Search NASA⌕ Search

SEARCH · Search NASA

Results for “styling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Genomic Patterns of Positive Selection at the Origin of Rust Fungi

Understanding the origin and evolution of pathogenicity and biotrophic life-style of rust fungi has remained a conundrum for decades. Research on the molecular mechanisms responsible for rust fungi evolution has been hampered by their biotrophic life-style until the sequencing of some rust fungi genomes. With the availability of multiple whole genomes and EST data for this group, it is now possible to employ genome-wide surveys and investigate how natural selection shaped their evolution. In this work, we employed a phylogenomics approach to search for positive selection and genes undergoing accelerated evolution at the origin of rust fungi on an assembly of single copy genes conserved across a broad range of basidiomycetes. Up to 985 genes were screened for positive selection on the phylogenetic branch leading to rusts, revealing a pervasive signal of positive selection throughout the data set with the proportion of positively selected genes ranging between 19.6–33.3%. Additionally, 30 genes were found to be under accelerated evolution at the origin of rust fungi, probably due to a mixture of positive selection and relaxation of purifying selection. Functional annotation of the positively selected genes revealed an enrichment in genes involved in the biosynthesis of secondary metabolites and several metabolism and transporter classes.

59 BASIC BIOLOGICAL SCIENCES↗

Preliminary Cryogenic Cold Test Results of the First 9-Cell LSF Shape Cavity

Following successful prototyping and testing of single- & 5-cell LSF shape cavities *, **, the first 9-cell LSF shape cavity LSF9-1 was successfully constructed using an innovative process at JLab with the in-house facilities. The cavity was then shipped to KEK for post-fabrication mechanical adjustment and ILC TDR style treatment and surface processing. Cold testing was carried out at the JLab VTA facility, instrumented with a suite of Kyoto instruments. Favorable values for the bath pressure detuning sensitivity and Lorentz force detuning coefficient were experimentally measured, validating the design improvement in cell stiffeners. Pass-band measurements indicate 4 out of 9 cells reaching gradient capability of > 45 MV/m, including 2 cells reaching 51 MV/m. Cornell OST detectors identified the cell and location responsible for the current hard quench limit. Multipacting-like barriers observed in end cells are investigated both analytically and numerically. The cavity was shipped to FNAL and received a light EP at the joint ANL/FNAL facility for further cold testing at Jlab. Two new 9-cell LSF cavities are being constructed including one made of large-grain niobium material.

43 PARTICLE ACCELERATORS↗

JLab New Injector Cryomodule Design, Fabrication and Testing

A new Injector Cryomodule (INJ CM) aimed to replace the existing Quarter Cryomodule in the CEBAF tunnel has been developed at Jefferson Lab (JLab). It is scheduled to be first tested in the Cryomodule Test Facility (CMTF) for module performance then the Upgraded Injector Test Facility (UITF) with electron beam. This new cryomodule, hosting a 2-cell and 7-cell cavity, is designed to boost the electron energy from 200 keV to 5 MeV and permit 380 ?A ? 1.0 mA of beam current. The 2-cell cavity is a new design whereas the 7-cell cavity is refurbished from a low loss cavity from the retired JLab Renascence Cryomodule. The INJ CM adopts quite a few designs from the JLab 12 GeV Upgrade Cryomodule (C100). Examples of this include having the cold mass hung from a spaceframe structure by use of axial and transverse Nitronic rods, cavities to be tuned by scissor-jack style tuners and the end cans are actually modified from C100 style end cans. However, this new INJ CM is not a quarter of the C100 Cryomodule. This paper focuses on the major design features, fabrication and alignment process and testing of the module and its components.

Cheng, Guangfeng↗

BEAM ACCELERATION WITH A Nb3Sn CRYOMODULE AT JLAB

We report on the electron beam acceleration experiment with a Nb3Sn cryomodule at Thomas Jefferson National Laboratory (JLAB). Two CEBAF-style 5-cell 1.5 GHz Nb3Sn cavities operated at 4 K, accelerating a 100 nA continuous-wave (CW) electron beam from 200 keV to 4 MeV at JLAB’s Upgraded Injector Test Facility (UITF). The acceleration gradients in each cavity reached 11 MV/m and 7 MV/m, respectively. No field emission was observed. The unloaded quality factors reached 2¿109 at low fields at 4 K.

