Search NASA⌕ Search

SEARCH · Search NASA

Results for “task design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Space station data system analysis/architecture study. Task 2: Options development, DR-5. Volume 2: Design options

The primary objective of Task 2 is the development of an information base that will support the conduct of trade studies and provide sufficient data to make key design/programmatic decisions. This includes: (1) the establishment of option categories that are most likely to influence Space Station Data System (SSDS) definition; (2) the identification of preferred options in each category; and (3) the characterization of these options with respect to performance attributes, constraints, cost and risk. This volume contains the options development for the design category. This category comprises alternative structures, configurations and techniques that can be used to develop designs that are responsive to the SSDS requirements. The specific areas discussed are software, including data base management and distributed operating systems; system architecture, including fault tolerance and system growth/automation/autonomy and system interfaces; time management; and system security/privacy. Also discussed are space communications and local area networking.

Source record↗

Preparation of Morpheus Vehicle for Vacuum Environment Testing

The main objective for this summer 2016 tour was to prepare the Morpheus vehicle for its upcoming test inside Plum Brook's vacuum chamber at NASA John H. Glenn Research Center. My contributions towards this project were mostly analytical in nature, providing numerical models to validate test data, generating computer aided analyses for the structure support of the vehicle's engine, and designing a vacuum can that is to protect the high speed camera used during testing. Furthermore, I was also tasked with designing a tank toroidal spray bar system.

Sandoval, Armando↗

Novel Composites for Wing and Fuselage Applications

Design development was successfully completed for textile preforms with continuous cross-stiffened epoxy panels with cut-outs. The preforms developed included 3-D angle interlock weaving of graphite structural fibers impregnated by resin film infiltration (RFI) and shown to be structurally suitable under conditions requiring minimum acquisition costs. Design guidelines/analysis methodology for such textile structures are given. The development was expanded to a fuselage side-panel component of a subsonic commercial airframe and found to be readily scalable. The successfully manufactured panel was delivered to NASA Langley for biaxial testing. This report covers the work performed under Task 3 -- Cross-Stiffened Subcomponent; Task 4 -- Design Guidelines/Analysis of Textile-Reinforced Composites; and Task 5 -- Integrally Woven Fuselage Panel.

Suarez, J. A.↗

Theoretical and experimental studies relevant to interpretation of auroral emissions

The accomplishments achieved over the past year are detailed with emphasis on the interpretation or auroral emissions and studies of potential spacecraft-induced contamination effects. Accordingly, the research was divided into two tasks. The first task is designed to add to the understanding of space vehicle induced external contamination. An experimental facility for simulation of the external environment for a spacecraft in low earth orbit was developed. The facility was used to make laboratory measurements of important phenomena required for improving the understanding of the space vehicle induced external environment and its effect on measurement of auroral emissions from space-based platforms. A workshop was sponsored to provide a forum for presentation of the latest research by nationally recognized experts on space vehicle contamination and to discuss the impact of this research on future missions involving space-based platforms. The second task is to add an ab initio auroral calculation to the extant ionospheric/thermospheric global modeling capabilities. Once the addition of the code was complete, the combined model was to be used to compare the relative intensities and behavior of various emission sources (dayglow, aurora, etc.). Such studies are essential to an understanding of the types of vacuum ultraviolet (VUV) auroral images which are expected to be available within two years with the successful deployment of the Ultraviolet Imager (UVI) on the ISTP POLAR spacecraft. In anticipation of this, the second task includes support for meetings of the science working group for the UVI to discuss operational and data analysis needs. Taken together, the proposed tasks outline a course of study designed to make significant contributions to the field of space-based auroral imaging.

