Search NASA⌕ Search

SEARCH · Search NASA

Results for “site operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Telephone multiline signaling using common signal pair

An operator can rapidly and automatically produce coded electrical signals by manipulating mechanical thumb wheel switches so as to instruct a service center to connect any number of telephone lines to the console thus enabling the operator to listen and/or talk over several lines simultaneously. The system includes an on-site console having several mechanically operated thumb wheel switches to which the desired lines to be connected can be dialed in. Electrical coded signals are fed to a number of banks of line AND gates representing units, tens and hundreds, a group of channel gates, and a command gate. These signals are gated out in a controlled manner to an encoder which generates tones that are transmitted over a single line to a communication service center.

Goodloe, R. R.↗

Overview of the Turbine Based Combined Cycle Discipline

The NASA Fundamental Aeronautics Hypersonics project is focused on technologies for combined cycle, airbreathing propulsions systems to enable reusable launch systems for access to space. Turbine Based Combined Cycle (TBCC) propulsion systems offer specific impulse (Isp) improvements over rocket-based propulsion systems in the subsonic takeoff and return mission segments and offer improved safety. The potential to realize more aircraft-like operations with expanded launch site capability and reduced system maintenance are additional benefits. The most critical TBCC enabling technologies as identified in the National Aeronautics Institute (NAI) study were: 1) mode transition from the low speed propulsion system to the high speed propulsion system, 2) high Mach turbine engine development, 3) transonic aero-propulsion performance, 4) low-Mach-number dual-mode scramjet operation, 5) innovative 3-D flowpath concepts and 6) innovative turbine based combined cycle integration. To address several of these key TBCC challenges, NASA s Hypersonics project (TBCC Discipline) initiated an experimental mode transition task that includes an analytic research endeavor to assess the state-of-the-art of propulsion system performance and design codes. This initiative includes inlet fluid and turbine performance codes and engineering-level algorithms. This effort has been focused on the Combined Cycle Engine Large-Scale Inlet Mode Transition Experiment (CCE LIMX) which is a fully integrated TBCC propulsion system with flow path sizing consistent with previous NASA and DoD proposed Hypersonic experimental flight test plans. This experiment is being tested in the NASA-GRC 10 x 10 Supersonic Wind Tunnel (SWT) Facility. The goal of this activity is to address key hypersonic combined-cycle-engine issues: (1) dual integrated inlet operability and performance issues unstart constraints, distortion constraints, bleed requirements, controls, and operability margins, (2) mode-transition constraints imposed by the turbine and the ramjet/scramjet flow paths (imposed variable geometry requirements), (3) turbine engine transients (and associated time scales) during transition, (4) high-altitude turbine engine re-light, and (5) the operating constraints of a Mach 3-7 combustor (specific to the TBCC). The model will be tested in several test phases to develop a unique TBCC database to assess and validate design and analysis tools and address operability, integration, and interaction issues for this class of advanced propulsion systems. The test article and all support equipment is complete and available at the facility. The test article installation and facility build-up in preparation for the inlet performance and operability characterization is near completion and testing is planned to commence in FY11.

Thomas, Scott R.↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 SWMU #041 Year 3 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 3 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 3 PMR extends from September 2021 through October 2022. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 3 reporting period was approximately 91%, with the majority of downtime attributed to system maintenance and repair. This is generally consistent with Year 1 and Year 2 runtimes of 85% and 92%, respectively. To help reduce downtime, an anti-scaling amendment, Redux 390, has been used to reduce scaling and help maintain system design parameters. Over nine million gallons of groundwater were treated during Year 3 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 97%. This PMR describes the activities that were performed during Year 3 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 3 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 3 plume conditions. Therefore, it can be assumed that the projected path remains valid for transition to MNA in one to two years of continuous HCS operation. The contents of this Year 3 PMR were presented during the February 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Replacement of MW0019 and VMP04 was also recommended, as well as additional direct-push technology sampling to further delineate the downgradient plume and confirm overall site-wide low-concentration plume boundaries. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

3D Visualization for Phoenix Mars Lander Science Operations

Planetary surface exploration missions present considerable operational challenges in the form of substantial communication delays, limited communication windows, and limited communication bandwidth. A 3D visualization software was developed and delivered to the 2008 Phoenix Mars Lander (PML) mission. The components of the system include an interactive 3D visualization environment called Mercator, terrain reconstruction software called the Ames Stereo Pipeline, and a server providing distributed access to terrain models. The software was successfully utilized during the mission for science analysis, site understanding, and science operations activity planning. A terrain server was implemented that provided distribution of terrain models from a central repository to clients running the Mercator software. The Ames Stereo Pipeline generates accurate, high-resolution, texture-mapped, 3D terrain models from stereo image pairs. These terrain models can then be visualized within the Mercator environment. The central cross-cutting goal for these tools is to provide an easy-to-use, high-quality, full-featured visualization environment that enhances the mission science team s ability to develop low-risk productive science activity plans. In addition, for the Mercator and Viz visualization environments, extensibility and adaptability to different missions and application areas are key design goals.