Geng, R. [Thomas Jefferson National Accelerator Fa↗

Origin of the lunar highlands Mg-suite: An integrated petrology, geochemistry, chronology, and remote sensing perspective

The Mg-suite represents an enigmatic episode of lunar highlands magmatism that presumably represents the first stage of crustal building following primordial differentiation. This review examines the mineralogy, geochemistry, petrology, chronology, and the planetary-scale distribution of this suite of highlands plutonic rocks, presents models for their origin, examines petrogenetic relationships to other highlands rocks, and explores the link between this style of magmatism and early stages of lunar differentiation. Of the models considered for the origin of the parent magmas for the Mg-suite, the data best fit a process in which hot (solidus temperature at ≥2 GPa = 1600 to 1800 °C) and less dense (r ~3100 kg/m3) early lunar magma ocean cumulates rise to the base of the crust during cumulate pile overturn. Some decompressional melting would occur, but placing a hot cumulate horizon adjacent to the plagioclase-rich primordial crust and KREEP-rich lithologies (at temperatures of <1300 °C) would result in the hybridization of these divergent primordial lithologies, producing Mg-suite parent magmas. As urKREEP (primeval KREEP) is not the “petrologic driver” of this style of magmatism, outside of the Procellarum KREEP Terrane (PKT), Mg-suite magmas are not required to have a KREEP signature. Evaluation of the chronology of this episode of highlands evolution indicates that Mg-suite magmatism was initiated soon after primordial differentiation (<10 m.y.). Alternatively, the thermal event associated with the mantle overturn may have disrupted the chronometers utilized to date the primordial crust. Petrogenetic relationships between the Mg-suite and other highlands suites (e.g., alkali-suite and magnesian anorthositic granulites) are consistent with both fractional crystallization processes and melting of distinctly different hybrid sources.

58 GEOSCIENCES↗

Support of US CLIVAR Project Office 2012

Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and development of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals

99 GENERAL AND MISCELLANEOUS↗

Case Study of the Maplewood Park Multifamily Retrofit for Energy Efficiency

Maplewood Park (Maplewood), a 110-unit multifamily apartment complex in Union City, Georgia, completed major renovations under the guidance of a third-party green building certification program in October 2012. Oak Ridge National Laboratory (ORNL) partnered with Southface Energy Institute (Southface) to use this project as a case study of energy retrofits in low-rise, garden-style, multifamily buildings in the southeastern United States. This report provides a comprehensive profile of this project including the project economics, findings of the building audit, and results of the analysis of energy retrofit measures specific to this project. With a main focus of energy retrofits, this report aims to discuss other aspects of multifamily building retrofit that would benefit future projects in terms of improved building audit process, streamlined tasks, and higher energy savings in low-rise, garden-style apartments. Maplewood received Low Income Housing Tax Credit (LIHTC) financing via the 2010 Georgia Qualified Allocation Plan (QAP). To be eligible for QAP funds in Georgia, all major renovations must incorporate energy-efficiency measures and adopt a third-party green building certification. Because of the unique demands of this financing, including requirements for long-term ownership, property owners were also especially motivated to invest in upgrades that will increase durability and comfort while reducing the energy cost for the tenants.

Kim, Euy-Jin↗

Blender Pump Fuel Survey: CRC Project E-95-2

With the increasing fuel diversity in the marketplace, the Coordinating Research Council and the U.S. Department of Energy's National Renewable Energy Laboratory conducted a survey of mid-level ethanol blends (MLEBs) in the market. A total of 73 fuel samples were collected from 20 retail stations. To target Class 4 volatility, the fuel samples were collected primarily in the midwestern United States in the month of February. Samples included the gasoline (E0), Flex Fuel, and every MLEB that was offered from each of the 20 stations. Photographs of each station were taken at the time of sample collection, detailing the pump labeling and configuration. The style and labeling of the pump, hose, and dispenser nozzle are all important features to prevent misfueling events. The physical location of the MLEB product relative to the gasoline product can also be important to prevent misfueling. In general, there were many differences in the style and labeling of the blender pumps surveyed in this study. All samples were analyzed for volatility and ethanol content. For the MLEB samples collected, the fuels tended to be lower in ethanol content than their indicated amount; however, the samples were all within 10 vol% of their indicated blend level. One of the 20 Flex Fuel samples was outside of the allowable limits for ethanol content. Four of the 20 Flex Fuel samples had volatility below the minimum requirement for Class 4.

