Search NASA⌕ Search

SEARCH · Search NASA

Results for “remote construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Telepresence work system concepts

Telepresence has been used in the context of the ultimate in remote manipulation where the operator is provided with the sensory feedback and control to perform highly dexterous tasks. The concept of a Telepresence Work Station (TWS) for operation in space is described. System requirements, concepts, and a development approach are discussed. The TWS has the potential for application on the Space Shuttle, on the Orbit Maneuver Vehicle, on an Orbit Transfer Vehicle, and on the Space Station. The TWS function is to perform satellite servicing tasks and construction and assembly operations in the buildup of large spacecraft. The basic concept is a pair of dexterous arms controlled from a remote station by an operation with feedback. It may be evolved through levels of supervisory control to a smart adaptive robotic system.

Jenkins, L. M.↗

Construction in space - Toward a fresh definition of the man/machine relation

The EVA (extravehicular activity) project forming part of the space construction process is reviewed. The manual EVA constuction, demonstrated by the crew of Skylab 3 by assembling a modest space structure in the form of the twin-pole sunshade, is considered, indicating that the experiment dispelled many doubts about man's ability to execute routine and contingency EVA operations. Tests demonstrating the feasibility of remote teleoperator rendezvous, station keeping, and docking operations, using hand controllers for direct input and television for feedback, are noted. Future plans for designing space construction machines are mentioned.

Watters, H. H.↗

Feasibility of remotely manipulated welding in space. A step in the development of novel joining technologies

In order to establish permanent human presence in space technologies of constructing and repairing space stations and other space structures must be developed. Most construction jobs are performed on earth and the fabricated modules will then be delivered to space by the Space Shuttle. Only limited final assembly jobs, which are primarily mechanical fastening, will be performed on site in space. Such fabrication plans, however, limit the designs of these structures, because each module must fit inside the transport vehicle and must withstand launching stresses which are considerably high. Large-scale utilization of space necessitates more extensive construction work on site. Furthermore, continuous operations of space stations and other structures require maintenance and repairs of structural components as well as of tools and equipment on these space structures. Metal joining technologies, and especially high-quality welding, in space need developing.

Masubuchi, K.↗

Remote Measurement of Pollution - A 40-Year Langley Retrospective: Temperature and Gaseous Species - Part 1

The National Aeronautics and Space Administration (NASA) phased down its Apollo Moon Program after 1970 in favor of a partly reusable Space Shuttle vehicle that could be used to construct and supply a manned, Earth-orbiting Space Station. Applications programs were emphasized in response to the growing public concern about Earth's finite natural resources and the degradation of its environment. Shortly thereafter, a workshop was convened in Norfolk, Virginia, on Remote Measurement of Pollution (or RMOP), and its findings are in a NASA Special Publication (NASA SP-285). The three primary workshop panels and their chairmen were focused on trace gas species (Will Kellogg), atmospheric particulates or aerosols (Verner Suomi), and water pollution (Gifford Ewing). Many of the workshop participants were specialists in the techniques that might be employed for the regional to global-scale, remote measurements from an Earth-orbiting satellite. The findings and recommendations of the RMOP Report represent the genesis of and a blueprint for the satellite, atmospheric sensing programs within NASA for nearly two decades. This paper is a brief, 40-year retrospective of those instrument developments that were an outgrowth of the RMOP activity. Its focus is on satellite measurement capabilities for temperature and gaseous species that were demonstrated by atmospheric technologists at the Langley Research Center. Limb absorption by solar occultation, limb infrared radiometry, and gas filter correlation radiometry techniques provided significant science data, so they are emphasized in this review.

