Search NASA⌕ Search

SEARCH · Search NASA

Results for “team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 289 records · Page 16

Human-Autonomy Teaming in a Flight Following Task

The NATO HFM-247 Working Group is creating a summary report of the group's activities on human-autonomy teaming. This chapter is a summary of our at NASA Ames work toward developing a framework for human-autonomy teaming (HAT) in aviation. The purpose of this project was to demonstrate and evaluate proposed tenets of HAT. The HAT features were derived from three tenets and were built into an automated recommender system on a ground station. These tenets include bi-directional communication, automation transparency, and operator directed interface. This study focused primarily on interactions with one piece of automation, the Autonomous Constrained Flight Planner (ACFP). The ACFP is designed to support rapid diversion decisions for commercial pilots in off-nominal situations. Much effort has gone into enhancing this tool not only in capability but also in transparency. In this study, participants used the ACFP at a ground station designed to aid dispatchers in a flight following role to reroute aircraft in situations such as inclement weather, system failures and medical emergencies. Participants performed this task both with HAT features enabled and without and provided feedback. We examined subjective and behavioral indicators of HAT collaborations using a proof-of-concept demonstration of HAT tenets. The data collected suggest potential advantages and disadvantages of HAT.

bi-directional communication↗

Autonomous, Context-Sensitive, Task Management Systems and Decision Support Tools I: Human-Autonomy Teaming Fundamentals and State of the Art

Recent advances in artificial intelligence, machine learning, data mining and extraction, and especially in sensor technology have resulted in the availability of a vast amount of digital data and information and the development of advanced automated reasoners. This creates the opportunity for the development of a robust dynamic task manager and decision support tool that is context sensitive and integrates information from a wide array of on-board and off aircraft sourcesa tool that monitors systems and the overall flight situation, anticipates information needs, prioritizes tasks appropriately, keeps pilots well informed, and is nimble and able to adapt to changing circumstances. This is the first of two companion reports exploring issues associated with autonomous, context-sensitive, task management and decision support tools. In the first report, we explore fundamental issues associated with the development of an integrated, dynamic, flight information and automation management system. We discuss human factors issues pertaining to information automation and review the current state of the art of pilot information management and decision support tools. We also explore how effective human-human team behavior and expectations could be extended to teams involving humans and automation or autonomous systems.

context-sensitive↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Center (POIC) at Marshall Space Flight Center (MSFC) recently increased via a High Operations Tempo (HOT) initiative, in order to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's (FCT) need to support this increasing pace of payload science operations was the impetus for creating a series of new tools. While their need was clear, the full scope and user experience for each tool was not as well-understood, thus establishing a fixed set of initial requirements was not feasible. A hybridized Agile Software Development (ASD) paradigm was created to take advantage of this uncertainty, plan for it, permit the exploration of novel concepts, and also facilitate a rapid and flexible response to inevitably changing requirements. The POIC's hybridized ASD approach places preeminent focus on providing customer value through the delivery of high quality, customer-focused solutions in short timeframes. This has been successfully achieved through creating unprecedented modes of cooperation and collaboration between operations and software development teams, frequent user evaluations of the software with well-defined feedback mechanisms, increased human factors involvement, and a dedication to successful outcomes by the whole of the POIC. Since space science operations and software development are not typically so closely linked, this paper discusses an approach that offers an optimal way to provide an increased return on investment and a faster time-to-completion than traditional software development paradigms, while aiming at delivering high quality products and customer-driven value.

Albers, Cerese M.↗

Active Sensing of CO2 Emissions over Nights, Days, and Seasons (ASCENDS): Final Report of the ASCENDS Ad Hoc Science Definition Team