Keffer, Charles E.↗

Development and Evaluation of the Active Response Gravity Offload System as a Lunar and Martian EVA Simulation Environment

In preparation for future exploration missions, NASA seeks the ability to simulate partial-gravity operations for use in ground-based research, crew training, and engineering design evaluations. The Active Response Gravity Offload System (ARGOS) at the Johnson Space Center (JSC) is designed to simulate reduced gravity environments, such as lunar, Martian, or microgravity, using a robotic system similar to an overhead bridge crane. ARGOS continuously offloads a portion of a suited human’s weight during all dynamic motions within the test facility, which can include basic functional movements such as walking, running, and jumping, as well as a wide range of planetary surface activities. This system will be used as part of a metabolic-rate task characterization study to determine the workload associated with partial-gravity extravehicular activity (EVA). Pilot testing was conducted using the MKIII prototype planetary space suit and two gimbal designs to determine the ability of the ARGOS test environment to simulate planetary EVA operations. This paper will describe the lessons learned from the feasibility testing, simulation-environment mockup design, and the results from the pilot tests and their influence into the final study design. Being able to effectively simulate partial-gravity environments and characterize the performance of crewmembers will have an impact on multiple domains including suit design, task design, thermal models, and life-support-system capacity verification plans, among others.

Omar S Bekdash↗

A dual-armed free flyer

In this summary, we present the main conclusions and results of a design study conducted by a group of 25 students at the University of Maryland. The students, all participants in the spring 1988 courses ENEE488Q and ENEE418 in the Electrical Engineering Department, considered the problem of designing a free-flying space robot for applications in satellite servicing. In addition to the paper study, a subgroup of eight students undertook the ambitious task of designing and building a laboratory testbed for the concept of a free flyer. This subgroup has already completed the main fabrication of the mechanical hardware and most of the onboard electronics. When completed by the end of the summer, the testbed will consist of a seven-degree-of-freedom dual-armed planar robot that will float on an air table and carry out various commanded tasks. All the fabrication and testing is being conducted in the Intelligent Servosystems Laboratory at the University of Maryland. The project team split up into subgroups as follows: (1) articulation concepts 1 and 2, to study competing ideas for the overall systems architecture and manipulator design; (2) real time control systems group; (3) a computer graphics group to provide animations of a planar design; (4) a mechanical hardware design group for the laboratory testbed; and (5) a control systems hardware design group for the same.

Source record↗

Maypole (Hoop/Column) concept development program

The program is divided into six tasks: preliminary design and performance; materials development; advanced concepts; economic assessment; demonstration/verification models; and a 15 meter engineering model. All support the main objective of the program which is the technology development necessary to evaluate, design, manufacture, package, transport and deploy the Hoop/Column reflector by means of a ground-based test program. Progress for each task is reported.

Sullivan, M. R.↗

Addressing Challenges to the Design & Test of Operational Lighting Environments for the International Space Station

In our day to day lives, the availability of light, with which to see our environment, is often taken for granted. The designers of land based lighting systems use sunlight and artificial light as their toolset. The availability of power, quantity of light sources, and variety of design options are often unlimited. The accessibility of most land based lighting systems makes it easy for the architect and engineer to verify and validate their design ideas. Failures with an implementation, while sometimes costly, can easily be addressed by renovation. Consider now, an architectural facility orbiting in space, 260 miles above the surface of the earth. This human rated architectural facility, the International Space Station (ISS) must maintain operations every day, including life support and appropriate human comforts without fail. The facility must also handle logistics of regular shipments of cargo, including new passengers. The ISS requires accommodations necessary for human control of machine systems. Additionally, the ISS is a research facility and supports investigations performed inside and outside its livable volume. Finally, the facility must support remote operations and observations by ground controllers. All of these architectural needs require a functional, safe, and even an aesthetic lighting environment. At Johnson Space Center, our Habitability and Human Factors team assists our diverse customers with their lighting environment challenges, via physical test and computer based analysis. Because of the complexity of ISS operational environment, our team has learned and developed processes that help ISS operate safely. Because of the dynamic exterior lighting environment, uses computational modeling to predict the lighting environment. The ISS' orbit exposes it to a sunrise every 90 minutes, causing work surfaces to quickly change from direct sunlight to earthshine to total darkness. Proper planning of vehicle approaches, robotics operations, and crewed Extra Vehicular Activities are mandatory to ensure safety to the crew and all others involved. Innovation in testing techniques is important as well. The advent of Solid State Lighting technology and the lack of stable national and international standards for its implementation pose new challenges on how to design, test and verify individual light fixtures and the environment that uses them. The ISS will soon be replacing its internal fluorescent lighting system to a solid state LED system. The Solid State Lighting Assembly will be used not only for general lighting, but also as a medical countermeasure to control the circadian rhythm of the crew. The new light source has performance criteria very specific to its spectral fingerprint, creating new challenges that were originally not as significant during the original design of the ISS. This presentation will showcase findings and toolsets our team is using to assist in the planning of tasks, and design of operational lighting environments on the International Space Station.