Remsberg, Ellis E.↗

Site-Selective Functionalization of (sp 3 )C-H Bonds Catalyzed by Artificial Metalloenzymes Containing an Iridium-Porphyrin Cofactor

The selective functionalization of one C-H bond over others in nearly identical steric and electronic environments can facilitate the construction of complex molecules. We report site-selective functionalizations of C-H bonds, differentiated solely by remote substituents, catalyzed by artificial metalloenzymes (ArMs) that are generated from the combination of an evolvable P450 scaffold and an iridium-porphyrin cofactor. The generated systems catalyze the insertion of carbenes into the C-H bonds of a range of phthalan derivatives containing substituents that render the two methylene positions in each phthalan inequivalent. These reactions occur with site-selectivity ratios of up to 17.8:1 and, in most cases, with pairs of enzyme mutants that preferentially form each of the two constitutional isomers. This study demonstrates the potential of abiotic reactions catalyzed by metalloenzymes to functionalize C-H bonds with site selectivity that is difficult to achieve with small-molecule catalysts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Site-Selective Functionalization of (sp 3 )C-H Bonds Catalyzed by Artificial Metalloenzymes Containing an Iridium-Porphyrin Cofactor

The selective functionalization of one C-H bond over others in nearly identical steric and electronic environments can facilitate the construction of complex molecules. We report site-selective functionalizations of C-H bonds, differentiated solely by remote substituents, catalyzed by artificial metalloenzymes (ArMs) that are generated from the combination of an evolvable P450 scaffold and an iridium-porphyrin cofactor. The generated systems catalyze the insertion of carbenes into the C-H bonds of a range of phthalan derivatives containing substituents that render the two methylene positions in each phthalan inequivalent. These reactions occur with site-selectivity ratios of up to 17.8:1 and, in most cases, with pairs of enzyme mutants that preferentially form each of the two constitutional isomers. This study demonstrates the potential of abiotic reactions catalyzed by metalloenzymes to functionalize C-H bonds with site selectivity that is difficult to achieve with small-molecule catalysts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Permanent-magnet helicon sources and arrays: A new type of rf plasma

Helicon discharges are known for their ability to produce high densities of partially ionized plasma, their efficiency arising from an unusual mechanism of rf coupling. However, the requirement of a dc magnetic field has prevented their wide acceptance in industry. The use of permanent magnets greatly simplifies helicon sources, and arrays of small sources extend the use of helicons to the processing of large substrates. An eight-tube array was designed and constructed, and its density uniformity measured in a 53x165 cm{sup 2} chamber. Three innovations involved (a) the remote field of ring magnets, (b) a low-field density peak, and (c) rf power distribution. High-density plasmas uniform over large areas requires compatibility in all three areas.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Streamlining Transportation Corridor Planning Processess: Freight and Traffic Information

The traffic investigation is one of the most important parts of an Environmental Impact Statement of projects involving the construction of new roadway facilities and/or the improvement of existing ones. The focus of the traffic analysis is on the determination of anticipated traffic flow characteristics of the proposed project, by the application of analytical methods that can be grouped under the umbrella of capacity analysis methodologies. In general, the main traffic parameter used in EISs to describe the quality of traffic flow is the Level of Service (LOS). The current state of the practice in terms of the traffic investigations for EISs has two main shortcomings. The first one is related to the information that is necessary to conduct the traffic analysis, and specifically to the lack of integration among the different transportation models and the sources of information that, in general, reside in GIS databases. A discussion of the benefits of integrating CRS&SI technologies and the transportation models used in the EIS traffic investigation is included. The second shortcoming is in the presentation of the results, both in terms of the appearance and formatting, as well as content. The presentation of traffic results (current and proposed) is discussed. This chapter also addresses the need of additional data, in terms of content and coverage. Regarding the former, other traffic parameters (e.g., delays) that are more meaningful to non-transportation experts than LOS, as well as additional information (e.g., freight flows) that can impact traffic conditions and safety are discussed. Spatial information technologies can decrease the negative effects of, and even eliminate, these shortcomings by making the relevant information that is input to the models more complete and readily available, and by providing the means to communicate the results in a more clear and efficient manner. The benefits that the application and use of CRS&SI technologies can provide to improve and expedite the traffic investigation part of the EIS process are presented.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development and testing of the flight command subsystem for the Mariner Mars 1971 spacecraft

The flight command subsystem for the Mariner Mars 1971 spacecraft is of the same basic design and construction as that for Mariner Mars 1969 except for its expanded capability. Its primary purpose is to provide remote control for the spacecraft. This report briefly describes the design changes, fabrication, and significant problems associated with the development of the Mariner Mars 1971 flight command subsystem.