Edwards, Laurence↗

Components Refurbishment and Chemical Analysis Facility, Hot Spot 1 Solid Waste Management Unit #041 Year 4 Annual Performance Monitoring Report Kennedy Space Center, Florida

This Year 4 Annual Performance Monitoring Report (PMR) presents the operations, maintenance, and monitoring activities for the Hydraulic Containment System (HCS) Interim Measure (IM) at the Components Refurbishment and Chemical Analysis (CRCA) facility located at John F. Kennedy Space Center (KSC), Florida. The primary objective of the HCS is to attain hydraulic control of the dissolved-phase chlorinated volatile organic compound (CVOC) plume, with the secondary objective to reduce concentrations of CVOCs in the high-concentration plume to support transition to monitored natural attenuation (MNA). CRCA has been designated Solid Waste Management Unit 041 under the KSC Resource Conservation and Recovery Act Corrective Action Program. The timeframe for activities documented in this Year 4 PMR extends from November 2022 through September 2023. Baseline sampling activities were completed in June 2019, and full-scale startup of the HCS IM was completed in July-August 2019. The operational runtime of the HCS for the Year 4 reporting period was approximately 94%, with the majority of downtime attributed to associated groundwater sampling events, maintenance, and Hurricane Nicole. Almost five million gallons of groundwater were treated during Year 4 of HCS operations, and concentrations of the site’s contaminants of concern (trans-1,2-dichloroethene and vinyl chloride) have been reduced by over 99%. This PMR describes the activities that were performed during Year 4 to operate and monitor the HCS IM, which includes three extraction wells, seven injection wells, and conveyance piping to a modular structure containing the control panel and an air stripper. Influent and effluent sampling results from the air stripper show that the system is operating as designed and is reducing concentrations of contaminants of concern to below detection limits. In addition to HCS operation, this PMR also discusses performance monitoring that has been implemented to assess progress of the HCS IM and overall plume conditions through scheduled groundwater (quarterly and semi-annual) and sub-slab soil gas (quarterly) sampling and analysis. Two ambient air samples were also collected on a quarterly basis in the vicinity of the modular structure and the paved driveway east of the Solvent Reclamation Area during routine operation and maintenance (O&M) activities to ensure safe breathing zone air quality for on-site personnel. All sub-slab soil gas and ambient air sampling conducted during the Year 4 operational period showed results below applicable regulatory air screening limits. Predictions made during the Year 2 groundwater model updates were in close correlation to post Year 4 plume conditions. A supplemental DPT study conducted in 2022 and 2023. This study indicated that low-concentration plume conditions, where concentrations exceed State of Florida Groundwater Cleanup Target Levels, expanded westward to Kennedy Parkway North and northward to the vicinity of the railroad tracks. Based on these results, recommendations were made to install 14 wells to monitor the downgradient and boundary conditions of the expanded LCP. The contents of this Year 4 PMR were presented during the November 2023 KSC Remediation Team meeting, where Team consensus was reached on several items including continued O&M of the HCS, and continued monitoring of groundwater, ambient air, and sub-slab soil gas. Sampling for per- and polyfluoroalkyl substances at CRCA is ongoing and will be submitted under separate cover.

K. Alex Murphy↗

Results from Three Years of Ka-band Propagation Characterization at Svalbard, Norway

