Search NASA⌕ Search

SEARCH · Search NASA

Results for “project development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Development Status of Amine-based, Combined Humidity, CO2, and Trace Contaminant Control System for CEV

Under a NASA-sponsored technology development project, a multi-disciplinary team consisting of industry, academia, and government organizations lead by Hamilton Sundstrand is developing an amine-based humidity and CO2 removal process and prototype equipment for Vision for Space Exploration (VSE) applications. Originally this project sought to research enhanced amine formulations and incorporate a trace contaminant control capability into the sorbent. In October 2005, NASA re-directed the project team to accelerate the delivery of hardware by approximately one year and emphasize deployment on board the Crew Exploration Vehicle (CEV) as the near-term developmental goal. Preliminary performance requirements were defined based on nominal and off-nominal conditions and the design effort was initiated using the baseline amine sorbent, SA9T. As part of the original project effort, basic sorbent development was continued with the University of Connecticut and dynamic equilibrium trace contaminant adsorption characteristics were evaluated by NASA. This paper summarizes the University sorbent research effort, the basic trace contaminant loading characteristics of the SA9T sorbent, design support testing, and the status of the full-scale system hardware design and manufacturing effort.

Smith, Fred↗

Ultrasonic techniques for repair of aircraft structures with bonded composite patches

This is a paper on a research and development project to demonstrate a novel ultrasonic process for the field application of boron/epoxy (B/Ep) patches for repair of aircraft structures. The first phase of the project was on process optimization and testing to develop the most practical ultrasonic processing techniques. Accelerated testing and aging behavior of precured B/Ep patches, which were ultrasonically bonded to simulated B-52 wing panel assemblies, were performed by conducting flight-by-flight spectrum loading fatigue tests. The spectrum represented 2340 missions/flights or 30 years of service. The effects of steady-state applied temperature and prior exposure of the B/Ep composite patches were evaluated. Representative experimental results of this phase of the project are presented.

Smith, S. H.↗

Hand-Eye Calibration of Robonaut

NASA's Human Space Flight program depends heavily on Extra-Vehicular Activities (EVA's) performed by human astronauts. EVA is a high risk environment that requires extensive training and ground support. In collaboration with the Defense Advanced Research Projects Agency (DARPA), NASA is conducting a ground development project to produce a robotic astronaut's assistant, called Robonaut, that could help reduce human EVA time and workload. The project described in this paper designed and implemented a hand-eye calibration scheme for Robonaut, Unit A. The intent of this calibration scheme is to improve hand-eye coordination of the robot. The basic approach is to use kinematic and stereo vision measurements, namely the joint angles self-reported by the right arm and 3-D positions of a calibration fixture as measured by vision, to estimate the transformation from Robonaut's base coordinate system to its hand coordinate system and to its vision coordinate system. Two methods of gathering data sets have been developed, along with software to support each. In the first, the system observes the robotic arm and neck angles as the robot is operated under external control, and measures the 3-D position of a calibration fixture using Robonaut's stereo cameras, and logs these data. In the second, the system drives the arm and neck through a set of pre-recorded configurations, and data are again logged. Two variants of the calibration scheme have been developed. The full calibration scheme is a batch procedure that estimates all relevant kinematic parameters of the arm and neck of the robot The daily calibration scheme estimates only joint offsets for each rotational joint on the arm and neck, which are assumed to change from day to day. The schemes have been designed to be automatic and easy to use so that the robot can be fully recalibrated when needed such as after repair, upgrade, etc, and can be partially recalibrated after each power cycle. The scheme has been implemented on Robonaut Unit A and has been shown to reduce mismatch between kinematically derived positions and visually derived positions from a mean of 13.75cm using the previous calibration to means of 1.85cm using a full calibration and 2.02cm using a suboptimal but faster daily calibration. This improved calibration has already enabled the robot to more accurately reach for and grasp objects that it sees within its workspace. The system has been used to support an autonomous wrench-grasping experiment and significantly improved the workspace positioning of the hand based on visually derived wrench position. estimates.

