Tracking and data system support for the Pioneer project - Pioneer 6 extended mission, 1 July 1966 - 1 July 1969, volume 5
Pioneer 6 tracking data and RF performance from 1 July 1966 - 1 July 1969
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Pioneer 6 tracking data and RF performance from 1 July 1966 - 1 July 1969
This paper describes the Spaceflight Tracking and Data Network (STDN) which will be used to provide command, telemetry and tracking support to the Space Tug in the 1980's. A description of the mission support capabilities of the two major elements of the STDN - the ground based sites (GSTDN) and the Tracking and Data Relay Satellite System (TDRSS) - is provided. This paper also contains a summary description of the mission/STDN RF and Data Handling interface.
Spacecraft tracking and data acquisition for Mariner II Venus probe
The NASA Space Network (SN) Operations began with the launch of the first Tracking and Data Relay Satellite (TDRS-1) on April 4, 1983 with on-orbit operations conducted from the White Sands Ground Terminal (WSGT) in Las Cruces, New Mexico. Over the past 35 years, the SN has evolved to its current configuration comprised of four strategically located satellite ground stations and a constellation of ten geosynchronous Tracking and Data Relay Satellites that provide customer support 24 hours a day, 365 days per year, at an unprecedented 99.9% proficiency. The Space Network provides total global Communications, Data Relay, and Tracking services for Low Earth Orbiting (LEO) satellites, Human Space Flight, Expendable Launch Vehicles (ELV) and Scientific missions. This paper will address the Operations Management of the NASA Space Network and the complexities associated with this responsibility, as well as significant mission support highlights.
ATS-F Nimbus E tracking and data relay experiment
The Tracking and Data Relay Satellite System (TDRSS), NASA's primary communications link between near-earth orbiting spacecraft and the ground, is addressed. The TDRSS supporting elements and their roles are described along with the different phases of the TDRSS life cycle. Users of TDRSS and the extent of support given to them are shown. TDRSS performance is evaluated in terms of availability and service proficiency.
The evolution of the Minitrack Network, the first worldwide satellite tracking capability (1957-1962), into the Satellite Tracking and Data Acquisition Network (1960-1966) is described. Attention is also given to the Mercury Network, which became operational in 1961, was the foundation for the Manned Space Flight Network, and supported the Gemini and Apollo missions. The development of the NASA Communications Network, which began to take shape in the early 1960s, is described. An account is also given of the way in which all these functions began playing together (1965) and were consolidated in the early 1970s as the Space Tracking and Data Network.
A user guide and programmer documentation is provided for a system of PRIME 400 minicomputer programs. The system was designed to support loading analyses on the Tracking Data Relay Satellite System (TDRSS). The system is a scheduler for various types of data relays (including tape recorder dumps and real time relays) from orbiting payloads to the TDRSS. Several model options are available to statistically generate data relay requirements. TDRSS time lines (representing resources available for scheduling) and payload/TDRSS acquisition and loss of sight time lines are input to the scheduler from disk. Tabulated output from the interactive system includes a summary of the scheduler activities over time intervals specified by the user and overall summary of scheduler input and output information. A history file, which records every event generated by the scheduler, is written to disk to allow further scheduling on remaining resources and to provide data for graphic displays or additional statistical analysis.
Requirements related to increases in data volume for missions projected for the 1990's could be met by increasing the number of satellites in the Tracking and Data Relay Satellite System (TDRSS) constellation or by providing a new tracking and data acquisition satellite system having greater capacity (gigabits), increased reliability, and more direct user-to-relay connectivity. The program to develop the heir to TDRSS for the 1990's, has been defined as Tracking and Data Acquisition System (TDAS). A description is presented of the system architectural considerations which have to be studied in order to develop a cost effective TDAS. Attention is given to basic TDAS design parameters, TDAS spacecraft architectures, system considerations, technology considerations, and TDAS constellation options involving 2, 3, and 4 satellites.
During the conceptual design phases of the tracking and data relay satellite (TDRS) II system provision was made for a future service growth (FSG) payload with an undefined mission. The intent of the FSG was to provide a resource for TDRS II applications which would be available to meet a change in requirements for the operational TDRS II system. This paper summarizes the effect of the consideration of potential FSG applications imposed on the tracking and data relay satellite (TDRS) II system. The following applications were considered as FSG candidates: An optical 650 Mbps space-to-space link (SSL) coupled to an optical or RF downlink, an RF or optical crosslink to extend the baseline TDRS II system coverage, -zone of exclusion (ZOE) closure, relay for lunar communications either RF or optically, and relay for Martian communications either RF or optically. This paper summarizes work done in the 1990 time frame on the above stated applications. Since then, NASA has sponsored several studies (during phase B of the TDRS II development cycle) of the ZOE closure application of the FSG. The purpose of this paper is to report on the efforts previously considered for the FSG. A previous paper was presented at the 1991 Congress related to the second application above. This paper extends this effort to the four stated applications.