30 DIRECT ENERGY CONVERSION↗

Dual-Edge Signaling Logic

The single-pulse nature of Josephson junction (JJ) logic functions makes logic design harder to do and not at all familiar to pretty much all people who might want to design using JJs—in effect, logic zeros are missing and the logic must be somewhat more complex in implementation to ‘get around’ that. One result of the single-sided logic is that a constant clock function is needed for most all the individual logic functions and gates in current JJ design styles to work. The resultant clock distribution is thus large and takes a large proportion of the logic energy. Here is a proposal for a different kind of logic design style and function that may well overcome most of the difficulties mentioned above. If the logic functionality shown here can actually be brought to life, it would be interesting to assess its impact in area, in energy usage, ease of design, etc.

97 MATHEMATICS AND COMPUTING↗

High-Efficiency Housing at the Fort Peck Indian Reservation: Opportunities and Lessons Learned

This project was initiated to provide design assistance in an effort to maximize energy performance for affordable housing at the Fort Peck Indian Reservation near Poplar, Montana. The Make It Right Foundation (MIRF) built 20 high performing homes (LEED Platinum) in 2015 and 2016 with three (3) different design options. NREL and EPA set out to provide energy analysis along with measurement and verification (M and V) of the homes to characterize energy use and provide clarity for future decision making with regard to tribal housing options. The results included herein summarize the energy end uses and documents projected energy impacts from various aspects of the MIRF home designs and construction. This report includes an analysis of energy use in 5 MIRF homes, comparing energy use across the different styles and configurations. Energy models were created for the 2 styles of MIRF homes, including renewable energy assessment for photovoltaic (PV) systems. Existing tribal housing has also been analyzed, with 5 housing units being analyzed for energy use and an energy model being created for 1 housing unit. The findings of this study highlight many of the challenges that arise when attempting to construct high performance housing in a region where such construction practices are still relatively rare. Homes in Poplar are well designed and, for the most part, and include climate specific design considerations appropriate for northeastern Montana. The most significant issues identified in MIRF homes were related to the work done to put the homes on the foundation, insulate the crawlspaces, and do final connection with the utilities. The Taxed II Credit homes are well designed and well suited to northeastern Montana, and with slight modifications to the design and construction could be very efficient. All occupant comfort and energy usage issues that were identified during the site visits can be remedied through retrofit measures that are relatively inexpensive. Energy efficiency opportunities were found that can be implemented in each of the homes. These retrofits are generally inexpensive and have a quick return on investment. While the MIRF houses as well as the Taxed II Credit homes can achieve high levels of energy performance with modest retrofits. Similar houses built in the future could achieve even better performance with minor design changes, and generally low incremental cost. Renewable energy systems are economically feasible in this area, but the payback is on the high side of what would likely be acceptable to homeowners. If the price of solar comes down to $2/watt installed, the systems will achieve a simple payback of 13 years, which is likely a return on investment that is attractive to homeowners. If the homes are made sufficiently tight to be high performance, energy recovery ventilators will be necessary to maintain acceptable indoor air quality. The Taxed II Credit homes are already equipped with heat recovery ventilators (HRVs), and they seem to function well. As PV prices continue to decline, start implementing projects as they become cost effective.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Scintillating Xenon Bubble Chamber for Dark Matter Detection. Final Report

This report describes the progress in the search for particle dark matter achieved under DOE award DE-SC0012161, as well as the invention of a new dark matter and neutrino detection technique. Work supported by this award follows in three distinct thrusts: (1) the successful completion of the Generation-1 Direct Detection experiment PICO-60, which set the world-leading limit on the spin-dependent coupling of dark matter to protons and achieved a precise understanding of the response of bubble chambers to nuclear-recoil signals and electron-recoil backgrounds; (2) the construction of the Generation-2 Direct Detection experiment LZ, which will soon be the world's most sensitive dark matter detector; and (3) the demonstration of the first scintillating bubble chamber. The development of a scintillating liquid noble bubble chamber was the primary goal of the proposed work, with the aim of combining the excellent background rejection of a PICO-style bubble chamber with the event-by-event energy resolution of a liquid-noble detector such as LZ. This work produced the first ever observation of coincident scintillation and bubble nucleation by a nuclear recoil in a superheated fluid and also revealed an unexpected benefit to the use of noble liquids in a bubble chamber, namely the ability to increase the degree of superheat by an order of magnitude beyond that achievable in PICO-style detectors while maintaining PICO's world-leading background rejection. This discovery has led to new projects in the US and Canada, developing noble liquid bubble chambers both as detectors for low-mass dark matter and as detectors of coherent elastic neutrino-nucleus scattering (CEvNS) by neutrinos produced at nuclear reactors.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