Improved remote sensing observations of atmospheric carbon dioxide (CO2) are critically needed to quantify, monitor, and understand the Earth's carbon cycle and its evolution in a changing climate. The processes governing ocean and terrestrial carbon uptake remain poorly understood,especially in dynamic regions with large carbon stocks and strong vulnerability to climate change,for example, the tropical land biosphere, the northern hemisphere high latitudes, and the Southern Ocean. Because the passive spectrometers used by GOSAT (Greenhouse gases Observing SATellite) and OCO-2 (Orbiting Carbon Observatory-2) require sunlit and cloud-free conditions,current observations over these regions remain infrequent and are subject to biases. These short comings limit our ability to understand and predict the processes controlling the carbon cycle on regional to global scales.In contrast, active CO2 remote-sensing techniques allow accurate measurements to be taken day and night, over ocean and land surfaces, in the presence of thin or scattered clouds, and at all times of year. Because of these benefits, the National Research Council recommended the National Aeronautics and Space Administration (NASA) Active Sensing of CO2 Emissions over Nights,Days, and Seasons (ASCENDS) mission in the 2007 report Earth Science and Applications from Space: National Imperatives for the Next Decade and Beyond. The ability of ASCENDS to collect low-bias observations in these key regions is expected to address important gaps in our knowledge of the contemporary carbon cycle.The ASCENDS ad hoc Science Definition Team (SDT), comprised of carbon cycle modeling and active remote sensing instrument teams throughout the United States (US), worked to develop the mission's requirements and advance its readiness from 2008 through 2018. Numerous scientific investigations were carried out to identify the benefit and feasibility of active CO2 remote sensing measurements for improving our understanding of CO2 sources and sinks. This report summarizes their findings and recommendations based on mission modeling studies, analysis of ancillary meteorological data products, development and demonstration of candidate technologies, anddesign studies of the ASCENDS mission concept.

Kawa, S. Randolph↗

Integrated Concurrent Engineering Teams for Increased Efficiency in Flight Projects

A highly integrated Concurrent Engineering Team (CET) within a flight project evolves in its function and has the potential to provide many benefits through the project lifecycle. The benefits include superior systems-oriented design products, as well as overall improved project efficiency and higher-performing interpersonal relationships within the project. If physically integrated, this can manifest as a Concurrent Engineering Center (CEC) centrally located within a project’s physical office space. Here we discuss the process to establish and maintain a tightly integrated engineering and design team for providing highly streamlined service to the project, including a cost/benefits analysis discussion.

Flight Project↗

Integrated Concurrent Engineering Teams for Increased Efficiency in Flight Projects

A highly integrated Concurrent Engineering Team (CET) within a flight project evolves in its function and has the potential to provide many benefits through the project lifecycle. The benefits include superior systems-oriented design products, as well as overall improved project efficiency and higher-performing interpersonal relationships within the project. If physically integrated, this can manifest as a Concurrent Engineering Center (CEC) centrally located within a project’s physical office space. Here we discuss the process to establish and maintain a tightly integrated engineering and design team for providing highly streamlined service to the project, including a cost/benefits analysis discussion.

Flight Project↗

GTOC9: Methods and Results from the Jet Propulsion Laboratory Team

The removal of 123 pieces of debris from the Sunsynchronous LEO environment is accomplished by a 10-spacecraft campaign wherein the spacecraft, flying in succession over an 8-yr period, rendezvous with a series of the debris objects, delivering a de-orbit package at each one before moving on to the next object by means of impulsive manoeuvres. This was the GTOC9 problem, as posed by the European Space Agency. The methods used by the Jet Propulsion Laboratory team are described, along with the winning solution found by the team. Methods include branch-and-bound searches that exploit the natural nodal drift to compute long chains of rendezvous with debris objects, beam searches for synthesising campaigns, ant colony optimisation, and a genetic algorithm. Databases of transfers between all bodies on a fine time grid are made, containing an easyto- compute yet accurate estimate of the transfer V . Lastly, a final non-linear programming optimisation is performed to ensure the trajectories meet all the constraints and are locally optimal in initial mass.

Sims, Jon↗

Perceived Similarity Predicts Viable Relationships and Team Performance

Conditions expected for future space exploration require an expanded understanding of interpersonal compatibility. Limited research has examined interpersonal perception at the dyadic level and how these perceptions shape relationships and team performance over time. We investigated the extent to which a novel approach for assessing interpersonal compatibility - focused on interpersonal perception and perceived similarity between dyads - predicts the viability of relationships and team performance over time in simulated space crews.