Clark, Toni A.↗

Interchangeable end effector tools utilized on the PFMA

An instrumented task board, used for measuring forces applied by the Protoflight Manipulator Arm (PFMA) to the task board, was fabricated and delivered to Marshall Space Flight Center. SRS Technologies phased out the existing IBM compatible data acquisition system, used with a instrumented task board, and integrated the force measuring electronic hardware in with the Macintosh II data acquisition system. The purpose of this change was to acquire all data with the same time tag, allowing easier and more accurate data reduction in addition to real-time graphics. A three-dimensional optical position sensing system for determining the location of the PFMA's end effect or in reference to the center of the instrumented task board was also designed and delivered under. An improved task board was fabricated which included an improved instrumented beam design. The modified design of the task board improved the force/torque measurement system by increasing the sensitivity, reliability, load range and ease of maintenance. A calibration panel for the optical position system was also designed and fabricated. The calibration method developed for the position sensors enhanced the performance of the sensors as well as simplified the installation and calibration procedures required. The modifications made under this effort expanded the capabilities of the task board system. The system developed determines the arm's position relative to the task board and measures the signals to the joints resulting from the operator's control signals in addition to the task board forces. The software and hardware required to calculate and record the position of the PFMA during the performance of tasks with the instrumented task board were defined, designed and delivered to MSFC. PFMA joint input signals can be measured from a breakout box to evaluate the sensitivity or response of the arm operation to control commands. The data processing system provides the capability for post processing of time-history graphics and plots of the PFMA positions, the operator's actions, and the PFMA servo reactions in addition to realtime force and position sensor data presentation.

Cody, Joe↗

Human Factors Throughout the Life Cycle: Lessons Learned from the Shuttle Program

With the ending of the Space Shuttle Program, it is critical that we not forget the Human Factors lessons we have learned over the years. At every phase of the life cycle, from manufacturing, processing and integrating vehicle and payload, to launch, flight operations, mission control and landing, hundreds of teams have worked together to achieve mission success in one of the most complex, high-risk socio-technical enterprises ever designed. Just as there was great diversity in the types of operations performed at every stage, there was a myriad of human factors that could further complicate these human systems. A single mishap or close call could point to issues at the individual level (perceptual or workload limitations, training, fatigue, human error susceptibilities), the task level (design of tools, procedures and aspects of the workplace), as well as the organizational level (appropriate resources, safety policies, information access and communication channels). While we have often had to learn through human mistakes and technological failures, we have also begun to understand how to design human systems in which individuals can excel, where tasks and procedures are not only safe but efficient, and how organizations can foster a proactive approach to managing risk and supporting human enterprises. Panelists will talk about their experiences as they relate human factors to a particular phase of the shuttle life cycle. They will conclude with a framework for tying together human factors lessons-learned into system-level risk management strategies.

human factors↗

Development of high temperature containerless processing equipment and the design and evaluation of associated systems required for microgravity materials processing and property measurements

The development of high temperature containerless processing equipment and the design and evaluation of associated systems required for microgravity materials processing and property measurements are discussed. Efforts were directed towards the following task areas: design and development of a High Temperature Acoustic Levitator (HAL) for containerless processing and property measurements at high temperatures; testing of the HAL module to establish this technology for use as a positioning device for microgravity uses; construction and evaluation of a brassboard hot wall Acoustic Levitation Furnace; construction and evaluation of a noncontact temperature measurement (NCTM) system based on AGEMA thermal imaging camera; construction of a prototype Division of Amplitude Polarimetric Pyrometer for NCTM of levitated specimens; evaluation of and recommendations for techniques to control contamination in containerless materials processing chambers; and evaluation of techniques for heating specimens to high temperatures for containerless materials experimentation.