Chitty, W. H.↗

Proceedings of Symposium on Utilization of Waste Glass in Secondary Products

Papers are reported which were presented at the conference on waste glass recovery and re-use in secondary products. The uses considered include: road surfacing, asphaltic concretes, road construction, terrazzo, cement concrete, pozzolan, glass wool, glass-polymer composites, and tiles. Problems of recycling glass in remote areas, and the economics and markets for secondary glass products are discussed.

Source record↗

The economic value of remote sensing of earth resources from space: An ERTS overview and the value of continuity of service. Volume 9: Oceans

The impact of remote sensing upon marine activities and oceanography is presented. The present capabilities of the current Earth Resources Technology Satellite (ERTS-1), as demonstrated by the principal investigators are discussed. Cost savings benefits are quantified in the area of nautical and hygrographic mapping and charting. Benefits are found in aiding coastal zone management and in the fields of weather (marine) prediction, fishery harvesting and management, and potential uses for ocean vegetation. Difficulties in quantification are explained, the primary factor being that remotely sensed information will be of greater benefit as input to forecasting models which have not yet been constructed.

Lietzke, K. R.↗

Interchangeable Tools for Remote Manipulators

Report presents concepts and specifications for set of interchangeable end-effector tools used on remotely operated manipulator to work on satellites in orbit. Tools make urgent repairs, do routine maintenance, transfer fluids, construct and assemble satellites, and deploy and retract appendages. With modifications, tool concepts and systematic approach to tool design applicable to such terrestrial uses as industrial robots, manually operated tools, and safety equipment. Report discusses concept for tool-storage system that holds tools securely when not used but kept accessible to manipulator.

Cody, J. C.↗

System architecture for the telerobotic work system

The functional and performance requirements and design concepts for a telerobotic work system (TWS) being considered as an adjunct to the Shuttle Remote Manipulator System and other applications are described. The multiple-armed free-flyer would be controlled by an operator in the Orbiter cabin and would perform remote sensing and manipulative tasks that EVA crew otherwise carry out. The TWS could also perform hazardous tasks, construction operations, and be an asset to the Space Station. Alternative system architectures are described, including the man-machine interface, the types of manipulators and their stowage, and the controls and backup systems. Potential terrestrial applications of the TWS concept, augmented with AI capabilities, are discussed.

Jenkins, Lyle M.↗

Assembly considerations for large reflectors

The technologies developed at LaRC in the area of erectable instructures are discussed. The information is of direct value to the Large Deployable Reflector (LDR) because an option for the LDR backup structure is to assemble it in space. The efforts in this area, which include development of joints, underwater assembly simulation tests, flight assembly/disassembly tests, and fabrication of 5-meter trusses, led to the use of the LaRC concept as the baseline configuration for the Space Station Structure. The Space Station joint is linear in the load and displacement range of interest to Space Station; the ability to manually assemble and disassemble a 45-foot truss structure was demonstrated by astronauts in space as part of the ACCESS Shuttle Flight Experiment. The structure was built in 26 minutes 46 seconds, and involved a total of 500 manipulations of untethered hardware. Also, the correlation of the space experience with the neutral buoyancy simulation was very good. Sections of the proposed 5-meter bay Space Station truss have been built on the ground. Activities at LaRC have included the development of mobile remote manipulator systems (which can traverse the Space Station 5-meter structure), preliminary LDR sun shield concepts, LDR construction scenarios, and activities in robotic assembly of truss-type structures.