5.5 Hybrid Additively Manufactured Tooling for Large Composite Structures

This program sought to lower tooling costs for tightly toleranced, large composite aerostructures by using large format additive manufacturing (LFAM). LFAM tooling has the potential to lower tooling costs, but the large and unpredictable thermal expansion of polymer-based tooling did not previously allow for the production of large structures made with high performance resins requiring 350 deg F cures. Geometric tolerance issues and demolding concerns continued to arise. The proposed approach for this work was to print a thin shell via additive manufacturing that would be used as a scaffold for a conventional tooling prepreg. The prepreg would be laminated and cured onto both sides of the shell, creating a tool with a sandwich construction. The cured prepreg would then be machined and serve as the tooling surface. In addition to providing a clean, pit-free surface, the prepreg stiffness and low thermal expansion would physically restrain the AM shell and prevent it from expanding during thermal cycling, thus preventing any geometric mismatch between the nominal and actual part dimensions. A stair-step approach was taken to prove out this approach. Coupon level testing was done to ensure a good bond was possible between the AM shell and the tooling prepreg. These samples were also used to determine the amount of prepreg needed to achieve the desired coefficient of thermal expansion (CTE). The project team than progressed to a subscale tool measuring two feet in length. The geometry used was a C-section spar from Airbus’ Wing of Tomorrow program. A hybrid tool, using the AM shell and tooling prepreg, was made, and a composite part was fabricated with the tool. Dimensional scans of the tool and part indicated that the desired CTE was achieved with the tool. A second tooling approach was taken to reduce risk. In this approach, a subscale tool of the same geometry as previously mentioned was created, but the tool was entirely constructed of the tooling prepreg. AM was used to print a “master” that was then used to fabricate the tool by creating a splash off of the master using tooling prepreg. The innovation was that the master was not machined, but rather, was used right off the printer after a small amount of surface preparation. Removing this machining step was thought to make this approach economically viable when compared to conventional master fabrication. As before, the tool was used to fabricate a part and tested for dimensional accuracy. For the conclusion of the program, a ten-foot tool was created using the hybrid tool approach. The geometry also came from the Airbus C-section spar previously mentioned. Some difficulty arose in accurately predicting the geometry of the tool after laminating the tooling prepreg, resulting in multiple material additions and a tool geometry change. A part was fabricated in an autoclave using the tool. A cost savings of almost 50% was achieved on the subscale tool in both the hybrid and master-style tool, but the savings dropped considerably as the tool length increased in the full-scale tool. Given the less than expected cost savings and added complexity of the tool construction, it is suggested that the master-style tool is best for immediate commercialization for larger tools (although it may be appropriate for smaller, table-top size tools). Since its construction is very similar to conventionally made composite tooling, there already exists a broad supply chain for building the tool, and project partner Additive Engineering Solutions (AES) is well acquainted with the design and build of the AM master needed.

36 MATERIALS SCIENCE↗

A Tale of Two Bomb Designs: Why were both Little Boy and Fat Man created?

Little Boy and Fat Man. Two types of nuclear weapons were developed at the Los Alamos wartime lab in an effort to help end World War II. Both would be released above Japan just days apart in August 1945, and just weeks after the Trinity test in the New Mexico desert. These weapons were, however, as different as their monikers imply. Little Boy was a uranium, gun-type weapon, whereas Fat Man was a plutonium, implosion-style weapon. Two types were needed because there was only enough uranium for one gun-type weapon and the U.S. government knew it would need to make more than one weapon. Also, the unattainable challenges of a plutonium gun-type design prompted the shift to the implosion-style weapon.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

ICSBEP Benchmark Template

The purpose of this document is to demonstrate the ability of LATEX to create an ICSBEP benchmark evaluation. Creating a large document in LATEX offers many benefits, such as automatic numbering of items such as tables and figures, and easier placement of objects in the page. Additionally, it is easier to have multiple styles of pages in the same document, and in general the handling of large documents (which evaluations very commonly are) is not problematic. The formatting of this document is meant to conform to both the standards of the document and formatting guide and established practices in order to make the creation of new evaluations a more streamlined process. This will also help reduce the benchmark-to-benchmark variation in style.