Jessica Chackoria↗

Human Capabilities Assessments for Autonomous Missions: A Multi-Team Research Effort to Reduce Risk in the Human-System Integration Architecture for Future Deep-Space Missions

In future exploration missions beyond low earth-orbit, crew will have to execute complex operations and respond to off-nominal events, without real-time support from Mission Control. It is anticipated that increased reliance on automated systems, including human-centric vehicle and information architecture, will need to be designed to support the crew; increased risk to performance, health, and safety may occur if these are not implemented appropriately. The Human Factors and Behavioral Performance Element (HFBP) in the NASA Human Research Program supports research to characterize and mitigate such human health and performance risks, including the Risk of Adverse Outcome Due to Inadequate Human Systems Integration Architecture (HSIA). The HSIA risk addresses the integration of onboard capability and the crew roles and responsibilities necessary to enable the crew to respond effectively and efficiently in the increasingly autonomous mission operations environment. In 2017, HFBP released the “Human Capabilities Assessments for Autonomous Missions” (HCAAM) research topic to address HSIA related questions. HCAAM is a major NASA research effort that has assembled a multidisciplinary team from seven institutions to work closely with design and engineering efforts on research towards developing and refining human performance standards, guidelines and automation tools. The scientific focus is on quantitative assessment of human capabilities relevant to future deep-space missions during which earth/spacecraft communication is so delayed and intermittent that the crew must be able to function autonomously. The integrated strategy of the HCAAM project characterizes human capabilities and limitations related to potential performance decrements during long duration exploration mission spaceflight as relevant to both routine and complex task performance; defines system characteristics that reduce the likelihood or impact of potential decrements in human performance capabilities; performs integrated assessment of intelligent system responses within the context of an operational environment with relevant NASA tools, systems, and data structures in order to determine positive or negative interactions and validate recommended approaches; and proposes specific updates to existing standards and guidelines for inclusion in NASA handbooks for the design of future spacecraft intelligent systems that provide crew performance assessment/feedback, and to also serve as decision-support aids for the onboard crew (i.e., NASA-STD-3001, and NASA/SP-Human Integration Design Handbook (HIDH)). The scientific research vectors being addressed by the seven HCAAM teams include: - crew task performance (accuracy, efficiency) (crew + automation) - crew performance (accuracy, efficiency) - crew Situation Awareness - procedure design and multi-modal enhancement - concurrent tasking (mixed manual + some level of autonomy) - task handover - crew self-planning and time-lining - task design - trust in automation, real-time calibration - human multi-sensory feedback and guidance - human trust in on-board software-based intelligent assistants - virtual assistants The presentation will highlight plans and progress made in each of these research areas as well as the methods by which surrogate astronaut crews in the NASA JSC HERA spaceflight analog facility will function as human test subjects for all of the HCAAM research projects.

HCAAM VNSCOR↗

Estimate Early and Estimate Often: How Your Concurrent Engineering Design Team Can Bootstrap Your Organizations Programmatic Capabilities

What do you do when it is necessary to generate reasonable cost estimates at the earliest Concept Maturity Levels and you have never flown any similar missions before? This paper describes the current and future Team X and A-Team cost processes and methods, how they are being used to expand our data frontiers, cost modelling capabilities and how this enables the ability to estimate early and estimate often.

Hihn, Jairus↗

Voyager and its Team—A Journey to The Outer Planets and Beyond

The Voyager Program and the twin Voyager 1 and Voyager 2 spacecraft are leg-endary, and the mission they continue to fly achieved significant milestones in the history of solar system exploration. NASA launched the two spacecraft in separate months in the summer of 1977. Eventually, between them, Voyager 1 and 2 would explore all four giant outer planets of our solar system, 48 of their moons, and their unique systems of rings and magnetic fields. To achieve this great success, the Voyager team had to work through a series of anomalies, start-ing with safe mode entries shortly after launch and telecommunications issues in early operations. The Voyager team pioneered deep-space exploration as they learned to solve these and many other problems in the mission’s 40-plus years.