Nickels, Kevin↗

Public-Private Collaborations with Earth-Space Benefits

The NASA Human Health and Performance Center (NHHPC) was established in October 2010 to promote collaborative problem solving and project development to advance human health and performance innovations benefiting life in space and on Earth. The NHHPC, which now boasts over 135 corporate, government, academic and non-profit members, has convened four successful workshops and engaged in multiple collaborative projects. The center is currently developing a streamlined partner engagement process to capture technical needs and opportunities of NHHPC members, facilitate partnership development, and establish and manage collaborative projects for NASA. The virtual center facilitates member engagement through a variety of vehicles, including annual inperson workshops, webcasts, quarterly electronic newsletters, web postings, and the new system for partner engagement. The most recent NHHPC workshop was conducted in November 2013 on the topic of "Accelerating Innovation: New Organizational Business Models," and focused on various collaborative approaches successfully used by organizations to achieve their goals. The powerful notion of collaboration across sectors to solve intractable problems was recently highlighted in Williams Eggers' book "The Solution Revolution,"i which provides numerous examples of how business, government and social enterprises partner to solve tough problems. Mr. Eggers was a keynote speaker at the workshop, along with Harvard Business School, Jump Associates, and the Conrad Foundation. The robust program also included an expert panel addressing collaboration across sectors, four interactive breakout sessions, and a concluding keynote on innovative ways to increase science, technology, engineering, and math (STEM) education by NASA Associate Administrator for Education, Leland Melvin. The NHHPC forum also provides a platform for international partners to interact on many topics. Members from around the world include ISS International Partner JAXA; the World Biomimetic Foundation in Spain who is interested in advancing the use of biomimicry to provide technical solutions in many industries; Satellite Application Catapult in London, England who interested in pursuing U.S. collaborations with the Space and Life Sciences Innovation Centre under development in Scotland; and DLR in Cologne, Germany who developed :envihab, a collaborative facility for partners to pursue research and technology projects of mutual interest. The NHHPC has sponsored two global networking forums on innovation by partners Wyle, NASA, and DLR, was featured in the 2013 Humans in Space Symposium Panel on "NHHPC and :envihab - reach out to Future Markets," and is working on an international meeting for Spring 2014 in Cologne with :envihab.

Davis, Jeffrey R.↗

Employing Earned Value Management in Government Research and Design - Lessons Learned from the Trenches

To effectively manage a project, the project manager must have a plan, understand the current conditions, and be able to take action to correct the course when challenges arise. Research and design projects face technical, schedule, and budget challenges that make it difficult to utilize project management tools developed for projects based on previously demonstrated technologies. Projects developing new technologies by their inherent nature are trying something new and thus have little to no data to support estimates for schedule and cost, let alone the technical outcome. Projects with a vision for the outcome but little confidence in the exact tasks to accomplish in order to achieve the vision incur cost and schedule penalties when conceptual solutions require unexpected iterations or even a reinvention of the plan. This presentation will share the project management methodology and tools developed through trial and error for a NASA research and design project combining industry, academia, and NASA inhouse work in which Earned Value Management principles were employed but adapted for the reality of the government financial system and the reality of challenging technology development. The priorities of the presented methodology are flexibility, accountability, and simplicity to give the manager tools to help deliver to the customer while not using up valuable time and resources on extensive planning and analysis. This presentation will share the methodology, tools, and work through failed and successful examples from the three years of process evolution.

Simon, Tom↗

Assessment of Ocean Wave Model used to Analyze the Constellation Program (CxP) Orion Project Crew Module Water Landing Conditions

Mr. Christopher Johnson, NASA's Systems Manager for the Orion Project Crew Module (CM) Landing and Recovery at the Johnson Space Center (JSC), and Mr. James Corliss, Project Engineer for the Orion CM Landing System Advanced Development Project at the Langley Research Center (LaRC) requested an independent assessment of the wave model that was developed to analyze the CM water landing conditions. A NASA Engineering and Safety Center (NESC) initial evaluation was approved November 20, 2008. Mr. Bryan Smith, NESC Chief Engineer at the NASA Glenn Research Center (GRC), was selected to lead this assessment. The Assessment Plan was presented and approved by the NESC Review Board (NRB) on December 18, 2008. The Assessment Report was presented to the NRB on March 12, 2009. This document is the final Assessment Report.