Over the next several years, NASA plans to launch several earth science missions which are expected to achieve data throughputs of 5-40 terabits per day transmitted from low earth orbiting spacecraft to ground stations. The current S-band and X-band frequency allocations in use by NASA, however, are incapable of supporting the data rates required to meet this demand. As such, NASA is in the planning stages to upgrade its existing Near Earth Network (NEN) polar ground stations to support Ka-band (25.5-27 GHz) operations. Consequently, it installed and operated a Ka-band radiometer at the Svalbard site. Svalbard was chosen as the appropriate site for two primary reasons: (1) Svalbard will be the first site to be upgraded to Ka-band operations within the NEN Polar Network enhancement plan, and (2) there exists a complete lack of Ka-band propagation data at this site (as opposed to the Fairbanks, AK NEN site, which has 5 years of characterization collected during the Advanced Communications Technology becomes imperative that characterization of propagation effects at these NEN sites is conducted to determine expected system Satellite (ACTS) campaign). processing and provide the Herein, we discuss the data three-year measurement results performance, particularly at low elevation angles ((is) less than 10 deg) from the ongoing Ka-band propagation characterization where spacecraft signal acquisition typically occurs. Since May 2011, NASA Glenn Research Center has installed and operated a Ka-band radiometer at the NEN site located in Svalbard, Norway. The Ka-band radiometer monitors the water vapor line, as well as 4 frequencies around 26.5 GHz at a fixed 10 deg elevation angle. Three-year data collection results indicate good campaign at Svalbard, Norway. Comparison of these results with the ITU models and existing ERA profile data indicates very good agreement when the 2010 rain maps and cloud statistics are used. Finally, the Svalbard data is used to derive the expected atmospheric margin requirements for this site agreement with models and comparable performance to necessary to maintain total system availability levels for the previously characterized northern latitude sites in the United States, i.e., Fairbanks, Alaska. The Svalbard data is used to upcoming Joint Polar Satellite System (JPSS) launch in the derive availability results for an upcoming earth-observation 2017/2022 timeframes. mission, JPSS-1, and indicate a requirement of 4 dB of atmospheric attenuation margin necessary to close the link with 99% overall system availability for the expected LEO orbital cycle, as observed from the Svalbard location.

Ka-band↗

Results from Three Years of Ka-Band Propagation Characterization at Svalbard, Norway

Over the next several years, NASA plans to launch several earth science missions which are expected to achieve data throughputs of 5-40 terabits per day transmitted from low earth orbiting spacecraft to ground stations. The current S-band and X-band frequency allocations in use by NASA, however, are incapable of supporting the data rates required to meet this demand. As such, NASA is in the planning stages to upgrade its existing Near Earth Network (NEN) polar ground stations to support Ka-band (25.5-27 GHz) operations. Consequently, it installed and operated a Ka-band radiometer at the Svalbard site. Svalbard was chosen as the appropriate site for two primary reasons: (1) Svalbard will be the first site to be upgraded to Ka-band operations within the NEN Polar Network enhancement plan, and (2) there exists a complete lack of Ka-band propagation data at this site (as opposed to the Fairbanks, AK NEN site, which has 5 years of characterization collected during the Advanced Communications Technology becomes imperative that characterization of propagation effects at these NEN sites is conducted to determine expected system Satellite (ACTS) campaign). processing and provide the Herein, we discuss the data three-year measurement results performance, particularly at low elevation angles ((is) less than 10 deg) from the ongoing Ka-band propagation characterization where spacecraft signal acquisition typically occurs. Since May 2011, NASA Glenn Research Center has installed and operated a Ka-band radiometer at the NEN site located in Svalbard, Norway. The Ka-band radiometer monitors the water vapor line, as well as 4 frequencies around 26.5 GHz at a fixed 10 deg elevation angle. Three-year data collection results indicate good campaign at Svalbard, Norway. Comparison of these results with the ITU models and existing ERA profile data indicates very good agreement when the 2010 rain maps and cloud statistics are used. Finally, the Svalbard data is used to derive the expected atmospheric margin requirements for this site agreement with models and comparable performance to necessary to maintain total system availability levels for the previously characterized northern latitude sites in the United States, i.e., Fairbanks, Alaska. The Svalbard data is used to upcoming Joint Polar Satellite System (JPSS) launch in the derive availability results for an upcoming earth-observation 2017/2022 timeframes. mission, JPSS-1, and indicate a requirement of 4 dB of atmospheric attenuation margin necessary to close the link with 99% overall system availability for the expected LEO orbital cycle, as observed from the Svalbard location.

near earth network↗

Concept for a large multi-mission amphibian aircraft

A very large aircraft has been proposed for meeting both civil cargo and military transport needs for 1995 and beyond. The concept includes a wide noncircular fuselage cross section with a low wing, thick inner wing section, fuselage-mounted engines, and an air cushion landing gear. The civil freighter operates independently of congested passenger airports, using sheltered water as a runway and a waterfront land site for parking and ground operations. The military transport can operate from a wide variety of surfaces and temporary bases. The air cushion landing gear weighs substantially less than conventional gear and permits the use of extended takeoff distance resulting in improved payload/gross weight ratio.

Vaughan, J. C., III↗

Mars Rover

The system integration issues associated with the design of Rovers for Mars ground surface operations are addressed in this paper. Requirements are established for both long distance traverse between geology sites and for geologic survey operations. To satisfy these mission requirements, a semi-autonomous vehicle design has been proposed and its performance capabilities are assessed. Furthermore, the mobility, power consumption, coordination and control (maneuverability), and reliability issues associated with the design of mobility systems to permit vehicle traverse over rugged terrain are examined and the direction of future work required to address these issues is outlined.