Wolf, Aron A.↗

A Concept for the Deployment of a Large Lunar Crater Radio Telescope Using Teams of Tethered Robots

Kilometer-scale craters on the far side of the Moon have unique potential as future locations for large radio telescopes, which can observe the universe at wavelengths and frequencies (> 10 m, < 30 MHz) not possible with conventional Earth or orbital-based approaches. Distinct advantages of building a Lunar Crater Radio Telescope (LCRT) on the far side include i) isolation from radio noise due to the Earth’s ionosphere, orbiting satellites, and the Sun, ii) days of uninterrupted dark/cold sky viewing during lunar night, and iii) terrain geometry naturally suited for constructing the largest mesh antenna structure in the Solar System. A key challenge to constructing LCRT on the Moon is related to the complexity of deploying a 1-km diameter antenna and hanging receiver within a lunar crater whose diameter, depth, and slope are 3-5 km, 1 km, and ~30 degrees respectively. In this paper, we first evaluate the trade space for deploying a large, complex structure within a crater, and then provide a more detailed concept evaluation of our favored approach, which employs coordinated teams of tethered rovers to extract and suspend a folded antenna from a lander at the base of a crater. NASA’s Jet Propulsion Laboratory in collaboration with California Institute of Technology (Caltech) have developed a novel robotic system for accessing extremely steep terrains; the Axel rover is a two-wheeled rugged terrain vehicle that is supported by an electro-mechanical tether that provides power, data, and tensile support from a top-side anchor location. Recently, a pair of Axel robots have been used in a DuAxel configuration that allows for four-wheel driving and repeated passive anchoring at different locations. The DuAxel system has unique advantages for deploying an LCRT antenna, including the ability to deploy from a lander near a crater, drive a distance to the crater rim to deploy an Axel, and later, retract the deployed Axel in order to sequentially lift up sections of the antenna. Our proposed concept involves delivering a packaged antenna and receiver to the bottom-center of a crater floor on a lander, then later sending a team of multiple DuAxel rovers to retrieve guide wires from the lander, which are pulled to the top of the crater. We explore this concept in detail and provide some initial quantitative analysis to demonstrate the feasibility of our system with respect to the spatial and mass properties of the antenna as juxtaposed to DuAxel capabilities. Finally, we outline next steps towards validating our concept on the way to a future lunar deployment opportunity.

Hallinan, Greg↗

Analytical Needs in a Sample Receiving Facility: Input from the MSR Operation Definition Team

The return of scientifically selected samples from Mars would provide a rare opportunity forinvestigation with the full range of the latest technology available, but to take full advantageof this opportunity, it is important to plan ahead to ensure the pristine nature of the samplesupon arrival within the Earth environment until scientific investigations can begin.The NASA/ESA science community-driven MSR Science Planning Group – Phase 2 (MSPG2)delivered recommendations and guidance regarding curation (1) and science (2, 3) activities tobe performed on the samples under containment. High-level requirements for the infrastruc-ture were also developed by MSPG2 (4). In order to prepare infrastructure-targeted input forthe ESA and NASA facility studies planned in the 2022-2023 timeframe, the agency-led MSROperational Scenarios Definition Team (MOSDT) was assembled to conceptualize the sampleoperations that will inform future architecture teams. Emphasis was placed on the respon-sibility of MOSDT to use community-defined requirements and to represent the view of the international scientific community.All necessary and sufficient instruments and analytical needs described in MSPG2 were inte-grated in MOSDT main deliverable, the operational workflow (see Hays et al, this conference).In MSPG2, notional instruments were split between curation analytical needs, and objective-driven (time-sensitive and sterilization-sensitive) science analytical needs. In MOSDT, whilethe first phases of curation, “pre-Basic Characterization” and “Basic Characterization” wererather streamlined and separate from other analytical needs, “Preliminary Examination” and“Science” instruments were not always physically segregated. In addition to the necessary andsufficient instruments described by MSPG2, the MOSDT recommended additional supportequipment for sterilization, cleanliness and contamination monitoring.It was sometimes necessary for the MOSDT to rely on assumptions to integrate instruments inthe activity workflow. In general, the assumptions were very conservative to limit contaminationand cross-contamination risks. It is expected that future work to refine limits of contaminationwill enable optimization of instrumentation.The community was consulted during the course of the MOSDT work. This abstract’s aimis two-fold: on one hand, inform the scientific community and overall MSR stakeholders, tobring their attention on the analytical needs currently considered as necessary and sufficient;on the other hand, to solicit feedback from a larger community audience to optimize and refineanalytical needs during the next phases of MSR ground-segment preparation.Disclaimer: The decision to implement Mars Sample Return will not be finalized until NASA’scompletion of the program’s National Environmental Policy Act (NEPA) process. This docu-ment is being made available for informational purposes only.[1] Tait et al. (2021) Preliminary planning for Mars Sample Return (MSR) curation activities ina Sample Receiving Facility (SRF). Astrobiology in press, doi:10.1089/ast.2021.0105. [2] Toscaet al. (2021) Time-sensitive aspects of Mars Sample Return (MSR) science. Astrobiologyin press, doi:10.1089/ast.2021.0115. [3] Velbel et al. (2021) Planning implications relatedto sterilization-sensitive science investigations associated with Mars Sample Return (MSR).Astrobiology in press, doi:10.1089/ast.2021.0113. [4] Carrier et al. (2021) Science and curationconsiderations for the design of a Mars Sample Return (MSR) Sample Receiving Facility (SRF).Astrobiology in press, doi:10.1089/ast.2021.0110.