Bush, H.↗

Development of multiple source data processing for structural analysis at a regional scale

Various image processing techniques developed for enhancement and extraction of linear features, of interest to the structural geologist, from digital remote sensing, geologic, and gravity data, are presented. These techniques include: (1) automatic detection of linear features and construction of rose diagrams from Landsat MSS data; (2) enhancement of principal structural directions using selective filters on Landsat MSS, Spacelab panchromatic, and HCMM NIR data; (3) directional filtering of Spacelab panchromatic data using Fast Fourier Transform; (4) detection of linear/elongated zones of high thermal gradient from thermal infrared data; and (5) extraction of strong gravimetric gradients from digitized Bouguer anomaly maps. Processing results can be compared to each other through the use of a geocoded database to evaluate the structural importance of each lineament according to its depth: superficial structures in the sedimentary cover, or deeper ones affecting the basement. These image processing techniques were successfully applied to achieve a better understanding of the transition between Provence and the Pyrenees structural blocks, in southeastern France, for an improved structural interpretation of the Mediterranean region.

Carrere, Veronique↗

Tours of High-containment and Pristine Facilities in Support of Mars Sample Return (MSR) Sample Receiving Facility (SRF) Definition Studies

During 2019 and 2020, the NASA Tiger Team RAMA (acronym of the authors) toured several high-containment biosafety laboratories and pristine space-mission facilities worldwide to better understand their practices, capabilities, and lessons-learned to aid in planning a Sample Receiving Facility (SRF) in support of Mars Sample Return (MSR). The team also included tours of a manufacturer of mobile and modular high-containment facilities as well as manufacturers of isolators and gloveboxes. In addition, the team visited the European Space Agency (ESA)ultraclean and sterile ISO 3 / airborne molecular contamination -9 (AMC-9) isolator line to clean and assemble the most critical hardware for ESA’s ExoMars Mars Lander System, and researchers developing a novel double-walled isolator (DWI) and robotic handling techniques in support of an MSR SRF. The RAMA team visits covered several construction modalities for an MSR SRF: (1) a new traditional fixed facility; (2) use of an existing fixed Biosafety Level 4(BSL-4) facility; (3) a novel modular BSL-4 approach; and (4) a hybrid combination of fixed, modular, and existing facilities. A new fixed facility approach can be tailored to MSR’s needs and is the approach used by all U.S. BSL-4 laboratories constructed to date. However, this approach could be the most expensive modality, take the longest to implement (8-12 years), and have significant programmatic risk of delay. The utilization of an existing BSL-4 facility may be possible depending on the final contamination control and science requirements for the MSR SRF. Due to the internal dimensions of the labs visited and facility structural requirements, it is unlikely that any modification can be made to the facility to meet cleanliness requirements. Furthermore, due to possible construction delays, possible capacity issues, and potential cross contamination vectors from in-house select agents, there may also be significant programmatic risks for sharing an existing facility. Another approach is building a contemporary modular facility. This is a novel approach that has recently been used for a BSL-3/3Ag facilities. The modular elements would be installed in a traditional building or shell structure. A modular facility has many advantages over a traditional fixed facility with lower costs, shorter design/construction/ commissioning schedule, and flexibility for easier retrofits and future expansion. Lastly, a hybrid approach of combining the use of either: (1) a modular facility inside a new fixed facility or (2) a modular and/or fixed BSL-4 annex in conjunction with an existing BSL-4 space should be considered. The advantage of a hybrid approach is that the facility could leverage the strengths of other approaches. Beyond facility construction approaches, the RAMA team investigated technologies and techniques for isolating and handling Martian samples in pristine environments. For example, ESA has been studying and developing a DWI breadboard along with other sample-handling technologies. The research and development investment for clean, remote manipulation and robotics at the start of the facility design phase would be beneficial to the SRF. Additionally, under-standing the lessons learned from Thales Alenia Space during the construction and operation of the most advanced state-of-the-art precision cleaning, sterilization, and assembly glovebox isolators ever developed for spacecraft hardware are also critical for the SRF. The RAMA team lays out a summary of the 18 facilities toured, and includes 43 observations,18 findings, and 22 areas of possible follow-up that the RAMA team and others could pursue to enable further findings. The observations and findings illustrate that constructing an MSR SRF would combine the complexity of both high-containment and pristine facilities, and merging these technologies would be challenging, but achievable.