Rey, Charles A.↗

Structural synthesis: Precursor and catalyst

More than twenty five years have elapsed since it was recognized that a rather general class of structural design optimization tasks could be properly posed as an inequality constrained minimization problem. It is suggested that, independent of primary discipline area, it will be useful to think about: (1) posing design problems in terms of an objective function and inequality constraints; (2) generating design oriented approximate analysis methods (giving special attention to behavior sensitivity analysis); (3) distinguishing between decisions that lead to an analysis model and those that lead to a design model; (4) finding ways to generate a sequence of approximate design optimization problems that capture the essential characteristics of the primary problem, while still having an explicit algebraic form that is matched to one or more of the established optimization algorithms; (5) examining the potential of optimum design sensitivity analysis to facilitate quantitative trade-off studies as well as participation in multilevel design activities. It should be kept in mind that multilevel methods are inherently well suited to a parallel mode of operation in computer terms or to a division of labor between task groups in organizational terms. Based on structural experience with multilevel methods general guidelines are suggested.

Schmit, L. A.↗

TrustDER: Trusted, Private and Scalable Coordination of Distributed Energy Resources

In this project, the Stanford and SLAC Teams have developed a Trusted, Private and Scalable platform for coordinating Coordination of Distributed Energy Resources (TrustDER). This is a layered system that ensures private, trusted and scalable coordination and monitoring of DERs. It accommodates a variety of resources, such as solar generation, gensets and loads, with a particular focus on battery systems-based resources, as they are a transformational technology experiencing fast growth in adoption by large critical facilities. The platform can be used as standalone or added to existing aggregation systems to enable trust, privacy and resilience. TrustDER consists of layers that address each of the shortcomings of the existing state of the art. Each layer in the platform can operate independently but provides information to the layers above it to enable a novel form of overall coordination architecture. The project consists of several tasks, with each task dedicated to the design of each layer. Task 2 Resource Virtualization defined a software abstraction layer for distributed energy resources (DERs). The goal of this abstraction was to simplify the implementation of algorithms utilizing cooperation of DERs resources in a variety of use cases. Task 3 is on Secure ID for Asset Authentication. Identity Management Systems (IDMS) are a foundational infrastructure for interactions between entities (organizations, users, devices, and services). Secure ID is blockchain-based a distributed identity management system allowing (1) identity provisioning, (2) authentication, (3) authorization, and (4) identity data sharing for IoT-enabled assets on the electricity grid. In this project, the SLAC team focused on designing and testing Keymaker, a protocol for authenticating device identity managed by Secure ID. Task 5 Private and Safe Integration is focused on the design and evaluation of a DER cooperation scheme which allows for the aggregation of DERs without impacting network reliability. The approach is designed based on realistic assumptions regarding data availability, communication infrastructure limitations, and privacy. Task 6 Scalable Distributed Privacy for Information explored how virtualized batteries could be managed privately. Specifically, it examined the case in which a principal provides a partitioned battery to multiple clients. Task 7 Use Cases was to ensure that this technology was applied in relevant situations and scenarios. Primarily, this means that virtualization needed to be employed in a manner that either improved flexibility, bolstered security or privacy, or decreased costs.

25 ENERGY STORAGE↗

Space Adaptation of Active Mirror Segment Concepts

This report summarizes the results of a three year effort by Blue Line Engineering Co. to advance the state of segmented mirror systems in several separate but related areas. The initial set of tasks were designed to address the issues of system level architecture, digital processing system, cluster level support structures, and advanced mirror fabrication concepts. Later in the project new tasks were added to provide support to the existing segmented mirror testbed at Marshall Space Flight Center (MSFC) in the form of upgrades to the 36 subaperture wavefront sensor. Still later, tasks were added to build and install a new system processor based on the results of the new system architecture. The project was successful in achieving a number of important results. These include the following most notable accomplishments: 1) The creation of a new modular digital processing system that is extremely capable and may be applied to a wide range of segmented mirror systems as well as many classes of Multiple Input Multiple Output (MIMO) control systems such as active structures or industrial automation. 2) A new graphical user interface was created for operation of segmented mirror systems. 3) The development of a high bit rate serial data loop that permits bi-directional flow of data to and from as many as 39 segments daisy-chained to form a single cluster of segments. 4) Upgrade of the 36 subaperture Hartmann type Wave Front Sensor (WFS) of the Phased Array Mirror, Extendible Large Aperture (PAMELA) testbed at MSFC resulting in a 40 to 5OX improvement in SNR which in turn enabled NASA personnel to achieve many significant strides in improved closed-loop system operation in 1998. 5) A new system level processor was built and delivered to MSFC for use with the PAMELA testbed. This new system featured a new graphical user interface to replace the obsolete and non-supported menu system originally delivered with the PAMELA system. The hardware featured Blue Line's new stackable processing system which included fiber optic data links, a WFS digital interface, and a very compact and reliable electronics package. The project also resulted in substantial advances in the evolution of concepts for integrated structures to be used to support clusters of segments while also serving as the means to distribute power, timing, and data communications resources. A prototype cluster base was built and delivered that would support a small array of 7 cm mirror segments. Another conceptual design effort led to substantial progress in the area of laminated silicon mirror segments. While finished mirrors were never successfully produced in this exploratory effort, the basic feasibility of the concept was established through a significant amount of experimental development in microelectronics processing laboratories at the University of Colorado in Colorado Springs. Ultimately lightweighted aluminum mirrors with replicated front surfaces were produced and delivered as part of a separate contract to develop integrated segmented mirror assemblies. Overall the project was very successful in advancing segmented mirror system architectures on several fronts. In fact, the results of this work have already served as the basic foundation for the system architectures of several projects proposed by Blue Line for different missions and customers. These include the NMSD and AMSD procurements for NASA's Next Generation Space Telescope, the HET figure maintenance system, and the 1 meter FAST telescope project.