Klein, G.↗

Current status of mission/system design for a Mars rover

The system integration issues associated with the design of Rovers for Mars ground surface operations are addressed in this article. Requirements are established for both long distance traverse between geology sites and for geologic survey operations. To satisfy these mission requirements, a semi-autonomous vehicle design has been proposed and its performance capabilities are assessed. Furthermore, the mobility, power consumption, coordination and control (maneuverability), and reliability issues associated with the design of mobility systems to permit vehicle traverse over rugged terrain are examined and the direction of future work required to address these issues is outlined.

Klein, Gail↗

Development of a Compact, Ground-Based Ozone DIAL System

We are developing a portable, eye-safe, ground-based ozone lidar instrument specialized for ozone differential absorption lidar (DIAL) measurements in the troposphere. This prototype instrument is intended to operate at remote field sites and to serve as the basic unit for future monitoring projects requiring multi-instrument networks, such as that proposed for the Global Tropospheric Ozone Project (GTOP). GTOP is currently being formulated by a scientific panel of the International Global Atmospheric Chemistry Project to meet its goal to better understand the processes that control the global distribution of tropospheric ozone. In order for the lidar to be widely deployed in networks, it must be fairly easy to use and maintain as well as being cost-competitive with ground station launching ozone sondes which operate several times a day. To achieve these goals, emphasis is placed upon the incorporation of: (1) all-solid state transmitters which can reliably produce 20-40 mJ pulses; (2) a highly efficient, narrow-bandpass receiver; (3) dual analog and photon-counting detector channels; and (4) flexible, user-friendly control software.

Chyba, T. H.↗

Opportunities for Launch Site Integrated System Health Engineering and Management

The launch site processing flow involves operations such as functional verification, preflight servicing and launch. These operations often include hazards that must be controlled to protect human life and critical space hardware assets. Existing command and control capabilities are limited to simple limit checking durig automated monitoring. Contingency actions are highly dependent on human recognition, decision making, and execution. Many opportunities for Integrated System Health Engineering and Management (ISHEM) exist throughout the processing flow. This paper will present the current human-centered approach to health management as performed today for the shuttle and space station programs. In addition, it will address some of the more critical ISHEM needs, and provide recommendations for future implementation of ISHEM at the launch site.

Waterman, Robert D.↗

Stardust Entry: Landing and Population Hazards in Mission Planning and Operations

The 385 kg Stardust mission was launched on Feb 7, 1999 on a mission to collect samples from the tail of comet Wild 2 and from interplanetary space. Stardust returned to Earth in the early morning of January 15, 2006. The sample return capsule landed in the Utah Test and Training Range (UTTR) southwest of Salt Lake City. Because Stardust was landing on Earth, hazard analysis was required by the National Aeronautics and Space Administration, UTTR, and the Stardust Project to ensure the safe return of the landing capsule along with the safety of people, ground assets, and aircraft. This paper focuses on the requirements affecting safe return of the capsule and safety of people on the ground by investigating parameters such as probability of impacting on UTTR, casualty expectation, and probability of casualty. This paper introduces the methods for the calculation of these requirements and shows how they affected mission planning, site selection, and mission operations. By analyzing these requirements before and during entry it allowed for the selection of a robust landing point that met all of the requirements during the actual landing event.