Mars Sample Return↗

Astronomical observatories on the Moon

The Space Exploration Initiative presents an opportunity to construct astronomical telescopes on the Moon using the infrastructure provided by the lunar outpost. Small automatically deployed telescopes can be carried on the survey missions, be deployed on the lunar surface and be operated remotely from the Earth. Possibilities for early, small optical telescopes are a zenith pointed transit telescope, a student telescope, and a 0.5 to 1 meter automatic, fully steerable telescope. After the lunar outpost is established the lunar interferometers will be constructed in an evolutionary fashion. There are three lunar interferometers which have been studied. The most ambitious is the optical interferometer with a 1 to 2 -km baseline and seven 1.5 aperture elements arranged in a 'Y' configuration with a central beam combiner. The Submillimeter interferometer would use seven, 5-m reflectors in a 'Y' or circular configuration with a 1-km baseline. The Very Low Frequency (VLF) array would operate below 30 mHz with as many as 100 elements and a 200-km baseline.

Swanson, Paul N.↗

Improving Decommissioning Success using the Tool of Virtual Reality; Increasing Worker Safety and Project Schedule Stability - 17193

operations, especially underwater, is essential. Equally essential is a precise game plan for disassembly which focuses attention on the skilled remote handling operators who must produce the results. Project success is based on clean, efficient cuts and take-aways, prepared paths for waste placement and containment, programmed return paths; and practice, practice, practice on the part of the operators. Recently, our Partner, WAK Ruackbau- und Entsorgungs- GmbH (Decommissioning and Waste Management Company) was tasked with dismantling and decommissioning the Karlsruhe Reprocessing Plant. The most difficult task in this project is the dismantling of the vitrification plant. Waelischmiller was selected to address this high-consequence project. Together, WAK and Waelischmiller determined that development of a virtual reality suite, where management and operators could create a virtual vitrification layout and subsequently map and rehearse their dismantling plan was essential. This approach, using Virtual Reality (VR) as a tool in streamlining operations and rehearsing difficult moves and cuts, will be a game changer for this and future projects. It will be a first-of-a-kind in Germany. The VR suite is contained in a room at the Karlsruhe facility with a large screen, control cabinet, simulation computer, a Waelischmiller Joyarm and Masterarm. To support the dismantling of the vitrification plant, WAK/HWM will conduct interactive feasibility studies for each dismantling step. All movements; cuts, take-aways and vessel segment insertion into transportation and disposal casks will be established, programed and practiced within virtual test suite. This allows savings in cost-intensive and complex construction of test rigs. Operating personnel can be trained in the VR suite, without taking the risk of damaging expensive remote handling equipment.While the operators are working on the operating element, they stand in front of a wide screen. Instead of a real TELBOT{sup R}, a virtual TELBOT{sup R} is moving on the screen in virtual reality. While practicing, the operators cannot damage the arm and the equipment, which is a big advantage. Moreover an interactive feasibility study can be realized without building a real test rig (mock-up). Consequently significant cost-expenses can be reduced. This paper will describe the virtual suite used by the WAK in Karlsruhe and the advantages of this new and innovative approach, which is unique in decommissioning of nuclear facilities. The viewpoint of each (WAK and HWM), and the decisions and benefits realized along the project path will be detailed in the paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