Smith, Bryan K.↗

Virtual environment and computer-aided technologies used for system prototyping and requirements development

The Space Station Freedom (SSF) Data Management System (DMS) consists of distributed hardware and software which monitor and control the many onboard systems. Virtual environment and off-the-shelf computer technologies can be used at critical points in project development to aid in objectives and requirements development. Geometric models (images) coupled with off-the-shelf hardware and software technologies were used in The Space Station Mockup and Trainer Facility (SSMTF) Crew Operational Assessment Project. Rapid prototyping is shown to be a valuable tool for operational procedure and system hardware and software requirements development. The project objectives, hardware and software technologies used, data gained, current activities, future development and training objectives shall be discussed. The importance of defining prototyping objectives and staying focused while maintaining schedules are discussed along with project pitfalls.

Logan, Cory↗

The role of orbital observations in detecting and monitoring geologic hazards - Prospects for the future

Prospects for improving the overall situation in the earth orbital remote sensing of dynamic phenomena related to geological hazards within the next decade are examined. In particular, attention is given to the development of the NASA's Earth Observing System Project, development of a high spatial resolution (better than 100 m/pixel) multispectral imager as proposed for a potential NASA Geostationary Earth Observatory mission, and implementation of a variety of relatively low-cost single-purpose satellite missions in low earth orbit. The importance of improving worldwide communications and international cooperation for taking advantage of the emerging operational technology is emphasized.

Pieri, David↗

Command and Control of Space Assets Through Internet-Based Technologies Demonstrated

The NASA Glenn Research Center successfully demonstrated a transmission-control-protocol/ Internet-protocol- (TCP/IP) based approach to the command and control of onorbit assets over a secure network. This is a significant accomplishment because future NASA missions will benefit by using Internet-standards-based protocols. Benefits of this Internet-based space command and control system architecture include reduced mission costs and increased mission efficiency. The demonstration proved that this communications architecture is viable for future NASA missions. This demonstration was a significant feat involving multiple NASA organizations and industry. Phillip Paulsen, from Glenn's Project Development and Integration Office, served as the overall project lead, and David Foltz, from Glenn's Satellite Networks and Architectures Branch, provided the hybrid networking support for the required Internet connections. The goal was to build a network that would emulate a connection between a space experiment on the International Space Station and a researcher accessing the experiment from anywhere on the Internet, as shown. The experiment was interfaced to a wireless 802.11 network inside the demonstration area. The wireless link provided connectivity to the Tracking and Data Relay Satellite System (TDRSS) Internet Link Terminal (TILT) satellite uplink terminal located 300 ft away in a parking lot on top of a panel van. TILT provided a crucial link in this demonstration. Leslie Ambrose, NASA Goddard Space Flight Center, provided the TILT/TDRSS support. The TILT unit transmitted the signal to TDRS 6 and was received at the White Sands Second TDRSS Ground Station. This station provided the gateway to the Internet. Coordination also took place at the White Sands station to install a Veridian Firewall and automated security incident measurement (ASIM) system to the Second TDRSS Ground Station Internet gateway. The firewall provides a trusted network for the simulated space experiment. A second Internet connection at the demonstration area was implemented to provide Internet connectivity to a group of workstations to serve as platforms for controlling the simulated space experiment. Installation of this Internet connection was coordinated with an Internet service provider (ISP) and local NASA Johnson Space Center personnel. Not only did this TCP/IP-based architecture prove that a principal investigator on the Internet can securely command and control on-orbit assets, it also demonstrated that valuable virtual testing of planned on-orbit activities can be conducted over the Internet prior to actual deployment in space.