Tracking and data handling systems for Pioneer III space probe and Pioneer IV lunar probe firings
Tracking and data acquisition support systems for Surveyor 7 mission
The Tracking and Data Relay Satellite System (TDRSS) is currently in operation and is providing support to users. This paper describes a candidate satellite configuration which will continue system operation when the current satellite fleet is expended in the 1996 to 1997 time frame. The new system is intended to meet the growth in space network user population and service needs expected through approximately 2010. It is believed that the candidate architecture described will lead to a low-risk evolution from the TDRS architecture used prior to implementation of the ATDRS. NASA is using the architecture described herein as a reference, but has not selected an implementation architecture for the ATDRS system. This selection will be made when an implementing contractor is chosen and will be based on reducing life cycle costs and the ability to meet mission needs.
An assessment of open-loop tracking occultation data from Constellation Observing System for Meteorology, Ionosphere, and Climate (COSMIC) is presented.
In March 2006, the Tracking and Data Relay Satellite (TDRS)-3 experienced an unexpected thrusting event, which caused significant changes to its orbit. Recovery from this anomaly was protracted, raising concerns during the Independent Review Team (IRT) investigation of the anomaly regarding the contingency response readiness. The simulations and readiness exercises discussed in this paper were part of the response to the IRT concerns. This paper explains the various levels of simulation needed to enhance the proficiency of the Flight Dynamics Facility (FDF) and supporting elements in recovery from a TDRS contingency situation. The main emergency to address is when a TDRS has experienced uncommanded, unreported, or misreported thrusting, causing a ground station to lose the ability to acquire the spacecraft, as happened in 2006. The following levels of simulation are proposed: 1) Tests that would be performed by the individual support sites to verify that internal procedures and tools are in place and up to date; 2) Tabletop simulations that would involve all of the key support sites talking through their respective operating procedures to ensure that proper notifications are made and communications links are established; and 3) Comprehensive simulations that would be infrequent, but realistic, involving data exchanges between ground sites and voice and electronic communications among the supporting elements.
NASA has contracted with Boeing to provide two third-generation Tracking and Data Relay Satellites (TDRS) designated TDRS K and L, with an option to provide two additional satellites designated TDRS M and N. These TDRS will be used to continue and enhance the user support services of the existing first- and second-generation TDRS spacecraft. The existing TDRS, in conjunction with the TDRS Ground Terminals at the White Sands NM Complex (WSC) and Guam, constitute the Tracking and Data Relay Satellite System (TDRSS). The TDRSS, with other supporting elements, is referred to as the Space Network (SN). The launch of the TDRS K is projected for 2012 with TDRS L planned to follow in 2013. The contract also provides for the modifications to the TDRS Ground Terminals at the WSC required for operation of the new TDRS. This paper provides an overview of the customer services provided by the existing and new TDRS. In addition, planned future customer services such as Bandwidth Efficient Modulation (BEM) and new coding schemes are briefly discussed.
The Tracking and Data System (TDS) Support for the Mariner Mars 1971 Mission final report contains the deep space tracking and data acquisition activities in support of orbital operations. During this period a major NASA objective was accomplished: completion of the 180th revolution and 90th day of data gathering with the spacecraft about the planet Mars. Included are presentations of the TDS flight support pass chronology data for each of the Deep Space Stations used, and performance evaluation for the Deep Space Network Telemetry, Tracking, Command, and Monitor Systems. With the loss of Mariner 8 at launch, Mariner 9 assumed the mission plan of Mariner 8, which included the TV mapping cycles and a 12-hr orbital period. The mission plan was modified as a result of a severe dust storm on the surface of Mars, which delayed the start of the TV mapping cycles. Thus, the end of primary mission date was extended to complete the TV mapping cycles.
As currently envisioned, NASA's Tracking and Data Relay Satellite System (TDRSS) will support the tracking and telecommunications requirements of LEO user satellites until the late 1990s, when existing TDRSS satellites will reach the end of their service lives. Spacecraft replacement is conceived as inseparable from network expansion for the accommodation of user population growth and the improvement of user services. The objective is to achieve a cost-effective/low-risk transition from TDRSS to Advanced TDRSS without interruption of user support. Attention is presently given to Advanced TDRSS architectural candidates studied and the choices which have emerged through technical tradeoff assessments.