Desai, P.↗

Encryption for Remote Control via Internet or Intranet

A data-communication protocol has been devised to enable secure, reliable remote control of processes and equipment via a collision-based network, while using minimal bandwidth and computation. The network could be the Internet or an intranet. Control is made secure by use of both a password and a dynamic key, which is sent transparently to a remote user by the controlled computer (that is, the computer, located at the site of the equipment or process to be controlled, that exerts direct control over the process). The protocol functions in the presence of network latency, overcomes errors caused by missed dynamic keys, and defeats attempts by unauthorized remote users to gain control. The protocol is not suitable for real-time control, but is well suited for applications in which control latencies up to about 0.5 second are acceptable. The encryption scheme involves the use of both a dynamic and a private key, without any additional overhead that would degrade performance. The dynamic key is embedded in the equipment- or process-monitor data packets sent out by the controlled computer: in other words, the dynamic key is a subset of the data in each such data packet. The controlled computer maintains a history of the last 3 to 5 data packets for use in decrypting incoming control commands. In addition, the controlled computer records a private key (password) that is given to the remote computer. The encrypted incoming command is permuted by both the dynamic and private key. A person who records the command data in a given packet for hostile purposes cannot use that packet after the public key expires (typically within 3 seconds). Even a person in possession of an unauthorized copy of the command/remote-display software cannot use that software in the absence of the password. The use of a dynamic key embedded in the outgoing data makes the central-processing unit overhead very small. The use of a National Instruments DataSocket(TradeMark) (or equivalent) protocol or the User Datagram Protocol makes it possible to obtain reasonably short response times: Typical response times in event-driven control, using packets sized .300 bytes, are <0.2 second for commands issued from locations anywhere on Earth. The protocol requires that control commands represent absolute values of controlled parameters (e.g., a specified temperature), as distinguished from changes in values of controlled parameters (e.g., a specified increment of temperature). Each command is issued three or more times to ensure delivery in crowded networks. The use of absolute-value commands prevents additional (redundant) commands from causing trouble. Because a remote controlling computer receives "talkback" in the form of data packets from the controlled computer, typically within a time interval < or =1 s, the controlling computer can re-issue a command if network failure has occurred. The controlled computer, the process or equipment that it controls, and any human operator(s) at the site of the controlled equipment or process should be equipped with safety measures to prevent damage to equipment or injury to humans. These features could be a combination of software, external hardware, and intervention by the human operator(s). The protocol is not fail-safe, but by adopting these safety measures as part of the protocol, one makes the protocol a robust means of controlling remote processes and equipment by use of typical office computers via intranets and/or the Internet.

Lineberger, Lewis↗

Payload integration and operations

Integration and operation of Spacelab payloads presents major challenges to engineering disciplines in areas of ground operations and flight mission operations. The integration of ground operations encompasses activities performed by the instrument developers and principal investigators and by the centralized payload integration site and launch site. The payload will be operated on orbit by a payload crew trained in payload experimentation and by a payload operations control center where investigator science groups and operations personnel are prepared to provide support. The payload mission planning, control center, data processing facility and operations are developed and verified prior to realtime flight operations. The mission management approach to minimize program costs and impacts to payloads and the Space Transportation System/Spacelab accommodations is presented.

Hall, R. R.↗

Landing Site Selection with a Variable-Resolution SLAM-Refined Map

In many scenarios it is desirable for planetary landers to select or modify their landing sites autonomously during descent. We present a landing site selection algorithm which is optimized to work in conjunction with a Simultaneous Localization and Mapping system. Our algorithm selects landing sites based on site slope, roughness, and operator-defined interest. In addition, we generate guidance commands and approximate fuel consumption for the highest ranked sites. We validate our algorithm with LiDAR and inertial data gathered by a vertical take-off and landing vehicle.

Chen, Po-Ting↗

A high performance frequency standard and distribution system for Cassini Ka-band experiment

This paper provides an overview and update of a specialized frequency reference system for the NASA Deep Space Network (DSN) to support Ka-band radio science experiments with the Cassini spacecraft, currently orbiting Saturn. Three major components, a Hydrogen Maser, Stabilized Fiber-optic Distribution Assembly (SFODA), and 10 Kelvin Cryocooled Sapphire Oscillator (10K CSO) and frequency-lock-loop, are integrated to achieve the very high performance, ground based frequency reference at a remote antenna site located 16 km from the hydrogen maser. Typical measured Allan Deviation is 1.6 -14 1 0a't 1 second and 1.7 x 10 -15 at 1000 seconds averaging intervals. Recently two 10K CSOs have been compared in situ while operating at the remote DSN site DSS-25. The CSO references were used operationally to downconvert the Ka band downlink received from the Cassini spacecraft in a series of occultation measurements performed over a 78 day period from March to June 2005.

sapphire↗

SOT: A rapid prototype using TAE windows

The development of the window interface extension feature of the Transportable Applications Executive (TAE) is discussed. This feature is being used to prototype a space station payload interface in order to demonstrate and assess the benefits of using windows on a bit mapped display and also to convey the concept of telescience, the control and operation of space station payloads from remote sites. The prototype version of the TAE with windows operates on a DEC VAXstation 100. This workstation has a high resolution 19 inch bit mapped display, a keyboard and a three-button mouse. The VAXstation 100 is not a stand-alone workstation, but is controlled by software executing on a VAX/8600. A short scenario was developed utilizing the Solar Optical Telescope (SOT) as an example payload. In the scenario the end-user station includes the VAXstation 100 plus an image analysis terminal used to display the CCD images. The layout and use of the prototype elements, i.e., the root menu, payload status window, and target acquisition menu is described.

Stephens, Mark↗