Mars Sample Return↗

Operational Workflow in a Sample Receiving Facility: Input from the MSR Operation Definition Team

The return of scientifically selected samples from Mars would provide a rare opportunity for investigation with the full range of the latest technology available. To take full advantage of this opportunity, it is important to plan ahead to ensure the pristine nature of the samples upon arrival within the Earth environment until scientific investigations can begin. The NASA/ESA science community-driven MSR Science Planning Group – Phase 2 (MSPG2) delivered recommendations and guidance regarding curation (1) and science (2,3) activities to be performed on the samples under containment. High-level requirements for the infrastructure were also developed by MSPG2 (4). In order to prepare infrastructure-targeted input for the ESA and NASA facility studies planned in the 2022-2023 timeframe, the MSR agency-led Operational Scenarios Definition Team (MOSDT) was assembled to conceptualize the sample operations that will inform future architecture teams. Emphasis was placed on the responsibility of MOSDT to use community-defined requirements and to represent the view of the international scientific community. The main deliverable of MOSDT was an operational workflow for a Sample Receiving Facility (SRF). Two other deliverables were produced: a report to narrate the workflow, and a list of instruments (see Hutzler et al., this conference). Activities described in the main sequence of the workflow range from engineering operations to curation to science, with the latter term being used here as the science to be done within a SRF. Side sequences (e.g. engineering inspection of hardware, head gas extraction) were also identified, and detailed when they would have a significant impact on the infrastructure of a SRF. It was necessary for the MOSDT to rely on assumptions for some steps and activities, and though these were kept to a minimum (and are described in both the report supporting the workflow and in the full presentation), in general, the assumptions and overall work were very conservative, as the impact of underestimating the scope of the SRF infrastructure was considered more detrimental than overestimating it. It is expected that future work will be able to confirm or inform these assumptions. The community was consulted during the course of the MOSDT work. This abstract’s aim is two-fold: on one hand, inform the scientific community and overall MSR stakeholders, to make the infrastructure studies and trade-off more understandable; on the other hand, to solicit feedback from a larger community audience for the next iterations planning for SRF design and activities.

Mars Sample Return↗

Advancing the Science of Both Coastal Ocean Biophysics and Atmospheric Pollution Chemistry: A Final Report to the Nasa Earth Science Division by the GEO-CAPE Team

The 2007 Decadal Survey (DS) included the recommendation for the Geostationary Coastal and Air Pollution Events (GEO-CAPE) mission to launch in 2013–2016 to advance the science of both coastal ocean biophysics and atmospheric-pollution chemistry. In 2009 the NASA Earth Science Division (ESD) initiated study activities for GEO-CAPE and 8 other near- to medium-term missions to help determine the readiness of these conceptual missions to begin the formulation phase. In FY15 the GEO-CAPE mission study team completed a white paper summarizing the results of the pre-formulation work accomplished to date: https://geo-cape.larc.nasa.gov/pdf/GEO-CAPE_2009-2015_SummativeWhitePaper.pdf The team was directed to complete a final report in FY18. This document, prepared as an addendum to the FY15 white paper, serves as the GEO-CAPE final report and focuses only on FY16-18 activities and on summarizing the final state.

