one of the most sophisticated and challenging developments to be undertaken by NASA. Its objective is to measure the relativistic drift of gyroscopes in orbit about the earth. In this paper, the experiment is described, and the strategy of phased procurements for accomplishing the engineering development of the hardware is discussed. The microcomputer is a very convenient and powerful tool in the management of GP-B. It is used in creating and monitoring such project data as schedules, budgets, hardware procurements and technical and interface requirements. Commercially available software in word processing, database management, communications, spreadsheet, graphics and program management are used. Examples are described of the efficacy of the application of the computer by the management team.

Neighbors, A. K.↗

NASA commercial programs

Highlights of NASA-sponsored and assisted commercial space activities of 1989 are presented. Industrial R and D in space, centers for the commercial development of space, and new cooperative agreements are addressed in the U.S. private sector in space section. In the building U.S. competitiveness through technology section, the following topics are presented: (1) technology utilization as a national priority; (2) an exploration of benefits; and (3) honoring Apollo-Era spinoffs. International and domestic R and D trends, and the space sector are discussed in the section on selected economic indicators. Other subjects included in this report are: (1) small business innovation; (2) budget highlights and trends; (3) commercial programs management; and (4) the commercial programs advisory committee.

Source record↗

The natural space environment: Effects on spacecraft

The effects of the natural space environments on spacecraft design, development, and operation are the topic of a series of NASA Reference Publications currently being developed by the Electromagnetics and Environments Branch, Systems Analysis and Integration Laboratory, Marshall Space Flight Center. This primer provides an overview of the natural space environments and their effect on spacecraft design, development, and operations, and also highlights some of the new developments in science and technology for each space environment. It is hoped that a better understanding of the space environment and its effect on spacecraft will enable program management to more effectively minimize program risks and costs, optimize design quality, and successfully achieve mission objectives.

James, Bonnie F.↗

STS-101: Atlantis Orbiter Upgrade Briefing

Live footage shows panelists, Manager of the Space Shuttle Program Development, Elric McHenry, and the Associate Program Manager for Space Shuttle Upgrades, Andy Allen, giving an overview of the new upgrades on the STS-101 Orbiter. McHenry and Allen speaks about the changes and modernization of Atlantis. The panelists' mentions all the new capabilities of the new glass cockpit. They emphasize the redesign of the engine, specifically, the ability to shut down automatically. They also discuss future implementation of a smart cockpit.

Source record↗

Space Science Research and Technology at NASA's Marshall Space Flight Center

This presentation will summarize the various projects and programs managed in the Space Science Programs and Projects Office at NASA's Marshall Space Flight Center in Huntsville, Alabama. Projects in the portfolio include NASA's Chandra X-Ray telescope, Hinode solar physics satellite, various advanced space propulsion technologies, including solar sails and tethers, as well as NASA's Discovery and New Frontiers Programs.

Johnson, Charles L.↗

Implementing Earned Value Management in the CxP EVA Systems Project Office

Earned Value Management (EVM), like project management, is as much art as it is science to develop an implementation plan for a project. This presentation will cover issues that were overcome and the implementation strategy to deploy Earned Value Management (EVM) within the Constellation Program (CxP), EVA Systems Project Office (ESPO), as well as discuss additional hurdles that currently prevent the organization from optimizing EVM. Each organization and each project within an organization needs to mold an EVM implementation plan around existing processes and tools, while at the same time revising those existing processes and tools as necessary to make them compatible with EVM. The ESPO EVM implementation covers work breakdown structure, organizational breakdown structure, control account, work/planning package development; integrated master schedule development using an integrated master plan; incorporating reporting requirements for existing funding process such as Planning, Programming, Budgeting, and Execution (PPBE) and JSC Internal Task Agreements (ITA); and interfacing with other software tools such as the Systems Applications and Products (SAP) accounting system and the CxP wInsight EVM analysis tool. However, there are always areas for improvement and EVM is no exception. As EVM continues to mature within the NASA CxP, these areas will continue to be worked to resolution to provide the Program Managers, Project Managers, and Control Account Managers the best EVM data possible to make informed decisions.

Sorge, Les L.↗

Keeping the dream alive: Managing the Space Station Program, 1982 to 1986

The management is described and analyzed of the formative years of the NASA Space Station Program (1982 to 1986), beginning with the successful initiative for program approval by Administrator James M. Beggs through to the decision to bring program management to Reston, Virginia. Emphasis is on internal management issues related to the implementation of the various phases of the program. Themes examined are the problem of bringing programmatic and institutional interests together and focusing them to forward the program; centralized versus decentralized control of the program; how the history of NASA and of the individual installations affected the decisions made; and the pressure from those outside NASA. The four sections are: (1) the decision to build the space station, (2) the design of the management experiment, (3) the experiment comes to life, and (4) the decision reversal.

Lewin, Thomas J.↗