Ames, Gregory H.↗

Conservative buffering of approximate nonlinear constraints

In engineering design practice behavior is usually predicted based on some known nominal design. However, when the design is fabricated it will differ from the nominal design because of manufacturing tolerances. In order to generate nominal designs that will still satisfy behavior constraints in the presence of manufacturing tolerances, engineers resort to the use of safety factors, over and above those introduced to account for other uncertainties (e.g., in load conditions, material properties, analysis modeling). The accurate selection of the values of these manufacturing tolerances safety factors is dependent on the capability of the engineer to determine the sensitivity of the critical constraints to changes in the design variables. This process usually leads to overly conservative designs. The task of choosing safety factors is much more difficult in structural synthesis because: (1) it is not known which constraints will be active at the final design, (2) as the design changes during the synthesis process the sensitivities of the constraints with respect to the design variables also change, and (3) the imposition of the safety factors themselves may change the set of critical constraints. These difficulties can be overcome with the approximation concepts approach to structural synthesis by buffering the approximate constraints with quantities that are related to the design variable tolerances and the accurate sensitivities of the constraints with respect to the design variable. Designs generated by this approach tend to be feasible but not overly conservative.

Thomas, H. L.↗

Conceptual design study of potential early commercial MHD powerplant. Report of task 2 results

The conceptual design of one of the potential early commercial MHD power plants was studied. The plant employs oxygen enrichment of the combustion air and preheating of this oxygen enriched air to an intermediate temperature of 1200 F attainable with a tubular type recuperative heat exchanger. Conceptual designs of plant componets and equipment with performance, operational characteristics, and costs are reported. Plant economics and overall performance including full and part load operation are reviewed. The projected performance and estimated cost of this early MHD plant are compared to conventional power plants, although it does not offer the same high efficiency and low costs as the mature MHD power plant. Environmental aspects and the methods incorporated in plant design for emission control of sulfur and nitrogen are reviewed.

Hals, F. A.↗

SE and I system testability: The key to space system FDIR and verification testing

The key to implementing self-diagnosing design is a systems engineering task focused on design for testability concurrent with design for functionality. The design for testability process described here is the product of several years of DOD study and experience. Its application to the space station has begun on Work Package II under NASA and McDonnell direction. Other work package teams are being briefed by Harris Corporation with the hope of convincing them to embrace the process. For the purpose of this discussion the term testability is used to describe the systems engineering process by which designers can assure themselves and their reviewers that their designs are TESTABLE, that is they will support the downstream process of determining their functionality. Due to the complexity and density of present-day state-of-the-art designs, such as pipeline processors and high-speed integrated circuit technology, testability feature design is a critical requirement of the functional design process. A systematic approach to Space systems test and checkout as well as fault detection fault isolation reconfiguration (FDFIR) will minimize operational costs and maximize operational efficiency. An effective design for the testability program must be implemented by all contractors to insure meeting this objective. The process is well understood and technology is here to support it.

Barry, Thomas↗