Geostationary Coastal and Air Pollution Events↗

Examining the Trends in Financial Support Given to Science Teams for Data Analysis in Mission Proposals

Introduction: The goal of this summer internship research project was to analyze trends in financial support proposed for the science teams of planetary missions. The analysis focuses on the funding for Co-Investigators (Co-Is) to conduct research and/or data analysis needed to achieve the science objectives of the mission. The operational portion of the missions after launch (i.e., Phase E, including cruise and prime operations at the final destination) were examined since that is when the bulk of research is funded and conducted. The objectives of the project were to determine the average level of support for Co-Investigators, identify variation between mission competitions and over time, and determine the relationship between mission type and the amount of support requested. Methodology: This project was conducted using data from 90 proposals submitted to six mission competitions in the Discovery and New Frontiers programs. The level of support for Co-Is was determined by examining Work Breakdown Structure (WBS) 4 (Science Analysis) for Phase E, which was further subdivided into cruise and prime operations. This data represents a proxy rather than the actual funding Co-Is receive to perform research and data analysis because not every dollar in WBS 4 is spent on this activity. Therefore, the proxy obtained in this research represents an overestimate of the funds allocated to Co-Is for research and data analysis. Findings: Analysis shows that on average a Co-I receives approximately four full years of support spread across the entirety of Phase E for science analysis. The variation among proposed missions is less than expected given the variety of factors that are expected to drive this metric (length of mission, mission type, etc.). Additionally, the level of requested support for Co-Is has been remarkably consistent across every variable considered (by competition, over time, by mission type) over the six competitions and nearly 20 years spanned by this project. This remains true for cruise, primary operations, and all of Phase E. Conclusions: A remarkable amount of science is accomplished by the science teams of planetary missions. However, a surprisingly small amount of funding is requested to support the science analysis driving this productivity, both in terms of absolute magnitude of funding and as a portion of total mission cost. This suggests improvements are needed to refine the estimates of Co-I support and/or that Co-Is rely on other funding sources to conduct their research. Better estimates can be determined by engaging directly with Co-Is and NASA centers to obtain data as well as finding other data sources. Additionally, NASA could consider mandating improved reporting of requested funding levels in mission competitions.

E Murray↗

Artemis Internal Science Team Update: Artemis Science Flight Operations

The Artemis Internal Science Team (AIST) is positioned across NASA to provide crossmission Science leadership across the Agency and Artemis. To prepare for the next generation of planetary surface exploration-based extravehicular activities (EVAs), we draw heavily from experience with Apollo, SkyLab, Space Shuttle, International Space Station (ISS), and analog tests to design the structure by which science will be integrated in the Plan, Train, and Fly phases of Artemis missions. AIST members have been working for years to integrate science into the Artemis flight operations structure, most notably through a tight collaboration with the NASA JSC Flight Operations Directorate (FOD). This abstract describes several examples of this integration, including Structure of RealTime Science Integration, the development of the EVA Science Officer Flight Controller Position, the development and testing of the Science Evaluation Room, and the development of Training for Artemis Science Teams.

K E Young↗

Enabling Communication Between Astronauts and Ground Teams for Space Exploration Missions

Over the last four years, Playbook’s Mission Log has evolved to become an enabling capability for analog missions that simulate deep space, exploration missions with communication transmission latency. Playbook is a planning and execution web-application for mission operations, aggregating multiple sources of information for astronauts to execute the mission in one place: timeline, procedures, chat interface. Playbook’s Mission Log provides a multimedia chat software interface with unique features and functionalities that support asynchronous communication between analog astronauts and ground support teams. This paper describes the iterative design the Mission Log has undergone based on user observations and solicited feedback. Key features include indicators that help users cope with asynchronous communication as well as aids that assist teams coordinate work. Future work and capabilities are outlined, which build upon the increased use of the Mission Log as a communication and coordination tool for space exploration.

communication↗