Foltz, David A.↗

Constellation Space Suit System Development Status

The Constellation Program has initiated the first new flight suit development project since the Extravehicular Mobility Unit (EMU) was developed for the Space Shuttle Program in the 1970s. The Constellation suit system represents a significant challenge to designers in that the system is required to address all space suit functions needed through all missions and mission phases. This is in marked contrast to the EMU, which was designed specifically for micro-gravity space walks. The Constellation suit system must serve in all of the following scenarios: launch, entry and abort crew survival; micro-gravity extravehicular activity (EVA); and lunar (1/6th-gravity) surface EVA. This paper discusses technical efforts performed from May 2006 through February 2007 for the Constellation space suit system pressure garment.

Ross, Amy↗

Hot-Fire Testing of 100 LB(sub F) LOX/LCH4 Reaction Control Engine at Altitude Conditions

Liquid oxygen/liquid methane (LO2/LCH4 ) has recently been viewed as a potential green propulsion system for both the Altair ascent main engine (AME) and reaction control system (RCS). The Propulsion and Cryogenic Advanced Development Project (PCAD) has been tasked by NASA to develop these green propellant systems to enable safe and cost effective exploration missions. However, experience with LO2/LCH4 as a propellant combination is limited, so testing of these systems is critical to demonstrating reliable ignition and performance. A test program of a 100 lb f reaction control engine (RCE) is underway at the Altitude Combustion Stand (ACS) of the NASA Glenn Research Center, with a focus on conducting tests at altitude conditions. These tests include a unique propellant conditioning feed system (PCFS) which allows for the inlet conditions of the propellant to be varied to test warm to subcooled liquid propellant temperatures. Engine performance, including thrust, c* and vacuum specific impulse (I(sub sp,vac)) will be presented as a function of propellant temperature conditions. In general, the engine performed as expected, with higher performance at warmer propellant temperatures but better efficiency at lower propellant temperatures. Mixture ratio effects were inconclusive within the uncertainty bands of data, but qualitatively showed higher performance at lower ratios.

Marshall, William M.↗

Interactive Concept of Operations Narrative Simulators

This paper reports on an exploratory design and development project. Specifically this paper discusses the design and development of Interactive Concept of Operations Narrative Simulators (ICONS) as a means of enhancing the functionality of traditional Concept of Operations documents by leveraging the affordances provided by applications commonly used within the Interactive Fiction literary genre. Recommendations for an ICONS design and development methodology, along a detailed description of a practical proof-of-concept ICONS created using this approach are discussed. The report concludes with a discussion of how ICONS can be extended to the K-12 mathematics education domain and conclude with a discussion of how ICONS can be used to assist those involved with strategic planning at Marshall Space Flight Center.

Denham, Andre R.↗

Nuclear rocket propulsion. NASA plans and progress, FY 1991

NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

Clark, John S.↗

Nuclear rocket propulsion: NASA plans and progress - FY 1991

NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.

Clark, John S.↗

Requirements management at NASA

Requirements have always been acknowledged as the backbone of any system. However, in many past development efforts, requirements were paid little heed. At NASA, in recent years, the hue and cry for project development has been "Faster, Better, Cheaper and Safer". This has impacted the way we develop software; it has increased the risks to quality, safety and reliability. At NASA, the Software Assurance Technology Center (SATC) is working with projects to emphasize the criticality of requirements throughout development, not just in the initial phases. This emphasis is on requirements relationship to all aspects of quality, including reliability and safety. In this presentation, we will look at some of these relationships through the eyes of quality.

Requirement management↗

LSA: Low-cost Solar Array project

Topics discussed include silicon material processing; large-area silicon sheet development; encapsulation materials testing and development; project engineering and operations activities, and manufacturing techniques. The steps taken to integrate these efforts, are described.

Source record↗

IT Project Success w\7120 and 7123 NPRs to Achieve Project Success

This slide presentation reviews management techniques to assure information technology development project success. Details include the work products, the work breakdown structure (WBS), system integration, verification and validation (IV&V), and deployment and operations. An example, the NASA Consolidated Active Directory (NCAD), is reviewed.

Walley, Tina L.↗