97 MATHEMATICS AND COMPUTING↗

Analysis of pressure test results of tube fittings for the potential application in cryo systems for helium leak rate reduction

Due to the nature of Helium, it is notoriously difficult to maintain a closed system without experiencing helium inventory loss through leakage in large tubing and piping runs. There are two standard fitting options readily available for piping and tubing assemblies, welded fittings or Swagelok ® . Welding is the best option for leak rate reduction, but more costly than Swagelok ® . A new style of fitting has come to the attention of BNL C-AD Cryo group, and a pressure test and leak rate analysis were performed to evaluate the viability of incorporating this new style fitting into current engineering design of warm helium tubing runs for the purpose of leak rate reduction.

43 PARTICLE ACCELERATORS↗

Development of a reliable Potting process for Photoconductive Semiconductor Switches (PCSS)

Electrical potting is an important process to protect semiconductor devices from damaging external elements (mechanical stress, moisture, high voltage, etc.) and provides structural support for delicate devices for electrical connectivity to a larger platform. This internship will focus on the development of a universal potting jig for photoconductive semiconductor switches (PCSS). The goal is to design a reliable compression jig that is cross compatible with various PCSS designs that allow for easy potting of devices with a high dielectric breakdown strength material. The challenge with the current potting jig is that the design is only compatible with one style of PCSS and applies uneven pressure that can lead to leakage of potting material. Our approach is to move from a design that applies pressure by binder clip to utilizing a micrometer based compressing jig for a reliable packaging process that can pot a variety of devices without having to have a unique compressing jig for each of style of PCSS. Possible roadblocks with the new design include epoxy leakage into the optical path and misalignment of the electrode – metal contact bond.

42 ENGINEERING↗

How Cloud is Accelerating Research at NREL

This presentation coincides with AWS's announcement of their new Parallel Computing Service (PCS) which allows for easy creation of HPC-style clusters in their AWS cloud computing platform. I helped them beta test this service before it was made generally available in August. AWS asked if we would be interested in discussing our experience with the PCS service, and our experience with HPC workloads in the cloud in general, so this slideshow discusses a brief history of scientific computing at NREL and shares a bit of our experiences and approach to utilizing cloud services for HPC-style workloads.

97 MATHEMATICS AND COMPUTING↗

ITER Generic Diagnostic Upper Port Plug Nuclear Heating and Personnel Dose Rate Assesment Neutronics Analysis using the ATTILA Discrete Ordinates Code

Neutronics analysis to find nuclear heating rates and personnel dose rates were conducted in support of the integration of diagnostics in to the ITER Upper Port Plugs. Simplified shielding models of the Visible-Infrared diagnostic and of the ECH heating system were incorporated in to the ITER global CAD model. Results for these systems are representative of typical designs with maximum shielding and a small aperture (Vis-IR) and minimal shielding with a large aperture (ECH). The neutronics discrete-ordinates code ATTILA® and SEVERIAN® (the ATTILA parallel processing version) was used. Material properties and the 500 MW D-T volume source were taken from the ITER “Brand Model” MCNP benchmark model. A biased quadrature set equivelant to Sn=32 and a scattering degree of Pn=3 were used along with a 46-neutron and 21-gamma FENDL energy subgrouping. Total nuclear heating (neutron plug gamma heating) in the upper port plugs ranged between 380 and 350 kW for the Vis-IR and ECH cases. The ECH or Large Aperture model exhibited lower total heating but much higher peak volumetric heating on the upper port plug structure. Personnel dose rates are calculated in a three step process involving a neutron-only transport calculation, the generation of activation volume sources at pre-defined time steps and finally gamma transport analyses are run for selected time steps. ANSI-ANS 6.1.1 1977 Flux-to-Dose conversion factors were used. Dose rates were evaluated for 1 full year of 500 MW DT operation which is comprised of 3000 1800-second pulses. After one year the machine is shut down for maintenance and personnel are permitted to access the diagnostic interspace after 2-weeks if dose rates are below 100 μSv/hr. Dose rates in the Visible-IR diagnostic model after one day of shutdown were 130 μSv/hr but fell below the limit to 90 μSv/hr 2-weeks later. The Large Aperture or ECH style shielding model exhibited higher and more persistent dose rates. After 1-day the dose rate was 230 μSv/hr but was still at 120 μSv/hr 4-weeks later. __________________________________________________

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